Loading...
HomeMy WebLinkAbout18547 Hamel Drive - SurveyEROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Draintile connection required. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________07/10/2023 hdunne Planning DepartmentApprovedDate:__________________07/13/2023 dmorey