Loading...
HomeMy WebLinkAboutLA219661 - APPROVED - James Mcgrath Permit Pack Flat1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONEEXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE ANDUSE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSIONOF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:James Mcgrath4746 165th St WLakeville Minnesota 55044AC SYSTEM SIZE: 11.31 kW ACDC SYSTEM SIZE: 15.795 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Brendan Fillmore November 4, 2023 889630 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 COVER SHEET PV1 GENERAL NOTES CODE AND STANDARDS SITE NOTES / OSHA REGULATION SOLAR CONTRACTOR EQUIPMENT LOCATIONS AERIAL VIEW DESIGN CRITERIA WIND SPEED:115 mph GROUND SNOW LOAD:50 lb/ft² WIND EXPOSURE FACTOR:C SEISMIC DESIGN CATEGORY:B SITE SPECIFICATIONS CONSTRUCTION - V-B ZONING: RESIDENTIAL SHEET INDEX PV1 - COVER SHEET PV2 - SITE PLAN PV3 - ROOF PLAN PV4 - STRUCTURAL PV5 - ELECTRICAL 3-LINE DIAGRAM PV6 - ELECTRICAL CALCULATIONS PV7 - WARNING LABELS AND LOCATIONS PV8 - PLACARD (ALL OTHER SHEETS AS REQUIRED) SS - PRODUCT SPEC. SHEETS UTILITY COMPANY: Xcel Energy MN PERMIT ISSUER: City of Lakeville PROJECT INFORMATION: NUMBER OF STORIES:2 CONDUIT RUN:Interior ECOBEE QTY:0 LIGHT BULB QTY:0 PV METER:Not Required ROOF TYPE (1) INFORMATION: ROOF TYPE:Comp Shingle FRAMING TYPE:Manufactured Truss SHEATHING TYPE:OSB ATTACHMENT:SFM Infinity Flashkit RACKING:Unirac SFM Infinity @ 24" OC Portrait / 48" OC Landscape NUMBER OF ATTACHMENTS:149 ROOF TYPE (2) INFORMATION (IF APPLICABLE): *SEE PV4.2 SCOPE OF WORK INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM AND ANY NECESSARY ADDITIONAL WORK NEEDED FOR INSTALLATION. SYSTEM TO BE INSTALLED INFORMATION: DC SYSTEM SIZE:15.795 kW DC AC SYSTEM SIZE:11.31 kW AC MODULE TYPE: (39) Qcells Q.PEAK DUO ML-G10+ 405 INVERTER TYPE:Enphase IQ8PLUS-72-2-US MONITORING:Enphase IQ Combiner 4 X-IQ-AM1-240-4 Sealed For Existing Roof & Attachment Only 11/6/23 I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that Iam a duly Licensed Professional Engineer under the lawsof the State of Minnesota.John A. Calvert, License No.52823 Expiration Date: 30-June-2024 Digitally signed by John A. Calvert Date: 2023.11.06 08:52:12 -07'00'Concept Approval ONLY Subject to Field Inspection Inspector Date 2015 MN Bldg Code 11/06/2023jnuetzman DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC M MSP AC CB 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONEEXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE ANDUSE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSIONOF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:James Mcgrath4746 165th St WLakeville Minnesota 55044AC SYSTEM SIZE: 11.31 kW ACDC SYSTEM SIZE: 15.795 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Brendan Fillmore November 4, 2023 889630 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 SITE PLAN PV2 SCALE: 1/16" = 1'-0" NO CLEARANCE ISSUES EXIST FOR OVERHEAD OR UNDERGROUND SERVICE LINES. A UTILITY REQUIRED YELLOW WITH BLACK LETTERING "PHOTOVOLTAIC SYSTEM CONNNECTED" PLACARD AT THE MAIN BILLING METER SHALL BE INSTALLED. 24/7 UNESCORTED KEYLESS ACCESS SHALL BE PROVIDED TO ALL XCEL ENERGY EQUIPMENT. M MSP AC CB LC SUB PV TS MAIN SERVICE PANEL UTILITY METER AC DISCONNECT COMBINER BOX LOAD CENTER SUBPANEL PV METER TRANSFER SWITCH JUNCTION BOX LEGEND FIRE SETBACK TRENCHING PROPERTY LINE ESS HUB RPO SUNPOWER ESS SUNPOWER HUB+ REMOTE POWER OFF PV SYSTEM SPECIFICATIONS TOTAL NUMBER OF MODULES:39 MODULE MAKE AND MODEL:Qcells Q.PEAK DUO ML-G10+ 405 MODULE WATTAGE:405W DC INVERTER MAKE AND MODEL:Enphase IQ8PLUS-72-2-US INVERTER TYPE: Microinverter (1 Inverter per PV Module) INVERTER CURRENT OUTPUT:1.21A AC INVERTER NOMINAL VOLTAGE: 240V INVERTER WATTAGE:290W AC XCEL PV AC DISCONNECT NOTES UTILITY PV AC DISCONNECT, WHERE REQUIRED, WILL BE INSTALLED WITHIN 10 FT OF UTILITY METER. AC DISCONNECT SHALL BE VISIBLE-OPEN TYPE, LOCKABLE,AND READILY ACCESSIBLE. A UTILITY-REQUIRED YELLOW WITH BLACK LETTERING“PV AC DISCONNECT” PLACARD AT THE AC DISCONNECT SHALL BE INSTALLED. IF THE AC DISCONNECT CANNOT BE LOCATED TOGETHER IN A READILY ACCESSIBLE LOCATION WITHIN 10' OF THE MAIN SERVICE METER, A DIRECTORYPLACARD WILL BE INSTALLED AT THE MAIN SERVICE METER CLEARLY SHOWINGTHE LOCATION OF THE AC DISCONNECT. FRONT OF HOME 4746 165TH ST W NEAREST CROSS STREET DULUTH TRAIL 450 FT W OF HOME 2'-6" UTILITY PV AC DISCONNECT PROPERTY LINE PROPERTY LINE GATEGATE FENCE FENCE Sealed For Existing Roof & Attachment Only 11/6/23 I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that Iam a duly Licensed Professional Engineer under the lawsof the State of Minnesota.John A. Calvert, License No.52823 Expiration Date: 30-June-2024 DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DC AC DC AC DC AC DC AC DC AC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DC AC DCAC DCAC DCAC DCAC M MSP AC CB 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONEEXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE ANDUSE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSIONOF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:James Mcgrath4746 165th St WLakeville Minnesota 55044AC SYSTEM SIZE: 11.31 kW ACDC SYSTEM SIZE: 15.795 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Brendan Fillmore November 4, 2023 889630 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 ROOF PLAN PV3 NO CLEARANCE ISSUES EXIST FOR OVERHEAD OR UNDERGROUND SERVICE LINES. A UTILITY REQUIRED YELLOW WITH BLACK LETTERING "PHOTOVOLTAIC SYSTEM CONNNECTED" PLACARD AT THE MAIN BILLING METER SHALL BE INSTALLED. 24/7 UNESCORTED KEYLESS ACCESS SHALL BE PROVIDED TO ALL XCEL ENERGY EQUIPMENT. SCALE: 1/8" = 1'-0" M MSP AC CB LC SUB PV TS MAIN SERVICE PANEL UTILITY METER AC DISCONNECT COMBINER BOX LOAD CENTER SUBPANEL PV METER TRANSFER SWITCH JUNCTION BOX LEGEND FIRE SETBACK TRENCHING PROPERTY LINE ESS HUB RPO SUNPOWER ESS SUNPOWER HUB+ REMOTE POWER OFF PV SYSTEM SPECIFICATIONS TOTAL NUMBER OF MODULES:39 MODULE MAKE AND MODEL:Qcells Q.PEAK DUO ML-G10+ 405 MODULE WATTAGE:405W DC INVERTER MAKE AND MODEL:Enphase IQ8PLUS-72-2-US INVERTER TYPE: Microinverter (1 Inverter per PV Module) INVERTER CURRENT OUTPUT:1.21A AC INVERTER NOMINAL VOLTAGE: 240V INVERTER WATTAGE:290W AC MP1 # OF MODULES: 39 AZIMUTH: 152 PITCH: 37 TSRF: 97% AREA: 1205 ft.² UNDERGROUND SERVICE LINE POINT OF INTERCONNECTION FRONT OF HOME XCEL PV AC DISCONNECT NOTES UTILITY PV AC DISCONNECT, WHERE REQUIRED, WILL BE INSTALLED WITHIN 10 FT OF UTILITY METER. AC DISCONNECT SHALL BE VISIBLE-OPEN TYPE, LOCKABLE, AND READILY ACCESSIBLE. A UTILITY-REQUIRED YELLOW WITH BLACK LETTERING“PV AC DISCONNECT” PLACARD AT THE AC DISCONNECT SHALL BE INSTALLED. IF THE AC DISCONNECT CANNOT BE LOCATED TOGETHER IN A READILY ACCESSIBLE LOCATION WITHIN 10' OF THE MAIN SERVICE METER, A DIRECTORY PLACARD WILL BE INSTALLED AT THE MAIN SERVICE METER CLEARLY SHOWING THE LOCATION OF THE AC DISCONNECT. UTILITY PV AC DISCONNECT 3' 1'-6"1'-6" 3' 1'-6" 1'-6" 2'-6" Sealed For Existing Roof & Attachment Only 11/6/23 I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that Iam a duly Licensed Professional Engineer under the lawsof the State of Minnesota.John A. Calvert, License No.52823 Expiration Date: 30-June-2024 ATTACHMENT SPACING- SIDE VIEWDSCALE: 1/2" = 1'-0" B A LANDSCAPE PORTRAIT A B MODULE WIDTH MODULE WIDTH PV MODULE ROOF STRUCTURE 37° PV MODULE UNIRAC SFM 2" MICRORAIL UNIRAC SFM 6.5" SPLICE PV MODULE UNIRAC SFM 2" MICRORAIL " MAX.48" MAX. MAX. "24" MAX. ATTACHMENT SPACING- FRONT VIEWCSCALE: 3/4" = 1'-0" UNIRAC SFM 8" ATTACHED SPLICE LANDSCAPE PORTRAIT BOTTOM STANDOFF DETAILBSCALE: 3" = 1'-0" MIDDLE/TOP STANDOFF DETAILASCALE: 3" = 1'-0" UNIRAC SFM INFINITY QCELLS Q.PEAK DUO ML-G10+ 405 PV MODULE UNIRAC SFM MICRORAIL/ SPLICE (E) ROOF SHEATHING FLASHING UNIRAC SFM SLIDER (1) 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE 212" MIN. EMBED. QCELLS Q.PEAK DUO ML-G10+ 405 PV MODULE (E) ROOF SHEATHING FLASHING UNIRAC SFM SLIDER AND TRIMRAIL ROOF ATTACHMENT (1) 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER (E) BUILDING STRUCTURE 212" MIN. EMBED. UNIRAC SFM TRIMRAIL 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONEEXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE ANDUSE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSIONOF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:James Mcgrath4746 165th St WLakeville Minnesota 55044AC SYSTEM SIZE: 11.31 kW ACDC SYSTEM SIZE: 15.795 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Brendan Fillmore November 4, 2023 889630 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 STRUCTURAL PV4 STRUCTURAL INFORMATION: ROOF TYPE (1): ROOF TYPE: Comp Shingle SHEATHING TYPE: OSB FRAMING TYPE: Manufactured Truss FRAMING SIZE: 2x4 @ 24" OC CEILING JOIST SIZE: 2x4 @ 24" OC ATTACHMENT: SFM Infinity Flashkit RACKING: Unirac SFM Infinity @ 24" OC Portrait / 48" OC Landscape NUMBER OF ATTACHMENTS: 149 PV MODULE COUNT: 39 Modules TOTAL ARRAY AREA: 795.6 ft² (20.4ft²/panel) TOTAL ROOF AREA: 3718 ft² ARRAY/ROOF AREA: 21.4% ARRAY WEIGHT: 1,950 lbs (50 lbs/panel) DISTRIBUTED LOAD: 2.45 lbs/ft² POINT LOAD: 13.09 lbs/attachment STRUCTURAL NOTES: None *NOTE: LISTED NUMBER OF ATTACHMENT POINTS ARE AN ESTIMATE ONLY AND MAY VARY BASED ON FIELD CONDITIONS. MAXIMUM ATTACHMENT SPACING TO BE FOLLOWED PER ENGINEER OF RECORD SPECIFICATIONS. -RACKING ATTACHMENTS TO BE STAGGERED Sealed For Existing Roof & Attachment Only 11/6/23 I hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that Iam a duly Licensed Professional Engineer under the lawsof the State of Minnesota.John A. Calvert, License No.52823 Expiration Date: 30-June-2024 NON-FUSED LOCKABLE, VISIBLE OPEN 60A, 240V, 2-POLE L1 L2NEGC 15 UTILITY COMPANY:Xcel Energy MNPERMIT ISSUER: City of Lakeville ELECTRICAL NOTES: 39 INVERTERS X 290 W AC = 11.31 KW AC SINGLE PHASE 240V PV SYSTEM. 24/7 UNESCORTED KEYLESS ACCESS SHALL BE PROVIDED TO ALL XCEL ENERGY EQUIPMENT. DESIGNER NOTES: INTERCONNECT USING A LOAD SIDE BREAKER IN MSP, INTERIOR POI. (1) CIRCUIT OF 13 MODULES (1) CIRCUIT OF 13 MODULES JB-1L1 L2 EGC L1 L2 (N) 20A / 2P L1 L2 EGC 12 JB (1) CIRCUIT OF 13 MODULES JB-1L1L2EGC L1L2 (N) 20A / 2P L1L2EGC 12 JB-1L1L2EGC L1L2 (N) 20A / 2P L1L2EGC 12 EGC N G 15A / 2P ENVOY (39) Qcells Q.PEAK DUO ML-G10+ 405 UL 1703 COMPLIANT (39) Enphase IQ8PLUS-72-2-US 1 PHASE, UL 1741 COMPLIANT ENPHASE IQ COMBINER 4 X-IQ-AM1-240-4 (SOLAR LOAD ONLY) 3 JB-1 EZ SOLAR JUNCTION BOX 4"x4"x4" PVC JUNCTION BOX 120/240 VAC 60HZ 1 PHASE TO UTILITY GRID L2 L1 N (E) 200A / 2P (N) 60A / 2P (E) LOADS (E) GROUNDING ELECTRODE(S) L2 L1 NEGC (E) 225A MAIN SERVICE PANEL (E) 200A / 2P MAIN BREAKER N G 15 *PV BREAKER TO BE LOCATED AT OPPOSITE END OF BUSSING FROM MAIN BREAKER INTERCONNECTION NOTES 705.12(B)(3) THE FOLLOWING METHOD(S) SHALL BE USED TO DETERMINE THE RATINGS OF BUSBARS: (2) WHERE TWO SOURCES, ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER SOURCE, ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE POWER-SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT EXCEED 12O PERCENT OF THE AMPACITY OF THE BUSBAR. IF REQUIRED, VERIFICATION WILL BE DONE TO ENSURE THE GROUNDING ELECTRODE SYSTEM IS CONGRUENT WITH CURRENT REQUIREMENTS. (NEC 250 PART III) IF NOT, A NEW GROUND ROD WILL BE INSTALLED. (N) 58" COPPER GROUND ROD,8' LONG, MIN. 6' FROM (E) GROUNDING CONDUCTOR. GEC INSTALLED PER NEC 250.64: 6 OR 4 AWG SOLID COPPER GEC. 1-PHASE, 3-WIRE UTILITY PV AC DISCONNECT 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONEEXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE ANDUSE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSIONOF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:James Mcgrath4746 165th St WLakeville Minnesota 55044AC SYSTEM SIZE: 11.31 kW ACDC SYSTEM SIZE: 15.795 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Brendan Fillmore November 4, 2023 889630 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 ELECTRICAL PV5 XCEL PV AC DISCONNECT NOTES UTILITY PV AC DISCONNECT, WHERE REQUIRED, WILL BE INSTALLED WITHIN 10 FT OF UTILITY METER. AC DISCONNECT SHALL BE VISIBLE-OPEN TYPE, LOCKABLE, AND READILY ACCESSIBLE. A UTILITY-REQUIRED YELLOW WITH BLACK LETTERING “PV AC DISCONNECT” PLACARD AT THE AC DISCONNECT SHALL BE INSTALLED. IF THE AC DISCONNECT CANNOT BE LOCATED TOGETHER IN A READILY ACCESSIBLE LOCATION WITHIN 10' OF THE MAIN SERVICE METER, A DIRECTORY PLACARD WILL BE INSTALLED AT THE MAIN SERVICE METER CLEARLY SHOWING THE LOCATION OF THE AC DISCONNECT. RPA LOCATION. TEST AT THE LUGS ON THE BOTTOM OF THE BUS BAR IN THE PV COMBINER BOX. GROUNDING NOTES 1. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 690.47] AND [NEC 250.50-60] SHALL BE PROVIDED. PER [NEC 690.47], THE GROUNDING ELECTRODE SYSTEM OF AN EXISTING BUILDING MAY BE USED AND BE BONDED AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP. 2. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 AWG COPPER WIRE PER [NEC 250.64(B)]. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 250.64(C)]. 3. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN 8 AWG AND NO GREATER THAN 6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. 4. PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 250.21], [NEC TABLE 250.122], AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 690.46]. 5. MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 690.42]. 6. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE. 7. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTION POINTS IDENTIFIED IN THEMANUFACTURER'S INSTALLATION INSTRUCTIONS. 8. ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS. 9. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL. 10. GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED.11. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO [NEC 690.45] AND BE A MINIMUM OF 10 AWG WHEN NOT EXPOSED TO DAMAGE (6 AWG SHALL BE USED WHEN EXPOSED TO DAMAGE). 12. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF 4 AWG OR LARGER). 13. ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS. 14. SYSTEM GEC SIZED ACCORDING TO [NEC 690.47], [NEC TABLE 250.66], DC SYSTEM GEC SIZED ACCORDING TO [NEC 250.166], MINIMUM 8 AWG WHEN INSULATED, 6 AWG WHEN EXPOSED TO DAMAGE. 15. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH [NEC 250.134] OR [NEC 250.136(A)] REGARDLESS OF VOLTAGE. WIRING & CONDUIT NOTES 1. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS. 2. BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR). 3. ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED 4. UV RESISTANT CABLE TIES (NOT ZIP TIES) USED FOR PERMANENT WIRE MANAGEMENT OFF THE ROOF SURFACE IN ACCORDANCE WITH [NEC 110.2,110.3(A-B)]. 5. SOLADECK JUNCTION BOXES MOUNTED FLUSH WITH ROOF SURFACE TO BE USED FOR WIRE MANAGEMENT AND AS FLASHED ROOF PENETRATIONS FOR INTERIOR CONDUIT RUNS. 6. ALL PV CABLES AND HOMERUN WIRES BE TYPE USE-2, AND SINGLE-CONDUCTOR CABLE LISTED AND IDENTIFIED AS PV WIRE, TYPE TC-ER, OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED. 7. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC 690.8] FOR MULTIPLE CONDUCTORS. 8. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE INSTALLED AT LEAST 7/8"ABOVE THE ROOF SURFACE AND DERATED ACCORDING TO [NEC TABLE 310.15 (B)(2)(A)], [NEC TABLE310.15(B)(3)(A)],& [NEC 310.15(B)(3)(C)]. 9. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES. 10. PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2 INSULATED, 90°C RATED, WET AND UV RESISTANT, RATED FOR 600V 11. 4-WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUNDMARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS. 12. ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION 13. VOLTAGE DROP LIMITED TO 2% FOR DC CIRCUITS AND 3% FOR AC CIRCUITS 14. NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: DC POSITIVE- RED (OR MARKED RED), DC NEGATIVE- GREY (OR MARKED GREY) 15. POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE- GREY (OR MARKED GREY), DC NEGATIVE- BLACK (OR MARKED BLACK) 16. AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL- WHITE/GRAY * USE-2 IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THWN-2 AND MAY BE USED INSIDE ** USE-2 IS AVAILABLE AS UV WHITE 17. RIGID CONDUIT, IF INSTALLED, (AND/OR NIPPLES) MUST HAVE A PULL BUSHING TO PROTECT WIRES.18. IF CONDUIT DETERMINED TO BE RAN THROUGH ATTIC IN FIELD THEN CONDUIT WILL BE EITHER EMT, FMC, OR MC CABLE IF DC CURRENT COMPLYING WITH [NEC 690.31], [NEC 250.118(10)]. DISCONNECTING MEANS SHALL COMPLY WITH [NEC 690.13] AND [NEC 690.15]. 19. CONDUIT RAN THROUGH ATTIC WILL BE AT LEAST 18" BELOW ROOF SURFACE COMPLYING WITH [NEC 230.6(4)] AND SECURED NO GREATER THAN 6' APART PER [NEC 330.30(B)]. 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONEEXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE ANDUSE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSIONOF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:James Mcgrath4746 165th St WLakeville Minnesota 55044AC SYSTEM SIZE: 11.31 kW ACDC SYSTEM SIZE: 15.795 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Brendan Fillmore November 4, 2023 889630 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 ELEC CALCS PV6 LABEL 1 FOR PV SYSTEM DISCONNECTING MEANS WHERE THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION. [2017 NEC 690.13(B)] [2020 NEC 690.13(B)] LABEL 2 SHALL BE MARKED AT AN ACCESSIBLE LOCATION AT THE DISCONNECTING MEANS AS A POWER SOURCE AND WITH THE RATED AC OUTPUT CURRENT AND THE NOMINAL OPERATING AC VOLTAGE. [2017 NEC 690.54] [2020 NEC 690.54] LABEL 3 IF INTERCONNECTING LOAD SIDE, INSTALL THIS LABEL ANYWHERE THAT IS POWERED BY BOTH THE UTILITY AND THE SOLAR PV SYSTEM, IE. MAIN SERVICE PANEL AND SUBPANELS. [2017 NEC 705.12(B)(3)] [2020 NEC 705.12(B)(3)] LABEL 4 APPLY TO THE DISTRIBUTION EQUIPMENT ADJACENT TO THE BACK-FED BREAKER FROM THE POWER SOURCE. [2017 NEC 705.12(B)(2)(3)(b)] [2020 NEC 705.12(B)(3)(2)] LABEL 6 BUILDINGS WITH PV SYSTEMS SHALL HAVE A PERMANENT LABEL LOCATED AT EACH SERVICE EQUIPMENT LOCATION TO WHICH THE PV SYSTEMS ARE CONNECTED OR AT AN APPROVED READILY VISIBLE LOCATION AND SHALL INDICATE THE LOCATION OF RAPID SHUTDOWN INITIATION DEVICES. [2017 NEC 690.56(C)(1)(a)] [2020 NEC 690.56(C)] LABEL 7 SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH [2017 NEC 690.56(C)(3)] [2020 NEC 690.56(C)(2)] LABEL 8 PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. [2017 NEC 705.10] [2020 NEC 705.10] LABEL 9 PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. [2017 NEC 705.10] [2020 NEC 705.10] LABEL 10 PERMANENT PLAQUE OR DIRECTORY TO BE LOCATED AT MAIN SERVICE EQUIPMENT DENOTING THE LOCATION OF THE RAPID SHUTDOWN SYSTEM DISCONNECTING MEANS IF SOLAR ARRAY RAPID SHUTDOWN DISCONNECTING SWITCH IS NOT GROUPED AND WITHIN LINE OF SITE OF MAIN SERVICE DISCONNECTING MEANS. [2017 NEC 705.10 AND 690.56(C)(1)(a)] [2020 NEC 705.10 AND 690.56(C)] LABEL 11 PERMANENT PLAQUE OR DIRECTORY TO BE LOCATED AT AC COMBINER PANEL. [2017 NEC 110.21(B)] [2020 NEC 110.21(B)] ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING! PHOTOVOLTAIC SYSTEM AC DISCONNECT!! 240 VNOMINAL OPERATING AC VOLTAGE RATED AC OUTPUT CURRENT 47.19 A DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM WARNING! POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING! SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE"OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCESHOCK HAZARDIN THE ARRAY SOLAR ELECTRICPV PANELS RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM MAIN DISTRIBUTION UTILITY DISCONNECT(S) POWER TO THIS BUILDING IS ALSO SUPPLIEDFROM A ROOF MOUNTED SOLAR ARRAY WITH A RAPID SHUTDOWN DISCONNECTING MEANS GROUPED AND LABELED WITHIN LINE OF SITEAND 10 FT OF THIS LOCATION WARNING! POWER TO THIS BUILDING IS ALSO SUPPLIED FROM MAIN DISTRIBUTION UTILITY DISCONNECT LOCATED WARNING! POWER TO THIS BUILDING IS ALSO SUPPLIED FROM A ROOF MOUNTED SOLAR ARRAY. SOLAR ARRAY RAPID SHUTDOWN DISCONNECT IS LOCATED OUTSIDE NEXT TO THE UTILITY METER. WARNING! PHOTOVOLTAIC SYSTEM COMBINER PANEL DO NOT ADD LOADS WARNING! 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONEEXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE ANDUSE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSIONOF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:James Mcgrath4746 165th St WLakeville Minnesota 55044AC SYSTEM SIZE: 11.31 kW ACDC SYSTEM SIZE: 15.795 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Brendan Fillmore November 4, 2023 889630 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 LABELS PV7 ADDITIONAL LABELS *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENTATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VARY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON 3 LINE DIAGRAM. 3 LINE DIAGRAM ON PV5 TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. UTILITY METER MAIN SERVICE PANEL 1 6 2 3 IF BREAKER IS USED4 8 10OR OR PLACARD SUBPANEL (IF INTERCONNECTION IS MADE HERE) 1 6 2 3 4 9 AC DISCONNECT 1 2 7 9 OR PLACARD PV COMBINER BOX 11 PV METER (IF APPLICABLE) LABELING NOTES 1) LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2) LABELING REQUIREMENTS BASED ON THE 2017 & 2020 NEC CODE, OSHA STANDARD 19010.145, ANSIZ535. 3) MATERIAL BASED ON THE REQUIREMENTS OF THE AHJ. 4) LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED AND SHALL NOT BE HANDWRITTEN [NEC 110.21] U2 U3 PV AC DISCONNECT LABEL U3 PLACARD TO BE YELLOW WITH BLACK LETTERING AND TO BE PLACED AT UTILITY PV AC DISCONNECT. PHOTOVOLTAIC SYSTEM CONNECTED LABEL U2 PLACARD TO BE YELLOW WITH BLACK LETTERING AND TO BE PLACED AT UTLITY METER. STANDARD LABELS PLACARD 3 1403 N. Research Way Orem, UT 84097 800.377.4480 WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONEEXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE ANDUSE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSIONOF BLUE RAVEN SOLAR LLC.CUSTOMER INFORMATION:James Mcgrath4746 165th St WLakeville Minnesota 55044AC SYSTEM SIZE: 11.31 kW ACDC SYSTEM SIZE: 15.795 kW DCDRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: Brendan Fillmore November 4, 2023 889630 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 800-377-4480 PLACARD PV8 DIRECTORY PLACARD NOTES [NEC 705.10] A PERMANENT PLAQUE OR DIRECTORY DENOTING THE LOCATION OF ALL ELECTRIC POWER SOURCE DISCONNECTING MEANS ON OR IN THE PREMISES SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION AND AT THE LOCATION(S) OF THE SYSTEM DISCONNECT(S) FOR ALL ELECTRIC POWER PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED. THE MARKING SHALL COMPLY WITH [110.21(B)]. DRAWING TITLE: DRAWING NUMBER:66 63(&6+((7 Q.PEAK DUO ML-G10+MODEL 395 - 415 Wp | 132 Cells 21.1 % Maximum Module Efficiency Q.PEAK DUO ML-G10+ SERIES {šak%ŽX))XFeFXF‰¥„k)e% ǩǧǩǩ‰k{{)8ka) TOP BRAND PV MODULES USA 2022 The ideal solution for: Rooftop arrays on residential buildings 1 See data sheet on rear for further information. 2 APT test conditions according to IEC / TS 62804-1:2015, method A (−1500 V, 96 h) Qcells is the first solar module manufacturer to pass the most comprehensive quality programme in the industry: The new “Quality Controlled PV” of the independent certification institute TÜV Rheinland. The most thorough testing programme in the industry Q.ANTUM DUO Z technology with zero gap cell layout boosts module efficiency up to 21.1 %. Breaking the 21 % efficiency barrier Innovative all-weather technology Optimal yields, whatever the weather with excellent low-light and temperature behaviour. High-tech aluminium alloy frame, certified for high snow (5400 Pa) and wind loads (4000 Pa). Extreme weather rating Inclusive 25-year product warranty and 25-year linear performance warranty1. A reliable investment Long-term yield security with Anti LeTID Technology, Anti PID Technology2 and Hot-Spot Protect. Enduring high performance DETAIL A 0.63" (16 mm) 0.33" (8.5 mm)0.96" (24.5 mm) 42.8" (1088 mm) 74.0" (1879 mm) 4 × Mounting slots (DETAIL A) Frame 41.1" (1045 mm) 39.2" (996 mm) 1.26" (32 mm) 8 × Drainage holes 15.6“ (395.5 mm) 4 × Grounding points ø 0.18" (4.5 mm) Label •49.2" (1250 mm) •49.2" (1250 mm) Format 74.0 in × 41.1 in × 1.26 in (including frame) (1879 mm × 1045 mm × 32 mm) Weight 48.5 lbs (22.0 kg) Front Cover 0.13 in (3.2 mm) thermally pre-stressed glass with anti-reflection technology Back Cover Composite film Frame Black anodised aluminium Cell 6 × 22 monocrystalline Q.ANTUM solar half cells Junction box 2.09-3.98 in × 1.26-2.36 in × 0.59-0.71 in (53-101 mm × 32-60 mm × 15-18 mm), IP67, with bypass diodes Cable 4 mm² Solar cable; (+) ≥ 49.2 in (1250 mm), (−) ≥ 49.2 in (1250 mm) Connector Stäubli MC4; IP68 Mechanical Specification Qcells pursues minimizing paper output in consideration of the global environment. Note: Installation instructions must be followed. Contact our technical service for further information on approved installation of this product. Hanwha Q CELLS America Inc. 400 Spectrum Center Drive, Suite 1400, Irvine, CA 92618, USA | TEL +1 949 748 59 96 | EMAIL hqc-inquiry@qcells.com | WEB www.qcells.com QQQ.PPEEAKK DDUUOO MMMLL---GGG10000++ SSEERRRRIEEEESS Specifications subject to technical changes © Qcells Q.PEAK_DUO_ML-G10+_series_395-415_2022-07_Rev01_NAProperties for System Design Maximum System Voltage VSYS [V] 1000 (IEC) / 1000 (UL)PV module classification Class II Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI / UL 61730 TYPE 2 Max. Design Load, Push / Pull3 [lbs / ft2] 75 (3600 Pa) / 55 (2660 Pa)Permitted Module Temperature on Continuous Duty −40 °F up to +185 °F (−40 °C up to +85 °C)Max. Test Load, Push / Pull3 [lbs / ft2] 113 (5400 Pa) / 84 (4000 Pa) 3 See Installation Manual UL 61730, CE-compliant, Quality Controlled PV - TÜV Rheinland, IEC 61215:2016, IEC 61730:2016, U.S. Patent No. 9,893,215 (solar cells), Qualifications and Certificates 200 400 600 800 1000 90 100 80 110 10 2515 20005 86 98 95 80 100 85 Electrical Characteristics TEMPERATURE COEFFICIENTS Temperature Coefficient of ISC α [% / K] +0.04 Temperature Coefficient of VOC β [% / K] −0.27 Temperature Coefficient of PMPP γ [% / K] −0.34 Nominal Module Operating Temperature NMOT [°F] 109 ± 5.4 (43   ± 3 °C) POWER CLASS 395 400 405 410 415 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC1 (POWER TOLERANCE +5 W / −0 W)MinimumPower at MPP1 PMPP [W]395 400 405 410 415 Short Circuit Current1 ISC [A]11.13 11.16 11.19 11.22 11.26 Open Circuit Voltage1 VOC [V]45.03 45.06 45.09 45.13 45.16 Current at MPP IMPP [A]10.58 10.64 10.70 10.76 10.82 Voltage at MPP VMPP [V]37.32 37.59 37.85 38.11 38.37 Efficiency1 η [%] ≥ 20.1 ≥ 20.4 ≥ 20.6 ≥ 20.9 ≥ 21.1 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 MinimumPower at MPP PMPP [W]296.4 300.1 303.9 307.6 311.4 Short Circuit Current ISC [A]8.97 8.99 9.02 9.04 9.07 Open Circuit Voltage VOC [V]42.46 42.49 42.52 42.56 42.59 Current at MPP IMPP [A]8.33 8.38 8.43 8.48 8.53 Voltage at MPP VMPP [V]35.59 35.82 36.04 36.27 36.49 1Measurement tolerances PMPP ± 3 %; ISC; VOC ± 5 % at STC: 1000 W/m2, 25 ± 2 °C, AM 1.5 according to IEC 60904-3 • ²800 W/m2, NMOT, spectrum AM 1.5 RELATIVE EFFCIENCY [%]Qcells PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98 % of nominal power during first year. Thereafter max. 0.5 % degradation per year. At least 93.5 % of nominal power up to 10 years. At least 86 % of nominal power up to 25 years. All data within measurement tolerances. Full warranties in accordance with the warranty terms of the Qcells sales organisation of your respective country. Typical module performance under low irradiance conditions in comparison to STC conditions (25 °C, 1000 W/m2). YEARS IRRADIANCE [W/m²] Qcells Industry standard of p-mono* *Standard terms of guarantee for the 5 PV companies with the highest production capacity in 2021 (February 2021) CertifiedUL 61730RELATIVE EFFCIENCYCOMPARED TO NOMINAL POWER [%] 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS IQ8 and IQ8+ Microinverters Our newest IQ8 Microinverters are the industry’s first microgrid-forming, software- defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently. The brain of the semiconductor-based microinverter is our proprietary application-specific integrated circuit (ASIC) which enables the microinverter to operate in grid-tied or off-grid modes. This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times to changing loads and grid events, alleviating constraints on battery sizing for home energy systems. Part of the Enphase Energy System, IQ8 Series Microinverters integrate with the Enphase IQ Battery, Enphase IQ Gateway, and the Enphase App monitoring and analysis software. IQ8 Series Microinverters redefine reliability standards with more than one million cumulative hours of power-on testing, enabling an industry- leading limited warranty of up to 25 years. Connect PV modules quickly and easily to IQ8 Series Microinverters using the included Q-DCC-2 adapter cable with plug-n-play MC4 connectors. IQ8 Series Microinverters are UL Listed as PV Rapid Shut Down Equipment and conform with various regulations, when installed according to manufacturer’s instructions. Easy to install • Lightweight and compact with plug-n-play connectors • Power Line Communication (PLC) between components • Faster installation with simple two-wire cabling High productivity and reliability • Produce power even when the grid is down* • More than one million cumulative hours of testing • Class II double-insulated enclosure • Optimized for the latest high- powered PV modules Microgrid-forming • Complies with the latest advanced grid support** • Remote automatic updates for the latest grid requirements • Configurable to support a wide range of grid profiles • Meets CA Rule 21 (UL 1741-SA) requirements © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ8 Microinverters, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ8SP-DS-0002-01-EN-US-2022-03-17 * Only when installed with IQ System Controller 2, meets UL 1741. ** IQ8 and IQ8Plus supports split phase, 240V installations only. DATA SHEET (1) No enforced DC/AC ratio. See the compatibility calculator at https://link.enphase.com/module-compatibility (2) Maximum continuous input DC current is 10.6A (3) Nominal voltage range can be extended beyond nominal if required by the utility. (4) Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. IQ8 and IQ8+ Microinverters INPUT DATA (DC) IQ8-60-2-US IQ8PLUS-72-2-US Commonly used module pairings1 W 235 – 350 235 – 440 Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27 – 37 29 – 45 Operating range V 25 – 48 25 – 58 Min/max start voltage V 30 / 48 30 / 58 Max input DC voltage V 50 60 Max DC current2 [module Isc]A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ8-60-2-US IQ8PLUS-72-2-US Peak output power VA 245 300 Max continuous output power VA 240 290 Nominal (L-L) voltage/range3 V 240 / 211 – 264 Max continuous output current A 1.0 1.21 Nominal frequency Hz 60 Extended frequency range Hz 50 – 68 AC short circuit fault current over 3 cycles Arms 2 Max units per 20 A (L-L) branch circuit4 16 13 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor (adjustable) 0.85 leading – 0.85 lagging Peak efficiency %97.5 97.6 CEC weighted efficiency %97 97 Night-time power consumption mW 60 MECHANICAL DATA Ambient temperature range -40ºC to +60ºC (-40ºF to +140ºF) Relative humidity range 4% to 100% (condensing) DC Connector type MC4 Dimensions (HxWxD) 212 mm (8.3”) x 175 mm (6.9”) x 30.2 mm (1.2”) Weight 1.08 kg (2.38 lbs) Cooling Natural convection – no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Environ. category / UV exposure rating NEMA Type 6 / outdoor COMPLIANCE Certifications CA Rule 21 (UL 1741-SA), UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according to manufacturer’s instructions. IQ8SP-DS-0002-01-EN-US-2022-03-17 IQ8PLUS-72-2-US 235 – 440 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell 29 – 45 25 – 58 30 / 58 60 IQ8PLUS-72-2-US 300 290 IQ8PLUS 72 2 US 290 1.21 13 97.6 9797 DRAWING NUMBER:SS BLUE RAVEN SOLAR The Enphase Q Cable™ and accessories are part of the latest generation Enphase IQ System™. These accessories provide simplicity, reliability, and faster installation times. Enphase Q Cable Accessories To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Q Cable Accessories REGION: Americas Enphase Q Cable • Two-wire, double-insulated Enphase Q Cable is 50% lighter than the previous generation Enphase cable • New cable numbering and plug and play connectors speed up installation and simplify wire management • Link connectors eliminate cable waste Field-Wireable Connectors • Easily connect Q cables on the roof without complex wiring • Make connections from any open connector and center feed any section of cable within branch limits • Available in male and female connector types To learn more about Enphase offerings, visit enphase.com © 2020 Enphase Energy. All rights reserved. Enphase, the Enphase logo, Enphase IQ 7A, Enphase IQ Battery, Enphase Enlighten, Enphase IQ Envoy, and other trademarks or service names are the trademarks of Enphase Energy, Inc. Data subject to change. 2020-06-26 CONDUCTOR SPECIFICATIONS 'IVXMƤGEXMSR UL3003 (raw cable), UL 9703 (cable assemblies), DG cable Flame test rating FT4 Compliance RoHS, OIL RES I, CE, UV Resistant, combined UL for Canada and United States Conductor type THHN/THWN-2 dry/wet Disconnecting means The AC and DC bulkhead connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Q CABLE TYPES / ORDERING OPTIONS Connectorized Models Size / Max Nominal Voltage Connector Spacing PV Module Orientation Connector Count per Box Q-12-10-240 12 AWG / 277 VAC 1.3 m (4.2 ft) Portrait 240 Q-12-17-240 12 AWG / 277 VAC 2.0 m (6.5 ft) Landscape (60-cell) 240 Q-12-20-200 12 AWG / 277 VAC 2.3 m (7.5 ft) Landscape (72-cell) 200 ENPHASE Q CABLE ACCESSORIES Name Model Number Description Raw Q Cable Q-12-RAW-300 300 meters of 12 AWG cable with no connectors Field-wireable connector (male)Q-CONN-10M Make connections from any open connector Field-wireable connector (female)Q-CONN-10F Make connections from any Q Cable open connector Cable Clip Q-CLIP-100 Used to fasten cabling to the racking or to secure looped cabling Disconnect tool Q-DISC-10 Disconnect tool for Q Cable connectors, DC connectors, and AC module mount Q Cable sealing caps (female)Q-SEAL-10 One needed to cover each unused connector on the cabling Terminator Q-TERM-10 Terminator cap for unused cable ends Enphase EN4 to MC4 adaptor¹ECA-EN4-S22 Connect PV module using MC4 connectors to IQ micros with EN4 (TE PV4-S SOLARLOK). 150mm/5.9” to MC4. Enphase EN4 non-terminated adaptor¹ECA-EN4-FW *SVƤIPH[MVMRKSJ90GIVXMƤIH('GSRRIGXSVW)2 8)4:7730%603/ XSnon-terminated cable. 150mm/5.9” Enphase EN4 to MC4 adaptor (long)¹ECA-EN4-S22-L Longer adapter cable for EN4 (TE PV4-S SOLARLOK) to MC4. Use with split cell modules or PV modules with short DC cable. 600mm/23.6” Replacement DC Adaptor (MC4)Q-DCC-2 DC adaptor to MC4 (max voltage 100 VDC) Replacement DC Adaptor (UTX)Q-DCC-5 DC adaptor to UTX (max voltage 100 VDC) 1. 5YEPMƤIHTIV90WYFNIGX Enphase Q Cable Accessories TERMINATOR Terminator cap for unused cable ends, sold in packs of ten (Q-TERM-10) SEALING CAPS Sealing caps for unused aggregator and cable connections (Q-BA-CAP-10 and Q-SEAL-10) DISCONNECT TOOL Plan to use at least one per installation, sold in packs of ten (Q-DISC-10) CABLE CLIP Used to fasten cabling to the racking or to secure looped cabling, sold in packs of one hundred (Q-CLIP-100) 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SHEET NAME: PAGE NUMBER:REVISION: 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEETS SS 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SSPROPRIETARY AND CONFIDENTIAL: THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF EZ SOLAR. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF EZ SOLAR IS PROHIBITED. Phone: 385-202-4150 www.ezsolarproducts.com ITEM No. 1 1 1 6 6 JB-1.2 Body POLYCARBONATE WITH UV INHIBITORS POLYCARBONATE WITH UV INHIBITORS #10 x 1-1/4” Phillips pan head screw #8 x 3/4” Phillips pan head screw JB-1.2 Lid2 3 4 PART NUMBER DESCRIPTION QTY Size SCALE: 1:2 WEIGHT: 1.45 LBS SHEET 1 of 3 DWG. NO. Rev B JB-1.2 Torque Specification: certification: WEIGHT: 15-20 LBS 1.45 LBS UL Standard 1741, nema 3r JB-1.2 Specification Sheet PV Junction Box for Composition/Asphalt Shingle Roofs • Maximum Voltage: 1,000 Volts • Maximum Current: 80 Amps • Allowable Wire: 14 AWG – 6 AWG • Spacing: Please maintain a spacing of at least ½” between uninsulated live parts and fittings for conduit, armored cable, and uninsulated live parts of opposite polarity. • Enclosure Rating: Type 3R • Roof Slope Range: 2.5 – 12:12 • Max Side Wall Fitting Size: 1” • Max Floor Pass-Through Fitting Size: 1” • Ambient Operating Conditions: (-35°C) - (+75°C) • Compliance: - JB-1.2: UL1741 - Approved wire connectors: must conform to UL1741 • System Marking: Interek Symbol and File #5019942 • Periodic Re-inspections: If re-inspections yield loose components, loose fasteners, or any corrosion between components, components that are found to be affected are to be replaced immediately. A. System Specifications and Ratings Phone: 385-202-4150 | www.ezsolarproducts.com 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS www.carlon.com180 Rigid Nonmetallic Conduit – Junction Boxes Molded Nonmetallic Junction Boxes6P Rated It’s another first from Carlon®- the first nonmetallic junction boxes UL Listed with a NEMA 6P rating per Section 314.29, Exception of the National Electrical Code. Manufactured from PVC or PPO thermoplastic molding compound and featuring foam-in-place gasketed lids attached with stainless steel screws, these rugged enclosures offer all the corrosion resistance and physical properties you need for direct burial applications. Type 6P enclosures are intended for indoor or outdoor use, primarily to provide a degree of protection against contact with enclosed equipment, falling dirt, hose- directed water, entry of water during prolonged submersion at a limited depth, and external ice formation. • All Carlon Junction Boxes are UL Listed and maintain a minimum of a NEMA Type 4/4x Rating. • Parts numbers with an asterisk (*) are UL Listed and maintain a NEMA Type 6P Rating and Type 4/4X Rating. E42728Except where noted by † Size in Std.Material Std. Inches Ctn. Min Min. Min. Min. Ta Tc Thermo-Ctn. Part No. H x W x D Qty.AT AB B C PVC plastic Wt. (Lbs.) E989NNJ-CAR* 4 x 4 x 2 5 311/16 35/8 N/A 2 .160 .155 X 3 E987N-CAR* 4 x 4 x 4 5 3 11/16 31/2 N/A 4 .160 .155 X 4 †E989NNR-CAR* 4 x 4 x 6 4 3 11/16 33/8 N/A 6 .160 .200 X 5 E989PPJ-CAR* 5 x 5 x 2 4 411/16 41/2 N/A 2 .110 .150 X 3 E987R-CAR* 6 x 6 x 4 2 6 5 5/8 N/A 4 .190 .190 X 3 E989RRR-UPC* 6 x 6 x 6 8 5 5/8 53/8 N/A 6 .160 .150 X 14 E989N-CAR 8 x 8 x 4 1 8 8 N/A 4 .185 .190 X 2 E989SSX-UPC 8 x 8 x 7 2 7 21/32 75/16 N/A 7 .160 .150 X 6 E989UUN 12 x 12 x 4 3 115/8 111/2 111/8 4 .160 .150 X 12 E989R-UPC 12 x 12 x 6 2 11 15/16 117/8 117/16 6 .265 .185 X 10 Typical Gross Automation (877) 268-3700 · www.carlonsales.com · sales@grossautomation.com DRAWING NUMBER:SS BLUE RAVEN SOLAR SFM INFINITY REVOLUTIONIZES ROOFTOP SOLAR WITH BENEFITS ACROSS YOUR BUSINESS, FROM DESIGN AND LOGISTICS, THROUGH ARRAY INSTALLATION AND SERVICE. SFM INFINITY 20% FEWER ATTACHMENTS Save time and money on every project: SFM INFINITY requires fewer attachments than rail systems. 2 INSTALLS PER DAY Make two installs per day your new standard. SFM INFINITY has fewer roof attachments, one tool installation, and pre-assembled components to get you off the roof 40% faster. BETTER AESTHETICS Install the system with the aesthetics preferred by homeowners, with integrated front trim, trim end caps, dark components, and recessed hardware. 30% LOGISTICS SAVINGS With fewer SKUs and compact components, SFM INFINITY is easier to stock, easier to transport, and easier to lift to the roof. Plus, make more efficient use of your vehicle fleet. SYSTEM OVERVIEW BONDING AND ACCESSORIES 2MW 3MW PART NAME DESCRIPTION TRIMRAIL ENDCAPS Covers ends of TRIMRAIL for refined aesthetic. TRIMRAIL BONDING CLAMP Electrically bonds TRIMRAIL and modules N/S BONDING CLAMP Electrically bonds rows of modules 2 3 4 5 6 1 1 4 3 5 6 7 SFM INFINITY 15 Attachments RAIL 20 Attachments 87%OF HOMEOWNERS PREFER MAXIMUM POWER DENSITY Easily mix module orientations to achieve optimal power density without incurring the increased bill of materials, labor, and attachments required by rail. 7 2 PART NAME DESCRIPTION TRIMRAIL Structural front trim provides aesthetic and aligns modules. TRIMRAIL SPLICE Connects and electrically bonds sections of TRIMRAIL. TRIMRAIL FLASHKIT Attaches TRIMRAIL to roof. Available for comp shingle or tile. MODULE CLIPS Secure modules to TRIMRAIL. MICRORAIL Connects modules to SLIDERS. Provides post-install array leveling. SPLICE Connects and supports modules. Provides east-west bonding. ATTACHED SPLICE also available. SLIDER FLASHKIT Roof attachment and flashing. Available for comp shingle and tile. DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 8FLASHKIT MOUNTING PILOT HOLES: 'ULOOSLORWKROHVIRUODJVFUHZVRU VWUXFWXUDOVFUHZV DVQHFHVVDU\ DW PDUNHGDWWDFKPHQWSRLQWV FLASHINGS: 3ODFHʴDVKLQJV Ô INSTALL SLIDERS AND TRIMRAIL ROOF ATTACHMENTS: • ,QVHUWʴDVKLQJVSHUPDQXIDFWXUHULQVWUXFWLRQV NOTE: Use Lag screw or structural fastener with a maximum diameter of 5/16" • $WWDFKVOLGHUVWRUDIWHUV • 9HULI\SURSHUURZWRURZVSDFLQJIRUPRGXOHVL]H 0RG16 • (QVXUHWKDW7ULPUDLOȺURRIDWWDFKPHQWVLQHDFKURZKDYHVXIʳFLHQW  HQJDJHPHQWZLWKVOLGHUGRYHWDLOVIRUSURSHUDWWDFKPHQW INSTALL SLIDERS AND ROOF ATTACHMENTS: )ROORZPDQXIDFWXUHULQVWUXFWLRQV IRUʴDVKLQJLQVWDOODWLRQSURFHGXUHV NOTE: If N-S module edge is within 1” of the shingle course above, you have the option to pivot / rotate slider at the attachment point to span the next course and cut shingles as required. ×UP-SLOPE DOWN-SLOPE × Mod NS + 1" Mod NS + 1" N/S MODULE EDGE Rotate Slider Cut Shingles as Required Less Than 1" DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 11TRIMRAIL & MICRORAIL INSTALLATION ATTACH TRIMRAIL TO ROOF ATTACHMENT: $WWDFKUDLOXVLQJKH[EROW 7ULGULYHRU VHUUDWHGʴDQJHQXWV0DNHVXUH7ULPUDLOTM is OHYHODFURVVDOO7ULPUDLOTMURRIDWWDFKPHQWV $IWHUUDLOLVOHYHOWLJKWHQFKDQQHOFODPS EROWVWRVHFXUH7ULPUDLOTM URRIDWWDFKPHQWV WRFKDQQHOV POSITION MODULE CLIPS ACCORDING TO MODULE THICKNESS: $OLJQQRWFKLQPRGXOHFOLSZLWKWULPUDLOULE DFFRUGLQJWRPRGXOHWKLFNQHVV LGHQWLʳHGLQ PPRQIDFHVRIPRGXOHFOLSV 5RWDWHFOLSWR SRVLWLRQDWUHTXLUHGORFDWLRQ INSTALL MODULE CLIPS ON TRIMRAIL: $WWDFKPRGXOHFOLSVWR7ULPUDLOXVLQJ 7EROWVDQG7ULGULYHRUVHUUDWHGʴDQJHQXWV$ PLQLPXPRIWZRFOLSVDUHUHTXLUHGSHUPRGXOH 5HIHUWR6)0' (JXLGHDQG8EXLOGHUIRU UHTXLUHGSRVLWLRQDQGTXDQWLW\RIPRGXOHFOLSV INSTALL MICRORAILS: ,QVWDOO0LFURUDLOTMDWPDUNHGDWWDFKPHQWSRLQWV&OLFN MicrorailTMLQWRVOLGHUVDQGSXVK0LFURUDLOTMWRWRSRIVOLGHU (QVXUHWKDWFDSUHPDLQVLQXSSHUPRVW PP SRVLWLRQ NOTE: module clips may be pre-installed on trimrail prior to attaching trimrail to roof attachments NOTE: Bonding pin on Microrails should be positioned downslope.Ñ%21',1*3,1 ÑÑÑÑ Ñ DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 19SYSTEM BONDING & GROUNDING E-W BONDING PATH: (:PRGXOHWRPRGXOHERQGLQJLVDFFRPSOLVKHG ZLWKSUHLQVWDOOHGERQGLQJSLQVZKLFKHQJDJH RQWKHVHFXUHVLGHRIWKH0LFURUDLO70DQGVSOLFH TRIMRAIL BONDING PATH: 7ULPUDLOWRPRGXOHERQGLQJLVDFFRPSOLVKHGZLWK ERQGLQJFODPSZLWKLQWHJUDOERQGLQJSLQDQG ERQGLQJ7EROW(refer also to alternate method) N-S BONDING PATH: 16PRGXOHWRPRGXOHERQGLQJLV DFFRPSOLVKHGZLWKERQGLQJFODPSZLWKLQWHJUDO ERQGLQJSLQV(refer also to alternate method) System bonding is accomplished through modules. System grounding accomplished by attaching DJURXQGOXJWRDQ\PRGXOHDWDORFDWLRQRQWKHPRGXOHVSHFLʳHGE\WKHPRGXOHPDQXIDFWXUHU LUG DETAIL & TORQUE INFO Ilsco Lay-In Lug (GBL-4DBT) • PRXQWLQJKDUGZDUH • 7RUTXH IWOE • $:*6ROLGRU6WUDQGHG LUG DETAIL & TORQUE INFO Ilsco Flange Lug (SGB-4) • ȧPRXQWLQJKDUGZDUH • 7RUTXH LQOE • $:*6ROLGRU6WUDQGHG LUG DETAIL & TORQUE INFO Wiley WEEBLug (6.7) • ȧPRXQWLQJKDUGZDUH • 7RUTXH IWOE • $:*6ROLGRU6WUDQGHG NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION TERMINAL TORQUE, Install Conductor and torque to the following: 4-6 AWG: 35in-lbs 8 AWG: 25 in-lbs 10-14 AWG: 20 in-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 6-14 AWG: 7ft-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 4-14 AWG: 35in-lbs WEEBLUG Single Use Only Star Washer is Single Use Only Ñ$OWHUQDWHPHWKRG $OWHUQDWHPHWKRG DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 20UL CODE COMPLIANCE NOTES SYSTEM LEVEL FIRE CLASSIFICATION 7KHV\VWHPʳUHFODVVUDWLQJUHTXLUHVLQVWDOODWLRQLQWKHPDQQHUVSHFLʳHGLQWKH 681)5$0(0,&525$,/ 6)0 ,QVWDOODWLRQ*XLGH6)0KDVEHHQFODVVLʳHGWR WKHV\VWHPOHYHOʳUHSRUWLRQRI8/7KLV8/FODVVLʳFDWLRQKDVEHHQ LQFRUSRUDWHGLQWRWKH8/SURGXFWFHUWLʳFDWLRQ6)0KDVDFKLHYHG&ODVV$ % &V\VWHPOHYHOSHUIRUPDQFHIRUORZVORSH VWHHSVORSHGURRIVZKHQXVHG LQFRQMXQFWLRQZLWKW\SHDQGW\SHPRGXOHV&ODVV$% &V\VWHPOHYHOʳUH UL2703 TEST MODULES 6HHSDJHVDQGIRUDOLVWRIPRGXOHVWKDWZHUHHOHFWULFDOO\DQGPHFKDQLFDOO\WHVWHGRU TXDOLʳHGZLWKWKH681)5$0(0,&525$,/ 6)0 FRPSRQHQWVRXWOLQHGZLWKLQWKLV,QVWDOODWLRQ*XLGH •0D[LPXP$UHDRI0RGXOH VTIW •8/'HVLJQ/RDG5DWLQJV D 'RZQZDUG3UHVVXUHȡ36)3D E 8SZDUG3UHVVXUHȡ36)3D F 'RZQ6ORSH/RDGȡ36)3D •7HVWHG/RDGV D 'RZQZDUG3UHVVXUHȡ36)3D E 8SZDUG3UHVVXUHȡ36)3D F 'RZQ6ORSH/RDGȡ36)3D •0D[LPXP6SDQ IW •8VHZLWKDPD[LPXPRYHUFXUUHQWSURWHFWLRQGHYLFH2&3'RI$ •6\VWHPFRQIRUPVWR8/6WGFHUWLʳHGWR/75$( •5DWHGIRUDGHVLJQORDGRI3D3DZLWKLQFKVSDQ •39PRGXOHVPD\KDYHDUHGXFHGORDGUDWLQJLQGHSHQGHQWRIWKH6)0ORDGUDWLQJ3OHDVHFRQVXOW WKH39PRGXOHPDQXIDFWXUHU VLQVWDOODWLRQJXLGHIRUPRUHLQIRUPDWLRQ •'RZQ6ORSHGHVLJQORDGUDWLQJRI36)3DIRUPRGXOHDUHDVRIVTIWRUOHVV Module Type Roof Slope System Level Fire Rating Microrail Direction Module Orientation Mitigation Required Type 1 and Type 2 6WHHS6ORSH /RZ6ORSH &ODVV$% & (DVW:HVW /DQGVFDSH253RUWUDLW None Required SHUIRUPDQFHLVLQKHUHQWLQWKH6)0GHVLJQDQGQRDGGLWLRQDOPLWLJDWLRQPHDVXUHV DUHUHTXLUHG7KHʳUHFODVVLʳFDWLRQUDWLQJLVYDOLGIRUDQ\URRISLWFK7KHUHLVQR UHTXLUHGPLQLPXPRUPD[LPXPKHLJKWOLPLWDWLRQDERYHWKHURRIGHFNWRPDLQWDLQ WKH&ODVV$% &ʳUHUDWLQJIRU6)0681)5$0(0,&525$,/TM FRPSRQHQWVVKDOO EHPRXQWHGRYHUDʳUHUHVLVWDQWURRIFRYHULQJUDWHGIRUWKHDSSOLFDWLRQ DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 21UL CODE COMPLIANCE NOTES LABEL MARKINGS •6\VWHPʳUHFODVVUDWLQJ6HHLQVWDOODWLRQLQVWUXFWLRQVIRULQVWDOODWLRQUHTXLUHPHQWVWRDFKLHYHDVSHFLʳHGV\VWHPʳUHFODVVUDWLQJZLWK8QLUDF •8QLUDF681)5$0(0,&525$,/TMLVOLVWHGWR8/ •$OOVSOLFHVZLWKLQDV\VWHPDUHVKLSSHGZLWKPDUNLQJLQGLFDWLQJGDWHDQGORFDWLRQRIPDQXIDFWXUH DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 22TESTED / CERTIFIED MODULE LIST Aleo P-Series $SWRV '1$ %)0)  '1$ %)0)  $VWURQHUJ\ &+603&+603+9&+600 &+600+9&+600 %/ %)  +)  CHSM72M-HC Auxin $;107$;137 $;107 $;137 $[LWHF $;,EODFNSUHPLXP PP  $;,SRZHU PP  $;,SRZHU PP  $;,SUHPLXP PP  $;,SUHPLXP PP  %RYLHW %90 %90 %<'P6K & MHK-36 Series Canadian Solar &6 +.8< 06 &6 ./8 &6.0%$*&6. 063 &6106&680%$*&68 063 &6: &6$0&6 .8 &6. 03 &6.06 &63 03 &68 03 &690&6;3 &HQWURVRODU$PHULFD C-Series & E-Series &HUWDLQ7HHG &7[[0[[&7[[3[[ &7[[[0[[&7[[[0 &7[[[0[[&7[[[+& 'HKXL '+0 Manufacture Module Model / Series Eco Solargy Orion 1000 & Apollo 1000 ET Solar ET-M672BHxxxTW )UHHGRP)RUHYHU FF-MP-BBB-370 )UHH9ROW Mono PERC GCL GCL-P6 & GCL-M6 Series Hansol 7'$17'$1 8%$18'$1 Heliene 0030 36HULHV +&00RQRIDFLDO%LIDFLDO6HULHV +&06/%LIDFLDO HT Solar +7 0  1'9  )  +7 03 Hyundai .*0*7*5,5*7,0,+, .,6HULHV HiA-SxxxHG ,7(. L7L7+( L76(6HULHV Japan Solar JPS-60 & JPS-72 Series JA Solar -$3[[[-$0[[[6,-$0 .  [[[-$3 N [[[%%-$36<<[[[== -$3 N [[[%%-$36<<[[[== -$0 N [[[==-$06<<[[[== -$0 N [[[==-$06<<[[[== L<< LL==6&35%3+L7,%0:05 -LQNR JKM & JKMS Series Eagle JKMxxxM -.0[[[0+/9 Kyocera KU Series Manufacture Module Model / Series Manufacture Module Model / Series ȫ8QOHVVRWKHUZLVHQRWHGDOOPRGXOHVOLVWHGDERYHLQFOXGHDOOZDWWDJHVDQGVSHFLʳFPRGHOVZLWKLQWKDWVHULHV9DULDEOHZDWWDJHVDUHUHSUHVHQWHGDV[[[ ȫ,WHPVLQSDUHQWKHVLVDUHWKRVHWKDWPD\RUPD\QRWEHSUHVHQWLQDFRPSDWLEOHPRGXOH VPRGHO,' ȫ6ODVKHVEHWZHHQRQHRUPRUHLWHPVLQGLFDWHVWKDWHLWKHURIWKRVHLWHPVPD\EHWKHRQHWKDWLVSUHVHQWLQDPRGXOH VPRGHO,' ȫ3OHDVHVHHWKH6)08/&RQVWUXFWLRQ'DWD5HSRUWDW8QLUDFFRPWRHQVXUHWKHH[DFWVRODUPRGXOHVHOHFWHGLVDSSURYHGIRUXVHZLWK6)0 ȫ6)0,QʳQLW\LVQRWFRPSDWLEOHZLWKPRGXOHIUDPHKHLJKWRIOHVVWKDQPPDQGPRUHWKDQPP6HH0RGXOH0RXQWLQJVHFWLRQSDJHIRUIXUWKHULQIRUPDWLRQ /*(OHFWURQLFV LGxxxN2T-A4 /*[[[ $&(&(.1&1.171: 4&4.6&6: $ LGxxxN2T-B5 LGxxxN1K-B6 /*[[[ $&0&0.1&1.4&4. 4$&4$. $ /*[[[ 1&1.171: ( /*[[[ 1&1.1:6&6: * LGxxxN2T-J5 /*[[[ 1.1:171: / /*[[[ 1&4&4. 1 /*[[[ 1&1.1:4&4. 9 LONGi /5 +,%+,++3%+3+ [[[0 /5 +,++3+ [[[0 /5 %3+%'+,%' [[[0 PP /5 %. 3( +3% +3+ [[[0 PP /5 %. 3( 3% 3+ [[[0 PP /5 %3 +%' +,%' [[[0 PP /5 +9 %. 3( 3+ 3% +3+ [[[0 PP /5 %. +9 3( 3% 3+ [[[0 PP Mission Solar Energy MSE Series 0LWVXELVKL MJE & MLE Series 1HR6RODU3RZHU&R '0 '36HULHV DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 23TESTED / CERTIFIED MODULE LIST 5(&6RODU FRQW 7ZLQ3HDN6HULHV 7ZLQ3HDN6HULHV 7ZLQ3HDN%/.6HULHV 7ZLQ3HDN6 0  ;9  7ZLQ3HDN6HULHV PP 73 %ODFN Renesola 9LWUXV6HULHV 6HULHV Risen 560 0'*  0 560 SEG Solar 6(*[[[%0'+9 6(*[[[%0'7% S-Energy 61 616HULHV PP Seraphim SEG-6 & SRP-6 Series Sharp NU-SA & NU-SC Series 6LOIDE 6/$6/*%&6HULHV 6,/[[[ %/1/17+/ 0/%.1;18+&  6RODUHYHU86$ 6( [[[01 Solaria 3RZHU;7[[[5 $&3'%' 3RZHU;7[[[&3' 3RZHU;7[[[530 $& SolarWorld 6XQPRGXOH3URWHFW Sunmodule Plus Sonali 660WR6HULHV 660WR6HULHV 660WR6HULHV 660WR%L)DFLDO6HULHV SS 230 - 265 SunEdison )6HULHV56HULHV )/(;);66HULHV Manufacture Module Model / Series 6XQLYD 096HULHV 2SWLPXV6HULHV SunPower $6HULHV$%/.6350$;;;;5 ;6HULHV(6HULHV 36HULHV 6XQWHFK 673673;;;6%:QKE Talesun 73737373 73+LSRU06PDUW Tesla 6&6&%6&%6&% 7[[[+7[[[6 Trina 3$3''''(''3( 3'3('''('('( PE15H Upsolar 830[[[3 %  830[[[0 % 8QLWHG5HQHZDEOH(QHUJ\ 85( '0[[[+$' 0. [[[+$ )$.[[[ &*(* )$0[[[(*%% )$0[[[(* %% FBMxxxMFG-BB 9LNUDP (OGRUD 6ROLYR Somera Waaree AC & Adiya Series Winaico WST & WSP Series Yingli YGE & YLM Series =16KLQH =;0=;01+B Manufacture Module Model / Series Manufacture Module Model / Series ȫ8QOHVVRWKHUZLVHQRWHGDOOPRGXOHVOLVWHGDERYHLQFOXGHDOOZDWWDJHVDQGVSHFLʳFPRGHOVZLWKLQWKDWVHULHV9DULDEOHZDWWDJHVDUHUHSUHVHQWHGDV[[[ ȫ,WHPVLQSDUHQWKHVLVDUHWKRVHWKDWPD\RUPD\QRWEHSUHVHQWLQDFRPSDWLEOHPRGXOH VPRGHO,' ȫ6ODVKHVEHWZHHQRQHRUPRUHLWHPVLQGLFDWHVWKDWHLWKHURIWKRVHLWHPVPD\EHWKHRQHWKDWLVSUHVHQWLQDPRGXOH VPRGHO,' ȫ3OHDVHVHHWKH6)08/&RQVWUXFWLRQ'DWD5HSRUWDW8QLUDFFRPWRHQVXUHWKHH[DFWVRODUPRGXOHVHOHFWHGLVDSSURYHGIRUXVHZLWK6)0 ȫ6)0,QʳQLW\LVQRWFRPSDWLEOHZLWKPRGXOHIUDPHKHLJKWRIOHVVWKDQPPDQGPRUHWKDQPP6HH0RGXOH0RXQWLQJVHFWLRQSDJHIRUIXUWKHULQIRUPDWLRQ Panasonic (939[[[ +.3.  9%+1[[[6$ 6$ 9%+1[[[6$ 6$ 9%+1[[[6$ (*  6$( 9%+1[[[.$ .$ .$ 9%+1[[[=$9%+1[[[=$ 9%+1[[[=$9%+1[[[=$ Peimar 6*[[[0 )%%) Phono Solar 3636 Prism Solar P72 Series 4&HOOV 3OXV3UR3HDN****  **  3UR3HDN/*/*/*/*/* 43($.'82%/.* 43($.'82%/.*76 43($.'82 %/. *  43($.'82/*%)) 43($.'82 %/. 0/*  43($.'82;/*** 43($.'82 %/. 0/*  43($.'82;/* FG 43($.'82%/.0/*W REC Solar $OSKD   %ODFN  3XUH RECxxxAA PURE-R 5(&[[[13%ODFN 13HDN %ODFN 13HDN %ODFN PEAK Energy Series PEAK Energy BLK2 Series PEAK Energy 72 Series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dŽ͗ ůƵĞZĂǀĞŶ^ŽůĂƌ ϭϰϬϯEŽƌƚŚZĞƐĞĂƌĐŚtĂLJ͕ƵŝůĚŝŶŐ: KƌĞŵ͕hd͘ϴϰϬϵϳ ^ƵďũĞĐƚ͗ ĞƌƚŝĨŝĐĂƚŝŽŶ>ĞƚƚĞƌ DĐŐƌĂƚŚZĞƐŝĚĞŶĐĞ ϰϳϰϲϭϲϱƚŚ^d͘t >ĂŬĞǀŝůůĞ͕DE͘ϱϱϬϰϰ dŽtŚŽŵ/ƚDĂLJŽŶĐĞƌŶ͕ ĞƐŝŐŶƌŝƚĞƌŝĂ͗ භ ƉƉůŝĐĂďůĞŽĚĞƐсϮϬϭϴ/ͬ/Z͕^ϳͲϭϲ භ ZŽŽĨĞĂĚ>ŽĂĚсϳƉƐĨ;DWϭͿ භ ZŽŽĨ>ŝǀĞ>ŽĂĚсϮϬƉƐĨ භ tŝŶĚ^ƉĞĞĚсϭϭϱŵƉŚ;sƵůƚͿ͕džƉŽƐƵƌĞ භ භ ^ŝŶĐĞƌĞůLJ͕ :ŽŚŶĂůǀĞƌƚ͕W͘͘ WƌŽũĞĐƚŶŐŝŶĞĞƌ dŚĞƐĐŽƉĞŽĨƚŚŝƐƌĞƉŽƌƚŝƐƐƚƌŝĐƚůLJůŝŵŝƚĞĚƚŽĂŶĞǀĂůƵĂƚŝŽŶŽĨƚŚĞĨĂƐƚĞŶĞƌĂƚƚĂĐŚŵĞŶƚ͕ƵŶĚĞƌůLJŝŶŐĨƌĂŵŝŶŐĂŶĚƐƵƉƉŽƌƚŝŶŐ ƐƚƌƵĐƚƵƌĞŽŶůLJ͘dŚĞĂƚƚĂĐŚŵĞŶƚΖƐƚŽƚŚĞĞdžŝƐƚŝŶŐƐƚƌƵĐƚƵƌĞĂƌĞƌĞƋƵŝƌĞĚƚŽďĞŝŶĂƐƚĂŐŐĞƌĞĚƉĂƚƚĞƌŶƚŽĞŶƐƵƌĞƉƌŽƉĞƌĚŝƐƚƌŝďƵƚŝŽŶ ŽĨůŽĂĚŝŶŐ͘ůůƉĂŶĞůƐ͕ƌĂĐŬŝŶŐĂŶĚŚĂƌĚǁĂƌĞƐŚĂůůďĞŝŶƐƚĂůůĞĚƉĞƌŵĂŶƵĨĂĐƚƵƌĞƌƐƉĞĐŝĨŝĐĂƚŝŽŶƐĂŶĚǁŝƚŚŝŶƐƉĞĐŝĨŝĞĚĚĞƐŝŐŶ ůŝŵŝƚĂƚŝŽŶƐ͘ůůǁĂƚĞƌƉƌŽŽĨŝŶŐƐŚĂůůďĞƉƌŽǀŝĚĞĚďLJƚŚĞŵĂŶƵĨĂĐƚƵƌĞƌ͘ŽŵƵƐ^ƚƌƵĐƚƵƌĂůŶŐŝŶĞĞƌŝŶŐĂƐƐƵŵĞƐŶŽƌĞƐƉŽŶƐŝďŝůŝƚLJĨŽƌ ŵŝƐƵƐĞŽƌŝŵƉƌŽƉĞƌŝŶƐƚĂůůĂƚŝŽŶŽĨƚŚĞƐŽůĂƌWsƉĂŶĞůƐŽƌƌĂĐŬŝŶŐ͘ WůĞĂƐĞĐŽŶƚĂĐƚŵĞǁŝƚŚĂŶLJĨƵƌƚŚĞƌƋƵĞƐƚŝŽŶƐŽƌĐŽŶĐĞƌŶƐƌĞŐĂƌĚŝŶŐƚŚŝƐƉƌŽũĞĐƚ͘ EŽƚĞ͗^ĞŝƐŵŝĐĐŚĞĐŬŝƐŶŽƚƌĞƋƵŝƌĞĚƐŝŶĐĞ^Ɛф͘ϰŐĂŶĚ^ĞŝƐŵŝĐĞƐŝŐŶĂƚĞŐŽƌLJ;^Ϳф ƚƚĂĐŚŵĞŶƚ͗ϭͲϱͬϭϲĚŝĂ͘ůĂŐƐĐƌĞǁǁŝƚŚϮ͘ϱŝŶĐŚŵŝŶ͘ĞŵďĞĚŵĞŶƚ ĚĞƉƚŚ͕ĂƚƐƉĂĐŝŶŐƐŚŽǁŶĂďŽǀĞ͘ ,KHUHE\FHUWLI\WKDWWKLVSODQVSHFLILFDWLRQRUUHSRUWZDVSUHSDUHGE\PHRU XQGHUP\GLUHFWVXSHUYLVLRQDQGWKDW,DPDGXO\/LFHQVHG3URIHVVLRQDO (QJLQHHUXQGHUWKHODZVRIWKH6WDWHRI0LQQHVRWD-RKQ$&DOYHUW /LFHQVH1R([SLUDWLRQ'DWH-XQH EŽǀĞŵďĞƌϲ͕ϮϬϮϯ dŚĞƌŽŽĨƐƚƌƵĐƚƵƌĞŽĨ;DWϭͿĐŽŶƐŝƐƚƐŽĨĐŽŵƉŽƐŝƚŝŽŶƐŚŝŶŐůĞŽŶƌŽŽĨƉůLJǁŽŽĚƚŚĂƚŝƐƐƵƉƉŽƌƚĞĚďLJƉƌĞͲŵĂŶƵĨĂĐƚƵƌĞĚƚƌƵƐƐĞƐƚŚĂƚ ĂƌĞƐƉĂĐĞĚĂƚΛϮϰΗŽ͘Đ͘͘dŚĞƚŽƉĐŚŽƌĚƐ͕ƐůŽƉĞĚĂƚϯϳĚĞŐƌĞĞƐ͕ĂƌĞϮdžϰƐĞĐƚŝŽŶƐ͕ƚŚĞďŽƚƚŽŵĐŚŽƌĚƐĂƌĞϮdžϰƐĞĐƚŝŽŶƐĂŶĚƚŚĞǁĞď ŵĞŵďĞƌƐĂƌĞϮdžϰƐĞĐƚŝŽŶƐ͘dŚĞƚƌƵƐƐŵĞŵďĞƌƐĂƌĞĐŽŶŶĞĐƚĞĚďLJƐƚĞĞůŐƵƐƐĞƚƉůĂƚĞƐ͘dŚĞŵĂdžƵŶƐƵƉƉŽƌƚĞĚƉƌŽũĞĐƚĞĚŚŽƌŝnjŽŶƚĂů ƚŽƉĐŚŽƌĚƐƉĂŶŝƐĂƉƉƌŽdžŝŵĂƚĞůLJϲΖͲϬΖΖ͘ dŚĞĞdžŝƐƚŝŶŐƌŽŽĨĨƌĂŵŝŶŐƐLJƐƚĞŵŽĨ;DWϭͿŝƐũƵĚŐĞĚƚŽďĞĂĚĞƋƵĂƚĞƚŽǁŝƚŚƐƚĂŶĚƚŚĞůŽĂĚŝŶŐŝŵƉŽƐĞĚďLJƚŚĞŝŶƐƚĂůůĂƚŝŽŶŽĨƚŚĞ ƐŽůĂƌƉĂŶĞůƐ͘EŽƌĞŝŶĨŽƌĐĞŵĞŶƚŝƐŶĞĐĞƐƐĂƌLJ͘ 'ƌŽƵŶĚ^ŶŽǁ>ŽĂĚсϱϬƉƐĨͲZŽŽĨ^ŶŽǁ>ŽĂĚсϯϱƉƐĨ dŚĞƐƉĂĐŝŶŐŽĨƚŚĞƐŽůĂƌƐƚĂŶĚŽĨĨƐƐŚŽƵůĚďĞŬĞƉƚĂƚϰϴΗŽ͘Đ͘ĨŽƌůĂŶĚƐĐĂƉĞĂŶĚϮϰΗŽ͘Đ͘ĨŽƌƉŽƌƚƌĂŝƚŽƌŝĞŶƚĂƚŝŽŶ͕ǁŝƚŚĂƐƚĂŐŐĞƌĞĚ ƉĂƚƚĞƌŶƚŽĞŶƐƵƌĞƉƌŽƉĞƌĚŝƐƚƌŝďƵƚŝŽŶŽĨůŽĂĚƐ͘ ũŽďƐŝƚĞŽďƐĞƌǀĂƚŝŽŶŽĨƚŚĞĐŽŶĚŝƚŝŽŶŽĨƚŚĞĞdžŝƐƚŝŶŐĨƌĂŵŝŶŐƐLJƐƚĞŵǁĂƐƉĞƌĨŽƌŵĞĚďLJĂŶĂƵĚŝƚƚĞĂŵŽĨůƵĞZĂǀĞŶ^ŽůĂƌĂƐĂ ƌĞƋƵĞƐƚĨƌŽŵŽŵƵƐ^ƚƌƵĐƚƵƌĂůŶŐŝŶĞĞƌŝŶŐ͘ůůƌĞǀŝĞǁŝƐďĂƐĞĚŽŶƚŚĞƐĞŽďƐĞƌǀĂƚŝŽŶƐĂŶĚƚŚĞĚĞƐŝŐŶĐƌŝƚĞƌŝĂůŝƐƚĞĚďĞůŽǁĂŶĚ ŽŶůLJĚĞĞŵĞĚǀĂůŝĚŝĨƉƌŽǀŝĚĞĚŝŶĨŽƌŵĂƚŝŽŶŝƐƚƌƵĞĂŶĚĂĐĐƵƌĂƚĞ͘ KŶƚŚĞĂďŽǀĞƌĞĨĞƌĞŶĐĞĚƉƌŽũĞĐƚ͕ƚŚĞƌŽŽĨƐƚƌƵĐƚƵƌĂůĨƌĂŵŝŶŐŚĂƐďĞĞŶƌĞǀŝĞǁĞĚĨŽƌĂĚĚŝƚŝŽŶĂůůŽĂĚŝŶŐĚƵĞƚŽƚŚĞŝŶƐƚĂůůĂƚŝŽŶŽĨ ƚŚĞƐŽůĂƌWsĂĚĚŝƚŝŽŶƚŽƚŚĞƌŽŽĨ͘dŚĞƐƚƌƵĐƚƵƌĂůƌĞǀŝĞǁŽŶůLJĂƉƉůŝĞƐƚŽƚŚĞƐĞĐƚŝŽŶŽĨƚŚĞƌŽŽĨƚŚĂƚŝƐĚŝƌĞĐƚůLJƐƵƉƉŽƌƚŝŶŐƚŚĞƐŽůĂƌ WsƐLJƐƚĞŵĂŶĚŝƚƐƐƵƉƉŽƌƚŝŶŐĞůĞŵĞŶƚƐ͘dŚĞŽďƐĞƌǀĞĚƌŽŽĨĨƌĂŵŝŶŐŝƐĚĞƐĐƌŝďĞĚďĞůŽǁ͘/ĨĨŝĞůĚĐŽŶĚŝƚŝŽŶƐĚŝĨĨĞƌ͕ĐŽŶƚƌĂĐƚŽƌƚŽ ŶŽƚŝĨLJĞŶŐŝŶĞĞƌƉƌŝŽƌƚŽƐƚĂƌƚŝŶŐĐŽŶƐƚƌƵĐƚŝŽŶ͘ 0FJUDWK/DNHYLOOH01 Digitally signed by John A. Calvert Date: 2023.11.06 08:51:04 -07'00' BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 'RPXV6WUXFWXUDO(QJLQHHULQJ//& 32%R[ %URRPILHOG&2  SURMHFWV#GRPXVVWUXFFRP 50.0 psf (ASCE7 - Eq 7-1) 1 (ASCE7 - Table 7-2) 1 (ASCE7 - Table 7-3) 1 35.0 psf (ASCE7 - Eq 7-2) 1 35.0 psf 3.76 psf 3.0 psf 2.00 ft 6.08 ft 12.17 sft 37 lb 4.00 2.00 0.73 0.00 (Ceiling Not Vaulted) 0.27 7.0 psf 8.8 psf PV Dead Load = 3 psf (Per Blue Raven Solar) DL Adjusted to 37 Degree Slope Point Loads of Standoffs Miscellaneous Vaulted Ceiling Total Roof DL (MP1) Roof Live Load = 20 psf Roof Plywood Roof Dead Load (MP1) Composition Shingle Note: Roof live load is removed in area's covered by PV array. Roof Snow Load Calculations pg = Ground Snow Load = Ce = Exposure Factor = pf = 0.7 CeCtI pg Ct = Thermal Factor = I = Importance Factor = Cs = Slope Factor = Standoff Tributary Area = ps = Cspf ps = Sloped Roof Snow Load = pf = Flat Roof Snow Load = DL Adjusted to 37 Degree Slope *UDYLW\/RDGLQJ PV System Weight Weight of PV System (Per Blue Raven Solar) X Standoff Spacing = Y Standoff Spacing = Note: PV standoffs are staggered to ensure proper distribution of loading 2x4 Top Chords @ 24"o.c. 0FJUDWK/DNHYLOOH01 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 'RPXV6WUXFWXUDO(QJLQHHULQJ//& 32%R[ %URRPILHOG&2  SURMHFWV#GRPXVVWUXFFRP 115 mph C Gable Roof 37 degrees 20 ft 21.3 ft 0 ft (Eq. 26.10-1) 0.90 (Table 30.3-1) 1.00 (Fig. 26.8-1) 0.85 (Table 26.6-1) 1.00 115 mph (Fig. 26.5-1A) II (Table 1.5-1) qh = 25.95 Zone 1 Zone 2 Zone 3 Positive ya =0.77 0.80 0.80 0.77 GCp =   (Fig. 30.3) Uplift Pressure =SVI SVI SVI SVI (T ASD Uplift Pressure =SVI SVI SVI SVI X Standoff Spacing = 2.00 2.00 1.33 Y Standoff Spacing = 6.08 3.04166667 3.04166667 Tributary Area = 12.17 6.08 4.06 Dead Load on attachment = 37 lb 18 lb 12 lb Footing Uplift (0.6D+0.6W) = -229 lb -141 lb -139 lb Zone 1 Zone 2 Zone 3 Positive ya =0.75 0.80 0.80 0.75 GCp =   (Fig. 30.3) Uplift Pressure =SVI SVI SVI SVI (T ASD Uplift Pressure (0.6W)=SVI SVI SVI SVI X Standoff Spacing = 4.00 4.00 2.67 Y Standoff Spacing = 3.50 1.75 1.75 Tributary Area = 14.00 7.00 4.67 Dead Load on attachment = 42.00 21.00 14.00 Footing Uplift (0.6D+0.6W) = -246 lb -162 lb -156 lb -246 lb 450 lb Therefore, OK Fastener =1 - 5/16" dia. lag Number of Fasteners = 1 Embedment Depth = 2.5 Pullout Capacity Per Inch = 250 lb Fastener Capacity = 625 lb w/ F.S. of 1.5 & DOL of 1.6= 667 lb Therefore, OK :LQG&DOFXODWLRQV Maximum Design Uplift = Design Wind Pressure Calculations qh = 0.00256 * Kz * Kzt * Kd * Ke * V^2 Kz (Exposure Coefficient) = Kzt (topographic factor) = Wind Speed Exposure Category Roof Shape Roof Slope Effective Wind Area WĞƌ^ϳͲϭϲŽŵƉŽŶĞŶƚƐĂŶĚůĂĚĚŝŶŐ Input Variables Fastener Capacity Check Mean Roof Height Ground Elevation Kd (Wind Directionality Factor) = 667.2 lb capacity > 246 lb demand Ke (Ground Elevation Factor) = V (Design Wind Speed) = Risk Category = Standoff Uplift Calculations-Portrait Standoff Uplift Calculations-Landscape Standoff Uplift Check Standoff Uplift Capacity = 450 lb capacity > 246 lb demand 0FJUDWK/DNHYLOOH01 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 'RPXV6WUXFWXUDO(QJLQHHULQJ//& 32%R[ %URRPILHOG&2  SURMHFWV#GRPXVVWUXFFRP 03 PASS Dead Load 8.8 psf PV Load 3.8 psf Snow Load 35.0 psf Governing Load Combo = DL + SL Total Load 47.5 psf Fb (psi) = f'b x Cd x Cf x Cr (NDS Table 4.3.1) 900 x 1.15 x 1.5 x 1.15 Allowed Bending Stress = 1785.3 psi (wL^2) / 8 = 427.6922 ft# = 5132.307 in# Actual Bending Stress = (Maximum Moment) / S = 1675.9 psi L/180 (E = 1600000 psi Per NDS) = 0.4 in Deflection Criteria Based on = (w*L^4) / (185*E*I) = = L/534 > L/180 Therefore OK Allowed Deflection (Live Load) =L/240 0.3 in (w*L^4) / (185*E*I) L/728 > L/240 Therefore OK Member Area = Fv (psi) = 180 psi (NDS Table 4A) Allowed Shear = Fv * A = Max Shear (V) = w * L / 2 = 285 lb Check Bending Stress (True Dimensions) Continuous Span 0.135 in 0.099 in Member Properties Member Size 2x4 S (in^3) 3.06 DF#2 Member Spacing @ 24"o.c. Maximum Moment = Check Deflection I (in^4) 5.36 Lumber Sp/Gr Actual Deflection (Live Load) = Allowed Deflection (Total Load) = Actual Deflection (Total Load) = Allowed > Actual -- 93.9% Stressed -- Therefore, OK 945 lb Allowed > Actual -- 30.2% Stressed -- Therefore, OK 5.3 in^2 Check Shear w = 95 plf 2x4 Top Chords @ 24"o.c. Member Span = 6' - 0" )UDPLQJ&KHFN 0FJUDWK/DNHYLOOH01 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 'RPXV6WUXFWXUDO(QJLQHHULQJ//& 32%R[ %URRPILHOG&2  SURMHFWV#GRPXVVWUXFFRP $SSHQGL[$*HQHUDO1RWHV *(1(5$/ Ɣ 7KHFRQWUDFWRUVKDOOYHULI\DOOGLPHQVLRQVSURSHUW\VHWEDFNV$+-+2$&& 5 VHOHYDWLRQVDQGVLWHFRQGLWLRQVEHIRUH VWDUWLQJZRUNDQGVKDOOQRWLI\'RPXV6WUXFWXUDO(QJLQHHULQJ//&RIDQ\GLVFUHSDQFLHV Ɣ $OOUHSRUWFRQFOXVLRQVUHSUHVHQW'RPXV6WUXFWXUDO(QJLQHHULQJ//& VEHVWSURIHVVLRQDOMXGJPHQWEDVHGXSRQLQGXVWU\ VWDQGDUGV Ɣ 5HVROYHDQ\FRQIOLFWVRQWKHGUDZLQJVZLWK'RPXV6WUXFWXUDO(QJLQHHULQJ//&EHIRUHSURFHHGLQJZLWKFRQVWUXFWLRQ Ɣ 7KHGHVLJQFULWHULDXVHGIRUWKLVSURMHFW OLVWHGRQWKHILUVWSDJHRIWKHUHSRUWLVEDVHGRQWKHHQJLQHHUVEHVWMXGJHPHQW DQGRUSURYLGHGE\WKH$7&FRXQFLO$+-VSHFLILFUHTXHVWVPD\GLIIHU3OHDVHFRQWDFWRXUWHDPLIWKHGHVLJQFULWHULDQHHGVWR EHPRGLILHG Ɣ $VLWHYLVLWZDVQRWSK\VLFDOO\FRQGXFWHGE\'RPXV6WUXFWXUDO(QJLQHHULQJ//&7KHDFFRPSDQ\LQJFDOFXODWLRQVDQG FHUWLILFDWLRQDUHSURYLGHGZLWKWKHXQGHUVWDQGLQJWKDWWKHVLWHEXLOGLQJDQGFRQVWUXFWLRQVWDQGDUGVPHHWDQDFFHSWDEOHOHYHORI LQGXVWU\VWDQGDUGV,WVKDOOEHWKHFRQWUDFWRUVUHVSRQVLELOLW\WRLGHQWLI\DQ\LUUHJXODULWLHVVXFKDVLQFRQVLVWHQWIUDPLQJ FRQGLWLRQVZDWHUGDPDJHILUHGDPDJHFUDFNHGVSOLWRUQRWLFHDEO\GHIOHFWLQJIUDPLQJPHPEHUV Ɣ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Ɣ $Q\DQGDOOZDWHUSURRILQJVKDOOEHSURYLGHGE\WKHFRQWUDFWRU'RPXV6WUXFWXUDO(QJLQHHULQJ//&LVQRWUHVSRQVLEOHIRU ZDWHUSURRILQJ Ɣ $OOKDUGZDUHVKDOOEHLQVWDOOHGSHUPDQXIDFWXUHUVSHFLILFDWLRQVDQGZLWKLQVSHFLILHGGHVLJQOLPLWDWLRQV'RPXV6WUXFWXUDO (QJLQHHULQJ//&DVVXPHVQRUHVSRQVLELOLW\IRULQFRUUHFWO\LQVWDOOHGKDUGZDUHRUKDUGZDUHLQVWDOOHGRXWVLGHRIWKH PDQIDFWXUHUVSHFLILFDWLRQV 86(55(/,$1&( Ɣ 'RPXV6WUXFWXUDO(QJLQHHULQJ//&ZDVHQJDJHGE\%OXH5DYHQ6RODU &OLHQW WRSHUIRUPWKLVDVVHVVPHQW7KLVUHSRUWDQG WKHLQIRUPDWLRQWKHUHLQDUHIRUWKHH[FOXVLYHXVHRIWKH&OLHQW7KLVUHSRUWKDVQRRWKHUSXUSRVHDQGVKDOOQRWEHUHOLHGXSRQ RUXVHGE\DQ\RWKHUSHUVRQRUHQWLW\ZLWKRXWWKHZULWWHQFRQVHQWRI'RXV6WUXFWXUDO(QJLQHHULQJ//&7KLUGSDUWLHVWKDW REWDLQWKLVUHSRUWRUWKHLQIRUPDWLRQZLWKLQVKDOOKDYHQRULJKWVRIUHFRXUVHRUUHFRYHU\DJDLQVW'RPXV6WUXFWXUDO (QJLQHHULQJ//&LW¶VRIILFHUVRUHPSOR\HHV 522)02817('$55$<6 Ɣ ,IDQDQDO\VLVRIDVXSSRUWLQJVWXFWXUHLVLQFOXGHGLQRXUVFRSHRIZRUNWKHVWUXFWXUDODVVHVVPHQWRQO\DSSOLHVWRWKHVHFWLRQ RIWKHURRIWKDWLVGLUHFWO\VXSSRUWLQJWKHSURSRVHGVRODU39V\VWHP Ɣ 1RVWUXFWXUDOPHPEHUVFDQEHFXWIRUFRQGXLWHWFXQOHVVVSHFLILFDOO\VKRZQ2EWDLQSULRUZULWWHQDSSURYDOIRULQVWDOODWLRQRI DQ\DGGLWLRQDOFRQGXLWHWF Ɣ ,WLVDVVXPHGWKDWDVWDQGDUGTXDOLW\RIFRQVWUXFWLRQFDUHZDVXVHGWRFRQVWUXFWWKHRULJLQDOEXLOGLQJ,WVKDOOEHWKH FRQWUDFWRUVUHVSRQVLELOLW\WRILHOGYHULI\DQ\DQGDOOIUDPLQJPHPEHUVXSSRUWLQJWKHSURSRVHG39DUUD\DUHLQDGHTXDWH FRQGLWLRQ7KHFRQWUDFWRUVKDOOILHOGLQVSHFWIRUVXEVWDQGDUGFRQVWUXFWLRQPHDQVVLJQVRIGU\URWPROGILUHGDPDJHHWFDQG QRWLI\HQJLQHHULIDQ\FRPSURPLVHGPDWHULDOLVIRXQGRQVLWHSULRUWRVWDUWLQJFRQVWUXFWLRQ Ɣ ,WLVDVVXPHGWKDWWKHUHKDYHEHHQQRDGGLWLRQDOORDGV +9$&RU0(3HTXLSPHQWDGGLWLRQDOOD\HUVRIURRILQJHWF DGGHGWR WKHEXLOGLQJRYHUWKHFRXUVHRIWKHVWUXFWXUHVKLVWUR\7KHFRQWUDFWRUDQGRUFOLHQWVKDOOYHULI\WKLVZLWKWKHSURSHUW\RZQHUDQG QRWLI\'RPXV6WUXFWXUDO(QJLQHHULQJ//&LIDGGLWLRQDOORDGKDVEHHQDGGHGWRWKHVWUXFWXUHDOUHDG\ Ɣ )OH[LEOHXWLOLW\FRQQHFWLRQVPXVWEHXVHGDWDQ\EXLOGLQJVHLVPLFMRLQW Ɣ &DUHVKRXOGEHWDNHQWRHQVXUHWKDW39DUUD\VGRQRWSUHFOXGHGUDLQDJHRIUDLQZDWHU Ɣ 8QOHVVRWKHUZLVHQRWHGFRQVWUXFWLRQPDWHULDOVKDOOEHHYHQO\GLVWULEXWHGLISODFHGRQIUDPHGIORRUVRUURRIV/RDGVVKDOOQRW H[FHHGWKHDOORZDEOHORDGLQJIRUWKHVXSSRUWLQJPHPEHUVDQGWKHLUFRQQHFWLRQV Ɣ $OOODJVRUZRRGVFUHZVDWWKHURRIVKDOOEHVWDLQOHVVVWHHODQGLQVWDOOHGZLWKLQJWKHPLGGOHRIWKHGLPHQVLRQDOZLGWKRIWKH IUDPLQJPHPEHUV Ɣ $OOIDVWHQHUVVKDOOEHDPLQLPXPRIDZD\IURPDQ\WUXVVSDQHORUKLQJHMRLQWVWUXVVSODWHVDQGRUPHPEHUHQGV)LHOG YHULI\ORFDWLRQRIIDVWHQHUVSULRUWRVWDUWLQJFRQVWUXFWLRQ$OOIDVWHQHUVVKDOOEHSUHGULOOHGWRDYRLGVSOLWWLQJH[LVWLQJOXPEHU Ɣ 'RPXV6WUXFWXUDO(QJLQHHULQJ//&LVQRWUHVSRQVLEOHIRUGRZQVORSHHIIHFWVRIVQRZVKHGGLQJRUVOLGLQJRIIRIWKH39DUUD\ QRUDQ\GDPDJHWRGRZQVORSHGHFNVURRIVZDONZD\VODQGVFDSLQJDXWRPRELOHVSHWVSHRSOHHWF,IVQRZJXDUGVDUH UHTXHVWHGE\WKHFXVWRPHUQRWLI\'RPXV6WUXFWXUDO(QJLQHHULQJ//& 0FJUDWK/DNHYLOOH01