HomeMy WebLinkAbout17919 Hidden Creek Court SURVEYZoning = RS-4
FY - 20' House, 25' Garage
SY - 7' Interior, 20' Corner
RY - 30'
SY Buffer - 30'
RY Buffer - 50'
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________10/05/2023 asobottka