HomeMy WebLinkAbout17972 Granite Court - SurveyZoning = RM-1FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 50'RY Buffer - 50'The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________08/14/2023 hdunnePlanning DepartmentApprovedDate:__________________08/21/2023 kjenson