Loading...
HomeMy WebLinkAbout17064-72 Dysart Place SurveyA. 9/27/23: Client Denotes set spike Denotes set iron monument Denotes found iron monument Denotes found scribed "x" Denotes set hub Denotes found hub Denotes proposed drainage Denotes top of curb Denotes existing elevation Denotes proposed elevation Denotes as-built elevation SURVEYOR'S CERTIFICATE I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. That this survey does not purport to show all improvements, easements or encroachments, to the property except as shown thereon. Signed this 21st day of September, 2023 Marcus F. Hampton, MN L.S. No. 47481 PROPERTY DESCRIPTION 17064, 17066, 17068, 17070 and, 17072 Dysart Place, Lakeville, Minnesota PROPERTY ADDRESS 1.Bearings are based on the recorded plat. 2.Building dimensions shown are for horizontal and vertical placement of structure only. See architectural plans for building and foundation dimensions. 3.No specific soils investigation has been completed on this lot by James R. Hill, Inc. the suitability of soils to support the specific house proposed is not the responsibility of James R. Hill, Inc. or the surveyor. 4.No specific title search for existence or non-existence of recorded or un-recorded easements has been conducted by the surveyor as a part of this survey. Only easements per the recorded plat are shown. 5.Proposed grades shown were taken from the grading &/or development plan prepared by Westwood Professional Services, Inc. 6.Grading plan date/revision date: September 27, 2023 7.Plan No.'s 2640-L, 2645-M, 2645-N, 2645-M and 2640-L NOTES FLOOR ELEVATIONS BENCHMARK Lots 47-51 Proposed Garage Floor @ Front = 940.8 Garage Top of Block = 941.2 House Top of Block = 941.2 Lowest Floor = 941.2 Top nut of hydrant located at Lots 24 and 25, Block 1 = 941.55 Lots 47, 48, 49, 50 and 51, Block 1, BROOKSHIRE, Dakota County, Minnesota The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________10/30/2023 asobottka Planning DepartmentApprovedDate:__________________10/31/2023 dmorey