HomeMy WebLinkAbout20093 Glenbrook Path-SURVEYThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________10/05/2023asobottkaPlanning DepartmentApprovedDate:__________________10/06/2023kjenson