HomeMy WebLinkAbout18873 Javelin Way - SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the
landscape inspection.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________08/08/2023 hdunne