Loading...
HomeMy WebLinkAbout18870 Ivorra Avenue-SURVEYThe curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________10/20/2023 asobottka tree 801: dead tree 805: REMOVED tree preservation reviewed 10/25/23 EA