Loading...
HomeMy WebLinkAboutLA215303-APPROVED - 20230712_Winona Renewable Energy_5226 175th ST W_SM_CD_RevDESIGN CRITERIA BUILDING CODE ASCE 7-16 OCCUPANCY/RISK CATEGORY II WIND SPEED (MPH)109 WIND EXPOSURE C GROUND SNOW LOAD (PSF)50 ROOF HEIGHT (FT)15 ROOF PITCH 30° PROJECT OVERVIEW PROJECT SIZE (KW DC)14.22 MODULE QUANTITY 36 MODULE SPECIFICATIONS MANUFACTURER JA SOLAR MODEL JAM54S31 395/MR LENGTH (IN)67.8 WIDTH (IN)44.6 FRAME THICKNESS (IN)1.2 WEIGHT (LBS)47.4 OUTPUT (W)395 ENGINEERING OUTPUT - SM PRODUCT LINE SOLARMOUNT-LT CLAMP TYPE UNIVERSAL AF CLAMP RAIL DIRECTION EW ROOF TYPE SHINGLE TOTAL WEIGHT (LBS)2027.96 MAXIMUM RAIL SPAN (IN)22 RAIL SPAN USED FOR THIS DESIGN (IN)22 MAX CANTILEVER AT DESIGN SPAN (IN)7 SHEET INDEX SM.100 COVER SHEET SM.200 KEY PLAN SM.301 ARRAY LAYOUT ARRAY 1 SM.400 SM DETAILS SM.500 ATTACHMENT DETAILS MAXIMUM JOINT REACTIONS FACTORED LOADS ASD ASCE 7-16 ZONE 1 ZONE 2 ZONE 3 UP(NON-EXPOSED)-70.6 LB -79.3 LB -113.2 LB UP(EXPOSED)-109.7 LB -122.7 LB -139.8 LB DOWN(NON-EXPOSED)142.3 LB 142.3 LB 142.3 LB DOWN(EXPOSED)142.3 LB 142.3 LB 109.9 LB ARRAY PARTS LIST - SM PART NUMBER DESCRIPTION QUANTITY 315246M SM LIGHT RAIL 246" MILL 16 303019M BND SPLICE BAR PRO SERIES MILL 8 302045M UNIVERSAL AF SERIES MID CLAMP MILL 64 302050M UNIVERSAL AF SERIES END CLAMP MILL 16 003250W #12-14 X 2.50 SCREW HDW SS SD (6 PER FLASHLOC DUO)912 004275M FLASHLOC DUO MILL 152 008009P ILSCO LAY IN LUG (GBL4DBT)4 008114M MLPE MOUNT ASSY 36 1411 BROADWAY BOULEVARD NEALBUQUERQUE, NEW MEXICO, USA, 87102WWW.UNIRAC.COMREVISIONSREVDATEDESCRIPTIONDRWCHK006/28/2023INITIAL RELEASECMNTA07/12/2023REVISED ATTACHMENT DETAILSCMNT-----------------------------------WINONA RENEWABLE ENERGY 5226 175TH ST W 5226 175TH ST W FARMINGTON, MN 55024 5226 175TH ST W FARMINGTON, MN 55024 GENERAL NOTES: 1.ALL CONSTRUCTION FOR UNIRAC'S 'ROOF MOUNT' (RM) RACKING SYSTEM SHALL CONFORM TO THE CODES SHOWN IN THE RM DESIGN CRITERIA TABLE BELOW. LOCAL JURISDICTION AMENDMENTS TO THE CODE MUST BE TAKEN INTO CONSIDERATION. 2.WHENEVER THE TERM "CONTRACTOR" IS USED IN THE CONSTRUCTION DOCUMENT, IT SHALL BE DEFINED TO MEAN THE GENERAL CONTRACTOR AND ANY SUB-CONTRACTOR COLLECTIVELY AS APPLICABLE AND AS REQUIRED. 3.THE CONTRACT "STRUCTURAL RACKING" DRAWINGS REPRESENT THE FINISHED STRUCTURE. UNIRAC AND THE ENGINEER OF RECORD WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF CONSTRUCTION. 4.UNIRAC AND THE ENGINEER OF RECORD WILL NOT BE RESPONSIBLE FOR CONSTRUCTION SITE SAFETY OR SAFETY PRECAUTIONS AND PROGRAMS INCIDENT HERETO. 5.IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ENSURE THAT ALL WORK IS IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANY STRUCTURAL INSPECTION/OBSERVATION PROVIDED BY OTHERS (INCLUDING UNIRAC AND THE ENGINEER OF RECORD) DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY. ANY DEVIATION FROM THE CONTRACT DOCUMENTS THAT IS ENCOUNTERED AT A LATER DATE AND IS DECLARED TO BE SIGNIFICANT BY UNIRAC AND THE ENGINEER OF RECORD SHALL BE CORRECTED BY THE CONTRACTOR (AT THE CONTRACTOR'S EXPENSE). ANY INDIVIDUALS FROM UNIRAC OR THE ENGINEER OF RECORD'S OFFICE PERFORMING SITE VISITS OR STRUCTURAL OBSERVATIONS ARE NOT AUTHORIZED TO DIRECT OR APPROVE ANY CHANGES FROM THE CONTRACT DOCUMENTS OR STOP AND/OR DELAY THE WORK. 6.CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATE SITE CONDITIONS WITH THE DRAWING PRIOR TO BIDDING AND THE START OF CONSTRUCTION. ANY CONFLICTS, DISCREPANCIES, OR OMISSIONS SHALL BE RESOLVED WITH UNIRAC AND THE ENGINEER OF RECORD PRIOR TO PROCEEDING. DO NOT SCALE DIMENSIONS FROM DRAWINGS. WRITTEN DIMENSIONS SHALL BE USED OR WHERE NO DIMENSION IS PROVIDED. CONSULT WITH UNIRAC FOR CLARIFICATION BEFORE PROCEEDING. 7.WHERE ANY DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, STRUCTURAL NOTES AND SPECIFICATIONS, THE GREATER (MOST CONSERVATIVE) REQUIREMENTS SHALL GOVERN. WHERE NO SPECIFIC DETAIL IS SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE PROJECT. IF THERE IS NO SIMILAR WORK CONSTRUCTION SHALL CONFORM TO INDUSTRY STANDARDS. CONTRACTOR MUST INFORM UNIRAC OF ANY DISCREPANCIES. 8.ANY EQUIPMENT OR CONDUIT BEING SUPPORTED BY OR SUSPENDED FROM THE RACKING STRUCTURE SHALL BE COORDINATED WITH UNIRAC AND THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL PRIOR TO PURCHASE AND INSTALLATION OF EQUIPMENT OR CONDUIT. 9.ASTM SPECIFICATIONS ON THE DRAWINGS SHALL BE OF THE LATEST ASTM STANDARD SPECIFICATION OR ASTM STANDARD ADOPTED BY THE SITE JURISDICTION. 10.ANY ENGINEERING DESIGN PROVIDED BY OTHERS AND SUBMITTED FOR REVIEW SHALL BEAR THE SEAL OF A PROFESSIONAL CIVIL OR STRUCTURAL ENGINEER REGISTERED IN THE STATE OF THE LOCAL JURISDICTION. 11.THE FOLLOWING DESIGN CRITERIA IS EXCLUDED FROM DESIGN: FLOOD LOADING, DEBRIS LOADING , DYNAMIC ANALYSIS, ACTS OF GOD (TORNADO, HURRICANE, WATER INUNDATION LOADING, ETC.), AND DYNAMIC LOADING FROM SEISMIC EVENTS AND CONDITIONS. 12.THE MINIMUM DISTANCE BETWEEN ROOF EDGE AND MODULES OR RM RACKING SYSTEM MUST BE 4 FT UNLESS NOTED OTHERWISE IN THE UNIRAC ENGINEERING REPORT. 13.UNIRAC IS NOT RESPONSIBLE FOR THE ORIGINAL BUILDING STRUCTURE. CONSULT WITH A LICENSED PROFESSIONAL ENGINEER IN THE JURISDICTION OF THE PROJECT TO ENSURE THE EXISTING BUILDING IS CAPABLE OF HANDLING ADDITIONAL LOAD FROM THE RM STRUCTURE. 14.IN THE EVENT THAT THE ARRAY IS DISPLACED FOR ANY REASON, THE ARRAY SHALL BE REPOSITIONED INTO ITS ORIGINAL DESIGN LOCATION SO AS TO ENSURE THAT PROPER SEISMIC AND FIREFIGHTING ACCESS CLEARANCES AND SEPARATIONS ARE MAINTAINED, IN ADDITION TO ELECTRICAL WIRING SEISMIC SLACK REQUIREMENTS. 15.THESE GENERAL NOTES APPLY TO ALL SHEETS IN THIS PACKAGE. SOLAR DESIGN: UNIRAC IS NOT THE SOLAR DESIGN ENGINEER OF RECORD AND IS NOT RESPONSIBLE FOR ANY SOLAR DESIGN, OUTPUT EFFICIENCIES, SHADING, ETC. IT IS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO CONFIRM THAT THE LOCATION OF THE RACKING/MODULES DOES NOT INTERFERE WITH OR BECOME SHADED BY OBSTRUCTIONS. ELECTRICAL DESIGN: UNIRAC IS NOT THE ELECTRICAL ENGINEER OF RECORD AND IS NOT RESPONSIBLE FOR THE ELECTRICAL DESIGN FOR THIS PROJECT. THE UNIRAC SYSTEM IS CERTIFIED TO UL-2703 WHEN PROPERLY INSTALLED. SEE THE RM INSTALLATION GUIDE FOR MORE DETAIL. MATERIAL MANAGEMENT: 1.PRIOR TO INSTALLATION , ALL MATERIALS MUST BE STORED PROPERLY. THIS MEANS MATERIALS REMAINING IN ONE PLACE FOR MORE THAN ONE WEEK MUST BE IN OPEN AIR CONDITIONS (I.E. UP AND ABOVE THE GROUND AND WATER TABLE). IF TARPS OR OTHER PROTECTIVE COVERS ARE USED, THEN ENDS SHALL BE LEFT OPEN FOR VENTILATION. TIGHT FITTING COVERINGS ARE NOT RECOMMENDED SINCE THEY CAN TRAP MOISTURE. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PROVIDE ALL MEASURES NECESSARY TO PROTECT THE RACKING SYSTEM FROM THE POINT OF UNIRAC DELIVERY THROUGHOUT THE 3.COMPLETION OF CONSTRUCTION. RM ALUMINUM COMPONENTS: 1.ALL ALUMINUM RM BAY MEMBERS HAVE BEEN DESIGNED IN ACCORDANCE WITH THE "2010 ALUMINUM DESIGN MANUAL" BY THE ALUMINUM DESIGN ASSOCIATION. 2.ALL ALUMINUM BAY MEMBERS SHALL CONFORM TO ONE OF THE FOLLOWING: SKI MATERIAL: ALLOY: 6063 TEMPER 5 (Ftu = 38 KSI, Fcy = 35 KSI) SKI MATERIAL: ALLOY: 6105 TEMPER 52 (Ftu = 38 KSI, Fcy = 35 KSI) DOWEL MATERIAL: ALLOY: 6063 TEMPER 5 (Ftu = 38 KSI, Fcy = 35 KSI) CLAMP MATERIAL: ALLOY: 6005A TEMPER 61 (Ftu = 38 KSI, Fcy = 35 KSI) HARDWARE: 1.3/8"-16 X 1-3/4" UNC 2A HARDWARE SHALL CONFORM TO 18/8 STAINLESS STEEL (AISI 300 SERIES), DIMENSIONS PER ASME B18.2.1. TORQUE REQUIREMENTS 3/8"Ø HARDWARE = 8 +/-1 FT-LBS SINGLE USE ONLY- DO NOT RE-TORQUE ONCE FULLY SEATED COVER SHEET SM.100 FOR ENGINEER'S STAMP PROJECT TITLE SHEET Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota. Signature: Typed or Printed Name: Saddam Ahmad Date: License Number: 5538113-JUL-2023 FOR PV RACKING ONLY 1411 BROADWAY BOULEVARD NEALBUQUERQUE, NEW MEXICO, USA, 87102WWW.UNIRAC.COMREVISIONSREVDATEDESCRIPTIONDRWCHK006/28/2023INITIAL RELEASECMNTA07/12/2023REVISED ATTACHMENT DETAILSCMNT-----------------------------------WINONA RENEWABLE ENERGY 5226 175TH ST W 5226 175TH ST W FARMINGTON, MN 55024 KEY PLAN SM.200 FOR ENGINEER'S STAMP PROJECT TITLE SHEET NOT TO SCALENORTHARRAY 1 Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota. Signature: Typed or Printed Name: Saddam Ahmad Date: License Number: 5538113-JUL-2023 FOR PV RACKING ONLY 13'-5 1/4" 13'-5 1/4" 13'-5 1/4" 13'-5 1/4"1411 BROADWAY BOULEVARD NEALBUQUERQUE, NEW MEXICO, USA, 87102WWW.UNIRAC.COMREVISIONSREVDATEDESCRIPTIONDRWCHK006/28/2023INITIAL RELEASECMNTA07/12/2023REVISED ATTACHMENT DETAILSCMNT-----------------------------------WINONA RENEWABLE ENERGY 5226 175TH ST W 5226 175TH ST W FARMINGTON, MN 55024 ARRAY LAYOUT ARRAY 1 SM.301 FOR ENGINEER'S STAMP PROJECT TITLE SHEET KEY PLAN NOT TO SCALE NOT TO SCALE NORTHPLAN NORTH- CUT-ONSITE RAIL - 246" RAIL - CUT-ONSITE RAIL LENGTH#'- # #" - REGULAR ATTACHMENT ARRAY 1 22'-101 4" 33'-93 4" 1" N/S MODULE GAP (TYP.) 1 2" E/W MODULE GAP (TYP.) SPLICE BAR Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota. Signature: Typed or Printed Name: Saddam Ahmad Date: License Number: 5538113-JUL-2023 FOR PV RACKING ONLY SPLICE DETAIL4 22 SIDE VIEW TYPICAL SPLICE BARISOMETRIC VIEW 4" 1 1/2" 15/16" SOLARMOUNT RAIL (LIGHT OR STANDARD) SPLICE BAR SIDE VIEW 5/16"-18 TYPE F THREAD CUTTING SCREWS INCLUDED SOLARMOUNT LIGHT RAIL PROPERTIES BEAM HEIGHT 1.700 in APPROXIMATE WEIGHT 0.491 plf CROSS SECTION AREA 0.409 in² SECTION MODULUS (X-AXIS)0.150 in³ SECTION MODULUS (Y-AXIS)0.067 in³ MOMENT OF INERTIA (X-AXIS)0.130 in⁴ MOMENT OF INERTIA (Y-AXIS)0.026 in⁴ RADIUS OF GYRATION (X-AXIS)0.564 in RADIUS OF GYRATION (Y-AXIS)0.254 in 111 16" 3 4" 3/8"∅ T-BOLT LOCATION 1/4"∅ T-BOLT LOCATION 11 SOLARMOUNT LIGHT RAIL UNIVERSAL AF END CLAMP 15 8" 13 16" 30mm to 46mm MODULE FRAME UNIVERSAL AF CLAMP MODULE MOUNTING HARDWARE UNIVERSAL AF MID CLAMP 11 2" 11 4" 30mm to 46mm MODULE FRAME 1 2" END VIEW - UNIVERSAL AF CLAMP MIDCLAMP ISO VIEW - INSTALLEDISO VIEW - INSTALLED UNIVERSAL MID CLAMP UNIVERSAL END CLAMP SMLIGHT RAIL WITH FLASHLOC DUO AT ROOF3 3 8"∅ T-BOLT AND SERRATED FLANGE NUT SOLARMOUNT LIGHT RAIL FLASHLOC DUO 1411 BROADWAY BOULEVARD NEALBUQUERQUE, NEW MEXICO, USA, 87102WWW.UNIRAC.COMREVISIONSREVDATEDESCRIPTIONDRWCHK006/28/2023INITIAL RELEASECMNTA07/12/2023REVISED ATTACHMENT DETAILSCMNT-----------------------------------WINONA RENEWABLE ENERGY 5226 175TH ST W 5226 175TH ST W FARMINGTON, MN 55024 SM DETAILS SM.400 FOR ENGINEER'S STAMP PROJECT TITLE SHEET Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota. Signature: Typed or Printed Name: Saddam Ahmad Date: License Number: 5538113-JUL-2023 FOR PV RACKING ONLY 916"12"12"916"12"11316"2"6X #12-14 SCREW, HWH, SS, SELF-DR W/ #12 EPDM WASHER 3/8"-16X 1" BND T-BOLT 3/8" SS SERRATED FLANGE NUT ADDITIONAL SCREWS REQUIRED FOR DECKING INSTALLATIONS 5 8"5 1116" 25 8" 312" 512" 8" 1116" 43 8" FLASHLOC DUO MILL OR DARK 1411 BROADWAY BOULEVARD NEALBUQUERQUE, NEW MEXICO, USA, 87102WWW.UNIRAC.COMREVISIONSREVDATEDESCRIPTIONDRWCHK006/28/2023INITIAL RELEASECMNTA07/12/2023REVISED ATTACHMENT DETAILSCMNT-----------------------------------WINONA RENEWABLE ENERGY 5226 175TH ST W 5226 175TH ST W FARMINGTON, MN 55024 ATTACHMENT DETAILS SM.500 FOR ENGINEER'S STAMP PROJECT TITLE SHEET Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota. Signature: Typed or Printed Name: Saddam Ahmad Date: License Number: 5538113-JUL-2023 FOR PV RACKING ONLY