Loading...
HomeMy WebLinkAbout17985 Granite Court-SURVEYPlanning DepartmentApprovedDate:__________________10/19/2023 kjenson Draintile cleanout coords:N = 179056.10E = 523956.70 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________10/20/2023 asobottka