HomeMy WebLinkAboutLA219598-19515 Harbor Dr Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
_____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
NAME OF APPLICANT (Please Print)DATE
I HEREBY APPLY FOR PERMIT AND ACKNOWLEDGE THAT ALL INFORMATION ON THIS
APPLICATION IS COMPLETE AND ACCURATE. THIS IS NOT A PERMIT AND WORK IS NOT TO
COMMENCE UNTIL SUCH TIME A PERMIT IS ISSUED. ALL WORK WILL COMPLY WITH
LAKEVILLE CITY CODE, THE MINNESOTA STATE BUILDING CODE, AND THE APPROVED
PLANS. INTEREST EARNINGS ON ESCROW ACCOUNTS, IF ANY, WILL BE RETAINED BY THE
CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE
ESCROW APPLICATION AND REFUND.
OFFICE PHONE #:_
OFFICE PHONE #:_
*Entering your name affirms your intent to comply with the statement above.
*
Submit Application To: permits@lakevillemn.gov
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT
CONDO
REROOF
RESIDE
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES
LOWER LEVEL FINISH
ADDITION
FOUNDATION ONLY
MISCELLANEOUS
DEMO
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
CITY BUILDING VALUATION: $
BUILDING PERMIT FEES
$PERMIT FEE
$PLAN CHECK
$SURCHARGE
$METRO SAC
$CITY WATER HOOKUP UNIT
$CITY SEWER HOOKUP UNIT
$LANDSCAPE ESCROW
$TREE ESCROW
$MISC ESCROW
$PLUMBING
$MECHANICAL
$SEWER WATER
WATER METER
PRESSURE REDUCING VALVE
$OTHER
$TOTAL
METER SIZE
PRESSURE REDUCING VALVE
SEWER/WATER
SEWER/WATER
FINAL
STREET DRAINTILE
BUILDING INFORMATION
TYPE OF CONSTRUCTION
ZONING
CODE EDITION
FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
MECHANICAL
AIR TEST
FINAL
ROUGH-IN
PLUMBING
FINAL
ROUGH-IN
INSULATION
LATH
DECK FOOTING
FIREPLACE
FOOTING
FOUNDATION
FRAMING
PORCH FRAMING
PORCH FOOTING
POURED WALL
SITE
LOWER LEVEL FINAL
OTHER
DECK FRAMING
LOWER LEVEL FRAMING
LANDSCAPING
DECK FINAL
$
$
ACCESSORY BUILDING
EGRESS WINDOW
UNDERGROUND
Concept Approval ONLY
Subject to Field Inspection
Inspector Date
2020
MN Bldg
Code
11/02/2023dmathews
Smoke
Smoke
CO
UFER Ground
-Provide 20' Rebar in footing and stub
up near electrical service panel.
-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).
FAN
-Top and bottom wall connections and
blocking required along all shear/braced
walls indicated.
5/8" GYP BD, ONE SIDE 4" OC 12" OC#6 X 1 1/4" SCREW
SPACINGWALL
DESCRIPTION EDGE FIELD
FASTENER
SIZE
FASTENING
(Cont.)
B24 (2) - 9-1/2" LVL
(Cont.)
23" diameter footing
for roof and floor loads
-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).
FAN
Loads exceed crushing
limits of standard SPF top
plates, remove plates and
support beams directly on
built column.
BWPs
Above
BWPs
Above
-Top and bottom wall connections and
blocking required along all shear/braced
walls indicated.
5/8" GYP BD, ONE SIDE 4" OC 12" OC#6 X 1 1/4" SCREW
SPACINGWALL
DESCRIPTION EDGE FIELD
FASTENER
SIZE
FASTENING
B10 (4) - 24" LVL FlushB10-Copy1 (1) - W12X58(A992) ASTM Steel Flushor(Cont.)(Cont.)(Cont.)
(Cont.)
FAN
FAN
Smoke
Smoke
Smoke
Smoke
CO
Smoke
-Min. 15" clearance to anyobstruction from center of
W.C., 24" in front(typ).
Verify loads with girder
truss specs, may require
removal of top plates at
bearing due to crushing.
-Top and bottom wall connections and
blocking required along all shear/braced
walls indicated.
5/8" GYP BD, ONE SIDE 4" OC 12" OC#6 X 1 1/4" SCREW
SPACINGWALL
DESCRIPTION EDGE FIELD
FASTENER
SIZE
FASTENING
(Cont.)
Prepared by:
Leonetti Wall Bracing Plan
Chris Timm, PE
Michael A. DeSutter
57193 2023-09-18
E-mail : christimm2688@gmail.com
Cell : 605-929-2456
Christopher M. Timm
2023-10-05
Page No
Job
Comm. No.
Date
Name
Leonetti Wall Bracing Plan
9-18-23
CMT
2020
SOLID BLUE WALLS INDICATE
STRUCTURAL SHEAR WALLS
5/8" GYP BD, ONE SIDE 4" OC 12" OC#6 X 1 1/4" SCREW
MARK SPACINGWALL
DESCRIPTION EDGE FIELD
FASTENER
SIZE
FASTENING
WALL BRACING PLAN
Per the requirements of Chapter 6 of the 2020
Minnesota Residential Building Code, the
residence was designed for wind loads generated
from ASCE 7-15, with all applicable Minnesota
Building Code load combinations. The critical load
combinations for wind loads on the shear walls
included checks for uplift forces and sheathing
capacity.
10-05-2023
DESIGN COMMENT: THE GARAGE DOORS EXTERIOR WALL IS TREATED AS A OPEN FRONT
STRUCTURE. PER THE NDS SDPWS THE SHEARWALLS WERE DESIGNED AS CANTILEVERED
3 SIDED DIAPPHRAGM
Page No
Job
Comm. No.
Date
Name
Leonetti Wall Bracing Plan
9-18-23
CMT
2020
SOLID BLUE WALLS INDICATE
STRUCTURAL SHEAR WALLS
5/8" GYP BD, ONE SIDE 4" OC 12" OC#6 X 1 1/4" SCREW
MARK SPACINGWALL
DESCRIPTION EDGE FIELD
FASTENER
SIZE
FASTENING
WALL BRACING PLAN
Per the requirements of Chapter 6 of the 2020
Minnesota Residential Building Code, the
residence was designed for wind loads generated
from ASCE 7-15, with all applicable Minnesota
Building Code load combinations. The critical load
combinations for wind loads on the shear walls
included checks for uplift forces and sheathing
capacity.
10-05-2023
Page No
Job
Comm. No.
Date
Name
Leonetti Wall Bracing Plan
9-18-23
CMT
SHEAR WALL
FLOOR TRUSSFLOOR TRUSS
FLOOR SHEATHING
SHEAR WALL
TYPE AND LOCATION INDICATED
ON PLAN. SEE SHEAR WALL SCHED
ON SHEET S620 FOR SHEATHING
SEE SHEAR WALL SCHED
FOR TOP AND BOTTOM
PL CONN REQUIREMENTS
2X NAILER
(TYP)
ALIGN TRUSS W/
SHEAR WALL ABOVE
(TYP)
NO WALL BELOW
@ SIM
SHEATHING NOT REQ'D
AT TRUSS @ SIM
WALL BRACING
TYPICAL DETAILS
16d NAILS @ 12" OC
SIM FOR TRUSS BRG DIRECTION
WITH LADDER TRUSS BETWEEN
BRG END TRUSSES
10-05-2023
Page No
Job
Comm. No.
Date
Name
Leonetti Wall Bracing Plan
9-18-23
CMT
2X WALL
(SEE PLAN / SCHED)
ROOF TRUSS
(SEE PLAN)
CONNECTION AT TRUSS ALIGNING WITH SHEAR WALL
CONNECTION AT TRUSS NOT ALIGNING WITH SHEAR WALL
2 X 6 BLOCKING @
#'-#" W/ 2 -16d NAILS
TO EACH WALL
3 -16d NAILING
BLOCKING TO TRUSS
ROOF TRUSS
(SEE PLAN)
2X WALL
(SEE PLAN / SCHED)
DBL TOP PLATE
DBL TOP PLATE
TRUSS FASTENING
TO SHEAR WALL
(SEE SCHED)
WALL BRACING
TYPICAL DETAILS
FASTEN W/ SIMPSON A35 @ 4'-0" OC
4'-0"
10-05-2023
[][][||][|||][[[][][][][]
[]
[]
[]][
[][[]
||][|[B23 (2) - 2x10B24 (2) - 9-1/2" LVL
B25 (2) - 2x10 Flush
This doesn't line up
with bearing above.
Why is this bearing
wall here?
Footing needed hereB26 (2) - 2x10B27 (2) - 2x10
B28 (2) - 9-1/2" LVL B34 (2) - 2x10 Flush
B29 (2) - 9-1/2" LVL
[
B30 (3) - 9-1/2" LVL Cont.
2 Trimmers
B31 (2) - 9-1/2" LVL
2 Trimmers
B32 (2) - 2x10
2 Trimmers
[[B33 (2) - 2x10B35 (2) - 2x12 Cont. TRTDB34 (2) - 2x12 Cont. TRTD
Floor Trussesby Others|||||[][||][][][][[[][]
[]
[]
[][][[[[||[]
B1 (3) - 9-1/2" LVL Cont.B2 (3) - 9-1/2" LVL Cont.B3 (2) - 9-1/2" LVL
B4 (2) - 2x10H12 (3) - 2x10
Clear Span
H13 (2) - 2x10 Cont.B5 (2) - 11-7/8" LVL Flush
B6 (2) - 2x10
2 TrimmersB7 (2) - 9-1/2" LVLB8 (2) - 2x10H14 (2) - 2x10B9 (2) - 11-7/8" LVL Flush
C1 5x7 PSL
C2 5x5 PSL
B11 (2) - 11-7/8" LVL FlushB12 (2) - 20" LVL FlushB10 (4) - 24" LVL FlushNeeds to be 2x8 wall.
H15 (2) - 2x12
B13 (3) - 16" LVL
4 Trimmers
4 - 2x6 H16 (2) - 2x12
H17 (2) - 2x10 Cont.
B14 (2) - 11-7/8" LVL Flush
B15 (2) - 2x10
B16 (2) - 9-1/2" LVL B17 (2) - 2x10B18 (2) - 2x10(2) - 2x10B19 (2) - 2x10B20 (2) - 2x10 FlushB21 (2) - 2x10 Flush
B22 (2) - 2x10
5x5 PSL
orB10-Copy1 (1) - W12X58(A992) ASTM Steel Flush
H1 (2) - 9-1/2" LVL
H2 (2) - 2x10 Cont.
H3 (2) - 2x10H4 (2) - 2x10
(2) - 2x10H5 (2) - 2x10H6 (2) - 2x10 H6 (2) - 2x10
H7 (2) - 2x10
H8 (2) - 2x10
H9 (2) - 9-1/2" LVL H10 (2) - 2x10H11 (2) - 2x10H11 (2) - 2x10H18 (2) - 2x10
G1
4-2x6
4-2x6
Stone Cottage
HVAC Load Calculations
for
Stone Cottage
19515 Harbor Dr
Lakeville,mn
Prepared By:
Randy Andrews
Lofgren Heating
5708 Upper 147th Street West
Apple Vallley, MN 55124
Monday, September 25, 2023
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Stone Cottage
Project Date:Monday, September 25, 2023
Client Name:Stone Cottage
Client Address:19515 Harbor Dr
Client City:Lakeville,mn
Company Name:Lofgren Heating
Company Representative:Randy Andrews
Company Address:5708 Upper 147th Street West
Company City:Apple Vallley, MN 55124
Company E-Mail Address:rrandrews@lofgrenheating-ac.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces East
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,490 CFM Per Square ft.:0.327
Square ft. of Room Area:4,557 Square ft. Per Ton:1,402
Volume (ft³) of Cond. Space:41,013
Building Loads
Total Heating Required Including Ventilation Air:59,307 Btuh 59.307 MBH
Total Sensible Gain:32,150 Btuh 82 %
Total Latent Gain:6,847 Btuh 18 %
Total Cooling Required Including Ventilation Air:38,997 Btuh 3.25 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 3
Miscellaneous Report
System 1 Whole House
Input Data
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Outdoor
Rel.Hum
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29.27
Duct Sizing Inputs
Main Trunk Runouts
Calculate:Yes Yes
Use Schedule:No No
Roughness Factor:0.00300 0.01000
Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft.
Minimum Velocity:650 ft./min 450 ft./min
Maximum Velocity:900 ft./min 750 ft./min
Minimum Height:8 in.6 in.
Maximum Height:10 in.6 in.
Outside Air Data
Winter Summer
Infiltration Specified:0.250 AC/hr 0.130 AC/hr
119 CFM 62 CFM
Infiltration Actual:0.250 AC/hr 0.130 AC/hr
Above Grade Volume:Cu.ft.Cu.ft.X 28,557 X 28,557
7,139 Cu.ft./hr 3,712 Cu.ft./hr
X 0.0167 X 0.0167
Total Building Infiltration:119 CFM 62 CFM
Total Building Ventilation:140 CFM 70 CFM
---System 1---
Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference)
Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference)
Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference)
Winter Infiltration Specified:0.250 AC/hr (119 CFM), Construction: Unknown
Summer Infiltration Specified:0.130 AC/hr (62 CFM), Construction: Unknown
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 4
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 3.25 1,402 4,557 32,150 6,847 38,997 59,307 1,140 1,490 1,490
System 1 Yes 3.25 1,402 4,557 32,150 6,847 38,997 59,307 1,140 1,490 1,490 26x10
Ventilation 340 1,352 1,692 4,550
Zone 1 4,557 31,810 5,495 37,305 54,757 1,140 1,490 1,490 26x10
1-Main Level 1,384 14,990 1,952 16,942 22,362 466 702 702 8--6
2-Upper Level 1,789 15,360 2,643 18,003 24,703 514 720 720 8--6
3-Lower Level 1,384 1,460 900 2,360 7,692 160 68 68 1--6
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 5
Duct Size Preview
Room or
Duct Name
Minimum
Velocity
Maximum
Velocity
Rough.
Factor
Design
L/100
Actual
L/100
SP
Loss
Duct
Velocity
Duct
Length Htg
Flow
Clg
Flow
Act.
Flow
Duct
Size
System 1
Supply Runouts
Zone 1
1-Main Level 450 750 0 0.1 0.1 447.1 466 702 702 8--6
2-Upper Level 450 750 0 0.1 0.1 458.1 514 720 720 8--6
3-Lower Level 450 750 0 0.1 0.1 348.4 160 68 68 1--6
Other Ducts
Supply Main Trunk 650 900 0 0.1 0.1 825.4 1,140 1,490 1,490 26x10
SummarySummarySummarySummarySummarySummarySummarySummary
System 1
Heating Flow:1140
Cooling Flow:1490
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 6
System 1 - Whole House - Adequate Exposure Diversity Test
Test For Adequate Exposure Diversity
Average Glass
Sensible Gain
Over 12 Hours
1.3 x Average
Glass Gain
Hourly Glass Gain Hourly Total Net
GainHeat Gain, Btuh17.8% Diff. from Avg.
0
10,000
20,000
30,000
40,000
50,000
8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm
AED Calculation Summary
--- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. ---
System is on N, E, S, W rosette.
Peak load exceeds 12-hour average load by 17.8%.
AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh
Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not
exceed the average glass load for the entire conditioned space by more than 30 percent.
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 7
System 1 - Whole House - Psychrometric Chart
ZC Zone (Room) Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain
HRV Heat Recovery Ventilator
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 8
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
592 16,481 0 17,497 17,497
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2678 15,145 0 2,315 2,315
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1098 4,682 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1789 3,113 0 1,717 1,717
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1384 3,010 0 0 0
Subtotals for structure:43,709 0 21,881 21,881
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 119, Summer CFM: 62 11,048 1,195 859 2,054
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
Total Building Load Totals:59,307 6,847 32,150 38,997
Check Figures
Total Building Supply CFM:1,490 CFM Per Square ft.:0.327
Square ft. of Room Area:4,557 Square ft. Per Ton:1,402
Volume (ft³) of Cond. Space:41,013
Building Loads
Total Heating Required Including Ventilation Air:59,307 Btuh 59.307 MBH
Total Sensible Gain:32,150 Btuh 82 %
Total Latent Gain:6,847 Btuh 18 %
Total Cooling Required Including Ventilation Air:38,997 Btuh 3.25 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 9
Building Pie Chart
Building
Loss
59,307
Btuh
Floor 5%
Roof 5%
Wall 33%
Glass 28%
Door 2%
Infiltration 19%
Ventilation 8%
Building
Gain
38,997
Btuh
Roof 4%Wall 6%
Glass 45%
Door 1%
People 10%
Equipment 24%
Infiltration 5%Ventilation 4%
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 10
Building Bar Graph
Building
Loss
59,307
Btuh
0
5,000
10,000
15,000
20,000
Floor 5%Wall 33%Door 2%Ventilation 8%
Roof 5%Glass 28%Infiltration 19%
Building
Gain
38,997
Btuh
0
5,000
10,000
15,000
20,000
Roof 4%Glass 45%People 10%Infiltration 5%
Wall 6%Door 1%Equipment 24%Ventilation 4%
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 11
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
592 16,481 0 17,497 17,497
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2678 15,145 0 2,315 2,315
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1098 4,682 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1789 3,113 0 1,717 1,717
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1384 3,010 0 0 0
Subtotals for structure:43,709 0 21,881 21,881
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 119, Summer CFM: 62 11,048 1,195 859 2,054
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
System 1 Whole House Load Totals:59,307 6,847 32,150 38,997
Check Figures
Supply CFM:1,490 CFM Per Square ft.:0.327
Square ft. of Room Area:4,557 Square ft. Per Ton:1,402
Volume (ft³) of Cond. Space:41,013
System Loads
Total Heating Required Including Ventilation Air:59,307 Btuh 59.307 MBH
Total Sensible Gain:32,150 Btuh 82 %
Total Latent Gain:6,847 Btuh 18 %
Total Cooling Required Including Ventilation Air:38,997 Btuh 3.25 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 12
System 1 Whole House Pie Chart
System
1 Whole
House
Loss
59,307
Btuh
Floor 5%
Roof 5%
Wall 33%
Glass 28%
Door 2%
Infiltration 19%
Ventilation 8%
System
1 Whole
House
Gain
38,997
Btuh
Roof 4%Wall 6%
Glass 45%
Door 1%
People 10%
Equipment 24%
Infiltration 5%Ventilation 4%
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 13
System 1 Whole House Bar Graph
System
1 Whole
House
Loss
59,307
Btuh
0
5,000
10,000
15,000
20,000
Floor 5%Wall 33%Door 2%Ventilation 8%
Roof 5%Glass 28%Infiltration 19%
System
1 Whole
House
Gain
38,997
Btuh
0
5,000
10,000
15,000
20,000
Roof 4%Glass 45%People 10%Infiltration 5%
Wall 6%Door 1%Equipment 24%Ventilation 4%
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 14
System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms)
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
592 16,481 0 17,497 17,497
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2678 15,145 0 2,315 2,315
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1098 4,682 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1789 3,113 0 1,717 1,717
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1384 3,010 0 0 0
Subtotals for structure:43,709 0 21,881 21,881
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 119, Summer CFM: 62 11,048 1,195 859 2,054
System 1, Zone 1 Load Totals:54,757 5,495 31,810 37,305
Check Figures
Supply CFM:1,490 CFM Per Square ft.:0.327
Square ft. of Room Area:4,557 Square ft. Per Ton:1,466
Volume (ft³) of Cond. Space:41,013
Zone Loads
Total Heating Required:54,757 Btuh 54.757 MBH
Total Sensible Gain:31,810 Btuh 85 %
Total Latent Gain:5,495 Btuh 15 %
Total Cooling Required:37,305 Btuh 3.11 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 15
System 1, Zone 1 Pie Chart
System
1, Zone
1
Loss
54,757
Btuh
Floor 5%
Roof 6%
Wall 36%
Glass 30%
Door 2%
Infiltration 20%
System
1, Zone
1
Gain
37,305
Btuh
Roof 5%
Wall 6%
Glass 47%
Door 1%
People 10%
Equipment 25%
Infiltration 6%
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 16
System 1, Zone 1 Bar Graph
System
1, Zone
1
Loss
54,757
Btuh
0
5,000
10,000
15,000
20,000
Floor 5%Wall 36%Door 2%
Roof 6%Glass 30%Infiltration 20%
System
1, Zone
1
Gain
37,305
Btuh
0
5,000
10,000
15,000
20,000
Roof 5%Glass 47%People 10%Infiltration 6%
Wall 6%Door 1%Equipment 25%
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 17
Detailed Room Loads - Room 1 - Main Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,384.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,384.0 sq.ft.Supply Air:702 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.4 AC/hr
Volume:12,456.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:8 Actual Winter Vent.:57 CFM
Runout Air:88 CFM Percent of Supply.:8 %
Runout Duct Size:6 in.Actual Summer Vent.:33 CFM
Runout Air Velocity:447 ft./min.Percent of Supply:5 %
Runout Air Velocity:447 ft./min.Actual Winter Infil.:55 CFM
Actual Loss:0.125 in.wg./100 ft.Actual Summer Infil.:29 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
W -Wall-12F-0sw 48 X 9 316 0.065 5.7 1,787 0.9 0 273
E -Wall-12F-0sw 48 X 9 299 0.065 5.7 1,691 0.9 0 258
N -Wall-12F-0sw 37 X 9 271 0.065 5.7 1,533 0.9 0 234
S -Wall-12F-0sw 37 X 9 261 0.065 5.7 1,476 0.9 0 226
W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
W -Gls-4A-1a-o shgc-0.33 0%S 95 0.320 27.8 2,645 35.0 0 3,326
E -Gls-4A-1a-o shgc-0.33 0%S 133 0.320 27.8 3,703 35.0 0 4,656
N -Gls-4A-1a-o shgc-0.33 100%S 41 0.320 27.8 1,141 10.4 0 427
S -Gls-4A-1a-o shgc-0.33 0%S 72 0.320 27.8 2,004 19.2 0 1,381
Subtotals for Structure:17,258 0 11,133
Infil.: Win.: 55.0, Sum.: 28.6 1,530 3.336 5,104 0.259 552 397
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,000 3,000
Room Totals:22,362 1,952 14,990
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 18
Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,789.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,789.0 sq.ft.Supply Air:720 CFM
Ceiling Height:9.0 ft.Supply Air Changes:2.7 AC/hr
Volume:16,101.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:8 Actual Winter Vent.:63 CFM
Runout Air:90 CFM Percent of Supply.:9 %
Runout Duct Size:6 in.Actual Summer Vent.:34 CFM
Runout Air Velocity:458 ft./min.Percent of Supply:5 %
Runout Air Velocity:458 ft./min.Actual Winter Infil.:64 CFM
Actual Loss:0.131 in.wg./100 ft.Actual Summer Infil.:33 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
W -Wall-12F-0sw 47 X 9 327 0.065 5.7 1,849 0.9 0 283
E -Wall-12F-0sw 47 X 9 323 0.065 5.7 1,827 0.9 0 279
N -Wall-12F-0sw 52 X 9 444 0.065 5.7 2,511 0.9 0 384
S -Wall-12F-0sw 52 X 9 437 0.065 5.7 2,471 0.9 0 378
W -Gls-4A-1a-o shgc-0.33 0%S 96 0.320 27.8 2,673 35.0 0 3,361
E -Gls-4A-1a-o shgc-0.33 0%S 100 0.320 27.8 2,784 35.0 0 3,501
N -Gls-4A-1a-o shgc-0.33 100%S 24 0.320 27.8 668 10.4 0 250
S -Gls-4A-1a-o shgc-0.33 0%S 31 0.320 27.8 863 19.2 0 595
UP-Ceil-16B-50 1789 X 1 1789 0.020 1.7 3,113 1.0 0 1,717
Subtotals for Structure:18,759 0 10,748
Infil.: Win.: 64.0, Sum.: 33.3 1,782 3.336 5,944 0.259 643 462
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 3,000
Room Totals:24,703 2,643 15,360
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 19
Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,384.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,384.0 sq.ft.Supply Air:68 CFM
Ceiling Height:9.0 ft.Supply Air Changes:0.3 AC/hr
Volume:12,456.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:1 Actual Winter Vent.:20 CFM
Runout Air:68 CFM Percent of Supply.:29 %
Runout Duct Size:6 in.Actual Summer Vent.:3 CFM
Runout Air Velocity:348 ft./min.Percent of Supply:5 %
Runout Air Velocity:348 ft./min.Actual Winter Infil.:0 CFM
Actual Loss:0.077 in.wg./100 ft.Actual Summer Infil.:0 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
W -Wall-15B0-10sf-10 48 X 9 432 0.049 4.3 1,842 0.0 0 0
N -Wall-15B0-10sf-10 37 X 9 333 0.049 4.3 1,420 0.0 0 0
S -Wall-15B0-10sf-10 37 X 9 333 0.049 4.3 1,420 0.0 0 0
Floor-21A-24 1 X 1384 1384 0.025 2.2 3,010 0.0 0 0
Subtotals for Structure:7,692 0 0
Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:500 1,000
Room Totals:7,692 900 1,460
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 20
Room Cooling and Heating Loads Bar Graphs
Cooling
Heating
Btuh
Lower Level
Upper Level
Main Level
0 5,000 10,000 15,000 20,000 25,000
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 21
Room Cooling Loads Bar Graphs
Sensible
Latent
Btuh
Lower Level
Upper Level
Main Level
0 5,000 10,000 15,000 20,000
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 22
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Main Level 1,384 22,362 466 8-6 447 14,990 1,952 702 702
2 Upper Level 1,789 24,703 514 8-6 458 15,360 2,643 720 720
3 Lower Level 1,384 7,692 160 1-6 348 1,460 900 68 68
Ventilation 4,550 340 1,352
System 1 total 4,557 59,307 1,140 32,150 6,847 1,490 1,490
System 1 Main Trunk Size:26x10 in.
Velocity:825 ft./min
Loss per 100 ft.:0.092 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:3.25 82% / 18%32,150 6,847 38,997
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\19515 HARBOR LAKEVILLE 09252023.rhv Monday, September 25, 2023, 10:16 AM
Builders Associaton of Minnesota version 101014
Date Certificate Posted
x Passive (No Fan)
Active (With fan and monometer
or other system monitoring
Location (or future location) of Fan:
Other Please Describe Here
x
10/15 x x
x
20 x
20 x
21 x
49 x
x
x
x
x Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:Input in
BTUS:
70,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
x Passive
Low: Other, describe:
x Low:
Location of fan(s), describe: Cfm's
4" " round duct OR Flex
" metal duct
ML193UH070
Heating Loss
Manufacturer Lennox
Natural Gas
Output in
Tons:
3 Ton50
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Capacity continuous ventilation rate in cfms:
200CFM
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
32,150Residential Load Calculation
SEER
/EER
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Electric
Make-up Air Select a Type
AO Smith
Domestic Water
Heater
MECHANICAL SYSTEMS
Rating or Size
Efficiency 13 Seer
Building envelope air tightness:
Rim Joist (1st Floor)
GPVL-50 13ACXN042-230 Model
Heating System
Natrual Gas
Lennox Fiberglass, Batts Foundation Wall
R-value
Average U-Factor (excludes skylights and one door) U:
Duct system air tightness:
Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply
Mineral Fiberboard Insulation Location
Foam, Closed Cell0.22
Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Non or Not ApplicableAttic
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Rim Joist (2nd Floor+)
0.30
Appliances
Mech Room
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
59,307
Heating Gain Cooling Load
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Place your
logo here
New Construction Energy Code Compliance Certificate
Name of Residential Contractor
Stone Cottage Construction Inc.
MN License Number
Lakeville19515 Harbor Dr
BC636874
City Mailing Address of the Dwelling or Dwelling Unit
Combustion Air Select a Type
Location of duct or system:
38,997
Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500
10/9/23 X
PM