HomeMy WebLinkAbout17905 Greeley Place-SURVEYThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________09/27/2023asobottkaEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONPlanning DepartmentApprovedDate:__________________09/28/2023kjenson