HomeMy WebLinkAboutLA218936 - 8376 186th St W Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
_____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
NAME OF APPLICANT (Please Print)DATE
I HEREBY APPLY FOR PERMIT AND ACKNOWLEDGE THAT ALL INFORMATION ON THIS APPLICATION IS
COMPLETE AND ACCURATE. THIS IS NOT A PERMIT AND WORK IS NOT TO COMMENCE UNTIL SUCH TIME A
PERMIT IS ISSUED. ALL WORK WILL COMPLY WITH LAKEVILLE CITY CODE, THE MINNESOTA STATE BUILDING
CODE, AND THE APPROVED PLANS. INTEREST EARNINGS ON ESCROW ACCOUNTS, IF ANY, WILL BE RETAINED
BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW
APPLICATION AND REFUND.
OFFICE PHONE #:_
OFFICE PHONE #:_
*Entering your name affirms your intent to comply with the statement above.
*
Submit Application To: permits@lakevillemn.gov
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT
CONDO
REROOF
RESIDE
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES
LOWER LEVEL FINISH
ADDITION
FOUNDATION ONLY
MISCELLANEOUS
DEMO
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
CITY BUILDING VALUATION: $
BUILDING PERMIT FEES
$PERMIT FEE
$PLAN CHECK
$SURCHARGE
$METRO SAC
$CITY WATER HOOKUP UNIT
$CITY SEWER HOOKUP UNIT
$LANDSCAPE ESCROW
$TREE ESCROW
$MISC ESCROW
$PLUMBING
$MECHANICAL
$SEWER WATER
WATER METER
PRESSURE REDUCING VALVE
$OTHER
$TOTAL
METER SIZE
PRESSURE REDUCING VALVE
SEWER/WATER
SEWER/WATER
FINAL
STREET DRAINTILE
BUILDING INFORMATION
TYPE OF CONSTRUCTION
ZONING
CODE EDITION
FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
MECHANICAL
AIR TEST
FINAL
ROUGH-IN
PLUMBING
FINAL
ROUGH-IN
INSULATION
LATH
DECK FOOTING
FIREPLACE
FOOTING
FOUNDATION
FRAMING
PORCH FRAMING
PORCH FOOTING
POURED WALL
SITE
LOWER LEVEL FINAL
OTHER
DECK FRAMING
LOWER LEVEL FRAMING
LANDSCAPING
DECK FINAL
$
$
ACCESSORY BUILDING
EGRESS WINDOW
UNDERGROUND
Concept Approval ONLYSubject to Field Inspection
Inspector Date
2015
MN Bldg
Code
10/03/2023jnuetzman
Secure door closed until deck is
constructed with a separate permit.
CO
UFER Ground
-Provide 20' Rebar in footing and stub
up near electrical service panel.
FAN
CO
-Min. 15" clearance to any
obstruction from center of
W.C., 24" in front(typ).
Distinctive Design Build
HVAC Load Calculations
for
Distinctive Design Build
8376 186th St W
Lakeville,mn
Prepared By:
Randy Andrews
Lofgren Heating
5708 Upper 147th Street West
Apple Vallley, MN 55124
Monday, September 18, 2023
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Distinctive Design Build
Project Date:Monday, September 18, 2023
Client Name:Distinctive Design Build
Client Address:8376 186th St W
Client City:Lakeville,mn
Company Name:Lofgren Heating
Company Representative:Randy Andrews
Company Address:5708 Upper 147th Street West
Company City:Apple Vallley, MN 55124
Company E-Mail Address:rrandrews@lofgrenheating-ac.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces North
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,037 CFM Per Square ft.:0.337
Square ft. of Room Area:3,078 Square ft. Per Ton:1,338
Volume (ft³) of Cond. Space:27,702
Building Loads
Total Heating Required Including Ventilation Air:44,142 Btuh 44.142 MBH
Total Sensible Gain:22,572 Btuh 82 %
Total Latent Gain:5,039 Btuh 18 %
Total Cooling Required Including Ventilation Air:27,611 Btuh 2.30 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 3
Miscellaneous Report
System 1 Whole House
Input Data
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Outdoor
Rel.Hum
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29.27
Duct Sizing Inputs
Main Trunk Runouts
Calculate:Yes Yes
Use Schedule:No No
Roughness Factor:0.00300 0.01000
Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft.
Minimum Velocity:650 ft./min 450 ft./min
Maximum Velocity:900 ft./min 750 ft./min
Minimum Height:8 in.6 in.
Maximum Height:10 in.6 in.
Outside Air Data
Winter Summer
Infiltration Specified:0.250 AC/hr 0.130 AC/hr
78 CFM 41 CFM
Infiltration Actual:0.250 AC/hr 0.130 AC/hr
Above Grade Volume:Cu.ft.Cu.ft.X 18,820 X 18,820
4,705 Cu.ft./hr 2,447 Cu.ft./hr
X 0.0167 X 0.0167
Total Building Infiltration:78 CFM 41 CFM
Total Building Ventilation:140 CFM 70 CFM
---System 1---
Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference)
Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference)
Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference)
Winter Infiltration Specified:0.250 AC/hr (78 CFM), Construction: Unknown
Summer Infiltration Specified:0.130 AC/hr (41 CFM), Construction: Unknown
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 4
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.30 1,338 3,078 22,572 5,039 27,611 44,142 797 1,037 1,037
System 1 Yes 2.30 1,338 3,078 22,572 5,039 27,611 44,142 797 1,037 1,037 18x10
Ventilation 437 1,352 1,789 5,850
Zone 1 3,078 22,135 3,687 25,822 38,292 797 1,037 1,037 18x10
1-Upper Level 1,539 20,191 2,623 22,814 27,810 579 946 946 11--6
2-Lower Level 1,539 1,944 1,064 3,008 10,482 218 91 91 1--6
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 5
Duct Size Preview
Room or
Duct Name
Minimum
Velocity
Maximum
Velocity
Rough.
Factor
Design
L/100
Actual
L/100
SP
Loss
Duct
Velocity
Duct
Length Htg
Flow
Clg
Flow
Act.
Flow
Duct
Size
System 1
Supply Runouts
Zone 1
1-Upper Level 450 750 0 0.1 0.1 438 579 946 946 11--6
2-Lower Level 450 750 0 0.1 0.1 463.8 218 91 91 1--6
Other Ducts
Supply Main Trunk 650 900 0 0.1 0.1 829.6 797 1,037 1,037 18x10
SummarySummarySummarySummarySummarySummarySummarySummary
System 1
Heating Flow:797
Cooling Flow:1037
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 6
System 1 - Whole House - Adequate Exposure Diversity Test
Test For Adequate Exposure Diversity
Average Glass
Sensible Gain
Over 12 Hours
1.3 x Average
Glass Gain
Hourly Glass Gain Hourly Total Net
GainHeat Gain, Btuh22.2% Diff. from Avg.
0
10,000
20,000
30,000
40,000
8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm
AED Calculation Summary
--- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. ---
System is on N, E, S, W rosette.
Peak load exceeds 12-hour average load by 22.2%.
AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh
Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not
exceed the average glass load for the entire conditioned space by more than 30 percent.
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 7
System 1 - Whole House - Psychrometric Chart
ZC Zone (Room) Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain
HRV Heat Recovery Ventilator
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 8
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
418 11,636 0 10,777 10,777
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
1565 8,850 0 1,353 1,353
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
756 3,222 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1539 2,678 0 1,477 1,477
21A-24-c: Floor-Basement, Concrete slab, any thickness,
2 or more feet below grade, no insulation below floor,
carpet covering, shortest side of floor slab is 24' wide
1539 3,347 0 0 0
Subtotals for structure:31,011 0 13,959 13,959
People:7 1,400 1,610 3,010
Equipment:1,500 6,000 7,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 78, Summer CFM: 41 7,281 787 566 1,353
Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789
Total Building Load Totals:44,142 5,039 22,572 27,611
Check Figures
Total Building Supply CFM:1,037 CFM Per Square ft.:0.337
Square ft. of Room Area:3,078 Square ft. Per Ton:1,338
Volume (ft³) of Cond. Space:27,702
Building Loads
Total Heating Required Including Ventilation Air:44,142 Btuh 44.142 MBH
Total Sensible Gain:22,572 Btuh 82 %
Total Latent Gain:5,039 Btuh 18 %
Total Cooling Required Including Ventilation Air:27,611 Btuh 2.30 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 9
Building Pie Chart
Building
Loss
44,142
Btuh
Floor 8%
Roof 6%
Wall 27%
Glass 26%
Door 3%
Infiltration 16%
Ventilation 13%
Building
Gain
27,611
Btuh
Roof 5%
Wall 5%
Glass 39%
Door 1%People 11%
Equipment 27%
Infiltration 5%
Ventilation 6%
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 10
Building Bar Graph
Building
Loss
44,142
Btuh
0
5,000
10,000
15,000
Floor 8%Wall 27%Door 3%Ventilation 13%
Roof 6%Glass 26%Infiltration 16%
Building
Gain
27,611
Btuh
0
5,000
10,000
15,000
Roof 5%Glass 39%People 11%Infiltration 5%
Wall 5%Door 1%Equipment 27%Ventilation 6%
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 11
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
418 11,636 0 10,777 10,777
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
1565 8,850 0 1,353 1,353
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
756 3,222 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1539 2,678 0 1,477 1,477
21A-24-c: Floor-Basement, Concrete slab, any thickness,
2 or more feet below grade, no insulation below floor,
carpet covering, shortest side of floor slab is 24' wide
1539 3,347 0 0 0
Subtotals for structure:31,011 0 13,959 13,959
People:7 1,400 1,610 3,010
Equipment:1,500 6,000 7,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 78, Summer CFM: 41 7,281 787 566 1,353
Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789
System 1 Whole House Load Totals:44,142 5,039 22,572 27,611
Check Figures
Supply CFM:1,037 CFM Per Square ft.:0.337
Square ft. of Room Area:3,078 Square ft. Per Ton:1,338
Volume (ft³) of Cond. Space:27,702
System Loads
Total Heating Required Including Ventilation Air:44,142 Btuh 44.142 MBH
Total Sensible Gain:22,572 Btuh 82 %
Total Latent Gain:5,039 Btuh 18 %
Total Cooling Required Including Ventilation Air:27,611 Btuh 2.30 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 12
System 1 Whole House Pie Chart
System
1 Whole
House
Loss
44,142
Btuh
Floor 8%
Roof 6%
Wall 27%
Glass 26%
Door 3%
Infiltration 16%
Ventilation 13%
System
1 Whole
House
Gain
27,611
Btuh
Roof 5%
Wall 5%
Glass 39%
Door 1%People 11%
Equipment 27%
Infiltration 5%
Ventilation 6%
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 13
System 1 Whole House Bar Graph
System
1 Whole
House
Loss
44,142
Btuh
0
5,000
10,000
15,000
Floor 8%Wall 27%Door 3%Ventilation 13%
Roof 6%Glass 26%Infiltration 16%
System
1 Whole
House
Gain
27,611
Btuh
0
5,000
10,000
15,000
Roof 5%Glass 39%People 11%Infiltration 5%
Wall 5%Door 1%Equipment 27%Ventilation 6%
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 14
System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms)
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
418 11,636 0 10,777 10,777
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
1565 8,850 0 1,353 1,353
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
756 3,222 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1539 2,678 0 1,477 1,477
21A-24-c: Floor-Basement, Concrete slab, any thickness,
2 or more feet below grade, no insulation below floor,
carpet covering, shortest side of floor slab is 24' wide
1539 3,347 0 0 0
Subtotals for structure:31,011 0 13,959 13,959
People:7 1,400 1,610 3,010
Equipment:1,500 6,000 7,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 78, Summer CFM: 41 7,281 787 566 1,353
System 1, Zone 1 Load Totals:38,292 3,687 22,135 25,822
Check Figures
Supply CFM:1,037 CFM Per Square ft.:0.337
Square ft. of Room Area:3,078 Square ft. Per Ton:1,430
Volume (ft³) of Cond. Space:27,702
Zone Loads
Total Heating Required:38,292 Btuh 38.292 MBH
Total Sensible Gain:22,135 Btuh 86 %
Total Latent Gain:3,687 Btuh 14 %
Total Cooling Required:25,822 Btuh 2.15 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 15
System 1, Zone 1 Pie Chart
System
1, Zone
1
Loss
38,292
Btuh
Floor 9%
Roof 7%
Wall 32%
Glass 30%
Door 3%
Infiltration 19%
System
1, Zone
1
Gain
25,822
Btuh
Roof 6%
Wall 5%
Glass 42%
Door 1%
People 12%
Equipment 29%
Infiltration 5%
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 16
System 1, Zone 1 Bar Graph
System
1, Zone
1
Loss
38,292
Btuh
0
5,000
10,000
15,000
Floor 9%Wall 32%Door 3%
Roof 7%Glass 30%Infiltration 19%
System
1, Zone
1
Gain
25,822
Btuh
0
5,000
10,000
15,000
Roof 6%Glass 42%People 12%Infiltration 5%
Wall 5%Door 1%Equipment 29%
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 17
Detailed Room Loads - Room 1 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,539.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,539.0 sq.ft.Supply Air:946 CFM
Ceiling Height:9.0 ft.Supply Air Changes:4.1 AC/hr
Volume:13,851.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:11 Actual Winter Vent.:102 CFM
Runout Air:86 CFM Percent of Supply.:11 %
Runout Duct Size:6 in.Actual Summer Vent.:64 CFM
Runout Air Velocity:438 ft./min.Percent of Supply:7 %
Runout Air Velocity:438 ft./min.Actual Winter Infil.:62 CFM
Actual Loss:0.120 in.wg./100 ft.Actual Summer Infil.:32 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0sw 47 X 9 295 0.065 5.7 1,668 0.9 0 255
S -Wall-12F-0sw 47 X 9 313 0.065 5.7 1,770 0.9 0 271
E -Wall-12F-0sw 42 X 9 272 0.065 5.7 1,538 0.9 0 235
W -Wall-12F-0sw 42 X 9 262 0.065 5.7 1,482 0.9 0 226
N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
N -Gls-4A-1a-o shgc-0.33 100%S 86 0.320 27.8 2,394 10.4 0 895
S -Gls-4A-1a-o shgc-0.33 0%S 110 0.320 27.8 3,062 19.2 0 2,110
E -Gls-4A-1a-o shgc-0.33 0%S 106 0.320 27.8 2,951 35.0 0 3,711
W -Gls-4A-1a-o shgc-0.33 0%S 116 0.320 27.8 3,229 35.0 0 4,061
UP-Ceil-16B-50 1539 X 1 1539 0.020 1.7 2,678 1.0 0 1,477
Subtotals for Structure:22,050 0 13,593
Infil.: Win.: 62.0, Sum.: 32.3 1,602 3.596 5,760 0.280 623 448
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 5,000
Room Totals:27,810 2,623 20,191
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 18
Detailed Room Loads - Room 2 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,539.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,539.0 sq.ft.Supply Air:91 CFM
Ceiling Height:9.0 ft.Supply Air Changes:0.4 AC/hr
Volume:13,851.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:1 Actual Winter Vent.:38 CFM
Runout Air:91 CFM Percent of Supply.:42 %
Runout Duct Size:6 in.Actual Summer Vent.:6 CFM
Runout Air Velocity:464 ft./min.Percent of Supply:7 %
Runout Air Velocity:464 ft./min.Actual Winter Infil.:16 CFM
Actual Loss:0.134 in.wg./100 ft.Actual Summer Infil.:9 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0sw 47 X 9 423 0.065 5.7 2,392 0.9 0 366
E -Wall-15B0-10sf-10 42 X 9 378 0.049 4.3 1,611 0.0 0 0
W -Wall-15B0-10sf-10 42 X 9 378 0.049 4.3 1,611 0.0 0 0
Floor-21A-24 1 X 1539 1539 0.025 2.2 3,347 0.0 0 0
Subtotals for Structure:8,961 0 366
Infil.: Win.: 16.4, Sum.: 8.5 423 3.596 1,521 0.279 164 118
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:500 1,000
Room Totals:10,482 1,064 1,944
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 19
Room Cooling and Heating Loads Bar Graphs
Cooling
Heating
Btuh
Lower Level
Upper Level
0 5,000 10,000 15,000 20,000 25,000 30,000
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 20
Room Cooling Loads Bar Graphs
Sensible
Latent
Btuh
Lower Level
Upper Level
0 5,000 10,000 15,000 20,000 25,000
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Distinctive Design Build
Farmington, MN 55024 Page 21
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Upper Level 1,539 27,810 579 11-6 438 20,191 2,623 946 946
2 Lower Level 1,539 10,482 218 1-6 464 1,944 1,064 91 91
Ventilation 5,850 437 1,352
System 1 total 3,078 44,142 797 22,572 5,039 1,037 1,037
System 1 Main Trunk Size:18x10 in.
Velocity:830 ft./min
Loss per 100 ft.:0.108 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.30 82% / 18%22,572 5,039 27,611
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\8376 186TH ST LAKEVILLE 09182023.rhv Monday, September 18, 2023, 11:55 AM
Passive (No Fan)
Active (With fan and monitoring
device )
Location (or future location) of Fan:
Other Please Describe Here
Not applicable, all ducts located in conditioned space
Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:
Input in
BTUS:
Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
Passive
Low: Other, describe:
Low:
Location of fan(s), describe: Cfm's
" round duct OR
" metal duct
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution
panel.
New Construction Energy Code Compliance Certificate
Name of Residential Contractor MN License Number
City Mailing Address of the Dwelling or Dwelling Unit
Rigid, Extruded PolystyreneHeat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
Combustion Air Select a Type
Location of duct or system:
Rim Joist (2nd Floor+)
Building envelope air tightness:
Below Entire Slab
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
THERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Total R-Value of all Types of InsulationType: Check All That Apply
Mineral FiberboardInsulation Location Foam, Closed Cell Describe other insulated areas
Ceiling, flat Non or Not ApplicableFiberglass, BlownFiberglass, Batts Foundation Wall
Output
in Tons:
Appliances Cooling System
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Make-up Air Select a Type
Domestic Water
Heater
Model
Heating System
Rim Joist (1st Floor)
Average U-Factor (excludes skylights and one door ) U:
Duct system air tightness:
Rating or Size
Efficiency
Heating Gain Cooling Load
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
Residential Load
Calculation
SEER
/EER
Capacity continuous ventilation rate in cfms:
Heating Loss
Manufacturer
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Date Cert. Posted
R-value
MECHANICAL SYSTEMS
Builders Associaton of Minnesota version 101014
9/27/23 X
PM