Loading...
HomeMy WebLinkAboutSurvey - 17074-76-78-80-82 Dysart PlA. 7/07/23: ClientDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes found scribed "x"Denotes set hubDenotes found hubDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationDenotes as-built elevationSURVEYOR'S CERTIFICATEI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 26th day of June, 2023Marcus F. Hampton, MN L.S. No. 47481PROPERTY DESCRIPTION17074, 17076, 17078, 17080 and, 17082 Dysart Place, Lakeville, MinnesotaPROPERTY ADDRESS1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/or developmentplan prepared by Westwood Professional Services, Inc.6.Grading plan date/revision date: June 5, 20237.Plan No.'s 2640-L, 2645-M, 2645-N, 2645-M and 2640-LNOTESFLOOR ELEVATIONSBENCHMARKLot 52Lots 53-54Lots 55-56ProposedProposedProposedGarage Floor @ Front= 940.1= 939.1= 938.1Garage Top of Block= 940.5= 939.5= 938.5House Top of Block= 940.5= 939.5= 938.5Lowest Floor= 940.5= 939.5= 938.5Top nut of hydrant located at Lots 24 and 25, Block 1 = 941.55Lots 52, 53, 54, 55 and 56, Block 1, BROOKSHIRE, Dakota County, MinnesotaB. 7/19/23: CityPlanning DepartmentApprovedDate:__________________07/19/2023dmoreyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Draintile connection required.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________07/19/2023hdunne