HomeMy WebLinkAbout17064-72 Dysart Place SurveyA. 9/27/23: Client
Denotes set spike
Denotes set iron monument
Denotes found iron monument
Denotes found scribed "x"
Denotes set hub
Denotes found hub
Denotes proposed drainage
Denotes top of curb
Denotes existing elevation
Denotes proposed elevation
Denotes as-built elevation
SURVEYOR'S CERTIFICATE
I hereby certify that this survey, plan or report was prepared by me or under
my direct supervision and that I am a duly Licensed Land Surveyor under the
laws of the State of Minnesota. That this survey does not purport to show all
improvements, easements or encroachments, to the property except as
shown thereon.
Signed this 21st day of September, 2023
Marcus F. Hampton, MN L.S. No. 47481
PROPERTY DESCRIPTION
17064, 17066, 17068, 17070 and, 17072 Dysart Place, Lakeville, Minnesota
PROPERTY ADDRESS
1.Bearings are based on the recorded plat.
2.Building dimensions shown are for horizontal and vertical placement of
structure only. See architectural plans for building and foundation
dimensions.
3.No specific soils investigation has been completed on this lot by James
R. Hill, Inc. the suitability of soils to support the specific house proposed
is not the responsibility of James R. Hill, Inc. or the surveyor.
4.No specific title search for existence or non-existence of recorded or
un-recorded easements has been conducted by the surveyor as a part
of this survey. Only easements per the recorded plat are shown.
5.Proposed grades shown were taken from the grading &/or development
plan prepared by Westwood Professional Services, Inc.
6.Grading plan date/revision date: September 27, 2023
7.Plan No.'s 2640-L, 2645-M, 2645-N, 2645-M and 2640-L
NOTES
FLOOR ELEVATIONS
BENCHMARK
Lots 47-51
Proposed
Garage Floor @ Front = 940.8
Garage Top of Block = 941.2
House Top of Block = 941.2
Lowest Floor = 941.2
Top nut of hydrant located at Lots 24 and 25, Block 1 = 941.55
Lots 47, 48, 49, 50 and 51, Block 1, BROOKSHIRE, Dakota County, Minnesota
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________10/30/2023 asobottka
Planning DepartmentApprovedDate:__________________10/31/2023 dmorey