HomeMy WebLinkAboutsurvey signFRONT ELEVATIONSCALE 1:205'-0 1/2"1'-4" DIA2'-0" DIA5'-0"
3"
6'-0 7/16" OAH1'-1 1/8"
4'-9"
4'-11 5/16"(6) #5 VERTICAL REBAREQUALLY SPACED AROUND1'-4" DIA CIRCLE(3) #3 TIES IN THE TOP 5" O/C,10" O/C THEREAFTER12" CONDUIT
PROJECTIONFINISH GRADEDETAIL-'A'STRUCTURAL BASE(2) LIFTING EYE BOLTSLOPE TOP TO SHED WATER(3) 1" DIAMETERCONDUITS REQUIRED1 1/2"CLEAR4" CLEAR(TYP, SIDE & BOTTOM)(4) 3/4" DIA X 40" LONG ANCHOR BOLTS,W/ 10" THREAD @ TOP AND3" THREAD @ BOTTOM,(4) NUTS & (2) WASHERS PER BOLT,(080-00069)THE DISTANCE FROM THE TOP OFTHE FOUNDATION TO THE BOTTOMOF THE BASE PLATE TO BE 1"-2"DOUBLE NUTS (GALV.)FLAT WASHERS5" PROJECTIONLEVELING NUTTIGHTEN THIS NUT 1/6 TURN BEYOND SNUG-TIGHT(MIN 60°, MAX 80°)60°ANCHOR BOLT DETAIL-'A' SCALE: NONETIGHTEN THIS NUT SNUG-TIGHT8"ANCHOR BOLT PATTERN SCALE 1:16ELECTRICALPASSAGEOVERTURNINGDIRECTION8"4"4"22 15/16"12 5/8"PHOTO REQUIREMENTSINSTALLER TO PROVIDE COMPLETION PHOTOS OF THE FOLLOWING1. MATCH PLATE/SIGN CONNECTIONS2. BEFORE AND AFTER PHOTOS OF ALL PLUG WELDS, CAP PLATE WELDS, AND ANYOTHER WELDED CONNECTIONS DONE IN THE FIELD3. ELECTRICAL WIRING4. ALL SIGN ILLUMINATING (PREFRABLY SHOWING LED'S OR LAMPS ILLUMINATING)5. ANY WALL PENETRATION CAULKED AND SEALED6. OVERALL ELEVATIONGENERAL NOTESTHIS SIGN IS INTENDED TO BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OFARTICLE 600 OF THE NATIONAL ELECTRIC CODE AND/OR OTHER APPLICABLE LOCALCODES. THIS INCLUDES PROPER GROUNDING AND BONDING OF THE SIGN AND INSTALLINGDISCONNECT SWITCHES IF NOT FACTORY INSTALLED ON THE SIGN.SIGN ASSEMBLY IS INTENDED FOR OUTDOOR WET LOCATION.INSTALLER TO BE SURE SIGNS ARE PROPERLY INSTALLED, CONNECTED AND GROUNDED.LANDSCAPING MATERIALS SHOULD BE KEPT MINIMUM TWO INCHES AWAY FROM SIGNPOLES OR BASE PLATES.THIS DRAWING IS FOR INSTALLATION PURPOSES ONLY AND NOT TO BE USED FORMANUFACTURING.CONCRETE SPECIFICATION0.58 CU. YDS. TOTAL. CONCRETE SHALL HAVE A MIN. COMPRESSIVE STRENGTH OF 3,000PSI @ 28 DAYS. REINFORCING STEEL SHALL HAVE A MIN. YIELD STRENGTH OF 60,000 PSI.RECOMMENDED MIN. CURE TIME OF 7 DAYS BEFORE PROCEEDING WITH INSTALLATION.LIFTING HOLE NOTEANY LIFTING HOLES CREATED ARE THE RESPONSIBILITY OF THE INSTALLER. LIFTINGHOLES ARE TO BE SEALED BY A CAP PLATE, WELDED OVER TO COVER AND THEN PAINTED.WELDING NOTEANY REQUIRED WELDING IS TO BE COMPLETED BY AN AWS CERTIFIED WELDER QUALIFIEDIN THE APPLICABLE POSITIONS NEEDED. PROOF OF WELDER CERTIFICATION REQUIRED (COPY OF WELDER CERTIFICATION,PHOTO OF AWS CERTIFICATION CARD OF PERSONDOING THE WELDING).DESIGN NOTESIGN, POLE AND CONCRETE FOUNDATION ARE DESIGNED TO WITHSTAND AN ALLOWABLEWIND LOAD OF 35 PSF, 123 MPH,IBC 2009,EXPOSURE C.CONCRETE BASE DESIGNED USING A LATERAL SOIL BEARING CAPACITY OF 150 PSF / FT.OF DEPTH. IF THESE SOIL CONDITIONS DO NOT EXIST AT THE FOUNDATION LOCATION, IT ISTHE ERECTOR'S RESPONSIBILITY TO NOTIFY EVERBRITE, LLC PRIOR TO PERFORMINGADDITIONAL EXCAVATION OR ANY CONCRETE PLACEMENT.INSTALLATION INSTRUCTIONS1. STAKE FOUNDATION AREA AND CONFIRM FINAL GRADE REQUIREMENTS WITH G. C.2. EXCAVATE FOUNDATION AREA.3. SET ANCHOR BOLTS, REBAR AND CONDUIT STUB. (PRIMARY ELECTRICAL SERVICE TOBASE BY G.C.)4. POUR CONCRETE. ALLOW CONCRETE CURE TIME AS REQUIRED. RECOMMENDED MIN.CURE TIME OF 7 DAYS BEFORE PROCEEDING WITH INSTALLATION.5. ANCHOR POLE(S) AS SHOWN IN AB DETAIL. CHECK FOR PLUMB.6. MOUNT SIGNAGE TO POLE(S). (INSTALLER TO PROVIDE WIRE BETWEEN SIGN ANDBASE OF POLE.)7. MAKE FINAL ELECTRICAL HOOK-UP. (ALL ELECTRICAL TO MEET LOCAL CODES.)8. TEST SIGNAGE FOR PROPER FUNCTION AND LIGHTING.9. REMOVE ANY LIFTING BRACKETS AND REINSTALL BOLTS.10. CLEAN UP AREA AND REMOVE ANY PACKING MATERIAL. DO NOT DISCARD ANYMATERIAL OR DEBRIS INTO ON SITE DUMPSTERS.DRAWN BYCHECKED BYDATETITLESITEPROJECT NO.AS SHOWNDATEREVDRAWING NO.REVADATERELEASED FOR INSTALLATION DESCRIPTIONBYCHKTHESE DRAWINGS ARE THE EXCLUSIVEPROPERTY OF EVERBRITE, LLC. USE OF,OR DUPLICATION IN ANY MANNER WITH-OUT EXPRESS WRITTEN PERMISSION OFEVERBRITE, LLC. IS PROHIBITED.4949 SO. 110TH ST.P.O. BOX 20020GREENFIELD, WI 53220414-529-3500RIN458081C SCALE458081REFAINSTALLATIONDRAWING10/05/21TECHNO-SKSCJB10/05/21CJB10/05/21TACO 6'-0 7/16" X 5'-0 1/2" V12 DOUBLEMENU BOARD SWL @ 6'-0 7/16" OAHTECHNO-SKSEVERBRITE TO FURNISH1. 6'-0 7/16" X 5'-0 1/2" MENU BOARD WITH POLE2. (4) ANCHOR BOLTS AND NUTS3. ALL MOUNTING HARDWAREINSTALLER TO FURNISH1. ALL ELECTRICAL COMPONENTS REQUIRED2. FOUNDATIONGENERAL CONTRACTOR TO FURNISH1. PRIMARY WIRES FROM BUILDING TO SIGNELECTRICAL SPECIFICATION :POWER SUPPLIES : HARDWIRED AC POWER120/240V 50/60Hz1150W (@ MAX LOAD)UL RATED @ 10AmpBACKLIGHT: LED LIGHT SOURCE380 CD/M2 TO 3,500 CD/M2WEIGTH : 915 LBSSTANDARD DRAWINGLA219852