HomeMy WebLinkAbout18547 Hamel Drive - SurveyEROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Draintile connection required.
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________07/10/2023 hdunne
Planning DepartmentApprovedDate:__________________07/13/2023 dmorey