Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA220208-20076 Gabardine La Permit Pack
RESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ _____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ NAME OF APPLICANT (Please Print)DATE I HEREBY APPLY FOR PERMIT AND ACKNOWLEDGE THAT ALL INFORMATION ON THIS APPLICATION IS COMPLETE AND ACCURATE. THIS IS NOT A PERMIT AND WORK IS NOT TO COMMENCE UNTIL SUCH TIME A PERMIT IS ISSUED. ALL WORK WILL COMPLY WITH LAKEVILLE CITY CODE, THE MINNESOTA STATE BUILDING CODE, AND THE APPROVED PLANS. INTEREST EARNINGS ON ESCROW ACCOUNTS, IF ANY, WILL BE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. OFFICE PHONE #:_ OFFICE PHONE #:_ *Entering your name affirms your intent to comply with the statement above. * Submit Application To: permits@lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT CONDO REROOF RESIDE RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LOWER LEVEL FINISH ADDITION FOUNDATION ONLY MISCELLANEOUS DEMO APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: CITY BUILDING VALUATION: $ BUILDING PERMIT FEES $PERMIT FEE $PLAN CHECK $SURCHARGE $METRO SAC $CITY WATER HOOKUP UNIT $CITY SEWER HOOKUP UNIT $LANDSCAPE ESCROW $TREE ESCROW $MISC ESCROW $PLUMBING $MECHANICAL $SEWER WATER WATER METER PRESSURE REDUCING VALVE $OTHER $TOTAL METER SIZE PRESSURE REDUCING VALVE SEWER/WATER SEWER/WATER FINAL STREET DRAINTILE BUILDING INFORMATION TYPE OF CONSTRUCTION ZONING CODE EDITION FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP MECHANICAL AIR TEST FINAL ROUGH-IN PLUMBING FINAL ROUGH-IN INSULATION LATH DECK FOOTING FIREPLACE FOOTING FOUNDATION FRAMING PORCH FRAMING PORCH FOOTING POURED WALL SITE LOWER LEVEL FINAL OTHER DECK FRAMING LOWER LEVEL FRAMING LANDSCAPING DECK FINAL $ $ ACCESSORY BUILDING EGRESS WINDOW UNDERGROUND EV4S SALERNO -3 CAR 20076 Gabardine Lane Cedar Hills-3rd AdditionConcept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode11/13/2023jnuetzman SCALE:A11FRONT ELEVATION1/4" = 1'- 0"SCALE:A12ROOF PLAN1/8" = 1'- 0"SCALE:A13SIDE ELEVATION1/8" = 1'- 0"SCALE:A14REAR ELEVATION1/8" = 1'- 0"SCALE:A15SIDE ELEVATION1/8" = 1'- 0"SCALE:A16COLUMN DETAIL1/2" = 1'- 0"GARAGE HARDWARE PERCOMMUNITY SPECS 20076 Gabardine Lane Cedar Hills-3rd AdditionEXTERIOR MATERIALS % LAP SIDING = 21% STONE = 44% SHAKE = 24% TRIM = 11%LP SHAKE SIDINGFACE APPLIED STONE VENEERLP HORIZONTAL LAP SIDINGHARDBOARD SIDING ON FRONT ELEVATION.FACE APPLIED STONE VENEERHARDBOARD SIDING ON SIDE AND REAR ELEVATIONS.2' GARAGE BUMP SEE PAGE A3.4D4-SEASON PORCH SEE PAGE A3.3DLP HORIZONTAL LAP SIDINGLP HORIZONTAL LAP SIDING 6" GRANULAR FILL16"x8" CONC. FOOTINGW/ SILL SEALER(TR) 2x6 SILL PLATEGRADER-20 BATT INS.BOLT AT 72" O.C.1/2" DIA. x 10" ANCHOR8" POURED CONC.FOUNDATION WALL CONC. SLABEXT. FIN. PER PLANDOUBLE TOP PLATEHEADER AT WIN.4 MIL POLY8"2"TYVEK WITH SIDINGPER PLAN (EXT. PER PLAN)VAPOR BARRIERR-10 RIGID INSUL.OR APPROV. STRAPMIN. 42"WATERPROOFINGREQ'D. @ TOPFDN. WALL5/8" DRYWALL1/2" DRYWALL30 MIL PVC MEMBRANESEAL ALL SEAMS,CORNERS & EDGES W/ 35MIL POLYETHYLENEBACKED SYNTHETICBUTYL RUBBER ADHESIVEMEMBRANE6" GRANULAR FILL CONC. SLAB10"VAPOR BARRIERR-10 RIGID INSUL.8"CONC. STOOPAT FOUNDATION2" D.x8" H. LEDGEWATERPROOFINGFOUNDATION NOTES:1. MAXIMUM WALL LENGTH WITHOUT A CONTROL JOINT TO BE 50'-0".2. PRIOR TO BACKFILLING, FOUNDATION WALLS MUST BE LATERALLYSUPPORTED BY FLOOR CONSTRUCTION AT BOTH TOP AND BOTTOM OR BYADEQUATE TEMPORARY BRACING.3. EXTERIOR WATERPROOFING SHALL COMPLY W/ R 406.2 PER 2020 MNRESIDENTIAL CODE. WATERPROOFING SHALL EXTEND FROM TOP OF INSIDEEDGE, ACROSS TOP, AND DOWN EXTERIOR FACE OF FOUNDATION WALL TOFOOTING.4. EXTERIOR FIBER BOARD INSULATION TO BE APPLIED OVER WATERPROOFING.ABOVE GRADE TO BE 2" THICK, R-10 CERTISTUD (OR EQUAL) TO ALLOW FORSIDING APPLICATION. BELOW GRADE TO BE R-10, 2 3/8" THICK FIBERBOARD(WATCHDOG OR EQUAL). SILL PLATE TO OVERHANG FOUNDATION BY 1 1/2" TOALIGN FOUNDATION INSULATION W/ 1/2" SHEATHING ABOVE. A GROUNDBREAKER PRODUCT WILL BE USED TO TRANSITION FINAL GRADE TO SIDINGMATERIAL.5. WALLS WITH EQUAL BACKFILL ON BOTH SIDES REQUIRE NO REINFORCINGFOR WALL LENGTHS LESS THAN 25'-0" LONG AND HORIZONTAL REINFORCINGONLY FOR WALLS LONGER THAN 25'-0".SCALE:A21FOUNDATION PLAN1/4" = 1'- 0"SCALE:A22SLAB ON GRADE DETAIL3/4" = 1'- 0"SCALE:A23STOOP DETAIL3/4" = 1'- 0"2' GARAGE BUMP SEE PAGE A3.4D4-SEASON PORCH SEE PAGE A3.3DSCALE:A3.31SOG FOUNDATION PLAN1/4" = 1'- 0" NOTE:WINDOW FALL PROTECTION TO BE PROVIDEDIN ACCORDANCE WITH R312.2GENERAL NOTES:·FIRST FLOOR CEILINGS TO BE 9'-1 1/8" ROUGH CEILING HEIGHT (U.N.O.)·T.O. FIRST FLOOR WINDOWS TO BE FRAMED AT 7'-11" (U.N.O.)·SECOND FLOOR CEILINGS TO BE 8'-1 1/8" ROUGH CEILING HEIGHT (U.N.O.)·T.O. SECOND FLOOR WINDOWS TO BE FRAMED AT 6'-11" (U.N.O.)·ALL EXTERIOR HOUSE WALLS TO BE 2x6 @ 16" O.C. (U.N.O.)·GARAGE/HOUSE COMMON WALLS TO BE 2x6 @ 16" O.C. (U.N.0.)·GARAGE WALLS TO BE 2x4 @ 16" O.C. (U.N.O.)·INSTALL 5/8" FIRECODE GYPSUM BOARD ON ALL GARAGE CEILINGS AND ADJOININGHOUSE WALLS·ALL INTERIOR HOUSE WALLS TO HAVE 1/2" GYPSUM BOARD, ALL HOUSE CEILINGS TOHAVE 5/8" FIRECODE GYPSUM BOARD·INTERIOR WALLS TO BE 2x4, WITH EXCEPTION TO THE 2x6 PLUMBING & BEARING WALLSPER PLAN (U.N.O.) ALL INTERIOR WALLS FRAMED @ 16" O.C.·ALL ANGLED WALLS ARE 45 DEGREES (U.N.O.)·BEARING WALLS SHALL BE FRAMED W/ DBL. TOP PLATE & STUDS ALIGNING W/ FLOORTRUSSES ABOVE, REFER TO FLOOR TRUSS LAYOUTS·ALL POINT LOAD SUPPORTS (JACK STUDS) TO BE CARRIED THRU EACH FLOOR LEVELTO BEAR ON FOUNDATION, INSTALL BLOCKING IN FLOOR SYSTEM BELOW ALL POINTLOAD SUPPORTS·ALL WOOD IN CONTACT W/ CONCRETE TO BE PRESSURE TREATED WOOD·ALL DIMENSIONS ARE TO ROUGH FRAME (U.N.O.)·S.R.O. SIZES LISTED ARE THE FINISHED SHEETROCK OPENING WIDTH AND HEIGHT PERPLAN (EXAMPLE: 2680 OR 2/6x8/0 = 2'-6"x8'-0")·FLOOR BREAK INDICATES CHANGE IN FLOORING MATERIAL, REFER TO THESPECIFICATIONS FOR ACTUAL FLOORING MATERIALS SELECTED·REFER TO SPECIFICATION INFORMATION FOR ALL APPLIANCES & THE APPROPRIATEELECTRICAL OR GAS HOOK-UP REQUIREMENTS FOR EACH·REFER TO SPECIFICATION INFORMATION FOR ALL TUB AND SHOWER SURROUNDMATERIALS·REFER TO SPECIFICATION INFORMATION & CABINET SHOP DRAWINGS FOR KITCHEN &BATH CABINET LAYOUT, SIZES & FEATURES PER CABINET SUPPLIER·ALL BATHROOM FANS TO BE VENTED TO EXTERIOR·TOWEL BARS MOUNTED AT 54" AFF, TOILET PAPER HOLDERS MOUNTED AT 24" AFF·ALL PANTRY & LINEN CLST'S. TO RECEIVE WIRE SHELVING, (U.N.O.)·ALL CLOSETS TO RECEIVE (1) ROD & (1) WIRE SHELF (U.N.O.)·ALL WASHERS ON LEFT SIDE, ALL DRYERS ON RIGHT SIDE·AT ALL BATHROOM VANITIES, INSTALL WOOD STUD FRAMING SO ELECTRICAL OUTLETIS CENTERED ON VANITY.SCALE:3.11FIRST FLOOR PLAN1/4" = 1'- 0"SCALE:3.12GOURMET KITCHEN OPTION1/4" = 1'- 0"SCALE:3.13TILED SHOWER W/ BENCH OPTION1/4" = 1'- 0"2' GARAGE BUMP SEE PAGE A3.4D4-SEASON PORCH SEE PAGE A3.3DSCALE:A3.324-SEASON PORCH FLOOR PLAN1/4" = 1'- 0"-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). GENERAL NOTES: PORCHES·SIDING & SOFFIT MATERIALS TO MATCH HOME PER COMMUNITY SPECIFICATIONS·EXTERIOR FINISHES AND STRUCTURE ARE PER PLAN - SEE SHEET A1.1 FORSPECIFIC STYLE TO MATCH·PORCH CEILINGS TO BE 9'-1 1/8" ROUGH CEILING HEIGHT W/ 3/12 INTERIOR VAULTPER PLAN (U.N.O.)·T.O. 4-SEASON PORCH WINDOWS TO BE FRAMED AT 8'-0" (U.N.O.)·4-SEASON PORCH EXTERIOR WALLS TO BE 2x6 @ 16" O.C. (U.N.O.)·DECKS AND SCREEN PORCH DECKS MUST BE MIN. 4" BELOW SUBFLOORELEVATION.SCALE:A3.324-SEASON PORCH FLOOR PLAN1/4" = 1'- 0"SCALE:A3.334-SEASON PORCH STRUCTURAL1/4" = 1'- 0"SCALE:A3.31SOG FOUNDATION PLAN1/4" = 1'- 0"SCALE:A3.344 -SEASON PORCH ELECTRICAL PLAN1/4" = 1'- 0"SCALE:A3.35SIDE ELEVATION1/8" = 1'- 0"SCALE:A3.36REAR ELEVATION1/8" = 1'- 0"SCALE:A3.394 SEASON PORCH SECTION1/4" = 1'- 0"SCALE:A3.384-SEASON PORCH ROOF PLAN1/8" = 1'- 0"SCALE:A3.37SIDE ELEVATION1/8" = 1'- 0" SCALE:3.45PARTIAL FIRST FLOOR PLAN1/4" = 1'- 0"SCALE:3.44PARTIAL FOUNDATION PLAN1/4" = 1'- 0"SCALE:3.41FRONT ELEVATION1/4" = 1'- 0"SCALE:3.42PARTIAL ROOF PLAN1/8" = 1'- 0"SCALE:3.43SIDE ELEVATIONS1/8" = 1'- 0"GARAGE HARDWARE PERCOMMUNITY SPECS LENNAR WILL INSTALL A "PASSIVE RADON READY" SYSTEM.ALL BASEMENT SLABS WILL HAVE A MIN. 4" CLEAN AGGREGATE, COVERED BY 6 MILPOLY. THIS POLY WILL HAVE 12" LAP AT ALL SEAMS. ALL TEARS OR PUNCTURESWILL BE SEALED OR COVERED BY POLY. ALL OPENINGS WILL BE SEALED USINGPOLYURETHANE CAULK OR ELASTOMERIC SEALANT AT ALL OPENINGS. ALL SUMPBASKETS WILL HAVE SEALED LIDS.LENNAR WILL INSTALL A 3" GASTIGHT PVC PIPE, AND WILL BE CONNECTED TO THEDRAIN TILE SYSTEM. USING A "T" FITTING, INTO THE DRAIN TILE SYSTEM. WE WILLUSE THE SHORTEST ROUTE TO EXIT THE ROOF SYSTEM, WITH A MAX. OF (2) 90DEGREE ELBOWS. IN UNCONDITIONED AREAS, THE RADON EXHAUST PIPE WILL BEINSULATED WITH AN R4 SLEEVE. THIS PIPE WILL BE LABELED "RADON GAS VENTSYSTEM" AT ALL ACCESSIBLE LOCATIONS. ALSO, ALL RADON PIPES WILL BE LABELEDAT ALL FLOORS FOR FUTURE REFERENCE.AT ROOF EXIT LOCATIONS, WE WILL MAINTAIN A 10' DISTANCE TO ANY WINDOWLOCATION, 2' BELOW EXHAUST POINT AND ANY ADJACENT STRUCTURE. THELOCATION OF THE EXIT POINT, IN TRUSS AREA, WILL BE CLEAR OF ANYOBSTRUCTIONS WITHIN 24" HORIZONTALLY AND 36" VERTICALLY. LENNAR WILLINSTALL AN OUTLET AND PULL CHORD LIGHT FOR FUTURE EXHAUST FAN ADDITION.RADON NOTE:BOTTOM OF TOP CHORDVAPOR BARRIERR-44 BLOWN INSULATIONEXTEND SHEATHING TO5/8" DRYWALL CLG. (TYP.)CEILING(WINDWASH)MANUF. TRUSSES24" O.C.12PER PLAN7/16" OSB SHEATHING, TYP.BATT INSULATION (R-20 MIN.)2x6 TOP & BOTTOM PLATES1/2" DRYWALL WALLS (TYP.)HOUSE WRAPVAPOR BARRIER2x6 STUDS 16" O.C.ROOF CONST.ASPHALT SHINGLES PER SPECS.WATERGUARD ICE BARRIER AT EAVESSOFFIT AND FASCIA PER SPEC. LEVELWALL CONST.SIDING PER SPEC. LEVEL7/16" OSB SHEATHING, TYP.INSULATION CHUTES15# FELT2x6 SUBFASCIA6" GRAVEL FILL6 MIL POLY / LAPPED 12" 4" CONCRETE SLAB8" POURED CONC. WALLFDN. WALL CONST.APPROX. GRADEINTERIOR RIGID INSUL. CONSTR.STD. ENERGYHEEL HT.MIN. 6"HOUSE WRAP CUTTING PATTERN12CUT HOUSE WRAPPER DIAGRAM.CUT UPPER FLAP AT 45FLEX WRAPWINDOW OPENINGWRAP TO SILL OF APPLY 10" FLEXUNDER HEAD INSTALL WINDOWINSTALL JAMBSTRIPS OVERINSTALLED WINDOWHOUSE WRAP FOLDHOUSE WRAP FOLDSTRIP UNDER UPPERINSTALL HEADUPPER FOLDAND TAPE OVERCUTOVER HEAD STRIPDROP UPPER FOLDTO SETTING WINDOWAPPY CAULK BEHINDWINDOW FINS PRIORHOLD UPPER FOLD OUT UNTIL FINAL STEPINSTALL, FOLD SIDEAFTER FLEX WRAPHOUSE WRAP FLAPSOVER FLEX WRAPAND TRIM / FASTENTAPETAPEWINDOW WRAP.CAP UNDERINSTALL DRIPDOWN EACH SIDE.BEND CORNERS3456789SEAMSSCALE:A4.12SECTION3/16" = 1'- 0"SCALE:A4.11TYP. WALL SECTION3/8" = 1'- 0"SCALE:A4.13SECTION3/16" = 1'- 0"SCALE:A4.14HOUSE WRAP DETAIL AT WINDOWN.T.S. HEADER1/2" GYPSUM BD.1/2" GYPSUM BD.WIN. OPNG.2x6 HEADER PLATEINSULATE1 1/4" RIM BOARD2x6 DOUBLE TOP PLATE2x6 SILL PLATESUBFL.INSULATE2" SPRAY6'-11 3/8" TO T.O. WIN. R.O.SUBFL. AT 8' CLG. 8'-0" TO SUBFL. AT 9' CLG.1x2 AT EA. SIDE OFWINDOW OPENINGSHEATHINGFOAM INSUL.FLOOR SYSTEM PER PLANINT/EXT WALL INTERSECTIONINTERIOR WALL CORNER2x6 EXTERIOR WALL1/2" GYPSUM BOARD2x6 R.W. 2x4 R.W. 2x6 EXTERIOR WALL2x2 R.W. INSIDE CORNEROUTSIDE CORNERINSULATE STUDCAVITIES OF ALLCORNERS AND INTERSECTIONSOF OUTSIDE WALLSSIDING2x4 INTERIOR WALL 2x4 BACKINGAT MID HGT.2x4 INT. WALLSHEATHING(EXT. FIN. MAY VARY PER PLAN)PER PLANEXT. MAY VARYSHEATHING12'-0"PLYWD. DIM.ALUM. SOFFITW/ALUM.2 x 6 SPF1/2" OXBOARD SHEATHINGGABLEEND TRUSS(WHERE APPL.)2x6 FOR LOOK OUTSUSE SCRAP 2x4 ORNOTE:ENG'DFASCIA2x4 INT. WALLBOARD1/2" GYPSUM5/8" GYPSUM BD.2x4 DOUBLETOP PLATE2x6 BACKINGBOTTOM CHORDOF TRUSSINT WALL2x2 NAILER3/4" PLYWOOD1/2" GYP. BD.FIRE STOP5/8" GYP. BD.I-JOISTCABINETDOUBLE TOP PLATE1'-0"1'-3"3"5/8" GYP. BD.1/2" GYP. BD.UPPERPER PLANHANGER(2) MICROLAM BEAMSHANGER1/2" GYPSUM BD.SUBFLOORNOTE:FOLLOW MFG'S NAILINGPATTERN FOR HANGERFLOORSYSTEMPER PLANFLOORSYSTEMPER PLANFLOOR SYSTEM PER PLAN1/2" GYPSUM BD.SUBFLOOR(2) 2 x HEADERS1/2" OSBDOUBLE TOP PLATESILL PLATESILL/ TILT TO OUTSIDEHEADER(1) 2X6 TRIMMER U.N.O. VARIES 8'-1 1/8" or 9'-1 1/8" TYPICAL VARIES 7'-0" OR 8'-0" (MAIN FLOOR) / 6'-11 3/8" (2ND FLR.) (R.O.)(R.O.)ON FLOOR PLAN(REFER TO PLAN)FOR WATER DRAINAGERUN TRIMMERS TOBOTTOM OF HEADER(SEE PLAN)BOTT. PL.10"2x12 STRINGERS3'-0"10"7 3/4" MAX.(3) 2x12 STRINGERS5/8" TYPE "X" GYP.AT ENCLOSED USABLESPACE (TYPICAL)UNLESS NOTED OTHERWISE IN CONSTR. WORK ORDERPARTICLE BOARD TREADS & RISERS3"6 1/2" W. x 3/4" T.WOOD CAP5/8" TYPE "X" GYP.AT ENCLOSED USABLESPACE (TYPICAL)ALLOW 6'-8" MIN. HEADROOMNOTE:REFER TO SELECTIONS FOR REFER TO PLAN OR WORK ORDER FOR RAIL AND FINISH TYPE(S)NOTE: THIS DETAIL IS FOR FRAMING PURPOSES ONLY4"MAX.RAIL TYPE3/4" PLYWOOD1 1/4" RIMBOARDSUBFLOORFACE OF RISER3/4" PLYWOOD1 14"7 3/4" MAX.11 14"FLOORSYSTEMPER PLANMAX.MAX.1 14"11 14"MAX.MAX.2x4 TO EXTEND 1 1/2"BEYOND 2x AT EA. ENDCAULKNOTE:5 DEG.2 x W/BEV. TOP"Z" FLASHINGSMOOTH FINISH 2x4EXT. FINISH PER PLANSEE PLANVARIESROUGH OPENINGROUGH OPENINGSUBFLOORCRIPPLEHEADER PLATEDOUBLE TOP PLATE9'-1 1/8" OR 8'-1 1/8" TYPICAL STUDSNOTE: THIS DETAIL IS FOR FRAMINGPURPOSES ONLY, REFER TO SPEC'S. BOX NEWELSTARTER1 3/4" RIM BD.1/2" GYP.SUBFLR.PER PLANFLR. SYSTEM3'-0" FROM FIN. FLR.FOR RAIL & FINISH TYPES TREADPOSTSTONE CAPOR ROWLOCK BRICKFLASHING - CONT.CAULKSHEATHING15# FELT1" AIR SPACESTUD WALLSIDING PER PLANSLOPED TO DRAINSHEATHING ONCEDAR 5/4x BLOW UP DETAIL1 1/8"CAULK"Z" FLASHING"Z" FLASHING4"MINIMUM FINISH MTR'L.PER PLANPER PLANCAULK2x6 FRAMINGFINISH MTR'L.PER PLANWIN. UNIT DIM.14"WIN. ROUGH OPENINGSHEATHINGWINDOW UNITGYPSUMSPRAY FOAM SIDINGTRANS.INSULATIONTRIMSTONE/BRICK CAPSLOPED TO DRAIN(FOR STONE CAP)CAULKTO BACK OF SILLSHEATHING15# FELT1" AIR SPACEFLASHING - CONT.FLASHING - CONT.(FOR BRICK CAP)TO BACK OF SILL36"24"4"30 1/2"(2) USP B88 CLIPS W/FRAMING HEIGHT FOR BOX PIER FINISH WIDTH IS PER PLAN(6) 3/8" x 1" LAG SCREWSTOP RAIL OF RAILING1/2" OSB SHEATHINGINSTALL ICE/WATER SHEILDBEHIND B88 CLIPS2X6 BACKER AT MID POINTBOTTOM RAIL OF RAILING24" IS MOST TYPICAL WIDTH2'-0"2x6 SPF MIN. ICE BARRIERVERT. TO ROOFW/ R19 BATT INS.2x6 STUD WALLON 4 MIL POLY1/2" GYPSUM BD.SOFFITSIDING PER PLANSHINGLES, 15# FELT, 48# BASESHEATHINGTRUSS BOT. CHORD5/8" GYPSUM BD.INSULATION BAFFLES (48" L.)ENG'D TRUSSES AT 24" O.C.R-44 INSULATIONDBL. TOP PLATEON 4 MIL POLYROOF VENTS AS REQUIREDSHEATHINGICE BARRIER6"MIN.HEEL HGT.ICE BARRIER TO END THIS POINTNOTE: ICE AND WATER SHIELD TO RUNENTIRE LENGTH OF ALL VALLEYS2 ROWS OF 24" TO INSURECOVERAGE PAST PLATE LINEEXTEND SHEATHING1 1/4" PAST END OF TRUSSFOR 6/12 PITCH ROOF.REDUCE OVERLAP PERSTEEPER PITCH TRUSSES.OVERLAP W/ FASCIAICE / WATER SHIELDNON-BEARING1FLASHING DETAIL3"= 1'-0"2NAILER DETAIL1"= 1'-0"9101516DOOR FRAMING1"= 1'-0"N/AN/AN/A3FLUSH BEAM1"= 1'-0"4DROPPED BEAM1"= 1'-0"5EAVE/RAKE1"= 1'-0"6SOFFIT DETAIL1"= 1'-0"7STONE CAP DTL.1"= 1'-0"8STONE SILL1"= 1'-0"11M. FLR. WDW. HDR.1"= 1'-0"1213TYP. STUD LAYOUT1"= 1'-0"14PIER/RAIL DETAIL3/4"= 1'-0"17WDW. FRAMING1"= 1'-0"18STAIR FRAMING1/2"= 1'-0"19RAIL DTL.1"= 1'-0"201X2 NAILER AT WDW.3"= 1'-0"21TRIM DETAIL3"= 1'-0"22TYP. OVERHANG1"= 1'-0"N/A ELEC. R.I. TO JUNCTIONBOX FOR FUTUREOUTLET INSIDE CABINETDUPLEX CONVENIENCE OUTLETDUPLEX OUTLET ABOVE COUNTERWEATHERPROOF DUPLEX OUTLETHALF-SWITCHED DUPLEX OUTLETDUPLEX OUTLET IN FLOOR220 VOLT OUTLETWALL SWITCHTHREE-WAY SWITCHFOUR-WAY SWITCHCEILING MOUNTED INCANDESCENT LIGHT FIXTURERECESSED INCANDESCENT LIGHT FIXTURELIGHT FIXTURE WITH PULL CHAINFLOURESCENT LIGHT FIXTUREEXHAUST FANCHIMESSMOKE DETECTORTHERMOSTATELECTRIC PANELPCWPELECTRICAL KEY DUPLEX OUTLET (GROUND FAULT PROTECTED)GFIPRECESSED INCANDESCENT EYE BALL FIXTURECARBON MONOXIDE DETECTORELECTRIC VEHICLE CHARGER ROUGH-IN (OPTIONAL)LED FIXTURELMULTI-MEDIA JACKEVCMMTCMSDCHPLUGMOLD PM34ELEC. R.I. TO JUNCTIONBOX FOR FUTUREOUTLET INSIDE CABINETAND HEATING PIPE LOCATIONS AND WOOD FRAMING MEMBERS1. THIS ELECTRICAL PLAN MAY VARY DEPENDING UPON PLUMBINGSUCH AS JOISTS, TRUSSES AND STUDS.GENERAL NOTES ELECTRICAL AND/OR GAS HOOK-UP REQUIREMENTS, THIS INCLUDES2. REFER TO SPECIFICATION INFORMATION FOR ALL APPLIANCEBUT IS NOT LIMITED TO WASHER, DRYER, RANGE/COOKTOP,MICROWAVE, OVEN AND/OR ADVANTIUM (WHERE APPLICABLE),DISHWASHER AND REFRIGERATOR.5. UNLESS OTHERWISE INDICATED, INSTALL SWITCHES & RECEPTACLESAT THE FOLLOWING HEIGHTS ABOVE FINISH FLOOR:REQUIREMENTS OF ALL GOVERNING CODES.AS REQUIRED BY NATIONAL ELECTRIC CODE (NEC) AND MEETING THE4. PROVIDE AND INSTALL GROUND FAULT CIRCUIT-INTERUPTERS (GFI)AND MEETING THE REQUIREMENTS OF ALL GOVERNING CODES.TELEVISION.........14"TELEPHONE........14"OUTLETS.............14"SWITCHES...........42"AS REQUIRED BY NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)3. PROVIDE AND INSTALL LOCALLY CERTIFIED SMOKE DETECTORSSCALE:E1.12GOURMET KITCHEN ELECTRICAL1/4" = 1'- 0"SCALE:E1.11FIRST FLOOR PLAN ELECTRICAL1/4" = 1'- 0" PAGE DESCRIPTION:PAGE NO.: PLAN NO. FIREPLACEFIREPLACESFIREPLACES REVISIONS DescriptionDateRevisionProject Number:Date:SA11Sheets: of1Print Name:Signed: License Number:Nick Hanson46665Date:I hereby certify that this plan, specification or reportwas prepared by me or under my direct supervisionand that I am a duly Licensed Professional Engineerunder the laws of the State of Minnesota.January 1, 20233.0011-1-23ADDENDUM TO 2023 FOUNDATION GUIDE SHEETS S1-S2WALL SECTIONSTANDARD WALL CONDITION1SA1SITE ADDRESS:City:State:Zip:MNCOPYRIGHT HANSON GROUP LLC 2023©3407 Kilmer Lane NorthSuite 4Plymouth, MN 55441Tel 612-708-3572www.hansongroupmn.comDRAWING USE GUIDELINES AND LIMITATIONSTHE CONTRACTOR LISTED IN THE TITLE BLOCK BELOW IS LICENSED BY THE HANSON GROUP TO USE THISPACKET WITHIN THESE LIMITATIONS NOTED FOR PROJECTS WHICH THE LICENSEE IS DIRECTLY RESPONSIBLE.THE LICENSEE MAY RELEASE THIS PACKET TO ITS SUB-CONTRACTORS AND CLIENTS FOR USE IN THEPROCUREMENT OF BUILDING PERMITS FOR PROJECTS WHICH THE LICENSEE IS USING THESE DRAWINGS.THE FOUNDATION GUIDELINES ARE TO BE ISSUED TO THE APPROPRIATE BUILDING DEPARTMENT INACCORDANCE WITH THEIR APPROVED PROCEDURE FOR USE BY THE BUILDING AGENCY DURING PLAN REVIEWAND INSPECTIONS.LIMITATIONS1.STRUCTURE HEIGHT IS NOT TO EXCEED TWO STORIES.2.OVERALL BUILDING IS ASSUMED TO FALL WITHIN THE PRESCRIPTIVE LIMITATIONS OF THE CODE. A SITESPECIFIC PLAN REVIEW HAS NOT BEEN PERFORMED.3.STRUCTURES CONSTRUCTED OF WOOD FLOOR, WOOD ROOF, AND WOOD WALLS ONLY. NO PRECAST ORSTRUCTURAL CONCRETE BEARING ON FOUNDATION WALLS IS PERMITTED.4.EXTERIOR GRADE SLOPING DOWN AND AWAY FROM THE FOUNDATION WALLS.5.ANY CASE BEYOND THE ABOVE NOTED ITEMS REQUIRES SEPARATE AND SPECIFIC STRUCTURALENGINEERING DOCUMENTS.COLD WEATHER GUIDELINES:1.THE CONTRACTOR AND CONCRETE SUPPLIER ARE TO WORK TO OBTAIN A MIX DESIGN WHICH WILLADEQUATELY PERFORM UNDER THE EXPECTED CONSTRUCTION CONDITIONS. THE USE OF ADDITIONALCEMENT, HIGH-EARLY STRENGTH CONCRETE, AND/OR ACCELERATOR IS RECOMMENDED ATTEMPERATURES AND CONDITIONS EXPECTED LESS THAN TWENTY DEGREES F.2.DELIVER CONCRETE WARM AND IN A TIMELY MANNER. PLACE CONCRETE EARLY IN THE DAY WHENPOSSIBLE.3.DO NOT ADD ADDITIONAL WATER TO THE CONCRETE. THE USE OF WATER REDUCING AGENTS ISRECOMMENDED WHEN WORKABILITY CONCERNS EXIST. NO CONCRETE IS TO BE PLACED ON SNOW OR INCONTACT WITH FROZEN MATERIALS.4.REBAR DOES NOT NEED TO BE PRE-HEATED, BUT IS TO BE FREE OF FROST, SNOW, AND ICE.5.BLANKETS OR OTHER ACCEPTED PROTECTION IS HIGHLY RECOMMENDED FOR THE TOP 24" OF THE WALLSWHEN THE AIR TEMPERATURE IS LESS THAN TEN DEGREES F AND FOR THE FULL HEIGHT OF THE WALLWHEN THE AIR TEMPERATURE IS LESS THAN ZERO DEGREES F.**THE ABOVE COLD WEATHER GUIDELINES ARE GENERAL RECOMMENDATIONS AND ALL ACI COLD WEATHERREQUIREMENTS ARE TO BE FOLLOWED AT THE RESPONSIBILITY OF THE LICENSEE.MATERIALSCONCRETE WALLS:F'c = 3000 PSI @ 28 DAYSMIX DESIGN AND PROPORTIONED BY CONCRETE SUPPLIERCONCRETE FOOTINGS:F'c = 5000 PSI @ 28 DAYS (OR 3000 PSI WITH AN APPROVED ADMIXTURE THAT PROVIDESA WATER AND VAPOR RESISTANCE AT LEAST OR EQUIVALENT TO 5000 PSI CONCRETE.AGGREGATE: FOOTINGS - 1 12" MAX. WALLS/SLABS - 34" MAX.REINFORCING STEEL: #4- BARS - ASTM A615 GRADE 40#5+ BARS - ASTM A615 GRADE 60TREATED SILL PLATE:SYP GRADE #2 OR BETTERALLOWABLE SOILBEARING PRESSURE1,500 PSF MINIMUMGENERAL NOTES1.DO NOT FRAME ON FOUNDATION WALLS UNTIL THE CONCRETE HAS REACHED A MINIMUM COMPRESSIVESTRENGTH OF 2,250 PSI.2.STRIP FOOTING MAY BE PLACED AT ELEVATIONS LOWER THAN SHOWN IN THE DETAILS.3.112" DEEP BY 312" WIDE BY CONTINUOUS KEYWAYS MAY BE USED IN LIEU OF DOWELS INTO FOOTINGS.4.STRIP FOOTING TO WALL CENTERLINES MAY BE OFFSET UP TO 2", HOWEVER, A MINIMUM OF 2" OF STRIPFOOTING IS TO EXTEND BEYOND THE WALL FACE ON EACH SIDE.5.PROVIDE CODE REQUIRED FROST PROTECTION TO THE BOTTOM OF ALL FOOTINGS.6.SLOPE GRADE DOWN AND AWAY FROM THE STRUCTURE A MINIMUM OF 6" WITHIN THE FIRST TEN FEETUNLESS ADEQUATE DRAINAGE OR SWALES ARE PROVIDED.7.BOTH MATERIALS AND INSTALLATION OF DRAIN TILE, WATER-PROOFING, CONTROL JOINTS, FLASHING, ANDINSULATION ARE TO BE IN ACCORDANCE WITH THE CODE BY THE GENERAL CONTRACTOR, UNLESS NOTEDOTHERWISE.8.ALL WALL WIDTHS SHOWN ARE NOMINAL DIMENSIONS, UNLESS NOTED OTHERWISE. OVERALL WALLTHICKNESS MAY VARY BY UP TO 12" FROM THAT SHOWN ON THE DRAWINGS.9.MINIMUM REBAR SPLICE LENGTHS ARE 30 BAR DIAMETERS FOR GRADE 40 STEEL AND 48 BAR DIAMETERSFOR GRADE 60 STEEL. TYING IS NOT REQUIRED.10.PROVIDE MATCHING HOOK BARS FOR ALL HORIZONTAL BARS AT WALL CORNERS AND INTERSECTIONS.HORIZONTAL BARS MAY BE PLACED ANYWHERE WITHIN THE WALL AS LONG AS A 2" MINIMUM CLEAR COVERIS ACHIEVED ON ALL SIDES.11.DOWELS MAY BE DRILLED AND GROUTED IN PLACE. VERTICAL BARS AND DOWELS DO NOT NEED TO ALIGN.VERTICAL BARS MAY BE DRILLED AND EMBEDDED 5" INTO THE STRIP FOOTING IN LIEU OF DOWELS.12.THE BOND BETWEEN CONCRETE AND REINFORCING WILL NOT BE APPRECIABLY REDUCED IF VERY MINORFORM OIL IS PRESENT FOR THE CONDITIONS CONTAINED WITHIN THESE DRAWINGS.13.SILL PLATES ARE TO BE ANCHORED WITH A MINIMUM OF TWO ANCHORS PER SILL SECTION. ALL SECTIONSARE TO HAVE AN ANCHOR WITHIN 4" TO 12" OF EACH END. AN ANCHOR IS TO BE PLACED AT ALL WALLCORNERS AND INTERSECTIONS ON WALLS MORE THAN TWO FEET IN LENGTH. WALLS TWO FEET OR LESS INLENGTH REQUIRE A MINIMUM OF ONE ANCHOR. REQUIREMENTS FOR SHEAR WALLS AND BRACED PANELSMAY BE IN EXCESS OF THESE REQUIREMENTS.14.ALL PRE-MANUFACTURED FASTENERS AND CONNECTORS ARE TO BE INSTALLED IN ACCORDANCE WITHTHE MANUFACTURER'S REQUIREMENTS.15.CARE IS TO BE TAKEN DURING CONCRETE PLACEMENT TO MINIMIZE INADEQUATE HORIZONTAL ANDDIAGONAL COLD JOINTS, AND TO PREVENT THESE JOINTS ENTIRELY IN WALLS WITHOUT VERTICALREINFORCEMENT. ADEQUATELY VIBRATE CONCRETE AT POTENTIAL JOINT LOCATIONS AS REQUIRED,BASED ON PLACEMENT CONDITIONS TO ELIMINATE HONEYCOMBING AND TO ENSURE SUFFICIENT BONDINGIS ACHIEVED.6" MIN.18" MAX.WOOD FRAMING ABOVE BY OTHERS12"Ø x 10" LONG ANCHORBOLTS (7" MIN. EMBED)@ 72" O.C. MAX. OREQUIVALENT METALSTRAP ANCHORSSLOPE GRADE AWAYFROM FOUNDATION6" MIN. WIDE STEM WALLSILL PLATE TO MATCHFRAME WALL ABOVE6" THICK STEM NOT TOEXCEED 24" HEIGHTSLAB-ON-GRADE BY OTHERS(1) #4 x CONTINUOUSHORIZONTAL BAR ATTOP OF WALL8" MIN. C.I.P. CONCRETEFOUNDATION WALL#4x2'-0" DOWELS @ 72" O.C. MAX(5" MIN. EMBED) DOWELS ARENOT REQUIRED IF BACKFILL ISPLACED EQUALLY ON BOTHSIDES IN LIFTS NOT TO EXCEED24"-ALTERNATE EACH SIDELennar Corporation16305 36th Ave N. Suite 600Plymouth, MN 55446SCOPE OF DRAWINGS:THESE CAST-IN-PLACE CONCRETE FOUNDATION WALL GUIDELINE DRAWINGS ARE PREPARED ANDCERTIFIED BY THE HANSON GROUP IN COMPLIANCE WITH THE MINNESOTA RESIDENTIAL CODE. THESEDRAWINGS CONTAIN STRUCTURAL INFORMATION FOR USE IN THE CONSTRUCTION OF STANDARD C.I.P.CONCRETE FOUNDATIONS FOR TYPICAL RESIDENTIAL CONDITIONS. THIS INFORMATION IS RELEVANTTO THE CONCRETE CONTRACTOR, THE GENERAL CONTRACTOR, AND THE FRAMING CONTRACTOR.THESE DRAWINGS EXPIRE ON DECEMBER 31, 2023.SLAB-ON-GRADE HOME FOUNDATION GUIDEUNREINFORCED CONCRETE STRIPFOOTING PER CODE OR BY BUILDINGDESIGNER, AS AN ALTERNATIVEGUIDE USE TABLE SHOWN BELOWUNREINFORCED CONCRETESTRIP FOOTING SEE 1/SA1WALL SECTIONWALL CONDITION WITH OPTIONALSTOOP SUPPORT LEDGE2SA12" WIDE SLAB LEDGE12"Ø x 10" LONG ANCHORBOLTS (7" MIN. EMBED)@ 72" O.C. MAX. OREQUIVALENT METALSTRAP ANCHORS#4x2'-0" DOWELS @ 72" O.C. MAX(5" MIN. EMBED) DOWELS ARENOT REQUIRED IF BACKFILL ISPLACED EQUALLY ON BOTHSIDES IN LIFTS NOT TO EXCEED24"-ALTERNATE EACH SIDE2" WIDE SLAB LEDGE6" MIN. WIDE STEM WALL2" WIDE EXTERIOR LEDGE6" THICK STEM NOT TOEXCEED 24" HEIGHTWOOD FRAMING ABOVE BY OTHERSSILL PLATE TO MATCHFRAME WALL ABOVESLAB-ON-GRADE BY OTHERS(1) #4 x CONTINUOUSHORIZONTAL BAR ATTOP OF WALL10" MIN. C.I.P. CONCRETEFOUNDATION WALLUNREINFORCED CONCRETESTRIP FOOTING SEE 1/SA1WALL SECTIONWALL CONDITION WITH OPTIONALBRICK/STONE SUPPORT LEDGE3SA112"Ø x 10" LONG ANCHORBOLTS (7" MIN. EMBED)@ 72" O.C. MAX. OREQUIVALENT METALSTRAP ANCHORS#4x2'-0" DOWELS @ 72" O.C. MAX(5" MIN. EMBED) DOWELS ARENOT REQUIRED IF BACKFILL ISPLACED EQUALLY ON BOTHSIDES IN LIFTS NOT TO EXCEED24"-ALTERNATE EACH SIDE2" WIDE SLAB LEDGE6" MIN. WIDE STEM WALL4" WIDE EXTERIOR LEDGE6" THICK STEM NOT TOEXCEED 24" HEIGHTWOOD FRAMING ABOVE BY OTHERSSILL PLATE TO MATCHFRAME WALL ABOVESLAB-ON-GRADE BY OTHERS(1) #4 x CONTINUOUSHORIZONTAL BAR ATTOP OF WALL12" MIN. C.I.P. CONCRETEFOUNDATION WALLNOTE: INCREASE STRIP FOOTING WIDTH AT ALLWALLS SUPPORTING MORE THAN 6'-0" OF VENEER.WIDTH TO INCREASE BY THICKNESS OF VENEERMULTIPLIED BY NUMBER OF STORIES.BRICK/STONEVENEER BY OTHERSWALL SECTIONPARTY WALL CONDITION INMULTI-FAMILY IRC TOWNHOMES4SA12" WIDE SLAB LEDGE12"Ø x 10" LONG ANCHORBOLTS (7" MIN. EMBED)@ 72" O.C. MAX. OREQUIVALENT METALSTRAP ANCHORS TYP.STEM WALL OF ADEQUATEWIDTH SUCH THAT SILL PLATESDO NOT OVERHANG MORETHAN 12" ON EITHER SIDE#4x2'-0" DOWELS @ 72" O.C. MAX(5" MIN. EMBED) DOWELS ARENOT REQUIRED IF BACKFILL ISPLACED EQUALLY ON BOTHSIDES IN LIFTS NOT TO EXCEED24"-ALTERNATE EACH SIDE(1) #4 x CONTINUOUSHORIZONTAL BAR ATTOP OF WALLUNREINFORCED CONCRETESTRIP FOOTING CENTEREDUNDER WALL SEE 1/SA1WOOD FRAMING/FIRE RATINGSABOVE BY OTHERS TYP.SILL PLATE TO MATCHFRAME WALL ABOVE TYP.SLAB-ON-GRADE BY OTHERSINCREASE FOOTING WIDTH ASREQ'D TO MAINTAIN 4" MIN.PROJECTION BOTH SIDESSLOPE GRADE AWAYFROM FOUNDATIONGENERAL STRIP FOOTING SIZE GUIDESOILONE-STORY STRUCTURETWO-STORY STRUCTURE2000 PSF16" WIDE x 8" THICK20" WIDE x 8" THICK1500 PSF20" WIDE x 8" THICK26" WIDE x 8" THICKTHIS TABLE IS A GENERAL FOOTING SIZE GUIDE FOR TRIBUTARY UNIFORM LOADING ONLY BASED ONMAXIMUM 25'-0" FLOOR SPANS & 50'-0" ROOF SPANS AND IS TO BE VERIFIED BY HOME DESIGNER. FURTHERCONSIDERATION IS TO BE TAKEN BY HOME DESIGNER FOR VENEER WEIGHT, WALL THICKNESSES OVER 10",AND FLOOR AND ROOF DEAD LOADS OVER 15 PSF. CONCENTRATED LOADS FROM GIRDER TRUSSES, BEAMS,HEADERS, ETC. ARE TO BE ACCOUNTED FOR AND SIZED INDEPENDENTLY OF THIS GUIDE BY OTHERS. UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel. 99 X X 160,000 66,000 352 1932 299 299 280 415 415 116 7" MUA 100 50 4 wrightsoft� Project SummaryEnt,re House Elander Mechanical Inc 645 Shenandoah Drive. Shakopee, MN 55379 Job: EV4S 4 season Date: 2023 By: Plan: Salemo SOG Pro·ect Information For: Notes: Desi n Information Weather: Minneapolis-St Paul lnt'I Arp, MN, US Winter Design Conditions Outside db -15 °F Inside db 70 °F Design TD 85 °F Structure Ducts Heating Summary 34959 Btuh Btuh Btuh Central vent (SER=50% 88 cfm) Heat recovery Humidification Piping 7818 3989 Equipment load 0 Btuh 0 Btuh 46766 Btuh Infiltration Method Simplified Semi-tight 0 Construction quality Fireplaces Area (ft2) Volume (ft3) Air changes/hour Equiv. AVF (cfm) Heating 1932 17528 0.26 76 Cooling 1932 17528 0.14 41 Heating Equipment Summary Lennox LENNOX Make Trade Model AHRI ref ML 193UH070XE368-* 202568879 Efficiency Heating input Heating output. Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 93 AFUE 66000 Btuh 63000 Btuh 50 °F 1181 cfm 0. 028 cfm/Btuh0 in H2O Summer Design Conditions Outside db 91 °F Inside db 75 °F Design TD 16 °F Daily range M Relative numidity 50 % Moisture difference 34 gr/lb Sensible Cooling Equipment Load Sizing Structure Ducts Central vent (SER=50% 88 cfm) Heat recovery Blower Use manufacturer's data Rate/swing multiplier Equipment sensible load 16935 Btuh 4121 Btuh 751 Btuh 0 Btuh n 0.96 20934 Btuh Latent Cooling Equipment Load Sizing Structure Ducts Central vent (88 cfm) Heat recover'( Equipment laten load Equipment Total Load (Sen+Lat) Req. total capacity at 0.82 SHR 1706 Btuh 866 Btuh 1948 Btuh 4520 Btuh 25454 Btuh 2.1 ton Cooling Equipment Summary Make Lennox Trade LENNOX Cond ML 14XC1S030-230A** Coil CX35-368++ TOR AHRI ref 9148954 Efficiency 11.5 EER2,13.8 SEER2 Sensible cooling 23572 Btuh Latent cooling 4828 Btuh Total cooling 28400 Btuh Actual air flow 947 cfm Air flow factor 0.045 cfm/Btuh Static pressure O in H2O Load sensible heat ratio 0. 83 Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ,___ -ti--wrightsotte .ft ...... �-·--·-• Right-Suite® Universal 2023 23.0.03 RSU13410 Cl>-. ... Ml Heat Loss FoldenLennar EV4 Salemo Slab.rup Cale= MJB Front Door faces: NW 2023-0ct-26 09:30:08 Page 1 Lennox 20076 Gabardine Lane Date Certificate Posted X Passive (No Fan ) Active (With fan and monometer or other system monitoring device) Location (or future location) of Fan: Other Please Describe Here X R-15 X X R-20 X R-20 X R-20 X R-49 X R-49 X R-30 X R-30 X X Not applicable, all ducts located in conditioned space Not required per mech. code X Passive Powered Interlocked with exhaust device. Describe: Input in BTUS:66,000 Capacity in Gallons:Other, describe: AFUE or HSPF% 93% 116 Cfm's 7 " round duct OR 6 " metal duct Not required per mech. code X Passive X Low: Other, describe: Low: Location of fan(s), describe: Cfm's 6 " round duct OR " metal duct Duct system air tightness: Heating or Cooling Ducts Outside Conditioned Spaces Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Describe other insulated areas Building envelope air tightness: Windows & Doors Average U-Factor (excludes skylights and one door ) U: 0.31 Solar Heat Gain Coefficient (SHGC):0.29 R-value MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System Nat Gas Nat Gas Elect RU160iN ML14XC1S030 Fuel Type Manufacturer Lennox Rinnai Lennox Model ML193UH070XE36B 14 Location of duct or system: Rating or Size Output in Tons:2.5 Efficiency SEER /EER Residential Load Calculation Heating Loss Heating Gain Cooling Load Mech Room 46,766 20,934 24,454 MECHANICAL VENTILATION SYSTEM Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Combustion Air Select a Type Select Type Heat Recover Ventilator (HRV) Capacity in cfms:100 MN License Number Lennar BC001413 THERMAL ENVELOPE RADON CONTROL SYSTEM Type: Check All That Apply Insulation Location Total R-Value of all Types of InsulationNon or Not ApplicableFiberglass, BlownFiberglass, BattsFoam, Closed CellFoam Open CellMineral FiberboardRigid, Extruded PolystyreneRigid, IsocynurateNew Construction Energy Code Compliance Certificate Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.11/8/2023 Mailing Address of the Dwelling or Dwelling Unit City Lakeville 20076 Gabardine Lane Name of Residential Contractor Below Entire Slab Foundation Wall Perimeter of Slab on Grade Rim Joist (1st Floor) Rim Joist (2nd Floor+) Wall Ceiling, flat Interior R5 + R10 Exterior Interior Interior Balanced Ventilation capacity in cfms:Mech Room Capacity continuous ventilation rate in cfms: Total ventilation (intermittent + continuous) rate in cfms: 50 High: Energy Recover Ventilator (ERV) Capacity in cfms:High: Location of duct or system: 000000Builders Associaton of Minnesota version 101014 NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.”(NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 20076 Gabardine Lane US Home LLC dba Lennar Jesse Schwarzrock 612-346-2648 Jesse.Schwarzrock@Lennar.com Residential Development 57174 Chad Johnson Stantec 651-325-6860 chad.johnson@stantec.com University of Minnesota 5/31/23 11/8/2023Kurt NiskaDigitally signed by Kurt Niska Date: 2023.11.08 13:42:03 -06'00' 11/9/23 X PM