Loading...
HomeMy WebLinkAbout17823 Hamburg Avenue - SurveyZoning = RM-1 FY - 20' House, 25' Garage SY - 7' Interior, 20' Corner RY - 30' SY Buffer - 50' RY Buffer - 50' The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required. *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________08/17/2023 hdunne Planning DepartmentApprovedDate:__________________08/22/2023 kjenson