Loading...
HomeMy WebLinkAboutLA216732-5421 177th St W - Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT CONDO REROOF RESIDE RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LOWER LEVEL FINISH ADDITION FOUNDATION ONLY MISCELLANEOUS DEMO APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: CITY BUILDING VALUATION: $ BUILDING PERMIT FEES $PERMIT FEE $PLAN CHECK $SURCHARGE $METRO SAC $CITY WATER HOOKUP UNIT $CITY SEWER HOOKUP UNIT $LANDSCAPE ESCROW $TREE ESCROW $MISC ESCROW $PLUMBING $MECHANICAL $SEWER WATER WATER METER PRESSURE REDUCING VALVE $OTHER $TOTAL METER SIZE PRESSURE REDUCING VALVE SEWER/WATER SEWER/WATER FINAL STREET DRAINTILE BUILDING INFORMATION TYPE OF CONSTRUCTION ZONING CODE EDITION FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP MECHANICAL AIR TEST FINAL ROUGH-IN PLUMBING FINAL ROUGH-IN INSULATION LATH DECK FOOTING FIREPLACE FOOTING FOUNDATION FRAMING PORCH FRAMING PORCH FOOTING POURED WALL SITE LOWER LEVEL FINAL OTHER DECK FRAMING LOWER LEVEL FRAMING LANDSCAPING DECK FINAL $ $ ACCESSORY BUILDING EGRESS WINDOW UNDERGROUND 5421 177TH STREET WEST, LAKEVILLE*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERwritten consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.cPHEASANT RUN MODEL #4#23-012SMA172023STONE COTTAGE CONSTRUCTION, INC. LOT 22, BLOCK 2, PHEASANT RUN OF LAKEVILLE 7TH ADDITION FRONT ELEVATION 1/4" = 1'-0" WOOD PORCHVINYL B & BVINYL B & B712712712712412VINYL B & BVINYL B & B4" TRIM8x7 OVH. DR.16x7 OVH. DR.SSSSVINYL SIDING4" TRIMSTONECAPSTONE2'-0"BOXED COLUMNVINYL B & BFRONT ONLYVINYL SIDINGALL SIDES4" TRIMFRONT ONLYSIMONTONWINDOWSSTONE AS SHOWNFRONT ONLYALUM. SOFFIT & FASCIAALL SIDES8'-4" POURED FOUNDATION9' CEILING @ FIRST FLOORTOTAL2nd FLR.1st FLR.1,060 SQ. FT.857 SQ. FT.1,917 SQ. FT.STONEON JOGConcept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode08/16/2023dmathews VERIFY ALLGRADE LINESPlanco MN, Inc.C#23-012SMA272023 LEFT ELEVATION 1/8" = 1'-0" 712712124SIDINGVINYL SIDINGVINYL VINYLCORNERS7/126" RIGHT ELEVATION 1/8" = 1'-0" 712712SIDINGVINYL SIDINGVINYL VINYLCORNERS REAR ELEVATION 1/8" = 1'-0" 712712SIDINGVINYL VINYLCORNERS ROOF PLAN 1/8" = 1'-0" 1247127127127127127121'-0"6"7127122'-2"2'-0"1'-0"2'-0"1'-0"Secure door closed until deck isconstructed with a separate permit. Planco MN, Inc.C#23-012SMA372023 BASEMENT PLAN 1/4" = 1'-0" UNEXCAVATED UP 16 R 42"4834246828682668WHFURNF.D.92%20" FLR.TRUSS24" O.C. 20" FLR.TRUSS 24" O.C.*UNFINISHED MECH/STORAGE 3/4 R.I. 53'-0"30'-0"23'-0"11'-0"19'-0"11'-0"12'-0"27'-0"41'-0"47'-0" 22'-6"24'-6" 2'-0"20'-6" 6'-6" 5'-6"5'-10"14'-8"1'-0"2" LEDGE3'-4"3'-4"20'-2"10"3-2x10 CONT.FLUSH11'-8"5'-5"7'-5"8'-4" POURED FOUNDATIONSUMPTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS(2) TRT. 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG.9"9'-6"9"TRT. 3-2x12 FLUSHTRT. 3-2x12 FLUSHTREATED 2x8 16" O.C.10'-4"3'-6"18" CANT.266840682'-6"27'-2"3'-8"10" FUT. FAMILY/REC ROOM *UNFINISHED FUT. BDRM *UNFINISHED2-9 1/2" LSL9/0x3/6 SL2-2x105/0x3/6 SL2-9 1/2" LSL5/0x3/6 SL11'-4"9'-3"14'-3"11'-7"5'-11"LOOKOUTLOOKOUT3-2x4(4) TRIMMERS(3) TRIMMERS4-2x4FLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FANUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.There is enough braced section length at each end of the wall and the intermediate sections are less than 20' apart.Nothing special has to be done to the lookout framing in the foundation. - Engineers Note Planco MN, Inc.C#23-012SMA472023 FIRST FLOOR PLAN 1/4" = 1'-0" 3068SLREF'G 12" S.B.3-2x106/0x6/10 P.D.3-11 7/8" LSL2-2x103/0x4/0 SH2668RAIL 2868PED 246824682868FIREDOORWD 16" SHLVS.20682868PKT.*CARPET*WOOD8x7 OVH. DR.16x7 OVH. DR.*4" CONC. FLOOR GARAGE *2x6 WALLS3/0x5/0-2 SH3-9 1/2" LSL WOOD PORCH FOYER *WOOD KITCHEN *WOOD*WOOD DINING *CARPET GREAT ROOM OFFICE *CARPET W.I.C. *VINYL*VINYL*VINYLFPANTRY*WOODTOP @ 7'-6" 4/0x3/6 SL UP 17 R DN 16 R MICROHOOD1,060 SQ. FT.9' CEILING @ FIRST FLOOR53'-0"30'-0"23'-0"11'-0"19'-0"11'-0"12'-0"5'-6"5'-6"6'-0"1'-0"6"10'-0"6"27'-0"12'-0"15'-0"41'-0"18'-0"11'-0"12'-0"6'-6"5'-6"5'-6"5'-6"8'-9"9'-3"47'-0" 22'-6"24'-6" 2'-0"20'-6" 7'-6"4'-6"12'-6" 3'-8"3'-10"2-2x108'-6"3'-6"2x612'-0"8'-6"5'-6"4'-0"4'-10"3'-8"5'-8"3'-4"3'-4"7'-0"2'-6"5'-2"5'-5" 5'-6"5'-10" 10" 14'-8" 10'-0"1'-5"4'-0"5'-6"3'-0"3'-6"SD/CO12" CANT.12" CANT.6'-6"6'-0"6"BOXEDCOLUMN2-9 1/2" LSL5'-9"5'-3"9'-6"9'-6"22'-0" GIRDER F.T.2-9 1/2" LSL CONT.2-9 1/2" LSL CONT.TRUSSES 24" O.C. GIRDER F.T.2-2x10 CONT.FLUSH6"F.P.GAS2-2x101'-6"5'-9" (FRAMING) 5'-10" (FINISHED) 5'-0"4'-8"5'-4" 20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C.4068CHASE2'-0"1'-8"9/0x5/0 SLTOP @ 7'-6"WALLHUNG LT2-2x10 ACCESS ATTIC 4 TRIMMERS 4-2x62-11 7/8" LSL2-2x12TRUSSES24" O.C.2 TRIMMERS2 TRIMMERS4-2x4(3) TRIMMERSBWPsAboveAT SHADED PORTIONS OF BWL 5, TIE THE FIRSTFLOOR TOP PLATE OF THE FLANKING STAIRWALLS TO THE BOTTOM CHORD OF THE CLOSESTSECOND FLOOR TRUSS THAT SPANS OVER THEDINING AREA. TIE WITH SIMPSON STRAP CS20STRAP WITH A MINIMUM OF 9" NAILING AT EACHEND OF STRAP.7777122.533333PFHPFHPFHCS-PF Planco MN, Inc.C#23-012SMA572023 SECOND FLOOR PLAN 1/4" = 1'-0" 857 SQ. FT.DN 17 R 5'-0" TUB & SHOWER 1 PIECE FIB.F266826682668266824681668LIN. 42" 84"LIN.206824682468 W.I.C. *CARPET*CARPET MASTER BEDROOM *CARPET BEDROOM #2 BEDROOM #3 *CARPET4/0x3/0 FXTEMP2-2x106/0x5/0 SL2-2x102-2x106/0x5/0 SL2-2x102/6x3/6 SH2-2x106/0x5/0 SL1/2 WALLW/ WD. CAPSD/COSDSDSDF2x633'-0"14'-1"7'-11"11'-0"7'-2"6'-11"3'-5"4'-6"5'-4"5'-8"25'-0" 11'-0"14'-0"6'-7"2'-2"5'-5"3'-4"3'-4"33'-0"12'-4"7'-0"13'-8"1'-0" 1'-0"6'-2"6'-2"3'-3"3'-9"27'-0" 12'-6"2'-6"12'-0" 7'-2"2'-10"4'-0"2'-0"3'-6"2'-5"8'-4"3'-10"10" 5'-6"5'-10"4'-8"GIRDERACCESS ATTIC TRUSSES 24" O.C. TRUSSES 24" O.C.2-7 1/4" LSLDROPPED*VINYL*VINYL506860 34 1 PIECE FIB. 2/4x3/6 SH 2-2x10 5'-8"5'-4" 3'-10"4-2x4Temper22222222222222-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). Planco MN, Inc.C#23-012SMA672023VENTEDSOFFITFASCIAALUM. ALUM.2'-2" CROSS SECTION 3/8" = 1'-0"  “3 1/2" CONC. FLOOR8'-118"3/4" T & G FLOOR3/4" T & G FLOOR9'-118"2x6- 16" O.C.VB1/2" GYP. BD.R-20 SPRAY FOAMR-21 INSUL.SIDING20" FLOOR TRUSSES @ 24" O.C.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.R-20 SPRAY FOAMSHEATHING5/8" GYP. BD.5/8" GYP. BD.W/ V.B.2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBSIDINGR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.SHEATHING25'-0"1'-0"R-20 SPRAY FOAM5/8" GYP. BD.GRADEMIN. R-301'-0" BATHROOM GREAT ROOM 9 1/2" I JTS. @ 16" O.C.50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTICVENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES2'-0"TRUSSES @ 24" O.C.(DESIGNED BY MFR)712R-49 INSUL.ENERGY HEEL9 516"ALUM.ALUM. FASCIASOFFITVENTED1'-0"ENERGY HEEL2-7 1/4" LSL26'-0"378"BOXEDCOLUMNTRT. 6x6 POST2-9 1/2" LSL6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS4- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS2-2x103-2x108'-6"7'-0"FLASHINGDRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSWATER PROOFINGDRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSR-10 W/ <2.6 ACHINSUL.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED20" FLOOR TRUSSES @ 24" O.C.9 1/2" I JTS. @ 16" O.C.10"75 8"10"77 16"DECKING2x8 JTS. @ 16" O.C.TRT. 6x6 POST24x24 PADFOOTING12x16 PIERFOOTINGTRT. 3-2x1241216 RISERS 17 RISERSWATER PROOFINGPOURED WALLGRADE2X6- 16" O.C.R-21 INSUL.VB2" R-10RIGID INSUL.FLASHING3 1/2" CONC. FLOOR2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBR-21 SPRAY FOAMGIRDER F.T.R-49 INSUL.5/8" GYP. BD.W/ V.B.5/8" GYP. BD.W/ V.B.8'-0"8'-11 8"2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB9'-11 8"  “5/8" GYP. BD.20" FLOOR TRUSSES @ 24" O.C. OFFICE CROSS SECTION 3/8" = 1'-0" GRADEPER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED Planco MN, Inc.C#23-012SMA772023 CROSS SECTION 3/8" = 1'-0"  “3 1/2" CONC. FLOOR8'-11 8"3/4" T & G FLOOR3/4" T & G FLOOR9'-11 8"2x6- 16" O.C.VB1/2" GYP. BD.R-20 SPRAY FOAMR-21 INSUL.SIDING2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.R-20 SPRAY FOAMSHEATHING5/8" GYP. BD.5/8" GYP. BD.W/ V.B.2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBR-20 SPRAY FOAMR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-20 SPRAY FOAM5/8" GYP. BD. MASTER BEDROOM BEDROOM #2 KITCHEN 50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTICVENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES2'-0"TRUSSES @ 24" O.C.(DESIGNED BY MFR)712ENERGY HEEL9 516"R-49 INSUL.4" CONC. FLOOR5/8" TYPE "X" GYP. BD. GARAGE GRADEPOURED WALL2X6- 16" O.C.SLOPE TO DOORS2'-0"9 5 16"ENERGY HEELTRUSSES @ 24" O.C.(DESIGNED BY MFR)25'-0"22'-0"WATER PROOFINGDRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSR-10 W/ <2.6 ACHINSUL.PER CODEWALL W/ REBAR8'-4" POURED1-2x6 TREATEDFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS“%(9(/20" FLOOR TRUSSES @ 24" O.C.20" FLOOR TRUSSES @ 24" O.C.DRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSWATER PROOFINGPOURED WALLGRADE2X6- 16" O.C.R-21 INSUL.VB2" R-10RIGID INSUL.FLASHING nc.2023 FIRST FLOOR PLAN 3068SLREF'G 12" S.B.3-2x106068 P.D.2-9 1/2" LVL3/0x5/0-3 SH2-2x103/0x3/6 SH2668RAIL 2868PED 246824682868FIREDOORLT WD 27"16" SHLVS.20682868PKT.*CARPET*WOOD3"3"8x7 OVH. DR.16x7 OVH. DR.*4" CONC. FLOOR GARAGE *2x6 WALLS3/0x5/0-2 SH2-9 1/2" LVL WOOD PORCH FOYER *WOOD KITCHEN *WOOD*WOOD DINING *CARPET GREAT ROOM OFFICE *CARPET W.I.C. *L.V.T.*L.V.T.*L.V.T.FPANTRY*WOOD2-2x10 2/6x3/6 SL UP 17 R DN 16 R MICROHOOD53'-0"30'-0"23'-0"11'-0"19'-0"11'-0"12'-0"5'-6"5'-6"6'-0"2'-0"6"10'-0"6"27'-0"12'-0"15'-0"41'-0"18'-0"11'-0"12'-0"6'-6"5'-6"5'-6"5'-6"8'-9"9'-3"47'-0" 22'-6"24'-6" 2'-0"20'-6" 7'-6"4'-6"12'-6" 3'-8"3'-10"2-2x108'-6"3'-6"2x612'-0"8'-6"5'-6"4'-0"4'-10"3'-8"5'-8"3'-4"3'-4"7'-0"2'-6"5'-2"5'-5" 4'-6"5'-10" 10" 14'-8" 10'-0"1'-5"4'-0"5'-6"3'-0"3'-6"SD/CO24" CANT.12" CANT.6'-6"6'-0"6"BOXEDCOLUMN2-2x105'-9"5'-3"9'-6"9'-6"22'-0" GIRDER F.T.2-9 1/2" LVL2-9 1/2" LVLTRUSSES 24" O.C. GIRDER F.T.2-9 1/2" LVLFLUSH6"F.P.GAS2-2x101'-6"5'-9" (FRAMING)5'-10" (FINISHED)5'-0"4'-8"5'-4"2'-8"2'-8"2'-4"2'-8"2/6x2/0 FXTOP @ 7'-6"2-2x10 2/6x2/0 FXTOP @ 7'-6"2-2x10 20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C.4068CHASE2'-0"1'-8"23'23'27'27'BWL 1BWL 2BWL 3BWL 4BWL 5BWL 63'3'3'3'2'-6"2'-6"3'4'4'SEE DETAIL 1/PF-1SEE DETAIL 2/PF-1SEE DETAIL 3/PF-112'7'7'7'7'AT SHADED PORTIONS OF BWL 5, TIE THE FIRSTFLOOR TOP PLATE OF THE FLANKING STAIRWALLS TO THE BOTTOM CHORD OF THE CLOSESTSECOND FLOOR TRUSS THAT SPANS OVER THEDINING AREA. TIE WITH SIMPSON STRAP CS20STRAP WITH A MINIMUM OF 9" NAILING AT EACHEND OF STRAP. SECOND FLOOR PLAN DN 17 R 5'-0" TUB & SHOWER 1 PIECE FIB.F266826682668266824681668LIN. 42" 5'-0" TUB ALCOVE 1 PIECE FIB.483460"LIN.166824682468 W.I.C. *CARPET1 PIECE FIB. 2-2x10 4/0x2/6 FX *CARPET MASTER BEDROOM *CARPET BEDROOM #2 BEDROOM #3 *CARPET4/0x3/0 FXTEMP2-2x103/0x5/0-2 SH2-2x103-2x103/0x5/0-2 SH2-2x102/6x3/6 SH2-2x104/0x5/0 SH1/2 WALLW/ WD. CAPSD/COSDSDSDF2x62x633'-0"14'-1"7'-11"11'-0"7'-2"6'-11"3'-5"4'-6"5'-4"5'-8"25'-0" 11'-0"14'-0" 5'-4"4'-4"1'-4" 2'-8"2'-8"6'-5"2'-2"5'-7"3'-4"3'-4"33'-0"12'-4"7'-0"13'-8"1'-0" 1'-0"6'-2"6'-2"3'-3"3'-9"27'-0"12'-6"2'-6"12'-0" 7'-2"2'-10"4'-0"2'-0"3'-6"2'-5"8'-4"3'-10"10" 5'-6"5'-10"4'-8"GIRDERACCESS ATTIC TRUSSES 24" O.C. TRUSSES 24" O.C.2-9 1/2" LVLDROPPED*L.V.T.*L.V.T.506833'25'BWL 7BWL 8BWL 9BWL 102'2'2'2'2'2'2'2'2'2'2'2'2'2' Voigt & Associates, Inc.C-1Structural Engineering Services 4635 Nicols Road, Suite 204Eagan, MN 55122MethodCS-WSPWind speed 115Exposure BWL 1 2 3 4 5 6 7 8 9 10Spacing - ft 23 23 23 27 27 27 25 25 33 33Level 2 2 2 2 2 2 1 1 1 1Length req'd- ft 7.3 7.3 7.3 8.3 8.3 8.3 4 4 5 5per Table R602.10.3(1)Adjustments:Exposure 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3Eave to ridge Height 1 1 1 1 1 1 1 1 1 1Wall Height 0.95 0.95 0.95 0.95 0.95 0.95 0.9 0.9 0.9 0.9# of BWL 1.3 1.3 1.3 1.3 1.3 1.3 1 1 1 14" Gyp WB w.block joints1 1 1 1 1 1 1 1 1 1Adjusted Length 11.7 11.7 11.7 13.3 13.3 13.3 4.7 4.7 5.9 5.9Pheasant Run Model #45421 177th St W, Lakeville, MNSheetC Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe:Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 22,711Residential Load Calculation SEER /EER Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Fiberglass, Batts Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply Mineral Fiberboard Insulation Location Foam, Closed Cell0.22 Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Non or Not ApplicableAttic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 44,396 Heating Gain Cooling Load Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville5421 177th St W BC636874 City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 29,080 Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat Stone Cottage HVAC Load Calculations for Stone Cottage 5421 177th St W Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Wednesday, June 14, 2023 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Wednesday, June 14, 2023 Client Name:Stone Cottage Client Address:5421 177th St W Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces South Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,044 CFM Per Square ft.:0.354 Square ft. of Room Area:2,951 Square ft. Per Ton:1,218 Volume (ft³) of Cond. Space:26,559 Building Loads Total Heating Required Including Ventilation Air:44,396 Btuh 44.396 MBH Total Sensible Gain:22,711 Btuh 78 % Total Latent Gain:6,369 Btuh 22 % Total Cooling Required Including Ventilation Air:29,080 Btuh 2.42 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Miscellaneous Report System 1 Whole House Input Data Outdoor Dry Bulb Outdoor Wet Bulb Outdoor Rel.Hum Indoor Rel.Hum Indoor Dry Bulb Grains Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29.27 Duct Sizing Inputs Main Trunk Runouts Calculate:Yes Yes Use Schedule:No No Roughness Factor:0.00300 0.01000 Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft. Minimum Velocity:650 ft./min 450 ft./min Maximum Velocity:900 ft./min 750 ft./min Minimum Height:8 in.6 in. Maximum Height:10 in.6 in. Outside Air Data Winter Summer Infiltration Specified:0.250 AC/hr 0.130 AC/hr 71 CFM 37 CFM Infiltration Actual:0.250 AC/hr 0.130 AC/hr Above Grade Volume:Cu.ft.Cu.ft.X 17,136 X 17,136 4,284 Cu.ft./hr 2,228 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration:71 CFM 37 CFM Total Building Ventilation:140 CFM 70 CFM ---System 1--- Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference) Winter Infiltration Specified:0.250 AC/hr (71 CFM), Construction: Unknown Summer Infiltration Specified:0.130 AC/hr (37 CFM), Construction: Unknown C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.42 1,218 2,951 22,711 6,369 29,080 44,396 803 1,044 1,044 System 1 Yes 2.42 1,218 2,951 22,711 6,369 29,080 44,396 803 1,044 1,044 20x10 Ventilation 437 1,352 1,789 5,850 Zone 1 2,951 22,274 5,017 27,291 38,546 803 1,044 1,044 20x10 1-Main Level 1,047 11,753 1,781 13,534 17,808 371 551 551 6--6 2-Upper Level 857 9,061 2,336 11,397 13,989 291 425 425 5--6 3-Lower Level 1,047 1,460 900 2,360 6,749 141 68 68 1--6 C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Duct Size Preview Room or Duct Name Minimum Velocity Maximum Velocity Rough. Factor Design L/100 Actual L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size System 1 Supply Runouts Zone 1 1-Main Level 450 750 0 0.1 0.1 467.4 371 551 551 6--6 2-Upper Level 450 750 0 0.1 0.1 432.4 291 425 425 5--6 3-Lower Level 450 750 0 0.1 0.1 348.4 141 68 68 1--6 Other Ducts Supply Main Trunk 650 900 0 0.1 0.1 751.3 803 1,044 1,044 20x10 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:803 Cooling Flow:1044 C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 - Whole House - Adequate Exposure Diversity Test Test For Adequate Exposure Diversity Average Glass Sensible Gain Over 12 Hours 1.3 x Average Glass Gain Hourly Glass Gain Hourly Total Net GainHeat Gain, Btuh22.8% Diff. from Avg. 0 10,000 20,000 30,000 40,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm AED Calculation Summary --- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 22.8%. AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 System 1 - Whole House - Psychrometric Chart ZC Zone (Room) Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain HRV Heat Recovery Ventilator C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 433 12,055 0 9,932 9,932 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1829 10,343 0 1,582 1,582 15B0-15sf-10: Wall-Basement, , R-15 board insulation to floor, no interior finish, 10' floor depth 1224 4,472 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 857 1,491 0 823 823 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1047 2,277 0 0 0 Subtotals for structure:31,916 0 12,689 12,689 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 71, Summer CFM: 37 6,630 717 515 1,232 Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789 Total Building Load Totals:44,396 6,369 22,711 29,080 Check Figures Total Building Supply CFM:1,044 CFM Per Square ft.:0.354 Square ft. of Room Area:2,951 Square ft. Per Ton:1,218 Volume (ft³) of Cond. Space:26,559 Building Loads Total Heating Required Including Ventilation Air:44,396 Btuh 44.396 MBH Total Sensible Gain:22,711 Btuh 78 % Total Latent Gain:6,369 Btuh 22 % Total Cooling Required Including Ventilation Air:29,080 Btuh 2.42 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Building Pie Chart Building Loss 44,396 Btuh Floor 5%Roof 3% Wall 33% Glass 27% Door 3% Infiltration 15% Ventilation 13% Building Gain 29,080 Btuh Roof 3%Wall 5% Glass 34% Door 1%People 13% Equipment 33% Infiltration 4% Ventilation 6% C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 Building Bar Graph Building Loss 44,396 Btuh 0 5,000 10,000 15,000 Floor 5%Wall 33%Door 3%Ventilation 13% Roof 3%Glass 27%Infiltration 15% Building Gain 29,080 Btuh 0 2,000 4,000 6,000 8,000 10,000 Roof 3%Glass 34%People 13%Infiltration 4% Wall 5%Door 1%Equipment 33%Ventilation 6% C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 11 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 433 12,055 0 9,932 9,932 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1829 10,343 0 1,582 1,582 15B0-15sf-10: Wall-Basement, , R-15 board insulation to floor, no interior finish, 10' floor depth 1224 4,472 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 857 1,491 0 823 823 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1047 2,277 0 0 0 Subtotals for structure:31,916 0 12,689 12,689 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 71, Summer CFM: 37 6,630 717 515 1,232 Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789 System 1 Whole House Load Totals:44,396 6,369 22,711 29,080 Check Figures Supply CFM:1,044 CFM Per Square ft.:0.354 Square ft. of Room Area:2,951 Square ft. Per Ton:1,218 Volume (ft³) of Cond. Space:26,559 System Loads Total Heating Required Including Ventilation Air:44,396 Btuh 44.396 MBH Total Sensible Gain:22,711 Btuh 78 % Total Latent Gain:6,369 Btuh 22 % Total Cooling Required Including Ventilation Air:29,080 Btuh 2.42 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 12 System 1 Whole House Pie Chart System 1 Whole House Loss 44,396 Btuh Floor 5%Roof 3% Wall 33% Glass 27% Door 3% Infiltration 15% Ventilation 13% System 1 Whole House Gain 29,080 Btuh Roof 3%Wall 5% Glass 34% Door 1%People 13% Equipment 33% Infiltration 4% Ventilation 6% C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 13 System 1 Whole House Bar Graph System 1 Whole House Loss 44,396 Btuh 0 5,000 10,000 15,000 Floor 5%Wall 33%Door 3%Ventilation 13% Roof 3%Glass 27%Infiltration 15% System 1 Whole House Gain 29,080 Btuh 0 2,000 4,000 6,000 8,000 10,000 Roof 3%Glass 34%People 13%Infiltration 4% Wall 5%Door 1%Equipment 33%Ventilation 6% C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 14 System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms) Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 433 12,055 0 9,932 9,932 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1829 10,343 0 1,582 1,582 15B0-15sf-10: Wall-Basement, , R-15 board insulation to floor, no interior finish, 10' floor depth 1224 4,472 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 857 1,491 0 823 823 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1047 2,277 0 0 0 Subtotals for structure:31,916 0 12,689 12,689 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 71, Summer CFM: 37 6,630 717 515 1,232 System 1, Zone 1 Load Totals:38,546 5,017 22,274 27,291 Check Figures Supply CFM:1,044 CFM Per Square ft.:0.354 Square ft. of Room Area:2,951 Square ft. Per Ton:1,298 Volume (ft³) of Cond. Space:26,559 Zone Loads Total Heating Required:38,546 Btuh 38.546 MBH Total Sensible Gain:22,274 Btuh 82 % Total Latent Gain:5,017 Btuh 18 % Total Cooling Required:27,291 Btuh 2.27 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 15 System 1, Zone 1 Pie Chart System 1, Zone 1 Loss 38,546 Btuh Floor 6% Roof 4% Wall 38% Glass 31% Door 3% Infiltration 17% System 1, Zone 1 Gain 27,291 Btuh Roof 3%Wall 6% Glass 36% Door 1%People 14% Equipment 35% Infiltration 5% C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 16 System 1, Zone 1 Bar Graph System 1, Zone 1 Loss 38,546 Btuh 0 5,000 10,000 15,000 Floor 6%Wall 38%Door 3% Roof 4%Glass 31%Infiltration 17% System 1, Zone 1 Gain 27,291 Btuh 0 2,000 4,000 6,000 8,000 10,000 Roof 3%Glass 36%People 14%Infiltration 5% Wall 6%Door 1%Equipment 35% C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 17 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,047.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,047.0 sq.ft.Supply Air:551 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.5 AC/hr Volume:9,423.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:65 CFM Runout Air:92 CFM Percent of Supply.:12 % Runout Duct Size:6 in.Actual Summer Vent.:37 CFM Runout Air Velocity:467 ft./min.Percent of Supply:7 % Runout Air Velocity:467 ft./min.Actual Winter Infil.:38 CFM Actual Loss:0.136 in.wg./100 ft.Actual Summer Infil.:20 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-12F-0sw 27 X 9 180 0.065 5.7 1,018 0.9 0 156 W -Wall-12F-0sw 27 X 9 160 0.065 5.7 905 0.9 0 138 S -Wall-12F-0sw 41 X 9 289 0.065 5.7 1,634 0.9 0 250 N -Wall-12F-0sw 41 X 9 268 0.065 5.7 1,516 0.9 0 232 S -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 S -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 E -Gls-4A-1a-o shgc-0.33 0%S 63 0.320 27.8 1,754 35.0 0 2,205 W -Gls-4A-1a-o shgc-0.33 0%S 83 0.320 27.8 2,311 35.0 0 2,905 S -Gls-4A-1a-o shgc-0.33 0%S 38 0.320 27.8 1,058 19.2 0 729 N -Gls-4A-1a-o shgc-0.33 100%S 101 0.320 27.8 2,812 10.4 0 1,052 Subtotals for Structure:14,286 0 8,019 Infil.: Win.: 37.9, Sum.: 19.7 1,224 2.877 3,522 0.224 381 274 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 3,000 Room Totals:17,808 1,781 11,753 C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 18 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:857.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:857.0 sq.ft.Supply Air:425 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.3 AC/hr Volume:7,713.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:5 Actual Winter Vent.:51 CFM Runout Air:85 CFM Percent of Supply.:12 % Runout Duct Size:6 in.Actual Summer Vent.:28 CFM Runout Air Velocity:432 ft./min.Percent of Supply:7 % Runout Air Velocity:432 ft./min.Actual Winter Infil.:33 CFM Actual Loss:0.117 in.wg./100 ft.Actual Summer Infil.:17 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 33 X 9 237 0.065 5.7 1,340 0.9 0 205 S -Wall-12F-0sw 33 X 9 255 0.065 5.7 1,442 0.9 0 220 E -Wall-12F-0sw 27 X 9 217 0.065 5.7 1,227 0.9 0 188 W -Wall-12F-0sw 27 X 9 223 0.065 5.7 1,261 0.9 0 193 N -Gls-4A-1a-o shgc-0.33 100%S 60 0.320 27.8 1,670 10.4 0 625 S -Gls-4A-1a-o shgc-0.33 0%S 42 0.320 27.8 1,169 19.2 0 806 E -Gls-4A-1a-o shgc-0.33 0%S 26 0.320 27.8 724 35.0 0 910 W -Gls-4A-1a-o shgc-0.33 0%S 20 0.320 27.8 557 35.0 0 700 UP-Ceil-16B-50 857 X 1 857 0.020 1.7 1,491 1.0 0 823 Subtotals for Structure:10,881 0 4,670 Infil.: Win.: 33.5, Sum.: 17.4 1,080 2.878 3,108 0.223 336 241 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:13,989 2,336 9,061 C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 19 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,047.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,047.0 sq.ft.Supply Air:68 CFM Ceiling Height:9.0 ft.Supply Air Changes:0.4 AC/hr Volume:9,423.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:1 Actual Winter Vent.:25 CFM Runout Air:68 CFM Percent of Supply.:36 % Runout Duct Size:6 in.Actual Summer Vent.:5 CFM Runout Air Velocity:348 ft./min.Percent of Supply:7 % Runout Air Velocity:348 ft./min.Actual Winter Infil.:0 CFM Actual Loss:0.077 in.wg./100 ft.Actual Summer Infil.:0 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-15B0-15sf-10 41 X 9 369 0.042 3.7 1,348 0.0 0 0 S -Wall-15B0-15sf-10 41 X 9 369 0.042 3.7 1,348 0.0 0 0 E -Wall-15B0-15sf-10 27 X 9 243 0.042 3.7 888 0.0 0 0 W -Wall-15B0-15sf-10 27 X 9 243 0.042 3.7 888 0.0 0 0 Floor-21A-24 1 X 1047 1047 0.025 2.2 2,277 0.0 0 0 Subtotals for Structure:6,749 0 0 Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:6,749 900 1,460 C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 20 Room Cooling and Heating Loads Bar Graphs Cooling Heating Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 21 Room Cooling Loads Bar Graphs Sensible Latent Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 22 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,047 17,808 371 6-6 467 11,753 1,781 551 551 2 Upper Level 857 13,989 291 5-6 432 9,061 2,336 425 425 3 Lower Level 1,047 6,749 141 1-6 348 1,460 900 68 68 Ventilation 5,850 437 1,352 System 1 total 2,951 44,396 803 22,711 6,369 1,044 1,044 System 1 Main Trunk Size:20x10 in. Velocity:751 ft./min Loss per 100 ft.:0.085 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.42 78% / 22%22,711 6,369 29,080 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\5421 177th st lakeville 06142023.rhv Wednesday, June 14, 2023, 9:39 AM NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 7/27/23 X PM