Loading...
HomeMy WebLinkAboutSurvey - 16469-75-81-87-93 Jaffna PlaceTop nut of hydrant located at Lot 10, Block 1 = 1005.18SURVEYOR'S CERTIFICATEDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc. PHONE: 952.890.6044 www.jrhinc.com PLANNERS / ENGINEERS / SURVEYORS CERTIFICATE OF SURVEY FOR D.R. HORTON - MINNESOTADRAWN BYDATEREVISIONSTAMCAD FILEPRO-ECT NO.SHEET 1 OF 1Lot 1, 2, 3, 4 and, 5, Block 1, CRYSTAL PARK, Dakota County, MinnesotaI hereby certify that this survey, plan or report wasprepared by me or under my direct supervision andthat I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this surveydoes not purport to show all improvements,easements or encroachments, to the propertyexcept as shown thereon.Signed this 24th day of May, 2023Marcus F. Hampton, MN L.S. No. 474815/24/2023411610-14.dwg411610-142999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306Lot 1, 2, 3, 4 and, 5, Block 1, CRYSTAL PARK, DakotaCounty, MinnesotaPROPERTY DESCRIPTION16469, 16475, 16481, 16487, and 16493 Jaffna Place,Lakeville, MinnesotaPROPERTY ADDRESS1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontaland vertical placement of structure only. Seearchitectural plans for building andfoundation dimensions.3.No specific soils investigation has beencompleted on this lot by James R. Hill, Inc. thesuitability of soils to support the specifichouse proposed is not the responsibility ofJames R. Hill, Inc. or the surveyor.4.No specific title search for existence ornon-existence of recorded or un-recordedeasements has been conducted by thesurveyor as a part of this survey. Onlyeasements per the recorded plat are shown.5.Proposed grades shown were taken from thegrading &/or development plan prepared byJames R. Hill, Inc.6.Grading plan date/revision date: 9/14/2021.7.Plan No. 2635-L, 2625-M, 2625-N, 2625-M,2635-LNOTESBENCHMARKFLOOR ELEVATIONSProposedGarage Floor @ Front= 1004.2Garage Top of Block= 1004.6House Top of Block= 1004.6Lowest Floor= 1004.6A. 6/1/23: ClientPlanning DepartmentApprovedDate:__________________07/07/2023kjensonEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Draintile connection required.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________07/10/2023hdunne