Loading...
HomeMy WebLinkAbout18693 Hamel Drive-SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________09/19/2023 asobottka Planning DepartmentApprovedDate:__________________09/20/2023 dmorey