Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA216473-APPROVED - Thakur Permit Pack flat
GENERAL NOTES CODE AND STANDARDS SITE NOTES / OSHA REGULATION SOLAR CONTRACTOR EQUIPMENT LOCATIONS AERIAL VIEW 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 CUSTOMER INFORMATION: Pari Thakur 17970 Havana Path Lakeville Minnesota 55044 AC SYSTEM SIZE: 3.15 kW AC DC SYSTEM SIZE: 4.2 kW DC PROJECT INFORMATION: NUMBER OF STORIES: 2 CONDUIT RUN: Interior ECOBEE QTY: 0 LIGHT BULB QTY: 0 PV METER: Utility PV Meter Required ROOF TYPE (1) INFORMATION: ROOF TYPE: Comp Shingle FRAMING TYPE: Manufactured Truss SHEATHING TYPE: OSB ATTACHMENT: SFM Infinity Flashkit RACKING: Unirac SFM Infinity @ 24" OC Portrait / 48" OC Landscape NUMBER OF ATTACHMENTS: 24 ROOF TYPE (2) INFORMATION (IF APPLICABLE): *SEE PV4.2 DESIGN CRITERIA WIND SPEED: 115 mph GROUND SNOW LOAD: 50 lb/ft² WIND EXPOSURE FACTOR: C SEISMIC DESIGN CATEGORY: B SITE SPECIFICATIONS CONSTRUCTION - V-B ZONING: RESIDENTIAL SHEET INDEX PV1 - COVER SHEET PV2 - SITE PLAN PV3 - ROOF PLAN PV4 - STRUCTURAL PV5 - ELECTRICAL 3-LINE DIAGRAM PV6 - ELECTRICAL CALCULATIONS PV7 - WARNING LABELS AND LOCATIONS PV8 - PLACARD Digitally signed (ALL OTHER SHEETS AS REQUIRED) SS - PRODUCT SPEC. SHEETS by John A. Calvert Date: 2023.08.10 SCOPE OF WORK INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM AND ANY NECESSARY ADDITIONAL WORK NEEDED FOR INSTALLATION. DRAWING BY: Brendan Fillmore PLOT DATE: August 10, 2023 SYSTEM TO BE INSTALLED INFORMATION: DC SYSTEM SIZE: 4.2 kW DC AC SYSTEM SIZE: 3.15 kW AC MODULE TYPE: (10) REC Solar REC420AA PURE-R INVERTER TYPE: Enphase IQ7X-96-2-US MONITORING: Enphase IQ Combiner 4 X-IQ-AM1-240-4 UTILITY COMPANY: 11:52:28 -06'00' Dakota Electric Association PERMIT ISSUER: City of Lakeville PROJECT NUMBER: 834156 SHEET NAME: COVER SHEET REVISION: 0 PAGE NUMBER: PV1 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.John A. Calvert, License No. 52823 Expiration Date: 30-June-2024 8/10/23 Sealed For Existing Roof & Attachment Only PV SYSTEM SPECIFICATIONS LEGEND JUNCTION BOX M UTILITY METER MSP MAIN SERVICE PANEL AC AC DISCONNECT CB COMBINER BOX LC LOAD CENTER SUB SUBPANEL PV PV METER TS TRANSFER SWITCH ESS SUNPOWER ESS HUB SUNPOWER HUB+ RPO REMOTE POWER OFF FIRE SETBACK TRENCHING PROPERTY LINE TOTAL NUMBER OF MODULES: 10 FRONT OF HOME MODULE MAKE AND MODEL: REC Solar REC420AA PURE-R 17970 HAVANA PATH MODULE WATTAGE: 420W DC INVERTER MAKE AND MODEL: Enphase IQ7X-96-2-US INVERTER TYPE: Microinverter (1 Inverter per PV Module) INVERTER CURRENT OUTPUT: 1.31A AC 1403 N. Research Way Orem, UT 84097 800.377.4480 INVERTER NOMINAL VOLTAGE: 240V WWW.BLUERAVENSOLAR.COM INVERTER WATTAGE: 315W AC CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney M #PV-011719-015866 MSP SUB CONTRACTOR: BRS FIELD OPS 800-377-4480 DC DC DC DC DC AC CUSTOMER INFORMATION: Pari Thakur 17970 Havana Path Lakeville Minnesota 55044 AC SYSTEM SIZE: 3.15 kW AC DC SYSTEM SIZE: 4.2 kW DC PV AC AC AC AC AC AC CB SCALE: 3/64" = 1'-0" DRAWING BY: Brendan Fillmore PLOT DATE: August 10, 2023 PROJECT NUMBER: 834156 SHEET NAME: SITE PLAN REVISION: PAGE NUMBER: 0 PV2 8/10/23 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.John A. Calvert, License No. 52823 Expiration Date: 30- June-2024 Sealed For Existing Roof & Attachment Only PV SYSTEM SPECIFICATIONS TOTAL NUMBER OF MODULES: 10 MODULE MAKE AND MODEL: REC Solar REC420AA PURE-R MODULE WATTAGE: 420W DC INVERTER MAKE AND MODEL: Enphase IQ7X-96-2-US INVERTER TYPE: Microinverter (1 Inverter per PV Module) INVERTER CURRENT OUTPUT: 1.31A AC INVERTER NOMINAL VOLTAGE: 240V INVERTER WATTAGE: 315W AC 3' 1'-6" 3' 1'-6" FRONT OF HOME 3' SUB M MSP UNDERGROUND SERVICE LINE POINT OF INTERCONNECTION M MSP AC CB LC SUB PV TS ESS HUB RPO LEGEND JUNCTION BOX UTILITY METER MAIN SERVICE PANEL AC DISCONNECT COMBINER BOX LOAD CENTER SUBPANEL PV METER TRANSFER SWITCH SUNPOWER ESS SUNPOWER HUB+ REMOTE POWER OFF FIRE SETBACK 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 3' 1'-6" DC DC AC AC 1'-6" 1'-6" AC DC DC DC AC AC AC PV TRENCHING PROPERTY LINE SCALE: 1/8" = 1'-0" DC DC AC AC DC DC DC AC AC AC AC 1'-6" CB 3' 3' 3' MP1 # OF MODULES: 10 AZIMUTH: 168 PITCH: 34 TSRF: 99% AREA: 1143 ft.² DRAWING BY: Brendan Fillmore PLOT DATE: August 10, 2023 PROJECT NUMBER: 834156 SHEET NAME: ROOF PLAN REVISION: 0 PAGE NUMBER: PV3 CERTIFIED CUSTOMER INFORMATION: Pari Thakur 17970 Havana Path Lakeville Minnesota 55044 AC SYSTEM SIZE: 3.15 kW AC DC SYSTEM SIZE: 4.2 kW DC I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.John A. Calvert, License No. 52823 Expiration Date: 30-June-2024 8/10/23 Sealed For Existing Roof & Attachment Only Concept Approval ONLYSubject to Field Inspection Inspector Date 2020 MN Bldg Code 08/11/2023dpfannenstein For each roof plane with a photo-voltaic array, two pathways not less than 36" wide shall be provided from the lowest roof edge to ridge on the same roof plane as the array,on an adjacent roof plane, or straddling the same and adjacent roof planes. Not fewer than one pathway shall be provided on the street or driveway side of the house. Not less than an 18" clear setback is required on both sides of a horizontal ridge. STRUCTURAL INFORMATION: ROOF TYPE (1): ROOF TYPE: Comp Shingle SHEATHING TYPE: OSB FRAMING TYPE: Manufactured Truss FRAMING SIZE: 2x4 @ 24" OC CEILING JOIST SIZE: 2x4 @ 24" OC ATTACHMENT: SFM Infinity Flashkit RACKING: Unirac SFM Infinity @ 24" OC Portrait / 48" OC Landscape NUMBER OF ATTACHMENTS: 24 PV MODULE COUNT: 10 Modules TOTAL ARRAY AREA: 204.0 ft² (20.4ft²/panel) TOTAL ROOF AREA: 3214 ft² ARRAY/ROOF AREA: 6.3% ARRAY WEIGHT: 500 lbs (50 lbs/panel) DISTRIBUTED LOAD: 2.45 lbs/ft² POINT LOAD: 20.83 lbs/attachment STRUCTURAL NOTES: None *NOTE: LISTED NUMBER OF ATTACHMENT POINTS ARE AN ESTIMATE ONLY AND MAY VARY BASED ON FIELD CONDITIONS. MAXIMUM ATTACHMENT SPACING TO BE FOLLOWED PER ENGINEER OF RECORD SPECIFICATIONS. PV MODULE UNIRAC SFM 2" MICRORAIL UNIRAC SFM 6.5" SPLICE 16" MAX. 48" MAX. LANDSCAPE PV MODULE UNIRAC SFM 2" MICRORAIL UNIRAC SFM 8" ATTACHED SPLICE 8" 24" MAX. MAX. PORTRAIT C ATTACHMENT SPACING- FRONT VIEW -RACKING ATTACHMENTS TO BE STAGGERED SCALE: 3/4" = 1'-0" 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 UNIRAC SFM INFINITY UNIRAC SFM MICRORAIL/ SPLICE REC SOLAR REC420AA PURE-R PV MODULE UNIRAC SFM SLIDER (E) ROOF SHEATHING FLASHING (1) 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER 212" MIN. EMBED. A MIDDLE/TOP STANDOFF DETAIL (E) BUILDING STRUCTURE SCALE: 3" = 1'-0" A PV MODULE B PORTRAIT ROOF STRUCTURE MODULE WIDTH A B LANDSCAPE 34° MODULE WIDTH D ATTACHMENT SPACING- SIDE VIEW SCALE: 1/2" = 1'-0" CONTRACTOR: BRS FIELD OPS 800-377-4480 CUSTOMER INFORMATION: Pari Thakur 17970 Havana Path Lakeville Minnesota 55044 AC SYSTEM SIZE: 3.15 kW AC DC SYSTEM SIZE: 4.2 kW DC REC SOLAR REC420AA PURE-R PV MODULE UNIRAC SFM TRIMRAIL FLASHING UNIRAC SFM SLIDER AND TRIMRAIL ROOF ATTACHMENT (E) ROOF SHEATHING (1) 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER 212" MIN. EMBED. B BOTTOM STANDOFF DETAIL (E) BUILDING STRUCTURE SCALE: 3" = 1'-0" DRAWING BY: Brendan Fillmore PLOT DATE: August 10, 2023 PROJECT NUMBER: 834156 SHEET NAME: STRUCTURAL REVISION: 0 PAGE NUMBER: PV4 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.John A. Calvert, License No. 52823 Expiration Date: 30-June-2024 8/10/23 Sealed For Existing Roof & Attachment Only DESIGNER NOTES: ELECTRICAL NOTES: LOAD SIDE TAP IN MSP. EXTERIOR POI. ADD 200 MAIN BREAKER TO INTERIOR SUBPANEL. UTILITY PV ENPHASE IQ COMBINER 4 (E) 200A MAIN SERVICE PANEL LOAD SIDE TAP PRODUCTION X-IQ-AM1-240-4 (E) 200A / 2P MAIN BREAKER METER (SOLAR LOAD ONLY) PV AC DISCONNECT LINE PV AC DISCONNECT (E) 200A / 2P FUSED, AIC 10kA L1 NON-FUSED LOCKABLE, VISIBLE OPEN L2 LOCKABLE, VISIBLE OPEN (10) REC Solar REC420AA PURE-R N 60A, 240V, 2-POLE 60A, 240V, 2-POLE UL 1703 COMPLIANT ENVOY (10) Enphase IQ7X-96-2-US 15A / 2P 1 PHASE, UL 1741 COMPLIANT 20A 4"x4"x4" PVC JB-1 EZ SOLAR FUSES N JUNCTION BOX JUNCTION BOX L1 L1 L1 (N) 20A / 2P JB JB-1 (1) CIRCUIT OF L2 L2 L2 L1 L1 L1 N N N L2 L2 L2 EGC EGC EGC EGC EGC EGC EGC 10 MODULES LOAD G 120/240 VAC LOAD SIDE TAP 3 2 1 60HZ 15 15 NEC 250.24(A)(5) 15 15 1 PHASE (E) 225A SUBPANEL DO NOT BOND *JUNCTION BOX TO UTILITY GROUNDS AND OPTIONAL IF UF-B GRID (N) 200A /2P CABLE USED FOR L1 NEUTRALS ENTIRE HOMERUN L2 NEW MAIN BREAKER IN SUB N N (E) LOADS INSTALLED TO PROTECT LOAD EGC SIDE OF (E) FEEDERS PER (E) N NEC 705.12(B)(2)(1) G (E) LOADS G (E) GROUNDING (N) 5 8" COPPER GROUND ROD, ELECTRODE(S) 8' LONG, MIN. 6' FROM (E) GROUNDING CONDUCTOR. IF REQUIRED, VERIFICATION WILL BE DONE TO ENSURE THE GROUNDING ELECTRODE SYSTEM IS GEC INSTALLED PER NEC CONGRUENT WITH CURRENT REQUIREMENTS. (NEC 250.64: 6 OR 4 AWG SOLID 250 PART III) IF NOT, A NEW GROUND ROD WILL BE COPPER GEC. INSTALLED. INTERCONNECTION NOTES 705.12(B)(1) WHERE THE POWER SOURCE OUTPUT CONNECTION IS MADE TO A FEEDER, THE FEEDER SHALL HAVE AN AMPACITY GREATER THAN OR EQUAL TO 125 PERCENT OF THE POWER-SOURCE OUTPUT CIRCUIT CURRENT. WHERE THE POWER-SOURCE OUTPUT CONNECTION IS MADE TO A FEEDER AT A LOCATION OTHER THAN THE OPPOSITE END OF THE FEEDER FROM THE PRIMARY SOURCE OVERCURRENT DEVICE, THAT PORTION OF THE FEEDER ON THE LOAD SIDE OF THE POWER SOURCE OUTPUT CONNECTION SHALL BE PROTECTED BY ONE OF THE FOLLOWING: (B) AN OVER CURRENT DEVICE AT THE LOAD SIDE OF THE POWER SOURCE CONNECTION POINT SHALL BE RATED NOT GREATER THAN THE AMPACITY OF THE FEEDER. 705.12(B)(2) WHERE POWER SOURCE OUTPUT CONNECTIONS ARE MADE AT FEEDERS, ALL TAPS SHALL BE SIZED BASED ON THE SUM OF 125 PERCENT OF ALL POWER SOURCE(S) OUTPUT CIRCUIT CURRENT(S) AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE FEEDER CONDUCTORS FOR SIZING TAP CONDUCTORS USING THE UTILITY COMPANY: Dakota Electric Association PERMIT ISSUER: City of Lakeville CALCULATIONS IN 240.21(B). 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 CUSTOMER INFORMATION: Pari Thakur 17970 Havana Path Lakeville Minnesota 55044 AC SYSTEM SIZE: 3.15 kW AC DC SYSTEM SIZE: 4.2 kW DC DRAWING BY: Brendan Fillmore PLOT DATE: August 10, 2023 PROJECT NUMBER: 834156 SHEET NAME: ELECTRICAL REVISION: 0 PAGE NUMBER: PV5 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 CUSTOMER INFORMATION: Pari Thakur 17970 Havana Path Lakeville Minnesota 55044 AC SYSTEM SIZE: 3.15 kW AC DC SYSTEM SIZE: 4.2 kW DC GROUNDING NOTES WIRING & CONDUIT NOTES 1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 690.47] AND [NEC 250.50-60] SHALL BE PROVIDED. PER [NEC 690.47], THE GROUNDING ELECTRODE SYSTEM OF AN EXISTING BUILDING MAY BE USED AND BE BONDED AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP. 2. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG COPPER WIRE PER [NEC 250.64(B)]. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 250.64(C)]. 3. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN 8 AWG AND NO GREATER THAN 6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 4. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.21], [NEC TABLE 250.122], AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 690.46]. 5. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 690.42]. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE. 7. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTION POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 8. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS. 9. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL. 10. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED. 11. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO [NEC 690.45] AND BE A MINIMUM OF 10 AWG WHEN NOT EXPOSED TO DAMAGE (6 AWG SHALL BE USED WHEN EXPOSED TO DAMAGE). 12. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF 4 AWG OR LARGER). 13. ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS. 14. SYSTEM GEC SIZED ACCORDING TO [NEC 690.47], [NEC TABLE 250.66], DC SYSTEM GEC SIZED ACCORDING TO [NEC 250.166], MINIMUM 8 AWG WHEN INSULATED, 6 AWG WHEN EXPOSED TO DAMAGE. 15. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH [NEC 250.134] OR [NEC 250.136(A)] REGARDLESS OF VOLTAGE. 1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS. 2. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR). 3. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED 4. UV RESISTANT CABLE TIES (NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT OFF THE ROOF SURFACE IN ACCORDANCE WITH [NEC 110.2,110.3(A-B)]. 5. SOLADECK JUNCTION BOXES MOUNTED FLUSH WITH ROOF SURFACE TO BE USED FOR WIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT RUNS. 6. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE-2, AND SINGLE-CONDUCTOR CABLE LISTED AND IDENTIFIED AS PV WIRE, TYPE TC-ER, OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED. 7. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC 690.8] FOR MULTIPLE CONDUCTORS. 8. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED AT LEAST 7/8" ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE 310.15 (B)(2)(A)], [NEC TABLE 310.15(B)(3)(A)],& [NEC 310.15(B)(3)(C)]. 9. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES. 10. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2 INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 600V 11. 4-WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS. 12. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION 13. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 3% FOR AC CIRCUITS 14. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY) 15. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKED BLACK) 16. AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL- WHITE/GRAY * USE-2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THWN-2 AND MAY BE USED INSIDE ** USE-2 IS AVAILABLE AS UV WHITE 17. RIGID CONDUIT, IF INSTALLED, (AND/OR NIPPLES) MUST HAVE A PULL BUSHING TO PROTECT WIRES. 18. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CONDUIT WILL BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH [NEC 690.31], [NEC 250.118(10)]. DISCONNECTING MEANS SHALL COMPLY WITH [NEC 690.13] AND [NEC 690.15]. 19. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SURFACE COMPLYING WITH [NEC 230.6(4)] AND SECURED NO GREATER THAN 6' APART PER [NEC 330.30(B)]. DRAWING BY: Brendan Fillmore PLOT DATE: August 10, 2023 PROJECT NUMBER: 834156 SHEET NAME: ELEC CALCS REVISION: PAGE NUMBER: 0 PV6 STANDARD LABELS ADDITIONAL LABELS LABEL 1 LABEL 8 ! WARNING FOR PV SYSTEM DISCONNECTING MEANS WHERE THE ! WARNING PERMANENT PLAQUE OR DIRECTORY DENOTING THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE LOCATION OF ALL ELECTRIC POWER SOURCE ELECTRIC SHOCK HAZARD OPEN POSITION. MAIN DISTRIBUTION UTILITY DISCONNECT(S) DISCONNECTING MEANS ON OR IN THE PREMISES TERMINALS ON THE LINE AND [2017 NEC 690.13(B)] POWER TO THIS BUILDING IS ALSO SUPPLIED SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT [2020 NEC 690.13(B)] FROM A ROOF MOUNTED SOLAR ARRAY WITH LOCATION AND AT THE LOCATION(S) OF THE SYSTEM LOAD SIDES MAY BE ENERGIZED A RAPID SHUTDOWN DISCONNECTING MEANS DISCONNECT(S) FOR ALL ELECTRIC POWER IN THE OPEN POSITION GROUPED AND LABELED WITHIN LINE OF SITE PRODUCTION SOURCES CAPABLE OF BEING AND 10 FT OF THIS LOCATION INTERCONNECTED. [2017 NEC 705.10] [2020 NEC 705.10] LABEL 2 PHOTOVOLTAIC SYSTEM SHALL BE MARKED AT AN ACCESSIBLE LOCATION AT ! AC DISCONNECT ! THE DISCONNECTING MEANS AS A POWER SOURCE LABEL 9 NOMINAL OPERATING AC VOLTAGE. WARNING AND WITH THE RATED AC OUTPUT CURRENT AND THE ! PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE RATED AC OUTPUT CURRENT 13.1 A [2017 NEC 690.54] POWER TO THIS BUILDING IS ALSO DISCONNECTING MEANS ON OR IN THE PREMISES [2020 NEC 690.54] SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT NOMINAL OPERATING AC VOLTAGE 240 V SUPPLIED FROM MAIN DISTRIBUTION LOCATION AND AT THE LOCATION(S) OF THE SYSTEM UTILITY DISCONNECT LOCATED DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. LABEL 3 [2017 NEC 705.10] ! WARNING IF INTERCONNECTING LOAD SIDE, INSTALL THIS LABEL [2020 NEC 705.10] ANYWHERE THAT IS POWERED BY BOTH THE UTILITY DUAL POWER SUPPLY AND THE SOLAR PV SYSTEM, IE. MAIN SERVICE PANEL AND SUBPANELS. LABEL 10 SOURCES: UTILITY GRID AND [2020 NEC 705.12(B)(3)] ! WARNING PERMANENT PLAQUE OR DIRECTORY TO BE [2017 NEC 705.12(B)(3)] PV SOLAR ELECTRIC SYSTEM LOCATED AT MAIN SERVICE EQUIPMENT DENOTING POWER TO THIS BUILDING IS ALSO SUPPLIED THE LOCATION OF THE RAPID SHUTDOWN SYSTEM FROM A ROOF MOUNTED SOLAR ARRAY. SOLAR DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUTDOWN DISCONNECTING SWITCH IS NOT LABEL 4 ARRAY RAPID SHUTDOWN DISCONNECT IS GROUPED AND WITHIN LINE OF SITE OF MAIN ! WARNING APPLY TO THE DISTRIBUTION EQUIPMENT ADJACENT LOCATED OUTSIDE NEXT TO THE UTILITY METER. SERVICE DISCONNECTING MEANS. TO THE BACK-FED BREAKER FROM THE POWER [2017 NEC 705.10 AND 690.56(C)(1)(a)] POWER SOURCE OUTPUT CONNECTION SOURCE. [2020 NEC 705.10 AND 690.56(C)] [2017 NEC 705.12(B)(2)(3)(b)] DO NOT RELOCATE [2020 NEC 705.12(B)(3)(2)] THIS OVERCURRENT LABEL 11 DEVICE ! WARNING PERMANENT PLAQUE OR DIRECTORY TO BE LOCATED AT AC COMBINER PANEL. PHOTOVOLTAIC SYSTEM [2017 NEC 110.21(B)] LABEL 5 COMBINER PANEL [2020 NEC 110.21(B)] ! WARNING APPLY TO THE PV COMBINER BOX [2017 NEC 705.12(B)(2)(3)(c)] DO NOT ADD LOADS [2020 NEC 705.12(B)(3)(3)] THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT SUBPANEL PV DEVICE, SHALL NOT EXCEED UTILITY MAIN (IF INTERCONNECTION AC METER PV COMBINER AMPACITY OF BUSBAR. METER SERVICE PANEL IS MADE HERE) DISCONNECT (IF APPLICABLE) BOX 1 6 1 6 1 2 1 2 SOLAR PV SYSTEM EQUIPPED LABEL 6 BUILDINGS WITH PV SYSTEMS SHALL HAVE A WITH RAPID SHUTDOWN PERMANENT LABEL LOCATED AT EACH SERVICE 2 3 2 3 7 5 8 EQUIPMENT LOCATION TO WHICH THE PV SYSTEMS TURN RAPID SHUTDOWN ARE CONNECTED OR AT AN APPROVED READILY SWITCH TO THE VISIBLE LOCATION AND SHALL INDICATE THE LOCATION IF BREAKER OR PLACARD "OFF" POSITION TO SOLAR ELECTRIC 4 IS USED 4 9 9 11 SHUT DOWN PV SYSTEM PV PANELS OF RAPID SHUTDOWN INITIATION DEVICES. AND REDUCE [2017 NEC 690.56(C)(1)(a)] SHOCK HAZARD IN THE ARRAY [2020 NEC 690.56(C)] 8 OR 10 OR PLACARD LABEL 7 RAPID SHUTDOWN SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH FOR SWITCH [2017 NEC 690.56(C)(3)] SOLAR PV SYSTEM [2020 NEC 690.56(C)(2)] LABELING NOTES 1) LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL 2) LABELING REQUIREMENTS BASED ON THE 2017 & 2020 NEC CODE, OSHA STANDARD 19010.145, ANSIZ535. REPRESENTATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED 3) MATERIAL BASED ON THE REQUIREMENTS OF THE AHJ. 4) LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED AND SHALL NOT BE MAY VARY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON 3 LINE HANDWRITTEN [NEC 110.21] DIAGRAM. 3 LINE DIAGRAM ON PV5 TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 CUSTOMER INFORMATION: Pari Thakur 17970 Havana Path Lakeville Minnesota 55044 AC SYSTEM SIZE: 3.15 kW AC DC SYSTEM SIZE: 4.2 kW DC DRAWING BY: Brendan Fillmore PLOT DATE: August 10, 2023 PROJECT NUMBER: 834156 SHEET NAME: LABELS REVISION: 0 PAGE NUMBER: PV7 DIRECTORY PLACARD NOTES [NEC 705.10] A PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. THE MARKING SHALL COMPLY WITH [110.21(B)]. 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 CUSTOMER INFORMATION: Pari Thakur 17970 Havana Path Lakeville Minnesota 55044 AC SYSTEM SIZE: 3.15 kW AC DC SYSTEM SIZE: 4.2 kW DC DRAWING BY: Brendan Fillmore PLOT DATE: August 10, 2023 PROJECT NUMBER: 834156 SHEET NAME: PLACARD REVISION: 0 PAGE NUMBER: PV8 Celltype:80halfͲcutRECbifacial,heterojunctioncellswith leadͲfree,gaplesstechnology Junctionbox:4Ͳpart,4bypassdiodes,leadͲfree Cable:12AWG(4mm²)PVwire,67+67in(1.7+1.7m) inaccordancewithEN50618 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM rec Alpha GENERALDATA Glass:0.13in(3.2mm)solarglasswithantiͲreflectivesurfacetreatment 1730±2.5 [68.1±0.1] 880 [34.6] 425 [16.7] GR GR GR CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR Pure-R SERIES Product Specifications inaccordancewithEN12150 Frame:Anodizedaluminum(black) StäubliMC4PVͲKBT4/KST4(12AWG) inaccordancewithIEC62852,IP68onlywhenconnected Dimensions:68.1x44.0x1.2in(20.77ft2)/1730x1118x30mm(1.93m2) 1700 [67] 11±0.2 [0.43±0.01] 20.5±0.5 [0.8±0.02] GR Lorem ipsum 6.0±0.2 [0.24±0.01] 1700 [67] IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP 45 [1.8] 22.5 [0.9] 594±3 [23.4±0.12] Origin:MadeinSingapore ELECTRICALDATAProductCode*:RECxxxAAPUREͲR Measurementsininches[mm] CERTIFICATIONS IEC61215:2016,IEC61730:2016,UL61730 IEC62804PID IEC61701SaltMist IEC62716AmmoniaResistance UL61730FireType2 IEC62782DynamicMechanicalLoad IEC61215Ͳ2:2016Hailstone(35mm) IEC62321LeadͲfreeacc.toRoHSEU863/2015 ISO14001,ISO9001,IEC45001,IEC62941 PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 TEMPERATURERATINGS* LeadͲFree COMPACT PANEL Size Valuesatstandardtestconditions(STC:airmassAM1.5,irradiance10.75W/sqft(1000W/m²),temperature77°F(25°C),basedonaproductionspread withatoleranceofPMAX,VOC&ISC±3%withinonewattclass.Nominalmoduleoperatingtemperature(NMOT:airmassAM1.5,irradiance800W/m², temperature68°F(20°C),windspeed3.3ft/s(1m/s).*Wherexxxindicatesthenominalpowerclass(PMAX)atSTCabove. TemperaturecoefficientofPMAX:Ͳ0.24%/°C TemperaturecoefficientofVOC:Ͳ0.24%/°C TemperaturecoefficientofISC:0.04%/°C *Thetemperaturecoefficientsstatedarelinearvalues 9 A module Current MAXIMUMRATINGS Operationaltemperature:Ͳ40...+85°C WARRANTY StandardRECProTrust DELIVERYINFORMATION compatible with MLPE Systemvoltage:1000VInstalledbyanREC CertifiedSolarProfessionalNoYesYesPanelsper40ftGP/highcubecontainer:858(26pallets) Testload(front):+7000Pa(146lbs/ft2)* SystemSizeAllч25kW25Ͳ500kWPanelsper53fttruck:858(26pallets) LOWLIGHTBEHAVIOUR TypicallowirradianceperformanceofmoduleatSTC: 105 430 wp experience Availablefrom: Designload=Testload/1.5(safetyfactor)AnnualDegradation0.25%0.25%0.25% Seewarrantydocumentsfordetails.Conditionsapply 100 959085100 200 3004005006007008009001000 Irradiance(W/m²) DRAWING BY: PLOT DATE: 20.7 w 22.3% Efficiency ELIGIBLE LEAD-FREE rohs cOMPLIANT performance Foundedin1996,RECGroupisaninternationalpioneeringsolarenergycompanydedicatedtoempoweringconsumers withclean,affordablesolarpower.AsSolar’sMostTrusted,RECiscommittedtohighquality,innovation,andalow carbonfootprintinthesolarmaterialsandsolarpanelsitmanufactures.HeadquarteredinNorwaywithoperational headquartersinSingapore,RECalsohasregionalhubsinNorthAmerica,Europe,andAsiaͲPacific. RECSolarPTE.LTD. 20TuasSouthAve.14 Singapore637312 post@recgroup.com www.recgroup.com PROJECT NUMBER: SHEET NAME: SPEC SHEET REVISION: ---- PAGE NUMBER: SS NominalModuleOperatingTemperature:44°C(±2°C) Panelsperpallet:33 PowerinYear2592%92%92% Weight:47.4lbs(21.5kg) CERTIFIED Backsheet:Highlyresistantpolymer(black) RECAlphaPUREͲRSeries ProductSPECIFICATIONSNMOTSTC1118±2.5 [44.0±0.1] 17 [0.7] 6.6±0.2 [0.26±0.01] Rel.Efficiency(%)30 [1.2] 1077±2.5 [42.4±0.1] Ref:PDͲDSͲAAPRRev3.103.23Specificationssubjecttochangewithoutnotice.Connectors: ft2 PowerOutputͲPMAX(Wp)400410420430 WattClassSortingͲ(W)0/+100/+100/+100/+10 NominalPowerVoltageͲVMPP(V)48.849.450.050.5 NominalPowerCurrentͲIMPP(A)8.208.308.408.52 OpenCircuitVoltageͲVOC(V)58.959.259.459.7 ShortCircuitCurrentͲISC(A)8.808.848.888.91 PowerDensity(W/ft2)19.2619.7420.2220.70 PanelEfficiency(%)20.721.221.822.3 PowerOutputͲPMAX(Wp)305312320327 NominalPowerVoltageͲVMPP(V)46.046.647.147.6 NominalPowerCurrentͲIMPP(A)6.646.706.806.88 OpenCircuitVoltageͲVOC(V) ShortCircuitCurrentͲISC(A) 55.5 7.11 55.8 7.16 56.0 7.20 56.3 7.24 Testload(rear):Ͳ4000Pa(83.5lbs/ft2)* ProductWarranty(yrs)202525 Seriesfuserating:25A PowerWarranty(yrs)252525 Reversecurrent:25A LaborWarranty(yrs)02510 *Seeinstallationmanualformountinginstructions. PowerinYear198%98%98% Data Sheet IQ7X Microinverter Enphase Microinverters Region: AMERICAS INPUT DATA (DC) IQ7X-96-2-US Commonly used module pairings¹ 320W - 460W Module compatibility 96-cell PV modules Maximum input DC voltage 79.5V Peak power tracking voltage 53V - 64V Operating range 25V - 79.5V Min/Max start voltage 33V/79.5V IQ7X Microinverter The high-powered, smart grid-ready Max DC short circuit current (module Isc) 10A Overvoltage class DC port II IQ7X Microinverter dramatically simplifies the DC port backfeed current 0A installation process while achieving the highest PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit system efficiency for systems with 96-cell modules. OUTPUT DATA (AC) @ 240VAC @ 208VAC Peak output power 320VA Part of the Enphase Energy System, the IQ7X Maximum continuous output power 315VA Microinverter integrates with the IQ Gateway, Nominal (L-L) voltage/range² 240V/211-264V 208V/183-229V IQ Battery, and the Enphase Installer App monitoring Maximum continuous output current 1.31A (240VAC) 1.51A (208VAC) Nominal frequency 60 Hz and analysis software. Extended frequency range 49 - 68 Hz The IQ Series Microinverters extend the reliability AC short circuit fault current over 3 cycles 5.8 Arms Maximum units per 20A (L-L) branch circuit³ 12 (240VAC) 10 (208VAC) standards set forth by previous generations and Overvoltage class AC port III undergo over a million hours of power-on testing, AC port backfeed current 18 mA Power factor setting 1.0 enabling Enphase to provide an industry-leading Power factor (adjustable) 0.85 leading ....... 0.85 lagging warranty of up to 25-years. EFFICIENCY @240VAC @208VAC CEC weighted efficiency 97.5 % 97.0 % MECHANICAL DATA Ambient temperature range -40ºC to +60ºC Relative humidity range 4% to 100% (condensing) Easy to Install Connector type (IQ7X-96-2-US) MC4 (or Amphenol H4 UTX with optional Q-DCC-5 adapter) Dimensions (WxHxD) 212 mm x 175 mm x 30.2 mm (without bracket) • Lightweight and simple Weight 1.08 kg (2.38 lbs) • Faster installation with improved, lighter two-wire cabling Cooling Natural convection - No fans • Built-in rapid shutdown compliant (NEC 2014, 2017 & 2020) Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Efficient and Reliable Environmental category/UV exposure rating NEMA Type 6/outdoor • Optimized for high powered 96-cell* modules FEATURES Communication Power Line Communication (PLC) • Highest CEC efficiency of 97.5% Monitoring Enphase Installer App and monitoring options • More than a million hours of testing Compatible with IQ Gateway • Class II double-insulated enclosure Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break • UL listed disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA), IEEE 1547:2018 (UL 1741-SB, 3rd Ed.) HEI Rule 14H SRD 2.0 Smart Grid-Ready UL 62109-1, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 • Complies with advanced grid support, voltage and frequency This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020, section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV ride-through requirements Systems, for AC and DC conductors, when installed according manufacturer’s instructions. • Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles • Meets CA Rule 21 (UL 1741-SA) and 1. Pairing PV modules with wattage above the limit may result in additional clipping losses. See the compatibility calculator IEEE 1547:2018 (UL 1741-SB, 3rd Ed.) 2. at https://link.enphase.com/module-compatibility.minal if required by the utility. Nominal voltage range can be extended beyond no 3. Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. * The IQ7X is required to support 96-cell modules. To learn more about Enphase offerings, visit enphase.com To learn more about Enphase offerings, visit enphase.com © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ7, IQ7+, IQ Battery, Enphase Installer App, IQ Gateway, IQ7X-DS-0099-EN-US-12-27-2022 and other trademarks or service names are the trademarks of Enphase Energy, Inc. IQ7X-DS-0099-EN-US-12-27-2022 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: SPEC SHEET REVISION: ---- PAGE NUMBER: SS ECA-EN4-FW For field wiring of UL certified DC connectors. EN4 (TE PV4-S SOLARLOK) to ECA-EN4-S22 SS Disconnect tool Q-DISC-10 Disconnect tool for Q Cable connectors, DC connectors, and AC module mount Terminator Q-TERM-10 Terminator cap for unused cable ends Data Sheet Enphase Q Cable Accessories REGION: Americas Enphase Q Cable Accessories CONDUCTOR SPECIFICATIONS BLUE RAVEN LAR Flame test rating FT4 Conductor type THHN/THWN-2 dry/wet Enphase Q Cable Accessories To learn more about Enphase offerings, visit enphase.com The Enphase Q Cable™ and accessories are part of the latest generation Enphase IQ System™. These accessories provide simplicity, reliability, and faster installation times. Enphase Q Cable • Two-wire, double-insulated Enphase Q Cable is 50% lighter than the previous generation Enphase cable • New cable numbering and plug and play connectors speed up installation and simplify wire management • Link connectors eliminate cable waste Field-Wireable Connectors • Easily connect Q cables on the roof without complex wiring • Make connections from any open connector and center feed any section of cable within branch limits • Available in male and female connector types Q CABLE TYPES / ORDERING OPTIONS Connectorized Models Size / Max Nominal Voltage Connector Spacing PV Module Orientation Connector Count per Box Q-12-10-240 12 AWG / 277 VAC 1.3 m (4.2 ft) Portrait 240 Q-12-17-240 12 AWG / 277 VAC 2.0 m (6.5 ft) Landscape (60-cell) 240 Q-12-20-200 12 AWG / 277 VAC 2.3 m (7.5 ft) Landscape (72-cell) 200 ENPHASE Q CABLE ACCESSORIES Name Model Number Description Raw Q Cable Q-12-RAW-300 300 meters of 12 AWG cable with no connectors Field-wireable connector (male) Q-CONN-10M Make connections from any open connector Field-wireable connector (female) Q-CONN-10F Make connections from any Q Cable open connector Cable Clip Q-CLIP-100 Used to fasten cabling to the racking or to secure looped cabling Q Cable sealing caps (female) Q-SEAL-10 One needed to cover each unused connector on the cabling Enphase EN4 to MC4 adaptor¹ Connect PV module using MC4 connectors to IQ micros with EN4 (TE PV4-S SOLARLOK). 150mm/5.9” to MC4. Enphase EN4 to MC4 adaptor (long)¹ ECA-EN4-S22-L Longer adapter cable for EN4 (TE PV4-S SOLARLOK) to MC4. Use with split cell modules or PV modules with short DC cable. 600mm/23.6” Replacement DC Adaptor (UTX) Q-DCC-5 DC adaptor to UTX (max voltage 100 VDC) 1. Qualified per UL subject 9703. TERMINATOR Terminator cap for unused cable ends, sold in packs of ten (Q-TERM-10) SEALING CAPS Sealing caps for unused aggregator and cable connections (Q-BA-CAP-10 and Q-SEAL-10) DISCONNECT TOOL Plan to use at least one per installation, sold in packs of ten (Q-DISC-10) CABLE CLIP Used to fasten cabling to the racking or to secure looped cabling, sold in packs of one hundred (Q-CLIP-100) To learn more about Enphase offerings, visit enphase.com © 2020 Enphase Energy. All rights reserved. Enphase, the Enphase logo, Enphase IQ 7A, Enphase IQ Battery, Enphase Enlighten, Enphase IQ Envoy, and other trademarks or service names are the trademarks of Enphase Energy, Inc. Data subject to change. 2020-06-26 DRAWING NUMBER: Certification UL3003 (raw cable), UL 9703 (cable assemblies), DG cable Replacement DC Adaptor (MC4) Q-DCC-2 DC adaptor to MC4 (max voltage 100 VDC) Compliance RoHS, OIL RES I, CE, UV Resistant, combined UL for Canada and United States 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SHEET NAME: SPEC SHEETS REVISION: 0 PAGE NUMBER: SS 1A 1W 2A 4D 1A 4D 4G both 1W 1A 4H 1A SingleMeterSocketsͲWithoutBypassSingleMeterSocketsͲWithoutBypass 125 & 200 Amp U204 (open) Application • Single meter position • Receive ANSI C12.10 watthour meters • Surface or flush mount (see chart) Construction • Ring type • NEMA Type 3R • ANSI 61 gray painted finish • Aluminum snap ring included Standards Accessories • UL 414 Listed • 5th Jaw Kit - see chart • ANSI C12.7 • AW Hub Style#Suffixes 011 F - Flush Mount (U) 207 MS18 - Lexan Cover (U) 204 MS21 - Top Hub Provision (U) 207 MS25 - Solar Ready (U) 207 MS25A - MS25 + MS18 927 MS68 - 2" Conduit Hub MS68A - MS73 + MS68 MS73 - AL Screw Type Ring SF - Semi Flush Mount SS - Stainless Steel 304 * SS6 - Stainless Steel 316 * Knockout Layouts 125 & 200 Amp KnockoutsͲConduitSizes 1W = 1»4" 1A = 1»2" 2A = 1»2" - 1»4" 4D = 11»4" - 1" - 3»4" - 1»2" 4E = 11»2" - 11»4" - 1" - 3»4" 4F = 2" - 11»2" - 11»4" - 1" 4G = 21»2" - 2" - 11»2" - 11»4" 4H - 3" - 21»2" - 2" - 11»2" 6G = 21»2" - 2" - 11»2" - 11»4" - 1" - 3»4" Top Provision = See Chart * Knockouts and top provisions are not available in Stainless Steel (SS) finish 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 DRAWING BY: PLOT DATE: PROJECT NUMBER: Data subject to change without notice. Consult local utility for area acceptance. All dimensions are in inches. Data subject to change without notice. Consult local utility for area acceptance. All dimensions are in inches. SHEET NAME: Eaton 4 B-Line series meter mounting equipment B-Line series meter mounting equipment 5 Eaton SPEC SHEET REVISION: ---- PAGE NUMBER: SS CERTIFIED Fig. 1 Top Provision 4F 4F 4F both sides 1A 011 (closed) Single Meter Sockets Without Bypass Single Meter Sockets Without Bypass Part/UPC Number Catalog Number Amp RatingJawsService TypeAccessConnectionsOverallDimensionsTop Provision Knockout Layout 5thJaw KitLineLoadNeutralHeightWidthDepth 78205142000 011125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 81/4" 35/8" AW Hub Fig.5 MSR5TK 78205142040 011F125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 45/8" 2" max KO Fig. 1 50365 78205142045 011MS73125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 81/4" 35/8" AW Hub Fig. 5 MSR5TK 78205142050 011SF125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 45/8" None None 50365 78205102315 011SS125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 45/8" None None 50365 79903882585 011SS6125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 45/8" None None 50365 79903882586 011MS25A125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 45/8" AW Hub Fig. 1 50365 79903856283 011MS25125 4 1Ø/3W OH/UG #14 - 2/0 #14 - 2/0 #14 - 2/0 12" 8" 45/8" AW Hub Fig. 1 50365 79903868944 011MSͲ18125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 81/4" 35/8" AW Hub Fig.5 MSR5TK 79903878861 011SRP125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 81/4" 35/8" AW Hub Fig.5 MSR5TK 79903878953 011SRPMS18125 4 1Ø/3W OH/UG #8 - 2/0 #8 - 2/0 #8 - 2/0 11" 81/4" 35/8" AW Hub Fig.5 MSR5TK 78205144030 927100 7 3Ø/4W OH/UG #14 - 1/0 #14 - 2/0 #14 - 2/0 17" 8" 45/8" AW Hub Fig. 1 50365 78205156000 204200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 45/8" AW Hub Fig. 2 50365 78205156020 204F200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 6" 2" max KO Fig. 2 50365 78205108796 204SS200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 6" None None 50365 79903882318 U204PSE200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None Fig. 7 50365 78205122640 U204FSS200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None None 50365 78205134301 U204SS200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None None 50365 78205153193 U204MS73SS200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None None 50365 78205156080 U204MS21SS200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None None 50365 78205156030 204FMS73200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 6" 2" max KO Fig. 2 50365 78205156040 204MS68200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 45/8" AW / 2" Hub Fig. 2 50365 78205156035 204MS68A200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 45/8" AW / 2" Hub Fig. 2 50365 78205108490 204MS73200 4 1Ø/3W OH #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 8" 45/8" AW Hub Fig. 2 50365 78205156005 U204200 4 1Ø/3W UG #6 - 350MCM #6 - 350MCM #6 - 350MCM 151/8" 111/4" 41/2" None Fig. 6 MSR5TK 78205156045 U204F200 4 1Ø/3W OH/UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" (2) 2" max KO Fig. 3 50365 78205156060 U204MS21200 4 1Ø/3W OH/UG #6 - 350MCM #6 - 350MCM #6 - 350MCM 151/8" 111/4" 41/2" AW / Cap Fig. 6 MSR5TK 78205156060 U204FMS73200 4 1Ø/3W UG #6 - 250MCM #6 - 350MCM #6 - 350MCM 15" 12" 6" None Fig. 3 50365 78205156070 U204MS73200 4 1Ø/3W OH/UG #6 - 350MCM #6 - 350MCM #6 - 350MCM 151/8" 111/4" 41/2" (2) 2" max KO Fig. 6 MSR5TK 78205156140 U207200 7 3Ø/4W OH/UG #6 - 250MCM #6 - 250MCM #6 - 250MCM 18" 12" 5" AW Hub Fig. 4 50365 78205156170 U207F200 7 3Ø/4W OH/UG #6 - 250MCM #6 - 250MCM #6 - 250MCM 18" 12" 5" 21/2" max KO Fig. 4 50365 78205156180 U207MS73200 7 3Ø/4W OH/UG #6 - 250MCM #6 - 250MCM #6 - 250MCM 18" 12" 5" AW Hub Fig. 4 50365 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: SPEC SHEET REVISION: ---- PAGE NUMBER: SS 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: SPEC SHEET REVISION: ---- PAGE NUMBER: SS JB-1.2 Phone: 385-202-4150 Specification Sheet ma kng so ar skmp e www.ezsolarproducts.com ma kng so ar skmp e PV Junction Box for Composition/Asphalt Shingle Roofs A. System Specifications and Ratings • Maximum Voltage: 1,000 Volts • Maximum Current: 80 Amps • Allowable Wire: 14 AWG – 6 AWG • Spacing: Please maintain a spacing of at least ½” between uninsulated live parts and fittings for conduit, armored cable, and uninsulated live parts of opposite polarity. • Enclosure Rating: Type 3R • Roof Slope Range: 2.5 – 12:12 • Max Side Wall Fitting Size: 1” • Max Floor Pass-Through Fitting Size: 1” • Ambient Operating Conditions: (-35°C) - (+75°C) • Compliance: - JB-1.2: UL1741 - Approved wire connectors: must conform to UL1741 • System Marking: Interek Symbol and File #5019942 • Periodic Re-inspections: If re-inspections yield loose components, loose fasteners, or any corrosion between components, components that are found to be affected are to be replaced immediately. Phone: 385-202-4150 | www.ezsolarproducts.com PROPRIETARY AND CONFIDENTIAL: THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF EZ SOLAR. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF EZ SOLAR IS PROHIBITED. 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: SPEC SHEET REVISION: ---- PAGE NUMBER: SS ITEM No. PART NUMBER DESCRIPTION QTY 1 JB-1.2 Body POLYCARBONATE WITH UV INHIBITORS 1 2 JB-1.2 Lid POLYCARBONATE WITH UV INHIBITORS 1 3 #10 x 1-1/4” Phillips pan head screw 6 4 #8 x 3/4” Phillips pan head screw 6 Size B DWG. NO. JB-1.2 Rev SCALE: 1:2 WEIGHT: 1.45 LBS SHEET 1 of 3 Torque Specification: 15-20 LBS certification: UL Standard 1741, nema 3r WEIGHT: 1.45 LBS Rigid Nonmetallic Conduit – Junction Boxes Molded Nonmetallic Junction Boxes Except where noted E42728 6P Rated by † It’s another first from Carlon® - the first nonmetallic junction boxes UL Listed with a NEMA 6P rating per Section 314.29, Exception of the National Electrical Code. Manufactured from PVC or PPO thermoplastic molding compound and featuring foam-in-place gasketed lids attached with stainless steel screws, these rugged enclosures offer all the corrosion resistance and physical properties you need for direct burial applications. Type 6P enclosures are intended for indoor or outdoor use, primarily to provide a degree of protection against contact with enclosed equipment, falling dirt, hose- directed water, entry of water during prolonged submersion at a limited depth, and external ice formation. • All Carlon Junction Boxes are UL Listed and maintain a minimum of a NEMA Type 4/4x Rating. • Parts numbers with an asterisk (*) are UL Listed and maintain a NEMA Type 6P Rating and Type 4/4X Rating. 180 www .carlon.com Gross Automation (877) 268-3700 ā www.carlonsales.com ā sales@grossautomation.com 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: SPEC SHEET REVISION: ---- PAGE NUMBER: SS Part No. Size in Inches H x W x D Std. Ctn. Qty. Min AT Min. AB Min. B Min. C Ta Tc Typical Material Std. Ctn. Wt. (Lbs.) PVC Thermo- plastic E989NNJ-CAR* 4 x 4 x 2 5 311/16 35/8 N/A 2 .160 .155 X 3 E987N-CAR* 4 x 4 x 4 5 311/16 31/2 N/A 4 .160 .155 X 4 †E989NNR-CAR* 4 x 4 x 6 4 311/16 33/8 N/A 6 .160 .200 X 5 E989PPJ-CAR* 5 x 5 x 2 4 411/16 41/2 N/A 2 .110 .150 X 3 E987R-CAR* 6 x 6 x 4 2 6 55/8 N/A 4 .190 .190 X 3 E989RRR-UPC* 6 x 6 x 6 8 55/8 53/8 N/A 6 .160 .150 X 14 E989N-CAR 8 x 8 x 4 1 8 8 N/A 4 .185 .190 X 2 E989SSX-UPC 8 x 8 x 7 2 721/32 75/16 N/A 7 .160 .150 X 6 E989UUN 12 x 12 x 4 3 115/8 111/2 111/8 4 .160 .150 X 12 E989R-UPC 12 x 12 x 6 2 1115/16 117/8 117/16 6 .265 .185 X 10 87 SS SFM INFINITY 6 7 BLUE RAVEN SOLAR 1 4 5 2 INSTALLS PER DAY Make two installs per day your new standard. SFM INFINITY has fewer roof attachments, one tool installation, and pre-assembled components to get you off the roof 40% faster. % POF RHOMEEFOWENERRS BETTER AESTHETICS Install the system with the aesthetics preferred by homeowners, with integrated front trim, trim end caps, dark components, and recessed hardware. MAXIMUM POWER DENSITY Easily mix module orientations to achieve optimal power density without incurring the increased bill of materials, labor, and attachments required by rail. 3 2 SYSTEM OVERVIEW BONDING AND ACCESSORIES 20% FEWER ATTACHMENTS Save time and money on every project: SFM INFINITY requires fewer attachments than rail systems. SFM INFINITY 15 Attachments RAIL 20 Attachments 30% LOGISTICS SAVINGS With fewer SKUs and compact components, SFM INFINITY is easier to stock, easier to transport, and easier to lift to the roof. Plus, make more efficient use of your vehicle fleet. 2MW 3MW SFM INFINITY REVOLUTIONIZES ROOFTOP SOLAR WITH BENEFITS ACROSS YOUR BUSINESS, FROM DESIGN AND LOGISTICS, THROUGH ARRAY INSTALLATION AND SERVICE. DRAWING NUMBER: PART NAME DESCRIPTION 1 Structural front trim provides aesthetic and aligns modules. TRIMRAIL 2 Connects and electrically bonds sections of TRIMRAIL. TRIMRAIL SPLICE 3 Attaches TRIMRAIL to roof. Available for comp shingle or tile. TRIMRAIL FLASHKIT 4 Secure modules to TRIMRAIL. MODULE CLIPS 5 Connects modules to SLIDERS. Provides post-install array leveling. MICRORAIL 6 Connects and supports modules. Provides east-west bonding. ATTACHED SPLICE also available. SPLICE 7 Roof attachment and flashing. Available for comp shingle and tile. SLIDER FLASHKIT PART NAME DESCRIPTION TRIMRAIL ENDCAPS Covers ends of TRIMRAIL for refined aesthetic. TRIMRAIL BONDING CLAMP Electrically bonds TRIMRAIL and modules N/S BONDING CLAMP Electrically bonds rows of modules SS SUN FRAME FLASHKIT MOUNTING 8 BLUE RAVEN SOLAR MICRORAIL™ INSTALLATION GUIDE PAGE INSTALLSLIDERSAND ROOFATTACHMENTS: Follow manufacturer instructions for flashing installation procedures × UPͲSLOPE PILOTHOLES: Drill pilot holes for lag screws or structural screws (as necessary) at marked attachment points FLASHINGS: Place flashings ModNS+1" NOTE:IfNͲSmoduleedgeiswithin1”ofthe shinglecourseabove,youhavetheoptionto pivot/rotatesliderattheattachmentpoint tospanthenextcourseandcutshinglesas required. CutShinglesasRequired RotateSlider ModNS+1" INSTALLSLIDERSANDTRIMRAILROOFATTACHMENTS: • Insert flashings per manufacturer instructions NOTE:UseLagscreworstructuralfastenerwithamaximumdiameterof5/16" • Attach sliders to rafters • Verify proper row to row spacing for module size (Mod NS + 1") • Ensure that Trimrail™roof attachments in each row have sufficient engagement with slider dovetails for proper attachment. N/SMODULEEDGE LessThan1" DOWNͲSLOPE DRAWING NUMBER: SFM SS SUN FRAME TRIMRAIL & MICRORAIL INSTALLATION 11 BLUE RAVEN SOLAR MICRORAIL™ INSTALLATION GUIDE PAGE ATTACHTRIMRAILTOROOFATTACHMENT: Attach rail using 3/8" hex bolt & Tri-drive or serrated flange nuts. Make sure TrimrailTMis level across all TrimrailTMroof attachments. After rail is level, tighten channel clamp bolts to secure TrimrailTMroof attachments to channels. POSITIONMODULECLIPSACCORDINGTO MODULETHICKNESS: Align notch in module clip with trimrail rib according to module thickness (identified in mm on faces of module clips). Rotate clip to position at required location. INSTALLMODULECLIPSONTRIMRAIL: Attach module clips to Trimrail using 3/8" T-bolts and Tri-drive or serrated flange nuts. A minimum of two clips are required per module. Refer to SFM D&E guide and U-builder for required position and quantity of module clips. NOTE:moduleclipsmaybepreͲinstalledontrimrail priortoattachingtrimrailtoroofattachments NOTE:BondingpinonMicrorailsshouldbepositioneddownslope. INSTALLMICRORAILS: Install MicrorailTMat marked attachment points. Click MicrorailTMinto sliders and push MicrorailTMto top of slider. Ensure that cap remains in upper most (40mm) position. DRAWING NUMBER: BONDING PIN SFM SS Alternate method SUN FRAME SYSTEM BONDING & GROUNDING 19 BLUE RAVEN SOLAR MICRORAIL™ INSTALLATION GUIDE PAGE EͲWBONDINGPATH: E-W module to module bonding is accomplished with 2 pre-installed bonding pins which engage on the secure side of the MicrorailTM and splice. StarWasheris SingleUseOnly TERMINALTORQUE, InstallConductorand torquetothefollowing: 4Ͳ6AWG:35inͲlbs 8AWG:25inͲlbs 10Ͳ14AWG:20inͲlbs LUGDETAIL&TORQUEINFO IlscoLayͲInLug(GBLͲ4DBT) • 10-32 mounting hardware • Torque = 5 ft-lb • AWG 4-14 - Solid or Stranded TERMINALTORQUE, InstallConductorand torquetothefollowing: 4Ͳ14AWG:35inͲlbs LUGDETAIL&TORQUEINFO IlscoFlangeLug(SGBͲ4) • 1/4” mounting hardware • Torque = 75 in-lb • AWG 4-14 - Solid or Stranded WEEBLUG SingleUseOnly TERMINALTORQUE, InstallConductorand torquetothefollowing: 6Ͳ14AWG:7ftͲlbs LUGDETAIL&TORQUEINFO WileyWEEBLug(6.7) • 1/4” mounting hardware • Torque = 10 ft-lb • AWG 6-14 - Solid or Stranded NͲSBONDINGPATH: N-S module to module bonding is accomplished with bonding clamp with 2 integral bonding pins. (referalsotoalternatemethod) TRIMRAILBONDINGPATH: NOTE:ISOLATECOPPERFROMALUMINUMCONTACTTOPREVENTCORROSION Systembondingisaccomplishedthroughmodules.Systemgroundingaccomplishedbyattaching a ground lug to any module at a location on the module specified by the module manufacturer. Trimrail to module bonding is accomplished with bonding clamp with integral bonding pin and bonding T-bolt. (referalsotoalternatemethod) DRAWING NUMBER: Alternate method SFM SS SUN FRAME UL CODE COMPLIANCE NOTES 20 BLUE RAVEN SOLAR MICRORAIL™ INSTALLATION GUIDE PAGE SYSTEMLEVELFIRECLASSIFICATION Thesystemfireclassratingrequiresinstallationinthemannerspecifiedinthe SUNFRAMEMICRORAIL(SFM)InstallationGuide.SFMhasbeenclassifiedto thesystemlevelfireportionofUL1703.ThisUL1703classificationhasbeen incorporatedintotheUL2703productcertification.SFMhasachievedClassA, B&Csystemlevelperformanceforlowslope&steepslopedroofswhenused inconjunctionwithtype1andtype2modules.ClassA,B&Csystemlevelfire performanceisinherentintheSFMdesign,andnoadditionalmitigationmeasures arerequired.Thefireclassificationratingisvalidforanyroofpitch.Thereisno requiredminimumormaximumheightlimitationabovetheroofdecktomaintain theClassA,B&CfireratingforSFM.SUNFRAMEMICRORAILTMcomponentsshall bemountedoverafireresistantroofcoveringratedfortheapplication. ModuleTypeRoofSlopeSystemLevelFireRatingMicrorailDirectionModuleOrientationMitigationRequired Type1andType2SteepSlope&LowSlopeClassA,B&CEastͲWestLandscapeORPortraitNoneRequired UL2703TESTMODULES Seepages22and23foralistofmodulesthatwereelectricallyandmechanicallytestedor qualifiedwiththeSUNFRAMEMICRORAIL(SFM)componentsoutlinedwithinthisInstallationGuide. • MaximumAreaofModule=27.76sqft • UL2703DesignLoadRatings: a) DownwardPressure–113PSF/5400Pa b) UpwardPressure–50PSF/2400Pa c) DownͲSlopeLoad–21.6PSF/1034Pa • TestedLoads: a) DownwardPressure–170PSF/8000Pa b) UpwardPressure–75PSF/3500Pa c) DownͲSlopeLoad–32.4PSF/1550Pa • MaximumSpan=6ft • UsewithamaximumovercurrentprotectiondeviceOCPDof30A • SystemconformstoULStd2703,certifiedtoLTRAEͲ001Ͳ2012 • Ratedforadesignloadof2400Pa/5400Pawith24inchspan • PVmodulesmayhaveareducedloadrating,independentoftheSFMloadrating.Pleaseconsult thePVmodulemanufacturer'sinstallationguideformoreinformation • DownͲSlopedesignloadratingof30PSF/1400Paformoduleareasof22.3sqftorless DRAWING NUMBER: SFM SS SUN FRAME UL CODE COMPLIANCE NOTES 21 BLUE RAVEN SOLAR MICRORAIL™ INSTALLATION GUIDE PAGE LABELMARKINGS • System fire class rating: See installation instructions for installation requirements to achieve a specified system fire class rating with Unirac. • Unirac SUNFRAME MICRORAILTMis listed to UL 2703. • All splices within a system are shipped with marking indicating date and location of manufacture. DRAWING NUMBER: SFM SS Manufacture ModuleModel/Series AleoPͲSeries Aptos DNAͲ120Ͳ(BF/MF)26 DNAͲ144Ͳ(BF/MF)26 Astronergy CHSM6612P,CHSM6612P/HV,CHSM6612M, CHSM6612M/HV,CHSM6610M(BL)(BF)/(HF), CHSM72MͲHC AuxinAXN6M610T,AXN6P610T, AXN6M612T&AXN6P612T Axitec AXIblackpremium60(35mm), AXIpower60(35mm), AXIpower72(40mm), AXIpremium60(35mm), AXIpremium72(40mm). BovietBVM6610, BVM6612 BYDP6K&MHKͲ36Series CanadianSolar CS1(H/K/U/Y)ͲMS CS3(K/L/U),CS3KͲMBͲAG,CS3KͲ(MS/P) CS3NͲMS,CS3UͲMBͲAG,CS3UͲ(MS/P),CS3W CS5AͲM,CS6(K/U),CS6KͲ(M/P),CS6KͲMS CS6PͲ(M/P),CS6UͲ(M/P),CS6VͲM,CS6XͲP CentrosolarAmericaCͲSeries&EͲSeries CertainTeed CT2xxMxxͲ01,CT2xxPxxͲ01, CTxxxMxxͲ02,CTxxxMͲ03, CTxxxMxxͲ04,CTxxxHC11Ͳ04 DehuiDHͲ60M Manufacture ModuleModel/Series EcoSolargyOrion1000&Apollo1000 ETSolarETͲM672BHxxxTW FreedomForeverFFͲMPͲBBBͲ370 FreeVoltMonoPERC GCLGCLͲP6&GCLͲM6Series HansolTDͲAN3,TDͲAN4, UBͲAN1,UDͲAN1 Heliene 36M,60M,60P,72M&72PSeries, 144HCM6Monofacial/BifacialSeries, 144HCM10SLBifacial HTSolarHT60Ͳ156(M)(NDV)(ͲF), HT72Ͳ156(M/P) HyundaiKG,MG,TG,RI,RG,TI,MI,HI&KISeries HiAͲSxxxHG ITEKiT,iTͲHE&iTͲSESeries JapanSolarJPSͲ60&JPSͲ72Series JASolar JAP660Ͳxxx,JAM6Ͳ60Ͳxxx/SI,JAM6(K)Ͳ60/ xxx,JAP6(k)Ͳ72Ͳxxx/4BB,JAP72SYYͲxxx/ZZ, JAP6(k)Ͳ60Ͳxxx/4BB,JAP60SYYͲxxx/ZZ, JAM6(k)Ͳ72Ͳxxx/ZZ,JAM72SYYͲxxx/ZZ, JAM6(k)Ͳ60Ͳxxx/ZZ,JAM60SYYͲxxx/ZZ. i. YY:01,02,03,09,10 ii. ZZ:SC,PR,BP,HiT,IB,MW,MR Jinko JKM&JKMSSeries EagleJKMxxxM JKMxxxMͲ72HLͲV KyoceraKUSeries Manufacture ModuleModel/Series LGElectronics LGxxxN2TͲA4 LGxxx(A1C/E1C/E1K/N1C/N1K/N2T/N2W/ Q1C/Q1K/S1C/S2W)ͲA5 LGxxxN2TͲB5 LGxxxN1KͲB6 LGxxx(A1C/M1C/M1K/N1C/N1K/Q1C/Q1K/ QAC/QAK)ͲA6 LGxxx(N1C/N1K/N2T/N2W)ͲE6 LGxxx(N1C/N1K/N2W/S1C/S2W)ͲG4 LGxxxN2TͲJ5 LGxxx(N1K/N1W/N2T/N2W)ͲL5 LGxxx(N1C/Q1C/Q1K)ͲN5 LGxxx(N1C/N1K/N2W/Q1C/Q1K)ͲV5 LONGi LR4Ͳ60(HIB/HIH/HPB/HPH)ͲxxxM LR4Ͳ72(HIH/HPH)ͲxxxM LR6Ͳ60(BP/HBD/HIBD)ͲxxxM(30mm) LR6Ͳ60(BK)(PE)(HPB)(HPH)ͲxxxM(35mm) LR6Ͳ60(BK)(PE)(PB)(PH)ͲxxxM(40mm) LR6Ͳ72(BP)(HBD)(HIBD)ͲxxxM(30mm) LR6Ͳ72(HV)(BK)(PE)(PH)(PB)(HPH)ͲxxxM (35mm) LR6Ͳ72(BK)(HV)(PE)(PB)(PH)ͲxxxM(40mm) MissionSolarEnergyMSESeries MitsubishiMJE&MLESeries NeoSolarPowerCo.D6M&D6PSeries SUN FRAME TESTED / CERTIFIED MODULE LIST 22 BLUE RAVEN SOLAR MICRORAIL™ INSTALLATION GUIDE PAGE • Unlessotherwisenoted,allmoduleslistedaboveincludeallwattagesandspecificmodelswithinthatseries.Variablewattagesarerepresentedas"xxx" • Itemsinparenthesisarethosethatmayormaynotbepresentinacompatiblemodule'smodelID • Slashes"/"betweenoneormoreitemsindicatesthateitherofthoseitemsmaybetheonethatispresentinamodule'smodelID • PleaseseetheSFMUL2703ConstructionDataReportatUnirac.comtoensuretheexactsolarmoduleselectedisapprovedforusewithSFM • SFMInfinityisnotcompatiblewithmoduleframeheightoflessthan30mmandmorethan40mm.SeeModuleMountingsection,page12forfurtherinformation DRAWING NUMBER: SFM SS Manufacture ModuleModel/Series Panasonic EVPVxxx(H/K/PK), VBHNxxxSA15&SA16, VBHNxxxSA17&SA18, VBHNxxxSA17(E/G)&SA18E, VBHNxxxKA01&KA03&KA04, VBHNxxxZA01,VBHNxxxZA02, VBHNxxxZA03,VBHNxxxZA04 PeimarSGxxxM(FB/BF) PhonoSolarPSͲ60,PSͲ72 PrismSolarP72Series Q.Cells Plus,Pro,Peak,G3,G4,G5,G6(+),G7,G8(+) Pro,PeakLͲG2,LͲG4,LͲG5,LͲG6,LͲG7 Q.PEAKDUOBLKͲG6+ Q.PEAKDUOBLKͲG6+/TS Q.PEAKDUO(BLK)ͲG8(+) Q.PEAKDUOLͲG8.3/BFF Q.PEAKDUO(BLK)MLͲG9(+) Q.PEAKDUOXLͲG9/G9.2/G9.3 Q.PEAKDUO(BLK)MLͲG10(+) Q.PEAKDUOXLͲG(10/10.2/10.3/10.c/10.d) Q.PEAKDUOBLKMLͲG10+/t RECSolar Alpha(72)(Black)(Pure) RECxxxAAPUREͲR RECxxxNP3Black NͲPeak(Black) NͲPeak2(Black) PEAKEnergySeries PEAKEnergyBLK2Series PEAKEnergy72Series Manufacture ModuleModel/Series RECSolar(cont.) TwinPeakSeries TwinPeak2Series TwinPeak2BLK2Series TwinPeak2S(M)72(XV) TwinPeak3Series(38mm) TP4(Black) RenesolaVitrus2Series&156Series RisenRSM72Ͳ6(MDG)(M),RSM60Ͳ6 SEGSolarSEGͲxxxͲBMDͲHV SEGͲxxxͲBMDͲTB SͲEnergySN72&SN60Series(40mm) SeraphimSEGͲ6&SRPͲ6Series SharpNUͲSA&NUͲSCSeries SilfabSLA,SLG,BCSeries&SILxxx(BL/NL/NT/HL/ ML/BK/NX/NU/HC) SolareverUSASEͲ166*83ͲxxxMͲ120N Solaria PowerXTͲxxxRͲ(AC/PD/BD) PowerXTͲxxxCͲPD PowerXTͲxxxRͲPM(AC) SolarWorldSunmoduleProtect, SunmodulePlus Sonali SSͲMͲ360to390Series, SSͲMͲ390to400Series, SSͲMͲ440to460Series, SSͲMͲ430to460BiFacialSeries, SS230Ͳ265 SunEdisonFͲSeries,RͲSeries&FLEXFXSSeries Manufacture ModuleModel/Series SunivaMVSeries&OptimusSeries SunPowerAͲSeriesA400ͲBLK,SPRͲMAX3ͲXXXͲR, XͲSeries,EͲSeries&PͲSeries SuntechSTP,STPXXXSͲB60/Wnhb TalesunTP572,TP596,TP654,TP660, TP672,HiporM,Smart TeslaSC,SCB,SCB1,SCB2 TxxxH,TxxxS Trina PA05,PD05,DD05,DE06,DD06,PE06, PD14,PE14,DD14,DE09.05,DE14,DE15, PE15H UpsolarUPͲMxxxP(ͲB), UPͲMxxxM(ͲB) UnitedRenewableEnergy (URE) D7MxxxH7A,D7(M/K)xxxH8A FAKxxx(C8G/E8G),FAMxxxE7GͲBB FAMxxxE8G(ͲBB) FBMxxxMFGͲBB Vikram Eldora, Solivo, Somera WaareeAC&AdiyaSeries WinaicoWST&WSPSeries YingliYGE&YLMSeries ZNShineZXM6Ͳ72,ZXM6ͲNH144Ͳ166_2094 SUN FRAME TESTED / CERTIFIED MODULE LIST 23 BLUE RAVEN SOLAR MICRORAIL™ INSTALLATION GUIDE PAGE • Unlessotherwisenoted,allmoduleslistedaboveincludeallwattagesandspecificmodelswithinthatseries.Variablewattagesarerepresentedas"xxx" • Itemsinparenthesisarethosethatmayormaynotbepresentinacompatiblemodule'smodelID • Slashes"/"betweenoneormoreitemsindicatesthateitherofthoseitemsmaybetheonethatispresentinamodule'smodelID • PleaseseetheSFMUL2703ConstructionDataReportatUnirac.comtoensuretheexactsolarmoduleselectedisapprovedforusewithSFM • SFMInfinityisnotcompatiblewithmoduleframeheightoflessthan30mmandmorethan40mm.SeeModuleMountingsection,page12forfurtherinformation DRAWING NUMBER: SFM 1403 N RESEARCH WAY, BUILDING J OREM, UT 84097 800-377-4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. NABCEP CERTIFIED PV INSTALLATION PROFESSIONAL Scott Gurney # PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385.498.6700 SHEET NAME SPEC SHEET PAGE NUMBER SS REVISION 0