Loading...
HomeMy WebLinkAbout17073-81 Dysart Pl SurveyA. 9/13/23: ClientDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes found scribed "x"Denotes set hubDenotes found hubDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationDenotes as-built elevationSURVEYOR'S CERTIFICATEI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 6th day of February, 2023Marcus F. Hampton, MN L.S. No. 47481PROPERTY DESCRIPTION17081, 17079, 17077, 17075 and 17073 Dysart Place, Lakeville, MinnesotaPROPERTY ADDRESS1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/or developmentplan prepared by Westwood Professional Services, Inc.6.Grading plan date/revision date: June 5, 20237.Plan No.'s 2640-L, 2645-M, 2645-N, 2645-M and 2640-LNOTESFLOOR ELEVATIONSBENCHMARKLot 20Lots 21-23Lot 24ProposedProposedProposedGarage Floor @ Front= 938.7= 939.7= 940.7Garage Top of Block= 939.1= 940.1= 941.1House Top of Block= 939.1= 940.1= 941.1Lowest Floor= 939.1= 940.1= 941.1Top nut of hydrant located at Lots 24 and 25, Block 1 = 941.55Lots 20, 21, 22, 23 and 24, Block 1, BROOKSHIRE, Dakota County, MinnesotaThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________09/18/2023asobottkaPlanning DepartmentApprovedDate:__________________09/28/2023dmorey