Loading...
HomeMy WebLinkAbout5280 177th St W - SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.*Draintile connection required.ENGINEERING REVIEWEDDate:__________________08/03/2023hdunne