Loading...
HomeMy WebLinkAbout18873 Javelin Way - SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.*Draintile connection required. ENGINEERING REVIEWED Date:__________________08/08/2023 hdunne