Loading...
HomeMy WebLinkAboutLA218312 - 19818 Henning Ave Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT CONDO REROOF RESIDE RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LOWER LEVEL FINISH ADDITION FOUNDATION ONLY MISCELLANEOUS DEMO APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: CITY BUILDING VALUATION: $ BUILDING PERMIT FEES $PERMIT FEE $PLAN CHECK $SURCHARGE $METRO SAC $CITY WATER HOOKUP UNIT $CITY SEWER HOOKUP UNIT $LANDSCAPE ESCROW $TREE ESCROW $MISC ESCROW $PLUMBING $MECHANICAL $SEWER WATER WATER METER PRESSURE REDUCING VALVE $OTHER $TOTAL METER SIZE PRESSURE REDUCING VALVE SEWER/WATER SEWER/WATER FINAL STREET DRAINTILE BUILDING INFORMATION TYPE OF CONSTRUCTION ZONING CODE EDITION FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP MECHANICAL AIR TEST FINAL ROUGH-IN PLUMBING FINAL ROUGH-IN INSULATION LATH DECK FOOTING FIREPLACE FOOTING FOUNDATION FRAMING PORCH FRAMING PORCH FOOTING POURED WALL SITE LOWER LEVEL FINAL OTHER DECK FRAMING LOWER LEVEL FRAMING LANDSCAPING DECK FINAL $ $ ACCESSORY BUILDING EGRESS WINDOW UNDERGROUND 198181 HENNING AVE, LAKEVILLE*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERRESIDENCE FOR:written consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.cBERRES RIDGE MODEL #12#23-019SMA172023STONE COTTAGE CONSTRUCTION, INC. LOT 6, BLOCK 3, BERRES RIDGE 7TH ADDITION FRONT ELEVATION 1/4" = 1'-0" VINYL SHAKEVINYL SHAKEVINYL SHAKESTONECAPSTONE4" TRIM101210121012712712712412612VINYLSIDINGVINYLSIDING12x12 BOXEDCOLUMNAZEK PORCHSTONEON JOGSTONEON JOG9x8 OVH. DR.16x8 OVH. DR.9x8 OVH. DR.VINYL SIDING4" TRIM4" VINYL SIDINGALL SIDESVINYL SHAKEFRONT ONLYSTONE AS SHOWNFRONT & SIDESALUM. SOFFIT & FASCIAALL SIDESWDW. GRIDS AS SHOWNFRONT ONLY1'-0"1'-3"8'-4" POURED FOUNDATION9' CEILING @ FIRST FLOORTOTAL2nd FLR.1st FLR.1,178 SQ. FT.1,384 SQ. FT.2,562 SQ. FT.TOTALBSM'T745 SQ. FT.3,307 SQ. FT.Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode09/25/2023dmathews VERIFY ALLGRADE LINESPlanco MN, Inc.C#23-019SMA272023 LEFT ELEVATION 1/8" = 1'-0" VINYLSIDINGVINYLSIDINGVINYLCORNERS71271271210121'-9"2x10 DECKLEDGER RIGHT ELEVATION 1/8" = 1'-0" VINYLSIDINGVINYLCORNERS71210121'-9" REAR ELEVATION 1/8" = 1'-0" VINYLSIDINGVINYLSIDINGVINYLCORNERS7127126"1'-0"7/12 ROOF PLAN 1/8" = 1'-0" 1'-9"1'-9"1'-3"10'-6"712712712712101210121012101210126"2'-2"12410127/126"1261'-5"7/121'-9"Secure door closed until deck isconstructed with a separate permit. Planco MN, Inc.C#23-019SMA372023 BASEMENT PLAN 1/4" = 1'-0" 8'-4" POURED FOUNDATIONUP15 R10"5'-10"4'-8"3'-8"3'-8"20682668483448"2468F*L.V.T.(2) TRT. 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG.2-2x10286828682668WHFURNF.D.92%2-2x10NO FTG.@ TOILET1 PIECE FIB.SUMP5/0x3/6 SL 2-2x10 36'-0" 11'-8"7'-4"5'-8"11'-4" 6'-1"5'-3"WALLEDGEWALLEDGETREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS20'-9"*CARPET BEDROOM #5 69'-0"31'-6"37'-6"21'-0" 26'-0"2'-0"24'-0" 9'-0" 2'-0" 19'-0"45'-0"19'-0"69'-0"43'-6"25'-6"11'-6"20'-6"11'-6"14'-6"11'-0"2'-0" 13'-0"11'-6"2'-0"”),1,6+('64)7 (;&/8'(667$,56 FAMILY/REC ROOM *CARPET UNEXCAVATED 7'-11"6'-7"9"9"6'-6"TRT. 3-2x8 FLUSHTRT. 3-2x8 FLUSHTREATED 2x8 16" O.C. 4'-6" MECH/STORAGE *UNFINISHED FUT. EXCERCISE RM *UNFINISHED2" LEDGE 2" LEDGE30"x30"x12"CONC. PAD FTG.SD/COSD2'-6"13'-4"13'-3"10'-10"15'-2"11 7/8" I JOIST 16" O.C. 11 7/8" I JOIST 16" O.C. 11 7/8" LSL 16" O.C.20681-11 7/8" LSLFLUSH24" CANT.11 7/8" I JOIST 16" O.C. 11 7/8" I JOIST 16" O.C. DOUBLE 210 DOUBLE 210 1-11 7/8" LSLFLUSH 6' LONG1-11 7/8" LSLFLUSH 6' LONGUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel. Planco MN, Inc.C#23-019SMA472023 FIRST FLOOR PLAN 1/4" = 1'-0" DN15 RUP17 R266826683080CHASE266824682868FIREDOOR3068FULLVIEW24682468REF'G 12" CAB.S.B.REF'GU.C.PANTRY*WOOD2-2x10 2/6x3/6 SH 30" SLIDE-IN RANGEW/ HOODVENT42"DRY BARGASF.P.9/0x5/0 SL2-9 1/2" LVL2-2x107/6x5/0 SLRAILGIRDER F.T.48" BENCH26"CUB.26"CUB.2/6x3/6 SH2-2x106/0x5/0 SL2-2x10 FOYER *WOOD*WOOD DINING *WOOD GREAT ROOM KITCHEN *WOOD OFFICE *CARPET W.I.C. *L.V.T.*L.V.T.*WOODF2x62x2REF'GRECESSCOSTCODOOR9x8 OVH. DR.9x8 OVH. DR.16x8 OVH. DR.*4" CONC. FLOOR GARAGE *2x6 WALLS2x62x62x62x610"9"6'-7"7'-11" AZEK PORCH 69'-0"31'-6"37'-6"15'-0"15'-0"7'-6"8'-9"6'-3"7'-6"7'-6"2'-0" 21'-0" 9'-0"6'-0"6'-0" 4'-1"1'-11"2'-0"7'-0"1,178 SQ. FT.9' CEILING @ FIRST FLOOR17'-0"7'-4"11'-8" 26'-0"2'-0"24'-0" 9'-0" 2'-0" 21'-0"47'-0"19'-0"2'-0"69'-0"43'-6"25'-6"11'-6"20'-6"11'-6"14'-6"11'-0"6'-0"5'-6"10'-3"10'-3"5'-6"6'-0"1'-6"5'-6"2'-0" 13'-0" 7'-0"6'-0"11'-6"7'-4"36'-0" 5'-3"6'-6"5'-3"WALL EDGEWALL EDGE1'-8"2-2x10 4'-0"6'-6"2'-6"6'-6"1'-0" 9'-6"13'-6" 4'-0"7'-2"4'-0"13'-2"5'-10"4'-8"3'-8"3'-8"6'-8"4'-8"4'-2"7'-5"2'-11"12x12 BOXEDCOLUMN2-2x10 12" CANT.2-2x1024" CANT.GIRDERGIRDER 3-14" LVL FLUSH2-7 1/4" LSL2-2x10TRUSSES 24" O.C. TRUSSES 24" O.C. 4'-6" 4'-0"6" 3-14" LVL FLUSH 2-9 1/2" LSLFLUSH20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C. 2'-0"SD/COMICROBASE CAB.W/ (3) FLOATING SH'S48" HIGHWAINSCOTTING2868PKT.WAINSCOTTINGFULL WALL32" HIGH B.I. 32" HIGH B.I.(2) OPEN SHLVS.3-16" LVL FLUSH2-2x10 FLUSH2-9 1/2" LSL FLUSH2-2x123-2x122-11 7/8" LSL2-7 1/4" LSLBWPsAboveTemper within 2'of door within thesame wall plane.Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.666810AT THIS HATCHED AREA, INSTALLSIMPSON CS20 STRAP FROM THETOP PLATE OF THE EXTERIORWALL AT THE PANTRY TO THE BOTTOM CHORD OF THE GIRDERTHAT SPANS THE GARAGE. PROVIDE A MINIMUM OF 9" OFNAILING AT EACH END OF STRAP.PFHPFH Planco MN, Inc.C#23-019SMA572023 SECOND FLOOR PLAN 1/4" = 1'-0" 1,382 SQ. FT.DN16 R10"2468PKT.246872"5'-0" TUB& SHOWER1 PIECE FIB.F2/0x3/6 SH2-2x102/0x3/6 SH2-2x102x624682668266811'-0"26687'-0" 3'-6"2'-7"6'-5"15'-6"LTWD27"2068LIN.2468PKT.28682068206826682068LIN.24682468PKT.F90"42"72"BENCH1'-6" 6' GLASS DOORS 2-2x10 2/6x3/6 SH 2-2x102/6x3/6 SH2-2x103/0x5/0 SH2-2x103/0x5/0 SH3-2x106/0x4/6 SL5/0x6/0 FX TEMP 2-2x10 TOP @ 8' OFF LNDG.6/0x5/0 SL2-2x106/0x5/0 SL2-2x10*CARPET MASTER BEDROOM *CARPET BEDROOM #2 BEDROOM #3 *CARPET BEDROOM #4 *CARPET W.I.C. *CARPET2x638'-0" 2'-6"10'-1"6'-3"8'-2" 1'-11"4'-4"37'-6"10'-6"15'-0"12'-0"6'-1"4'-5"2'-2"10'-8"2'-2"5'-10"6'-2"2x67'-8"4'-1"38'-0" 11'-0"7'-4"2'-8"14'-4"WALLEDGEWALLEDGE3'-8"3'-8" 2'-8"6'-8"4'-0"37'-6"11'-0"14'-6"12'-0"6'-0"6'-0"3'-6"7'-6"3'-6"9'-8"4'-9"8'-9"3'-8"3'-8"4'-8"5'-10"5'-10"1/2 WALLW/ WD. CAP2468 C.O.*C.T.*L.V.T.*L.V.T.2'-6"3'-10"4'-2"1'-0"SD/COSDSDSDSDSD3'-0" 3'-0"*L.V.T.*L.V.T.*L.V.T.ACCESS ATTIC 5'-6"5'-6"GIRDERGIRDERTRUSSES 24" O.C. TRUSSES 24" O.C.TRUSSES24" O.C.TRUSSES24" O.C.3'-0"(2) SHLVS.266826682668266826682068Temper glazingfacing a tubwithin 60".COFAN-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). Planco MN, Inc.C#23-019SMA672023 CROSS SECTION 3/8" = 1'-0" 17 RISERS 9'-118"3/4" T & G FLOORCURBTREATED 4x415 RISERS  “CURB2X6- 16" O.C.TREATED 4x63 1/2" CONC. FLOOR2X4- 16" O.C.CURB2X6- 16" O.C.TREATED 4x68'-118"5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.2x6R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.11'-8"2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOOR2x42x6VBR-21 INSUL.W/ V.B.5/8" GYP. BD.VB2'-0"R-20 SPRAY FOAM20" FLOOR TRUSSES @ 24" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDDRAIN TILE R-20 SPRAY FOAMR-20 SPRAY FOAMENERGY HEELENERGY HEEL4'-6"(DESIGNED BY MFR)TRUSSES @ 24" O.C.DECKING2x8 JTS. @ 16" O.C.6x6 POST35'-0"3'-0"GIRDERR-20 SPRAY FOAM2-7 1/4" LVL1261'-5"4'-0"31516"50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTIC1/2" SHTG.15# FELTSHINGLES1'-9"712R-30 INSUL.MIN.PROOFINGWATERR-10 W/ <2.6 ACHINSUL.24x24 PADFOOTING12x16 PIERFOOTINGTRT. 3-2x8GRADETRT. 6x6 POSTSIDINGSHEATHING7/16" OSBHOUSE WRAPFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS11 7/8" LSL @ 16" O.C. FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS4- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS11 7/8" LSL @ 16" O.C. 73 8"75 8"GRADE1-2x6 TREATEDSILL PLATE8'-4" POUREDWALL W/ REBARPER CODEWATER PROOFINGR-10 W/ <2.6 ACHINSUL.DRAIN TILE ALUM.ALUM. FASCIASOFFITVENTEDVENTEDSOFFITALUM.ALUM. FASCIASIDINGSHEATHING7/16" OSBHOUSE WRAP5/8" GYP. BD.FLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FAN Planco MN, Inc.C#23-019SMA772023 CROSS SECTION 3/8" = 1'-0" 9'-11 8"3/4" T & G FLOOR “3 1/2" CONC. FLOOR8'-11 8"5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOORVBR-21 INSUL.W/ V.B.5/8" GYP. BD.VBR-20 SPRAY FOAM20" FLOOR TRUSSES @ 24" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDDRAIN TILE R-20 SPRAY FOAMR-20 SPRAY FOAMENERGY HEELENERGY HEEL(DESIGNED BY MFR)TRUSSES @ 24" O.C.35'-0"3'-0"GIRDERR-20 SPRAY FOAM50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTIC1/2" SHTG.15# FELTSHINGLES1'-9"712R-30 INSUL.MIN.PROOFINGWATERR-10 W/ <2.6 ACHINSUL.SIDINGSHEATHING7/16" OSBHOUSE WRAPFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSDBL. 11 7/8" LSL @ 16" O.C. GRADE1-2x6 TREATEDSILL PLATE8'-4" POUREDWALL W/ REBARPER CODEWATER PROOFINGR-10 W/ <2.6 ACHINSUL.DRAIN TILE VENTEDSOFFITALUM.ALUM. FASCIA4" CONC. FLOOR5/8" TYPE "X" GYP. BD. GARAGE GRADEPOURED WALL2X6- 16" O.C.SLOPE TO DOORS5'-0"17'-0"VENTEDSOFFITFASCIAALUM. ALUM.2'-2"41221'-0"SIDINGSHEATHING7/16" OSBHOUSE WRAPVENTEDSOFFITALUM.ALUM. FASCIA1'-9"7122'-0"3-16" LVL3-14" LVL5/8" GYP. BD.2'-0" BASEMENT PLAN UP15 R10"5'-10"4'-8"3'-8"3'-8"40682668483448"2468F*L.V.T.(2) TRT. 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG.2-2x10286828682668WHFURNF.D.92%2-2x10NO FTG.@ TOILET1 PIECE FIB.SUMP5/0x3/6 SL 2-2x10 2'-0" 36'-0" 11'-8"7'-4"5'-8"11'-4" 6'-1"5'-3"WALLEDGEWALLEDGETREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS22'-9"*CARPET BEDROOM #5 69'-0"31'-6"37'-6"15'-0"15'-0"7'-6"21'-0" 26'-0"2'-0"24'-0" 9'-0" 2'-0" 21'-0"47'-0"19'-0"2'-0"69'-0"43'-6"25'-6"11'-6"20'-6"11'-6"14'-6"11'-0"2'-0" 13'-0"11'-6"2'-0" FAMILY/REC ROOM *CARPET UNEXCAVATED 7'-11"6'-7"9"9"6'-6"TRT. 2-2x8 FLUSHTRT. 2-2x8 FLUSHTREATED 2x8 16" O.C. 4'-6" MECH/STORAGE *UNFINISHED FUT. EXCERCISE RM *UNFINISHED2" LEDGE 2" LEDGE30"x30"x12"CONC. PAD FTG.SD/COSD2'-6"13'-4"13'-3"10'-10"15'-2"11 7/8" I JOIST 16" O.C. 11 7/8" I JOIST 16" O.C. 11 7/8" LSL 16" O.C.15'BWL 13'3'3' FIRST FLOOR PLAN DN15 RUP17 R266826683068SLCHASE266824682868FIREDOOR2868 C.O.3068FULLVIEW24682468MICROOVEN/REF'G 12" CAB.S.B.REF'GU.C.16" SHLVS.PANTRY*WOOD2-2x10 2/6x3/6 SH 30" RANGEW/ HOODVENT42"DRY BARGASF.P.9/0x5/0 SL2-9 1/2" LVL2-9 1/2" LSL7/6x5/0 SL2/6x2/0 FX 2-2x10 2/6x2/0 FX 2-2x10RAIL GIRDER F.T.48" BENCH26"CUB.26"CUB.2/6x3/6 SH2-2x106/0x5/0 SL3-2x10 FOYER *WOOD*WOOD DINING *WOOD GREAT ROOM KITCHEN *WOOD OFFICE *CARPET W.I.C. *L.V.T.*L.V.T.*L.V.T.F2x62x2REF'GRECESSCOSTCODOOR9x8 OVH. DR.9x8 OVH. DR.16x8 OVH. DR.2x62x62x62x610"9"6'-7"7'-11" WOOD PORCH 69'-0"31'-6"37'-6"15'-0"15'-0"7'-6"8'-9"6'-3"7'-6"7'-6"2'-0" 21'-0" 9'-0"6'-0"6'-0" 4'-1"1'-11"2'-0"7'-0" 17'-0"7'-4"11'-8" 26'-0"2'-0"24'-0" 9'-0" 2'-0" 21'-0"47'-0"19'-0"2'-0"69'-0"43'-6"25'-6"11'-6"20'-6"11'-6"14'-6"11'-0"6'-0"5'-6"10'-3"10'-3"5'-6"6'-0"1'-6"5'-6"2'-0" 13'-0" 7'-0"6'-0"11'-6"7'-4"36'-0" 5'-3"6'-6"5'-3"WALL EDGEWALL EDGE1'-8"2-2x10 4'-0"6'-6"2'-6"6'-6"1'-0" 9'-6"13'-6" 4'-0"7'-2"4'-0"13'-2"5'-10"4'-8"3'-8"3'-8"6'-8"4'-8"4'-2"7'-5"2'-11"12x12 BOXEDCOLUMN2-2x10 12" CANT.2-2x1024" CANT.GIRDERGIRDER FLUSH LVLLVL2-2x10TRUSSES 24" O.C. 4'-6" 4'-0"6" FLUSH LVL 2-9 1/2" LSLFLUSH20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C. 2'-0"SD/CO2'-101 2"2'-41 2"2'-41 2"2'-101 2"35'35'20'20'BWL 2BWL 3BWL 4BWL 5BWL 6BWL 74'4'3'2'-6"2'-6"SEE DETAIL 1/PF-16'6'6'5'-3"6'-8"8'10'*4" CONC. FLOOR GARAGE *2x6 WALLSTRUSSES24" O.C.AT THIS HATCHED AREA, INSTALLSIMPSON CS20 STRAP FROM THETOP PLATE OF THE EXTERIORWALL AT THE PANTRY TO THE BOTTOM CHORD OF THE GIRDERTHAT SPANS THE GARAGE. PROVIDE A MINIMUM OF 9" OFNAILING AT EACH END OF STRAP. SECOND FLOOR PLAN DN16 R10"2468PKT.246872"5'-0" TUB& SHOWER1 PIECE FIB.F2/0x3/6 SH2-2x102/0x3/6 SH2-2x102x624682668266811'-0"5068506850687'-0" 3'-6"2'-7"6'-5"15'-6"LTWD27"4068LIN.2468PKT.28682068206826682068LIN.24682468PKT.F90"42"72"BENCH1'-6" 6' GLASS DOORS 2-2x10 2/6x3/6 SH 2-2x102/6x3/6 SH2-2x103/0x5/0 SH2-2x103/0x5/0 SH3-2x106/0x4/6 SL5/0x6/0 FX TEMP 2-2x10 TOP @ 8' OFF LNDG.6/0x5/0 SL2-2x106/0x5/0 SL2-2x10*CARPET MASTER BEDROOM *CARPET BEDROOM #2 BEDROOM #3 *CARPET BEDROOM #4 *CARPET W.I.C. *CARPET2x638'-0"2'-6"10'-1"6'-3"8'-2"1'-11"4'-4"37'-6"10'-6"15'-0"12'-0"6'-1"4'-5"2'-2"10'-8"2'-2"5'-10"6'-2"2x67'-8"4'-1"38'-0" 11'-0"7'-4"2'-8"14'-4"WALLEDGEWALLEDGE3'-8"3'-8" 2'-8"6'-8"4'-0"37'-6"11'-0"14'-6"12'-0"6'-0"6'-0"3'-6"7'-6"3'-6"9'-8"4'-9"8'-9"3'-8"3'-8"4'-8"5'-10"5'-10"1/2 WALLW/ WD. CAP2468 C.O.*C.T.*C.T.*C.T.2'-6"3'-10"4'-2"1'-0"SD/COSDSDSDSDSD3'-0" 3'-0"*L.V.T.*L.V.T.*L.V.T.ACCESS ATTIC 5'-6"5'-6"GIRDERGIRDERTRUSSES 24" O.C. TRUSSES 24" O.C.TRUSSES24" O.C.TRUSSES24" O.C.3'-0"38'35'BWL 8BWL 4BWL 10BWL 112'2'2'2'2'2'2'2'2'2'2'2'2'2'2'2' Voigt & Associates, Inc.C-1Structural Engineering Services 4635 Nicols Road, Suite 204Eagan, MN 55122MethodCS-WSPWind speed 115Exposure C BWL 1 2 3 4 5 6 7 8 9 10 11Spacing - ft 15 20 20 20 35 35 35 35 35 38 38Level 3 2 2 2 2 2 2 1 1 1 1Length req'd- ft 7 6.5 6.5 6.5 10.3 10.3 10.3 5.3 5.3 5.7 5.7per Table R602.10.3(1)Adjustments:Exposure 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3Eave to ridge Height 1.02 1.03 1.03 1.03 1.03 1.03 1.03 1.06 1.06 1.06 1.06Wall Height 0.9 0.95 0.95 0.95 0.95 0.95 0.95 0.9 0.9 0.9 0.9# of BWL 1 1.3 1.3 1.3 1.3 1.3 1.3 1 1 1 14" Gyp WB w.block joints1 1 1 1 1 0.7 1 1 1 1 1Adjusted Length 8.4 10.7 10.7 10.7 17.0 11.9 17.0 6.6 6.6 7.17.1Berres Ridge Model #1219818 Henning Avenue, Lakeville, MNSheet Stone Cottage HVAC Load Calculations for Stone Cottage 19818 Henning Ave Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Wednesday, August 16, 2023 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Monday, August 14, 2023 Client Name:Stone Cottage Client Address:19818 Henning Ave Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces West Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,308 CFM Per Square ft.:0.350 Square ft. of Room Area:3,740 Square ft. Per Ton:1,287 Volume (ft³) of Cond. Space:33,660 Building Loads Total Heating Required Including Ventilation Air:52,084 Btuh 52.084 MBH Total Sensible Gain:28,263 Btuh 81 % Total Latent Gain:6,616 Btuh 19 % Total Cooling Required Including Ventilation Air:34,879 Btuh 2.91 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Miscellaneous Report System 1 Whole House Input Data Outdoor Dry Bulb Outdoor Wet Bulb Outdoor Rel.Hum Indoor Rel.Hum Indoor Dry Bulb Grains Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29.27 Duct Sizing Inputs Main Trunk Runouts Calculate:Yes Yes Use Schedule:No No Roughness Factor:0.00300 0.01000 Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft. Minimum Velocity:650 ft./min 450 ft./min Maximum Velocity:900 ft./min 750 ft./min Minimum Height:8 in.6 in. Maximum Height:10 in.6 in. Outside Air Data Winter Summer Infiltration Specified:0.250 AC/hr 0.130 AC/hr 96 CFM 50 CFM Infiltration Actual:0.250 AC/hr 0.130 AC/hr Above Grade Volume:Cu.ft.Cu.ft.X 23,058 X 23,058 5,765 Cu.ft./hr 2,998 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration:96 CFM 50 CFM Total Building Ventilation:140 CFM 70 CFM ---System 1--- Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference) Winter Infiltration Specified:0.250 AC/hr (96 CFM), Construction: Unknown Summer Infiltration Specified:0.130 AC/hr (50 CFM), Construction: Unknown C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.91 1,287 3,740 28,263 6,616 34,879 52,084 990 1,308 1,308 System 1 Yes 2.91 1,287 3,740 28,263 6,616 34,879 52,084 990 1,308 1,308 24x10 Ventilation 340 1,352 1,692 4,550 Zone 1 3,740 27,923 5,264 33,187 47,534 990 1,308 1,308 24x10 1-Main Level 1,178 12,223 1,882 14,105 18,747 390 573 573 7--6 2-Upper Level 1,384 14,240 2,482 16,722 20,469 426 667 667 8--6 3-Lower Level 1,178 1,460 900 2,360 8,318 173 68 68 1--6 C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Duct Size Preview Room or Duct Name Minimum Velocity Maximum Velocity Rough. Factor Design L/100 Actual L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size System 1 Supply Runouts Zone 1 1-Main Level 450 750 0 0.1 0.1 416.6 390 573 573 7--6 2-Upper Level 450 750 0 0.1 0.1 424.7 426 667 667 8--6 3-Lower Level 450 750 0 0.1 0.1 348.4 173 68 68 1--6 Other Ducts Supply Main Trunk 650 900 0 0.1 0.1 784.9 990 1,308 1,308 24x10 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:990 Cooling Flow:1308 C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 - Whole House - Adequate Exposure Diversity Test Test For Adequate Exposure Diversity Average Glass Sensible Gain Over 12 Hours 1.3 x Average Glass Gain Hourly Glass Gain Hourly Total Net GainHeat Gain, Btuh20.9% Diff. from Avg. 0 10,000 20,000 30,000 40,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm AED Calculation Summary --- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 20.9%. AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 System 1 - Whole House - Psychrometric Chart ZC Zone (Room) Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain HRV Heat Recovery Ventilator C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 522 14,531 0 14,630 14,630 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2136 12,079 0 1,848 1,848 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1350 5,756 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1384 2,408 0 1,329 1,329 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1178 2,562 0 0 0 Subtotals for structure:38,614 0 18,159 18,159 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 96, Summer CFM: 50 8,920 964 694 1,658 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 Total Building Load Totals:52,084 6,616 28,263 34,879 Check Figures Total Building Supply CFM:1,308 CFM Per Square ft.:0.350 Square ft. of Room Area:3,740 Square ft. Per Ton:1,287 Volume (ft³) of Cond. Space:33,660 Building Loads Total Heating Required Including Ventilation Air:52,084 Btuh 52.084 MBH Total Sensible Gain:28,263 Btuh 81 % Total Latent Gain:6,616 Btuh 19 % Total Cooling Required Including Ventilation Air:34,879 Btuh 2.91 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Building Pie Chart Building Loss 52,084 Btuh Floor 5%Roof 5% Wall 34% Glass 28% Door 2% Infiltration 17% Ventilation 9% Building Gain 34,879 Btuh Roof 4%Wall 5% Glass 42% Door 1% People 11% Equipment 27% Infiltration 5%Ventilation 5% C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 Building Bar Graph Building Loss 52,084 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 34%Door 2%Ventilation 9% Roof 5%Glass 28%Infiltration 17% Building Gain 34,879 Btuh 0 5,000 10,000 15,000 Roof 4%Glass 42%People 11%Infiltration 5% Wall 5%Door 1%Equipment 27%Ventilation 5% C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 11 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 522 14,531 0 14,630 14,630 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2136 12,079 0 1,848 1,848 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1350 5,756 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1384 2,408 0 1,329 1,329 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1178 2,562 0 0 0 Subtotals for structure:38,614 0 18,159 18,159 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 96, Summer CFM: 50 8,920 964 694 1,658 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 System 1 Whole House Load Totals:52,084 6,616 28,263 34,879 Check Figures Supply CFM:1,308 CFM Per Square ft.:0.350 Square ft. of Room Area:3,740 Square ft. Per Ton:1,287 Volume (ft³) of Cond. Space:33,660 System Loads Total Heating Required Including Ventilation Air:52,084 Btuh 52.084 MBH Total Sensible Gain:28,263 Btuh 81 % Total Latent Gain:6,616 Btuh 19 % Total Cooling Required Including Ventilation Air:34,879 Btuh 2.91 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 12 System 1 Whole House Pie Chart System 1 Whole House Loss 52,084 Btuh Floor 5%Roof 5% Wall 34% Glass 28% Door 2% Infiltration 17% Ventilation 9% System 1 Whole House Gain 34,879 Btuh Roof 4%Wall 5% Glass 42% Door 1% People 11% Equipment 27% Infiltration 5%Ventilation 5% C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 13 System 1 Whole House Bar Graph System 1 Whole House Loss 52,084 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 34%Door 2%Ventilation 9% Roof 5%Glass 28%Infiltration 17% System 1 Whole House Gain 34,879 Btuh 0 5,000 10,000 15,000 Roof 4%Glass 42%People 11%Infiltration 5% Wall 5%Door 1%Equipment 27%Ventilation 5% C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 14 System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms) Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 522 14,531 0 14,630 14,630 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2136 12,079 0 1,848 1,848 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1350 5,756 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1384 2,408 0 1,329 1,329 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1178 2,562 0 0 0 Subtotals for structure:38,614 0 18,159 18,159 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 96, Summer CFM: 50 8,920 964 694 1,658 System 1, Zone 1 Load Totals:47,534 5,264 27,923 33,187 Check Figures Supply CFM:1,308 CFM Per Square ft.:0.350 Square ft. of Room Area:3,740 Square ft. Per Ton:1,352 Volume (ft³) of Cond. Space:33,660 Zone Loads Total Heating Required:47,534 Btuh 47.534 MBH Total Sensible Gain:27,923 Btuh 84 % Total Latent Gain:5,264 Btuh 16 % Total Cooling Required:33,187 Btuh 2.77 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 15 System 1, Zone 1 Pie Chart System 1, Zone 1 Loss 47,534 Btuh Floor 5% Roof 5% Wall 38% Glass 31% Door 3% Infiltration 19% System 1, Zone 1 Gain 33,187 Btuh Roof 4%Wall 6% Glass 44% Door 1% People 12% Equipment 29% Infiltration 5% C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 16 System 1, Zone 1 Bar Graph System 1, Zone 1 Loss 47,534 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 38%Door 3% Roof 5%Glass 31%Infiltration 19% System 1, Zone 1 Gain 33,187 Btuh 0 5,000 10,000 15,000 Roof 4%Glass 44%People 12%Infiltration 5% Wall 6%Door 1%Equipment 29% C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 17 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,178.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,178.0 sq.ft.Supply Air:573 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.2 AC/hr Volume:10,602.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:7 Actual Winter Vent.:55 CFM Runout Air:82 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:31 CFM Runout Air Velocity:417 ft./min.Percent of Supply:5 % Runout Air Velocity:417 ft./min.Actual Winter Infil.:48 CFM Actual Loss:0.109 in.wg./100 ft.Actual Summer Infil.:25 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-12F-0sw 37 X 9 247 0.065 5.7 1,397 0.9 0 214 W -Wall-12F-0sw 37 X 9 230 0.065 5.7 1,301 0.9 0 199 N -Wall-12F-0sw 38 X 9 280 0.065 5.7 1,583 0.9 0 242 S -Wall-12F-0sw 38 X 9 298 0.065 5.7 1,685 0.9 0 258 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 E -Gls-4A-1a-o shgc-0.33 0%S 86 0.320 27.8 2,394 35.0 0 3,010 W -Gls-4A-1a-o shgc-0.33 0%S 82 0.320 27.8 2,283 35.0 0 2,870 N -Gls-4A-1a-o shgc-0.33 100%S 41 0.320 27.8 1,141 10.4 0 427 S -Gls-4A-1a-o shgc-0.33 0%S 44 0.320 27.8 1,225 19.2 0 844 Subtotals for Structure:14,287 0 8,416 Infil.: Win.: 48.0, Sum.: 25.0 1,350 3.304 4,460 0.257 482 347 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 3,000 Room Totals:18,747 1,882 12,223 C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 18 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,384.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,384.0 sq.ft.Supply Air:667 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.2 AC/hr Volume:12,456.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:8 Actual Winter Vent.:60 CFM Runout Air:83 CFM Percent of Supply.:9 % Runout Duct Size:6 in.Actual Summer Vent.:36 CFM Runout Air Velocity:425 ft./min.Percent of Supply:5 % Runout Air Velocity:425 ft./min.Actual Winter Infil.:48 CFM Actual Loss:0.113 in.wg./100 ft.Actual Summer Infil.:25 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-12F-0sw 37 X 9 247 0.065 5.7 1,397 0.9 0 214 W -Wall-12F-0sw 37 X 9 248 0.065 5.7 1,402 0.9 0 214 N -Wall-12F-0sw 38 X 9 298 0.065 5.7 1,685 0.9 0 258 S -Wall-12F-0sw 38 X 9 288 0.065 5.7 1,629 0.9 0 249 E -Gls-4A-1a-o shgc-0.33 0%S 86 0.320 27.8 2,394 35.0 0 3,010 W -Gls-4A-1a-o shgc-0.33 0%S 85 0.320 27.8 2,366 35.0 0 2,975 N -Gls-4A-1a-o shgc-0.33 100%S 44 0.320 27.8 1,225 10.4 0 458 S -Gls-4A-1a-o shgc-0.33 0%S 54 0.320 27.8 1,503 19.2 0 1,036 UP-Ceil-16B-50 1384 X 1 1384 0.020 1.7 2,408 1.0 0 1,329 Subtotals for Structure:16,009 0 9,743 Infil.: Win.: 48.0, Sum.: 25.0 1,350 3.304 4,460 0.257 482 347 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:20,469 2,482 14,240 C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 19 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,178.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,178.0 sq.ft.Supply Air:68 CFM Ceiling Height:9.0 ft.Supply Air Changes:0.4 AC/hr Volume:10,602.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:1 Actual Winter Vent.:24 CFM Runout Air:68 CFM Percent of Supply.:36 % Runout Duct Size:6 in.Actual Summer Vent.:4 CFM Runout Air Velocity:348 ft./min.Percent of Supply:5 % Runout Air Velocity:348 ft./min.Actual Winter Infil.:0 CFM Actual Loss:0.077 in.wg./100 ft.Actual Summer Infil.:0 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-15B0-10sf-10 37 X 9 333 0.049 4.3 1,420 0.0 0 0 W -Wall-15B0-10sf-10 37 X 9 333 0.049 4.3 1,420 0.0 0 0 N -Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0 S -Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0 Floor-21A-24 1 X 1178 1178 0.025 2.2 2,562 0.0 0 0 Subtotals for Structure:8,318 0 0 Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:8,318 900 1,460 C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 20 Room Cooling and Heating Loads Bar Graphs Cooling Heating Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 25,000 C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 21 Room Cooling Loads Bar Graphs Sensible Latent Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 22 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,178 18,747 390 7-6 417 12,223 1,882 573 573 2 Upper Level 1,384 20,469 426 8-6 425 14,240 2,482 667 667 3 Lower Level 1,178 8,318 173 1-6 348 1,460 900 68 68 Ventilation 4,550 340 1,352 System 1 total 3,740 52,084 990 28,263 6,616 1,308 1,308 System 1 Main Trunk Size:24x10 in. Velocity:785 ft./min Loss per 100 ft.:0.086 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.91 81% / 19%28,263 6,616 34,879 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\19818 HENNING LAKEVILLE 08162023.rhv Wednesday, August 16, 2023, 11:03 AM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe:Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 28,263Residential Load Calculation SEER /EER Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Fiberglass, Batts Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply Mineral Fiberboard Insulation Location Foam, Closed Cell0.22 Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Non or Not ApplicableAttic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 52,084 Heating Gain Cooling Load Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville19818 Henning Ave BC636874 City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 34,879 Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 9/20/23 X PM