Loading...
HomeMy WebLinkAboutLA220777 - APPROVED - Donald Mcgeel Permit Pack - flat1403 N 630 E Orem, Utah 84097 (800) 377-4480 BlueRavenSolar.com DRAWING TITLE: DRAWING NUMBER: December 29, 2023 PLOT DATE: DRAWN BY: REVISIONS: D PROJECT ID: DC SYSTEM SIZE: AC SYSTEM SIZE:CUSTOMER NAME:AHJ:UTILITY COMPANY:C B A 4.35 kW AC 6.08 kW DC BLUE RAVENSOLAR PV1 Cover Sheet Chantelle Wilkinson ---- ---- ---- ---- 912322 Dakota Electric AssociationCity of LakevilleROSEMOUNT, Minnesota 5506816133 Dodd LnDonald McGeelAPPLICABLE CODESAHJ UTILITY COMPANY SHEET INDEX City of Lakeville Dakota Electric Association *2023 NATIONAL ELECTRIC CODE (NEC)*2018 INTERNATIONAL BUILDING CODE (IBC) *2020 INTERNATIONAL RESIDENTIAL CODE (IRC), 2020 INTERNATIONAL PLUMBING CODE (IPC), AND ALL STATE AND LOCAL BUILDING, ELECTRICAL, AND PLUMBING CODES PV Installation Professional Scott Gurney #PV-011719-015866 Enphase ðê­ÐÞ±ć˜…ÂÞ RESIDENTIAL ROOFTOP SOLAR PERMIT PACKAGE Donald McGeel 16133 Dodd Ln ROSEMOUNT, Minnesota 55068 +19529533147 PV1 PV2 PV3 PV4PV5PV6 PV7 PV8 SS COVER SHEET SITE PLAN ROOF PLAN STRUCTURAL ELECTRICAL 3-LINE ELECTRICAL CALCULATIONS LABELS PLACARD SPEC SHEETS SCOPE OF WORK INSTALLATION OF ROOFTOP MOUNTED PHOTVOLTAIC SOLAR SYSTEM TOTAL DC SYSTEM SIZE 6.08 kW DC TOTAL AC SYSTEM SIZE 4.35 kW AC NEW PV SYSTEM INFORMATION AC SYSTEM SIZE: DC SYSTEM SIZE: MODULE TYPE: INVERTER TYPE: 4.35 kW AC 6.075 kW DC (15) Qcells Q.PEAK DUO ML-G10+ 405 Enphase IQ8PLUS-72-2-US DESIGN CRITERIA WIND SPEED: WIND EXPOSURE FACTOR: RISK CATEGORY: GROUND SNOW LOAD: ROOF SNOW LOAD: SEISMIC DESIGN CATEGORY: TYPICAL STRUCTURAL INFORMATION 115 C II 50  B ROOF MATERIAL: SHEATHING TYPE: FRAMING TYPE: RACKING TYPE: ATTACHMENT TYPE: TOTAL ATTACHMENTS: Comp Shingle OSB Manufactured Truss UNIRAC SFM INFINITY UNIRAC SFM INFINITY FLASHKIT 42 INFORMATION FOR INSTALLER 0 0 ECOBEE QTY: LED LIGHTBULB QTY: WEATHER STATION DATA MINNEAPOLIS-ST PAUL INT'L ARP 32°C -28°C WEATHER STATION: HIGH TEMP 2% AVG: EXTREME MINIMUM TEMP: GENERAL NOTES SUNPOWER® Sealed For Existing Roof & Attachment OnlyI hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer under thelaws of the State of Minnesota.John A.Calvert, License No. 52823 Expiration Date:30-June-2024 12/29/23 Digitally signed by John A. Calvert Date: 2023.12.29 12:22:40 -07'00' Concept Approval ONLYSubject to Field Inspection Inspector Date 2015 MN Bldg Code 01/02/2024jnuetzman DCACDCAC DCAC DCACDCAC DCAC DCAC DCAC DCAC DCACDCACDCACDCACDCACDCACMCBAC MSP PV N W S E 1403 N 630 E Orem, Utah 84097 (800) 377-4480 BlueRavenSolar.com DRAWING TITLE: DRAWING NUMBER: December 29, 2023 PLOT DATE: DRAWN BY: REVISIONS: D PROJECT ID: DC SYSTEM SIZE: AC SYSTEM SIZE:CUSTOMER NAME:AHJ:UTILITY COMPANY:C B A 4.35 kW AC 6.08 kW DC BLUE RAVENSOLAR PV2 Site Plan Chantelle Wilkinson ---- ---- ---- ---- 912322 Dakota Electric AssociationCity of LakevilleROSEMOUNT, Minnesota 5506816133 Dodd LnDonald McGeelSITE PLAN SCALE: 1/16" = 1'-0" UTILITY METER ROOF TOPJUNCTION BOX MAIN SERVICEPANEL SUBPANEL LEGEND AC DISCONNECT PV PRODUCTIONMETER COMBINER BOX BREAKER ENCLOSURE SUNPOWERHUB+ SUNVAULTESS GENERATORATS PANEL UTILITY METER CT CABINET TRENCH OROVERHEAD PROPERTY LINE REMOTE POWEROFF SWITCH FIRE SETBACKHATCH COMPASSPV SYSTEM SPECIFICATIONS PV MODULE: (15) Qcells Q.PEAK DUO ML-G10+ 405, POWER RATING: 405 W MICROINVERTER: Enphase IQ8PLUS-72-2-US, POWER RATING: 290 W NEW PV SYSTEM INFORMATION M MSP SUB BE AC PV CB ATS CT HUB ESS RPO FRONT OF HOME16133 Dodd LnSealed For Existing Roof & Attachment Only I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer under thelaws of the State of Minnesota.John A.Calvert, License No. 52823 Expiration Date:30-June-2024 12/29/23 DCACDCAC DCAC DCACDCAC DCAC DCAC DCAC DCAC DCACDCACDCACDCACDCACDCACMCBAC MSP PV N W S E 1403 N 630 E Orem, Utah 84097 (800) 377-4480 BlueRavenSolar.com DRAWING TITLE: DRAWING NUMBER: December 29, 2023 PLOT DATE: DRAWN BY: REVISIONS: D PROJECT ID: DC SYSTEM SIZE: AC SYSTEM SIZE:CUSTOMER NAME:AHJ:UTILITY COMPANY:C B A 4.35 kW AC 6.08 kW DC BLUE RAVENSOLAR PV3 Roof Plan Chantelle Wilkinson ---- ---- ---- ---- 912322 Dakota Electric AssociationCity of LakevilleROSEMOUNT, Minnesota 5506816133 Dodd LnDonald McGeelUTILITY METER ROOF TOPJUNCTION BOX MAIN SERVICEPANEL SUBPANEL LEGEND AC DISCONNECT PV PRODUCTIONMETER COMBINER BOX BREAKER ENCLOSURE SUNPOWERHUB+ SUNVAULTESS GENERATORATS PANEL UTILITY METER CT CABINET TRENCH OROVERHEAD PROPERTY LINE REMOTE POWEROFF SWITCH FIRE SETBACKHATCH COMPASSPV SYSTEM SPECIFICATIONS PV MODULE: (15) Qcells Q.PEAK DUO ML-G10+ 405, POWER RATING: 405 W MICROINVERTER: Enphase IQ8PLUS-72-2-US, POWER RATING: 290 W NEW PV SYSTEM INFORMATION M MSP SUB BE AC PV CB ATS CT HUB ESS RPO ROOF PLAN SCALE: 3/32" = 1'-0" SKYLIGHT POINT OF INTERCONNECTION UNDERGROUND SERVICE LINE FRONT OF HOMEMP2 MODULE QTY: 7 AZIMUTH: 139 PITCH: 23 TSRF: 90 AREA: 404 ft² MP1 MODULE QTY: 8 AZIMUTH: 229 PITCH: 23 TSRF: 90 AREA: 669 ft² 1'-6" TYP 3' TYP Sealed For Existing Roof & Attachment Only I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer under thelaws of the State of Minnesota.John A.Calvert, License No. 52823 Expiration Date:30-June-2024 12/29/23 FRAMING DETAIL SCALE: 1/2" = 1'-0"1 EXISTING FRAMINGROOF MATERIAL NOT SHOWN FOR CLARITY *THIS DETAIL IS NOT MEANT TO BE AN EXACT REPRESENTATION OF FRAMING OR PV MODULE LAYOUT EXTERIOR WALL PV MODULES SHALL NOT EXTEND ABOVE ROOF RIDGE LINE PV MODULE ATTACHMENT DETAIL SCALE: 1-1/2" = 1'-0"2 PV MODULE UNIRACSFM INFINITY 2" MICRORAIL UNIRACSFM INFINITY 6.5" SPLICE MAX CANTILEVER PER TABLE ABOVE(C) ATTACHMENT TYPE: Unirac SFM Infinity FRAMING SPACINGPER TABLE ABOVE ATTACHMENT SPACINGPER TABLE ABOVE(L) 212" MINEMBEDMENT(1) 5/16" LAG BOLTWITH EPDM WASHER PORTRAITLANDSCAPE ATTACHMENT PATTERNSCALE: 1/4" = 1'-0"3 *ATTACHMENT PATTERN SHOULD BE STAGGERED UNLESS OTHERWISE NOTED IN ENGINEERING LETTER FOLLOW ATTACHMENT SPACING IN TABLE ABOVE RIDGE EAVE MP1 MP2 MP3 MP4 MP5 MP6 MP7 MP8 PANEL COUNT ROOF MATERIAL SHEATHING TYPE FRAMING TYPE FRAMING SIZE AND SPACING RACKING TYPE ATTACHMENT TYPE MAXIMUMATTACHMENTSPACING (S) MAXIMUMCANTILEVER(C) CEILING JOIST/PURLINS SIZEAND SPACING AZIMUTH(DEG)PITCH(DEG)TSRF(%)AREA(ft²) TOTAL PV ATTACHMENTS TOTAL PV ARRAY WEIGHT (lbs) POINT LOAD (lbs/att.) TOTAL ROOF AREA (ft²) TOTAL PV ARRAY AREA (ft²) ROOF COVERAGE (%) DISTRIBUTED LOAD (psf) MP9 MP10 8 229 23 90 669 Comp Shingle OSB Manufactured Truss 2x4 @ 24 in OC 2x4 @ 24 in OC UNIRAC SFM INFINITY UNIRAC SFM INFINITY FLASHKIT 48''L / 24''P 16''L / 8''P 7 139 23 90 404 Comp Shingle OSB Manufactured Truss 2x4 @ 24 in OC 2x4 @ 24 in OC UNIRAC SFM INFINITY UNIRAC SFM INFINITY FLASHKIT 48''L / 24''P 16''L / 8''P 0 0 0 0 0 0 0 0 727.5 42 17.3 316.81 2601 2.3 12.18 1403 N 630 E Orem, Utah 84097 (800) 377-4480 BlueRavenSolar.com DRAWING TITLE: DRAWING NUMBER: December 29, 2023 PLOT DATE: DRAWN BY: REVISIONS: D PROJECT ID: DC SYSTEM SIZE: AC SYSTEM SIZE:CUSTOMER NAME:AHJ:UTILITY COMPANY:C B A 4.35 kW AC 6.08 kW DC BLUE RAVENSOLAR PV4 Structural Chantelle Wilkinson ---- ---- ---- ---- 912322 Dakota Electric AssociationCity of LakevilleROSEMOUNT, Minnesota 5506816133 Dodd LnDonald McGeelNOTES Sealed For Existing Roof & Attachment Only I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional Engineer under thelaws of the State of Minnesota.John A.Calvert, License No. 52823 Expiration Date:30-June-2024 12/29/23 EQUIPMENT DESCRIPTIONS PV MODULE: Qcells Q.PEAK DUO ML-G10+ 405, 405 W DC, UL 1703 / UL 61730 COMPLIANTA MICROINVERTER: ENPHASE IQ8PLUS-72-2-US, 290 W AC (0.290 kW), 1 PHASE, UL 1741 COMPLIANTB ROOFTOP JUNCTION BOX: EZ SOLAR JB-1.2 JUNCTION BOXC JUNCTION BOX: PVC 4 X 4 JUNCTION BOXD E F G H I J K L PV COMBINER BOX: ENPHASE IQ COMBINER 4 (X-IQ-AM1-240-4) M N O P Q R EQUIPMENT NOTES 1 2 3 4 5 6 7 8 9 10 11 12 S T LEGEND (E) SPD EXISTING (N)NEW (EL)EXISTING LOADS (RL)RELOCATED LOADS (PV)PV BREAKER (FIB)FACTORY INSTALLED BREAKER SURGE PROTECTIVE DEVICE GENERAL NOTES Utility Meter Number: 1ND90309085 Load side breaker in MSP. Interior POI MILBANK 200A METER SOCKET, RINGLESS, 1PH/3W, LEVER BYPASS, NEMA 3R UTILITY PV METER FOR PRODUCTION MONITORING. GROUNDING ELECTRODE SYSTEM SHALL BE IN ACCORDANCE WITH NEC 250.53. UNDERGROUND SERVICE120/240 VAC, 60 Hz 1 PHASE, 3 WIRE Utility Meter E N G (E) 150A Main Service Panel 9 (EL) (EL) (EL) (EL) (PV) 25A (E) 150A G UTILITY PVPRODUCTIONMETER I 4 4 LINE SIDE LOAD SIDE G G 3 AC DISCONNECT SAFETY SWITCH30A NON-FUSIBLE 4 4 L1L2 GN PV CIRCUIT 1 PRIMARY PV COMBINER BOX N G G (15) PV MODULES& MICROINVERTERS PRIMARY STRUCTURE AB CD E 1 2ENVOY 15A (N) 20A 8 MODULES 1 PV ARRAY 1 3 1 PV ARRAY 2PV CIRCUIT 27 MODULES 2 (N) 20A 1 L1 (1) 12 AWG THHN/THWN-2 CU RED Exterior L2 (1) G (1) 12 AWG THHN/THWN-2 CU BLACK 6 AWG BARE, CU ENPHASE Q-CABLE, 2-WIRE, FREE AIR 4 L1 (1) 6 AWG THHN/THWN-2 CU RED Exterior3/4 INCH L2 (1) N (1) G (1) 6 AWG THHN/THWN-2 CU BLACK 6 AWG THHN/THWN-2 CU WHITE 10 AWG THHN/THWN-2 CU GREEN EMT 2 L1 (1) 10 AWG THHN/THWN-2 CU REDL2(1) G (1) 10 AWG THHN/THWN-2 CU BLACK 10 AWG THHN/THWN-2 CU GREEN 3/4 INCH * *TYPE NM (ROMEX)/UF CABLE IS PERMITTED FOR INTERIOR OR ATTIC RUNS AND SHALL BE USED WHEN NEC CODE PERMITS 3 L1 (2) 10 AWG THHN/THWN-2 CU REDL2(2) G (1) 10 AWG THHN/THWN-2 CU BLACK 10 AWG THHN/THWN-2 CU GREEN 3/4 INCH EMT *TYPE UF CABLE MAY BE SUBSTITUTED FOR USE INCONDUIT WHERE NEC CODE PERMITS FINAL CONFIGURATION OF PV CIRCUITS TO BE DECIDED BY INSTALLER. MUST COMPLY WITH MAX MICROINVERTERS PER CIRCUIT AS LISTED ON ATTACHED SPEC SHEET. OTHER NOTES MI MECHANICAL INTERLOCK 1403 N 630 E Orem, Utah 84097 (800) 377-4480 BlueRavenSolar.com DRAWING TITLE: DRAWING NUMBER: December 29, 2023 PLOT DATE: DRAWN BY: REVISIONS: D PROJECT ID: DC SYSTEM SIZE: AC SYSTEM SIZE:CUSTOMER NAME:AHJ:UTILITY COMPANY:C B A 4.35 kW AC 6.08 kW DC BLUE RAVENSOLAR PV5 Electrical 3-Line Chantelle Wilkinson ---- ---- ---- ---- 912322 Dakota Electric AssociationCity of LakevilleROSEMOUNT, Minnesota 5506816133 Dodd LnDonald McGeel NUMBER OF MODULES PER CIRCUIT PV CIRCUIT SPECIFICATIONS RATED AC OUTPUT CURRENT (IOUT) MINIMUM AMPACITY (IOUT x 125%) OVERCURRENT PROTECTION RATING CIRCUIT 1 PRIMARY STRUCTURE DETACHED STRUCTURE WIRE SIZE SPECIFICATIONS CONDUCTOR MATERIAL CONDUCTOR TYPE 1 2 3 4 5 6 7 8 9 10 MINIMUM CONDUCTOR AMPACITY 12.1A AC CONDUCTOR SIZE CONDUCTOR AMPACITY AMBIENT TEMPERATURE ADJUSTMENT FACTOR CONDUIT FILL ADJUSTMENT FACTOR ADJUSTED CONDUCTOR AMPACITY COMBINED AC OUTPUT CURRENT (COUT) MINIMUM AMPACITY (COUT x 125%) COMBINED PV BREAKER RATING WIRE RUN DISTANCE (FT) CALCULATED VOLTAGE DROP TOTAL VOLTAGE DROP WIRE TAG #1 WIRE TAG #2 WIRE TAG #3 WIRE TAG #4 WIRE TAG #5 WIRE TAG #6 TOTAL VOLTAGE DROP 0.86% 0.41% 0.2% 0.08% 0% 0% 1.550000% DATA SOURCE STATE CITY WEATHER STATION HIGH TEMP 2% AVG EXTREME MINIMUM TEMP ASHRAE Weather Station Data Minnesota ROSEMOUNT ELECTRICAL INFORMATION UTILITY ELECTRICAL SYSTEM NEW PV SYSTEM QUANTITY TYPE OUTPUT CURRENT PV MODULES MICROINVERTERS WATTAGE TYPE NOMINAL VOLTAGE OUTPUT POWER 15 Qcells Q.PEAK DUO ML-G10+ 405 405W DC Enphase IQ8PLUS-72-2-US 1.21A AC 240V AC 290W AC AC SYSTEM SIZE DC SYSTEM SIZE 4.35kW AC 6.075kW DC DESIGN LOCATION AND TEMPERATURES 1-Phase, 3-Wire, 60Hz, 120/240V 1-Phase, 3-Wire, 60Hz, 120/240V MINNEAPOLIS-ST PAUL INT'L ARP 32°C -28°C CIRCUIT 2 CIRCUIT 3 CIRCUIT 4 CIRCUIT 5 CIRCUIT 6 CIRCUIT 7 CIRCUIT 8 CIRCUIT 1 CIRCUIT 2 CIRCUIT 3 CIRCUIT 4 CIRCUIT 5 87000000 00000 9.7A 8.5A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 12.1A 10.6A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 0.0A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 18.2A 22.7A 25AA 0.0A 0AA 0.0A CU THHN/THWN-2 12 AWG 30A 0.96 1 28.8A 12.1A AC 12.1A AC 22.66A AC ----A AC ----A AC ----A AC ----A AC ----A AC ----A AC CU CU CU ---- ---- ---- ---- ---- ---- THHN/THWN-2 THHN/THWN-2 THHN/THWN-2 ---- ---- ---- ---- ---- ---- 10 AWG 10 AWG 6 AWG ---- 40A 40A 75A ----A ----A ----A ----A ----A ----A 0.96 0.96 0.96 ---- ---- ---- ---- ---- ---- 1 0.8 1 ---- ---- ---- ---- ---- ---- 38.4A 30.72A 72A ----A ----A ----A ----A ----A ----A 52 40 20 10 ---- ---- ---- ---- ---- ---- 0.86% 0.41% 0.2% 0.08% 0% 0% 0% 0% 0% 0% MAIN SERVICEPANEL BUSBAR RATING PANEL OCPD RATING AVAILABLE BACKFEED (120% RULE) PV BREAKER RATING SUBPANEL 1 SUBPANEL 2 150A 150A 30A 25A ----A ----A ##A ----A ----A ##A PV BREAKER BACKFEED CALCULATIONS NEC 705.12(B) -- "120% RULE" (BUSBAR RATING * 120%) - OCPD RATING = AVAILABLE BACKFEED *PV BREAKER MUST BE RATED LESS THAN OR EQUAL TO AVAILABLE BACKFEED FOR CODE COMPLIANCE* 25A 25A *THESE CALCULATIONS ARE ONLY APPLICABLE IFPV INTERCONNECTION IS A LOAD SIDE BREAKER* 1403 N 630 E Orem, Utah 84097 (800) 377-4480 BlueRavenSolar.com DRAWING TITLE: DRAWING NUMBER: December 29, 2023 PLOT DATE: DRAWN BY: REVISIONS: D PROJECT ID: DC SYSTEM SIZE: AC SYSTEM SIZE:CUSTOMER NAME:AHJ:UTILITY COMPANY:C B A 4.35 kW AC 6.08 kW DC BLUE RAVENSOLAR PV6 Electrical Calculations Chantelle Wilkinson ---- ---- ---- ---- 912322 Dakota Electric AssociationCity of LakevilleROSEMOUNT, Minnesota 5506816133 Dodd LnDonald McGeel UTILITY METER MAIN SERVICE PANEL POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TOSHUTDOWN PV SYSTEMAND REDUCE SHOCK HAZARDIN THE ARRAY. SOLAR ELECTRICPV PANELS *LABEL INSTALLED NEXT TO PV BREAKER AC DISCONNECT RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM PV METER PV COMBINER BOX PHOTOVOLTAIC SYSTEM COMBINER PANEL DO NOT ADD LOADS AUTHORIZED PERSONNEL ONLY NO DC WIRES PRESENT RAPID SHUTDOWN TEST NOT REQUIRED WARNING WARNING LABELS FOR PHOTOVOLTAIC SYSTEM PHOTOVOLTAIC SYSTEM AC DISCONNECT!! 240 VNOMINAL OPERATING AC VOLTAGE RATED AC OUTPUT CURRENT 18.2 A ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE ANDLOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING IN CASE OF EMERGENCY, PLEASE CONTACT: BLUE RAVEN SOLAR (800) 377-4480 NOTICE LABELS WITH ROUND CORNERS ARE ADHESIVE STICKERS LABELS WITH SQUARE CORNERS ARE PLASTIC ENGRAVED PLACARDS 1403 N 630 E Orem, Utah 84097 (800) 377-4480 BlueRavenSolar.com DRAWING TITLE: DRAWING NUMBER: December 29, 2023 PLOT DATE: DRAWN BY: REVISIONS: D PROJECT ID: DC SYSTEM SIZE: AC SYSTEM SIZE:CUSTOMER NAME:AHJ:UTILITY COMPANY:C B A 4.35 kW AC 6.08 kW DC BLUE RAVENSOLAR PV7 Warning Labels Chantelle Wilkinson ---- ---- ---- ---- 912322 Dakota Electric AssociationCity of LakevilleROSEMOUNT, Minnesota 5506816133 Dodd LnDonald McGeel DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC DCAC MCBAC MSP PV 1403 N 630 E Orem, Utah 84097 (800) 377-4480 BlueRavenSolar.com DRAWING TITLE: DRAWING NUMBER: December 29, 2023 PLOT DATE: DRAWN BY: REVISIONS: D PROJECT ID: DC SYSTEM SIZE: AC SYSTEM SIZE:CUSTOMER NAME:AHJ:UTILITY COMPANY:C B A 4.35 kW AC 6.08 kW DC BLUE RAVENSOLAR PV8 Directory Placard Chantelle Wilkinson ---- ---- ---- ---- 912322 Dakota Electric AssociationCity of LakevilleROSEMOUNT, Minnesota 5506816133 Dodd LnDonald McGeel DRAWING TITLE: DRAWING NUMBER:66 63(&6+((7 Q.PEAK DUO ML-G10+MODEL 395 - 415 Wp | 132 Cells 21.1 % Maximum Module Efficiency Q.PEAK DUO ML-G10+ SERIES {šak%ŽX))XFeFXF‰¥„k)e% ǩǧǩǩ‰k{{)8ka) TOP BRAND PV MODULES USA 2022 The ideal solution for: Rooftop arrays on residential buildings 1 See data sheet on rear for further information. 2 APT test conditions according to IEC / TS 62804-1:2015, method A (−1500 V, 96 h) Qcells is the first solar module manufacturer to pass the most comprehensive quality programme in the industry: The new “Quality Controlled PV” of the independent certification institute TÜV Rheinland. The most thorough testing programme in the industry Q.ANTUM DUO Z technology with zero gap cell layout boosts module efficiency up to 21.1 %. Breaking the 21 % efficiency barrier Innovative all-weather technology Optimal yields, whatever the weather with excellent low-light and temperature behaviour. High-tech aluminium alloy frame, certified for high snow (5400 Pa) and wind loads (4000 Pa). Extreme weather rating Inclusive 25-year product warranty and 25-year linear performance warranty1. A reliable investment Long-term yield security with Anti LeTID Technology, Anti PID Technology2 and Hot-Spot Protect. Enduring high performance DETAIL A 0.63" (16 mm) 0.33" (8.5 mm)0.96" (24.5 mm) 42.8" (1088 mm) 74.0" (1879 mm) 4 × Mounting slots (DETAIL A) Frame 41.1" (1045 mm) 39.2" (996 mm) 1.26" (32 mm) 8 × Drainage holes 15.6“ (395.5 mm) 4 × Grounding points ø 0.18" (4.5 mm) Label •49.2" (1250 mm) •49.2" (1250 mm) Format 74.0 in × 41.1 in × 1.26 in (including frame) (1879 mm × 1045 mm × 32 mm) Weight 48.5 lbs (22.0 kg) Front Cover 0.13 in (3.2 mm) thermally pre-stressed glass with anti-reflection technology Back Cover Composite film Frame Black anodised aluminium Cell 6 × 22 monocrystalline Q.ANTUM solar half cells Junction box 2.09-3.98 in × 1.26-2.36 in × 0.59-0.71 in (53-101 mm × 32-60 mm × 15-18 mm), IP67, with bypass diodes Cable 4 mm² Solar cable; (+) ≥ 49.2 in (1250 mm), (−) ≥ 49.2 in (1250 mm) Connector Stäubli MC4; IP68 Mechanical Specification Qcells pursues minimizing paper output in consideration of the global environment. Note: Installation instructions must be followed. Contact our technical service for further information on approved installation of this product. Hanwha Q CELLS America Inc. 400 Spectrum Center Drive, Suite 1400, Irvine, CA 92618, USA | TEL +1 949 748 59 96 | EMAIL hqc-inquiry@qcells.com | WEB www.qcells.com QQQ.PPEEAKK DDUUOO MMMLL---GGG10000++ SSEERRRRIEEEESS Specifications subject to technical changes © Qcells Q.PEAK_DUO_ML-G10+_series_395-415_2022-07_Rev01_NAProperties for System Design Maximum System Voltage VSYS [V] 1000 (IEC) / 1000 (UL)PV module classification Class II Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI / UL 61730 TYPE 2 Max. Design Load, Push / Pull3 [lbs / ft2] 75 (3600 Pa) / 55 (2660 Pa)Permitted Module Temperature on Continuous Duty −40 °F up to +185 °F (−40 °C up to +85 °C)Max. Test Load, Push / Pull3 [lbs / ft2] 113 (5400 Pa) / 84 (4000 Pa) 3 See Installation Manual UL 61730, CE-compliant, Quality Controlled PV - TÜV Rheinland, IEC 61215:2016, IEC 61730:2016, U.S. Patent No. 9,893,215 (solar cells), Qualifications and Certificates 200 400 600 800 1000 90 100 80 110 10 2515 20005 86 98 95 80 100 85 Electrical Characteristics TEMPERATURE COEFFICIENTS Temperature Coefficient of ISC α [% / K] +0.04 Temperature Coefficient of VOC β [% / K] −0.27 Temperature Coefficient of PMPP γ [% / K] −0.34 Nominal Module Operating Temperature NMOT [°F] 109 ± 5.4 (43   ± 3 °C) POWER CLASS 395 400 405 410 415 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC1 (POWER TOLERANCE +5 W / −0 W)MinimumPower at MPP1 PMPP [W]395 400 405 410 415 Short Circuit Current1 ISC [A]11.13 11.16 11.19 11.22 11.26 Open Circuit Voltage1 VOC [V]45.03 45.06 45.09 45.13 45.16 Current at MPP IMPP [A]10.58 10.64 10.70 10.76 10.82 Voltage at MPP VMPP [V]37.32 37.59 37.85 38.11 38.37 Efficiency1 η [%] ≥ 20.1 ≥ 20.4 ≥ 20.6 ≥ 20.9 ≥ 21.1 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 MinimumPower at MPP PMPP [W]296.4 300.1 303.9 307.6 311.4 Short Circuit Current ISC [A]8.97 8.99 9.02 9.04 9.07 Open Circuit Voltage VOC [V]42.46 42.49 42.52 42.56 42.59 Current at MPP IMPP [A]8.33 8.38 8.43 8.48 8.53 Voltage at MPP VMPP [V]35.59 35.82 36.04 36.27 36.49 1Measurement tolerances PMPP ± 3 %; ISC; VOC ± 5 % at STC: 1000 W/m2, 25 ± 2 °C, AM 1.5 according to IEC 60904-3 • ²800 W/m2, NMOT, spectrum AM 1.5 RELATIVE EFFCIENCY [%]Qcells PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98 % of nominal power during first year. Thereafter max. 0.5 % degradation per year. At least 93.5 % of nominal power up to 10 years. At least 86 % of nominal power up to 25 years. All data within measurement tolerances. Full warranties in accordance with the warranty terms of the Qcells sales organisation of your respective country. Typical module performance under low irradiance conditions in comparison to STC conditions (25 °C, 1000 W/m2). YEARS IRRADIANCE [W/m²] Qcells Industry standard of p-mono* *Standard terms of guarantee for the 5 PV companies with the highest production capacity in 2021 (February 2021) CertifiedUL 61730RELATIVE EFFCIENCYCOMPARED TO NOMINAL POWER [%] 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS IQ8 and IQ8+ Microinverters Our newest IQ8 Microinverters are the industry’s first microgrid-forming, software- defined microinverters with split-phase power conversion capability to convert DC power to AC power efficiently. The brain of the semiconductor-based microinverter is our proprietary application-specific integrated circuit (ASIC) which enables the microinverter to operate in grid-tied or off-grid modes. This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times to changing loads and grid events, alleviating constraints on battery sizing for home energy systems. Part of the Enphase Energy System, IQ8 Series Microinverters integrate with the Enphase IQ Battery, Enphase IQ Gateway, and the Enphase App monitoring and analysis software. IQ8 Series Microinverters redefine reliability standards with more than one million cumulative hours of power-on testing, enabling an industry- leading limited warranty of up to 25 years. Connect PV modules quickly and easily to IQ8 Series Microinverters using the included Q-DCC-2 adapter cable with plug-n-play MC4 connectors. IQ8 Series Microinverters are UL Listed as PV Rapid Shut Down Equipment and conform with various regulations, when installed according to manufacturer’s instructions. Easy to install • Lightweight and compact with plug-n-play connectors • Power Line Communication (PLC) between components • Faster installation with simple two-wire cabling High productivity and reliability • Produce power even when the grid is down* • More than one million cumulative hours of testing • Class II double-insulated enclosure • Optimized for the latest high- powered PV modules Microgrid-forming • Complies with the latest advanced grid support** • Remote automatic updates for the latest grid requirements • Configurable to support a wide range of grid profiles • Meets CA Rule 21 (UL 1741-SA) requirements © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ8 Microinverters, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ8SP-DS-0002-01-EN-US-2022-03-17 * Only when installed with IQ System Controller 2, meets UL 1741. ** IQ8 and IQ8Plus supports split phase, 240V installations only. DATA SHEET (1) No enforced DC/AC ratio. See the compatibility calculator at https://link.enphase.com/module-compatibility (2) Maximum continuous input DC current is 10.6A (3) Nominal voltage range can be extended beyond nominal if required by the utility. (4) Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. IQ8 and IQ8+ Microinverters INPUT DATA (DC) IQ8-60-2-US IQ8PLUS-72-2-US Commonly used module pairings1 W 235 – 350 235 – 440 Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27 – 37 29 – 45 Operating range V 25 – 48 25 – 58 Min/max start voltage V 30 / 48 30 / 58 Max input DC voltage V 50 60 Max DC current2 [module Isc]A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ8-60-2-US IQ8PLUS-72-2-US Peak output power VA 245 300 Max continuous output power VA 240 290 Nominal (L-L) voltage/range3 V 240 / 211 – 264 Max continuous output current A 1.0 1.21 Nominal frequency Hz 60 Extended frequency range Hz 50 – 68 AC short circuit fault current over 3 cycles Arms 2 Max units per 20 A (L-L) branch circuit4 16 13 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor (adjustable) 0.85 leading – 0.85 lagging Peak efficiency %97.5 97.6 CEC weighted efficiency %97 97 Night-time power consumption mW 60 MECHANICAL DATA Ambient temperature range -40ºC to +60ºC (-40ºF to +140ºF) Relative humidity range 4% to 100% (condensing) DC Connector type MC4 Dimensions (HxWxD) 212 mm (8.3”) x 175 mm (6.9”) x 30.2 mm (1.2”) Weight 1.08 kg (2.38 lbs) Cooling Natural convection – no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated, corrosion resistant polymeric enclosure Environ. category / UV exposure rating NEMA Type 6 / outdoor COMPLIANCE Certifications CA Rule 21 (UL 1741-SA), UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according to manufacturer’s instructions. IQ8SP-DS-0002-01-EN-US-2022-03-17 IQ8PLUS-72-2-US 235 – 440 60-cell/120 half-cell, 66-cell/132 half-cell and 72-cell/144 half-cell 29 – 45 25 – 58 30 / 58 60 IQ8PLUS-72-2-US 300 290 IQ8PLUS 72 2 US 290 1.21 13 97.6 9797 DRAWING NUMBER:SS BLUE RAVEN SOLAR The Enphase Q Cable™ and accessories are part of the latest generation Enphase IQ System™. These accessories provide simplicity, reliability, and faster installation times. Enphase Q Cable Accessories To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Q Cable Accessories REGION: Americas Enphase Q Cable • Two-wire, double-insulated Enphase Q Cable is 50% lighter than the previous generation Enphase cable • New cable numbering and plug and play connectors speed up installation and simplify wire management • Link connectors eliminate cable waste Field-Wireable Connectors • Easily connect Q cables on the roof without complex wiring • Make connections from any open connector and center feed any section of cable within branch limits • Available in male and female connector types To learn more about Enphase offerings, visit enphase.com © 2020 Enphase Energy. All rights reserved. Enphase, the Enphase logo, Enphase IQ 7A, Enphase IQ Battery, Enphase Enlighten, Enphase IQ Envoy, and other trademarks or service names are the trademarks of Enphase Energy, Inc. Data subject to change. 2020-06-26 CONDUCTOR SPECIFICATIONS 'IVXMƤGEXMSR UL3003 (raw cable), UL 9703 (cable assemblies), DG cable Flame test rating FT4 Compliance RoHS, OIL RES I, CE, UV Resistant, combined UL for Canada and United States Conductor type THHN/THWN-2 dry/wet Disconnecting means The AC and DC bulkhead connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Q CABLE TYPES / ORDERING OPTIONS Connectorized Models Size / Max Nominal Voltage Connector Spacing PV Module Orientation Connector Count per Box Q-12-10-240 12 AWG / 277 VAC 1.3 m (4.2 ft) Portrait 240 Q-12-17-240 12 AWG / 277 VAC 2.0 m (6.5 ft) Landscape (60-cell) 240 Q-12-20-200 12 AWG / 277 VAC 2.3 m (7.5 ft) Landscape (72-cell) 200 ENPHASE Q CABLE ACCESSORIES Name Model Number Description Raw Q Cable Q-12-RAW-300 300 meters of 12 AWG cable with no connectors Field-wireable connector (male)Q-CONN-10M Make connections from any open connector Field-wireable connector (female)Q-CONN-10F Make connections from any Q Cable open connector Cable Clip Q-CLIP-100 Used to fasten cabling to the racking or to secure looped cabling Disconnect tool Q-DISC-10 Disconnect tool for Q Cable connectors, DC connectors, and AC module mount Q Cable sealing caps (female)Q-SEAL-10 One needed to cover each unused connector on the cabling Terminator Q-TERM-10 Terminator cap for unused cable ends Enphase EN4 to MC4 adaptor¹ECA-EN4-S22 Connect PV module using MC4 connectors to IQ micros with EN4 (TE PV4-S SOLARLOK). 150mm/5.9” to MC4. Enphase EN4 non-terminated adaptor¹ECA-EN4-FW *SVƤIPH[MVMRKSJ90GIVXMƤIH('GSRRIGXSVW)2 8)4:7730%603/ XSnon-terminated cable. 150mm/5.9” Enphase EN4 to MC4 adaptor (long)¹ECA-EN4-S22-L Longer adapter cable for EN4 (TE PV4-S SOLARLOK) to MC4. Use with split cell modules or PV modules with short DC cable. 600mm/23.6” Replacement DC Adaptor (MC4)Q-DCC-2 DC adaptor to MC4 (max voltage 100 VDC) Replacement DC Adaptor (UTX)Q-DCC-5 DC adaptor to UTX (max voltage 100 VDC) 1. 5YEPMƤIHTIV90WYFNIGX Enphase Q Cable Accessories TERMINATOR Terminator cap for unused cable ends, sold in packs of ten (Q-TERM-10) SEALING CAPS Sealing caps for unused aggregator and cable connections (Q-BA-CAP-10 and Q-SEAL-10) DISCONNECT TOOL Plan to use at least one per installation, sold in packs of ten (Q-DISC-10) CABLE CLIP Used to fasten cabling to the racking or to secure looped cabling, sold in packs of one hundred (Q-CLIP-100) 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. SHEET NAME: PAGE NUMBER:REVISION: 0 CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEETS SS 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS The Enphase IQ Envoy™ communications gateway delivers solar production and energy consumption data to Enphase Enlighten™ monitoring and analysis software for comprehensive, remote maintenance and management of the Enphase IQ System. With integrated revenue grade production metering and optional consumption monitoring, Envoy IQ is the platform for total energy management and integrates with the Enphase Ensemble™and the Enphase IQ Battery™. Enphase IQ Envoy To learn more about Enphase offerings, visit enphase.com Data Sheet Enphase Networking Smart • Enables web-based monitoring and control • Bidirectional communications for remote upgrades • Supports power export limiting and zeroexport applications Simple ŵ )EW] W]WXIQ GSRƤKYVEXMSR YWMRK Enphase Installer Toolkit™ mobile app • Flexible networking with Wi-Fi, Ethernet, or cellular Reliable • Designed for installation indoors or outdoors • Five-year warranty To learn more about Enphase offerings, visit enphase.com © 2021 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ Envoy, and other trademarks or service names are the trade- marks of Enphase Energy, Inc. Data subject to change. 06-30-2021 MODEL NUMBERS Enphase IQ Envoy™ ENV-IQ-AM1-240 Enphase IQ Envoy communications gateway with integrated revenue grade PV production metering (ANSI C12.20 +/- 0.5%) and optional consumption monitoring (+/- 2.5%). Includes one 200A continuous rated production CT (current transformer). ACCESORIES (Order Seperately) Enphase Mobile Connect™ CELLMODEM-M1 (4G based LTE-M/5-year data plan) CELLMODEM-M1-B (4G-based LTE-M1/5-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, where there is adequate cellular service in the installation area.) Consumption Monitoring CT CT-200-SPLIT Split-core consumption CTs enable whole home metering. Ensemble Communications Kit COMMS-KIT-01 Installed at the IQ Envoy. For communications with Enphase Encharge™ storage and Enphase Enpower™ smart switch. Includes USB cable for connection to IQ Envoy or Enphase IQ Combiner™ and allows wireless communication with Encharge and Enpower. POWER REQUIREMENTS Power requirements 120/240 VAC split-phase. Max 20 A overcurrent protection required. Typical Power Consumption 5W CAPACITY Number of microinverters polled Up to 600 MECHANICAL DATA Dimensions (WxHxD) 21.3 x 12.6 x 4.5 cm (8.4” x 5” x 1.8”) Weight 17.6 oz (498 g) Ambient temperature range -40° to 65° C (-40° to 149° F) -40° to 46° C (-40° to 115° F) if installed in an enclosure Environmental rating -4*SV MRWXEPPEXMSR MRHSSVW SV MR ER 2680GIVXMƤIH 2)1% X]TI 6 IRGPSWYVI Altitude To 2000 meters (6,560 feet) Production CT - Limited to 200A of continuous current / 250A OCPD – 72kW AC - Internal aperture measures 19.36mm to support 250MCM THWN conductors (max) - 90 GIVXMƤIH JSV VIZIRYI KVEHI QIXIVMRK Consumption CT - For electrical services to 250A with parallel runs up to 500A - Internal aperture measures 0.84” x 0.96” (21.33mm x 24.38mm) to support 3/0 THWN conductor90GIVXMƤIHJSVYWIEXWIVZMGIIRXVERGIJSVWIVZMGIWYTXS:EG INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet 802.3, Cat5E (or Cat 6) UTP Ethernet cable (not included) Mobile CELLMODEM-M1 (4G) or CELLMODEM-M1-B (4G). Not included. Note that an Enphase Mobile Connect cellular modem is required for all Ensemble installations. COMPLIANCE Compliance UL 61010-1 CAN/CSA C22.2 No. 61010-1 47 CFR, Part 15, Class B, ICES 003 IEC/EN 61010-1:2010, EN50065-1, EN61000-4-5, EN61000-6-1, EN61000-6-2 Metering: ANSI C12.20 accuracy class 0.5 (PV production only) Enphase IQ Envoy 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS Model No. MNSPD-115 MNSPD-300-AC MNSPD-300-DC MNSPD-600 Max Operating Voltage 90VAC/115VDC 250VAC 300VDC 485VAC/600VDC Surge Current per Phase 57kA 57kA 57kA 57kA Configuration 1 O, 3-wire (2 Legs) 1 O, 3-wire (2 Legs) 1 O, 3-wire (2 Legs) 1 O, 3-wire (2 Legs) MCOV 180V L-N 470V L-N 470V L-N 780V L-N SCCR 115kA 115kA 115kA 115kA VPR 600V/3kA L_G 330V 880V 880V 1500V O3.527” 4.425”3.82” 24” Wires O 2” ires Performance Surge Current Rating per Phase 57kA Short Circuit Current Rating 115kA T-MOVs 8 Fusing Individually fused MOVs Thermal Fusing Yes Over current Fusing Yes Operating Frequency 0 to 60 Hz Mechanical Description Enclosure Polycarbonate UL94V-0 Environmental Rating Type 4X Connection Method #12 AWG Weight 1 lb. Mounting Method 1/2” Conduit Knockout Operating Altitude Sea Level – 12,000’ (3,658 Meters) Storage Temp -40o F to +185o F (-40o C to +85o C) Operating Temp -40o F to +185o F (-40o C to +85o C) Diagnostics Blue status LED, one per leg Listings and Performance UL Standard for Safety, UL 1449 Surge Protective Devices-Third Edition CSA C22.2 No. 8-M1986 Electromangetic Interference (EMI) Filters, Fourth Edition Diagnostic Blue LED MNSPD-115, MNSPD-300-AC and MNSPD-300-DC LED indicates when voltage is present between L1+Ground and L2+Ground Thermal Disconnector - Internal Fuse Response time <1 micro sec. MNSPD-600 LED indicates when voltage is present between L1+L2 (PV + PV-) MNSPD-115 0 to 90 VAC 0 to 115 VDC 180V (162-198) 295V 1120 J (Full Device) 560 J (Each Section) Up to 90 VAC circuits, 12V, 24V, 48V DC battery circuits MNSPD-300-AC 0 to 250 VAC 470V (423-517) 775V 3130 J (Full Device) 1560 J (Each Section) 120/240 VAC circuits MNSPD-300-DC 0 to 300 VDC 470V (423-517) 775V 3130 J (Full Device) 1560 J (Each Section) Off-grid PV combiners Charge controller inputs up to 300VDC MNSPD-600 0 to 485 VAC 0 to 600 VDC 780V (702-858) 1290V 4320 J (Full Device) 2160 J (Each Section) 316V/480 VAC circuits Grid-tie PV combiners Grid-tie inverter input Non-Isolated Inverters PART NO. Nominal Voltage MCOV Clamp Voltage @ 100A Current 8/20 μs Energy Absorption In Joules Suggested Placement www.midnitesolar.com/spd 17722 - 67th Ave NE, Arlington, WA 98223 PH. 360-403-7207 FAX 360-691-6862 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS Milbank Manufacturing | 4801 Deramus Ave., Kansas City, MO 64120 | 877.483.5314 | milbankworks.com Please consult serving utility for their requirements prior to ordering or installing, as specifications and approvals vary by utility and may require local electrical inspector approval. All installations must be installed by a licensed electrician and must comply with all national and local codes, laws and regulations. Milbank reserves the right to make changes in specifications and features shown without notice or obligation. Catalog Number U5934-XL-BLG Marketing Product Description 4 Terminal Ringless Small Closing Plate 7-8 In Barrel Lock Ground With Bracket Provision UPC 784572592278 Length (IN)3.61 Width (IN)8 Height (IN)11.5 Brand Name Milbank Type Ringless Meter Socket Application Meter Socket Standard UL Listed;Type 3R Voltage Rating 600 Volts Alternating Current Amperage Rating 100 Continuous Ampere Phase 1 Phase Frequency Rating 60 Hertz Size 3.61L x 8W x 11.5H Number Of Cutouts 0 Cutout Size No Main Breaker Cable Entry Overhead or Underground Terminal Single Mechanical Insulation Glass Polyester Mounting Surface Mount Enclosure G90 Galvanized Steel with Powder Coat Finish Jaw Quantity 4 Terminal Bypass Type No Bypass Number of Meter Positions 1 Position Equipment Ground Ground Bar Hub Opening Small Closing Plate Line Side Wire Range 12 - 1/0 AWG Load Side Wire Range 12 - 1/0 AWG Number Of Receptacles 0 U5934-XL-BLG 1142546 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SSPROPRIETARY AND CONFIDENTIAL: THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF EZ SOLAR. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF EZ SOLAR IS PROHIBITED. Phone: 385-202-4150 www.ezsolarproducts.com ITEM No. 1 1 1 6 6 JB-1.2 Body POLYCARBONATE WITH UV INHIBITORS POLYCARBONATE WITH UV INHIBITORS #10 x 1-1/4” Phillips pan head screw #8 x 3/4” Phillips pan head screw JB-1.2 Lid2 3 4 PART NUMBER DESCRIPTION QTY Size SCALE: 1:2 WEIGHT: 1.45 LBS SHEET 1 of 3 DWG. NO. Rev B JB-1.2 Torque Specification: certification: WEIGHT: 15-20 LBS 1.45 LBS UL Standard 1741, nema 3r JB-1.2 Specification Sheet PV Junction Box for Composition/Asphalt Shingle Roofs • Maximum Voltage: 1,000 Volts • Maximum Current: 80 Amps • Allowable Wire: 14 AWG – 6 AWG • Spacing: Please maintain a spacing of at least ½” between uninsulated live parts and fittings for conduit, armored cable, and uninsulated live parts of opposite polarity. • Enclosure Rating: Type 3R • Roof Slope Range: 2.5 – 12:12 • Max Side Wall Fitting Size: 1” • Max Floor Pass-Through Fitting Size: 1” • Ambient Operating Conditions: (-35°C) - (+75°C) • Compliance: - JB-1.2: UL1741 - Approved wire connectors: must conform to UL1741 • System Marking: Interek Symbol and File #5019942 • Periodic Re-inspections: If re-inspections yield loose components, loose fasteners, or any corrosion between components, components that are found to be affected are to be replaced immediately. A. System Specifications and Ratings Phone: 385-202-4150 | www.ezsolarproducts.com 1403 N. Research Way Orem, UT 84097 800.377.4480WWW.BLUERAVENSOLAR.COM CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT BLUE RAVEN SOLAR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF BLUE RAVEN SOLAR LLC. DRAWING BY: PLOT DATE: PROJECT NUMBER: SHEET NAME: PAGE NUMBER:REVISION: ---- CERTIFIED NABCEP PV INSTALLATION PROFESSIONAL Scott Gurney #PV-011719-015866 CONTRACTOR: BRS FIELD OPS 385-498-6700 SPEC SHEET SS www.carlon.com180 Rigid Nonmetallic Conduit – Junction Boxes Molded Nonmetallic Junction Boxes6P Rated It’s another first from Carlon®- the first nonmetallic junction boxes UL Listed with a NEMA 6P rating per Section 314.29, Exception of the National Electrical Code. Manufactured from PVC or PPO thermoplastic molding compound and featuring foam-in-place gasketed lids attached with stainless steel screws, these rugged enclosures offer all the corrosion resistance and physical properties you need for direct burial applications. Type 6P enclosures are intended for indoor or outdoor use, primarily to provide a degree of protection against contact with enclosed equipment, falling dirt, hose- directed water, entry of water during prolonged submersion at a limited depth, and external ice formation. • All Carlon Junction Boxes are UL Listed and maintain a minimum of a NEMA Type 4/4x Rating. • Parts numbers with an asterisk (*) are UL Listed and maintain a NEMA Type 6P Rating and Type 4/4X Rating. E42728Except where noted by † Size in Std.Material Std. Inches Ctn. Min Min. Min. Min. Ta Tc Thermo-Ctn. Part No. H x W x D Qty.AT AB B C PVC plastic Wt. (Lbs.) E989NNJ-CAR* 4 x 4 x 2 5 311/16 35/8 N/A 2 .160 .155 X 3 E987N-CAR* 4 x 4 x 4 5 3 11/16 31/2 N/A 4 .160 .155 X 4 †E989NNR-CAR* 4 x 4 x 6 4 3 11/16 33/8 N/A 6 .160 .200 X 5 E989PPJ-CAR* 5 x 5 x 2 4 411/16 41/2 N/A 2 .110 .150 X 3 E987R-CAR* 6 x 6 x 4 2 6 5 5/8 N/A 4 .190 .190 X 3 E989RRR-UPC* 6 x 6 x 6 8 5 5/8 53/8 N/A 6 .160 .150 X 14 E989N-CAR 8 x 8 x 4 1 8 8 N/A 4 .185 .190 X 2 E989SSX-UPC 8 x 8 x 7 2 7 21/32 75/16 N/A 7 .160 .150 X 6 E989UUN 12 x 12 x 4 3 115/8 111/2 111/8 4 .160 .150 X 12 E989R-UPC 12 x 12 x 6 2 11 15/16 117/8 117/16 6 .265 .185 X 10 Typical Gross Automation (877) 268-3700 · www.carlonsales.com · sales@grossautomation.com DRAWING NUMBER:SS BLUE RAVEN SOLAR “Stay Connected” with Solar Power Components ® 1-4b1-800-526-4182 • 732-286-1800 (NJ) • FAX: 732-244-8843 • www.heyco.com Heyco®-Tite Liquid Tight Cordgrips for Enphase Q Cables Straight-Thru, NPT Hubs with Integral Sealing Ring The Ultimate in Liquid Tight Strain Relief Protection •Two new cordgrips now accommodate the Enphase Q Cable – M3231GCZ (1/2˝ NPT) and M3234GDA-SM (3/4˝ NPT). •The 1/2˝ version provides liquid tight entry for one Enphase Q Cable – .24 x .38˝ (6,1 x 9,7 mm). •The 3/4˝ version provides liquid tight entry for up to two Enphase Q Cables – .24 x .38” (6,1 x 9,7 mm) and an additional .130” (3,3 mm) dia. hole for a #8 solid grounding cable. •The 3/4˝ version utilizes our skinned- over technology so any unused holes will retain a liquid tight seal. •Rated for use with DG Cable. Material Nylon 6/6 with TPE Sealing Gland Certifications Listed under Underwriters’ Laboratories File E504900 CSA Certified by the Canadian Standards Association File 93876 Flammability Rating 94V-2 Temperature Range Static -40°F (-40°C) to 239°F (115°C) Dynamic -4°F (-20°C) to 212°F (100°C) IP Rating IP 68 GLAND PART NO. DESCRIPTION PART DIMENSIONS CONFIGURATION A B C D E Conductors or Clearance Max. O.A. Thread Wrenching Nut Type Size No. Black Hole Dia. Length Length Thickness Flat Size * mm. in. mm. in. mm. in. mm. in. mm. in. mm. Oval Gland Q Cable 6,1x 9,7 1 M3231GCZ LTCG 1/2 6.1x9.7MM .875 22,2 1.70 43,2 .61 15,5 .21 5,3 .98 24,9 Break-Thru Skinned Over Gland Q Cables 6,1x 9,7 2 SMCG 3/4 2-6.1x9.7MMplusM3234GDA-SM 1.040 26,4 2.00 50,8 .62 15,7 .25 6,4 1.30 33,0 Ground 3,3 1 1-3.3MM Metal Locknuts INCLUDED. Heyco®Helios®UVX Clip – Blind Mount •The jersey pine tree mounting style installs easily with superior holding power. •UVX nylon protects from corrosion due to outdoor exposure. •Installs into .260˝ (6,6 mm) mounting hole. •Holds up to 2 cables between .230 - .315˝ (5,8 - 8,0 mm) each. •Cables install with fingertip pressure. •Molded from our robust UVX nylon 6/6 with extended UV capabilities for our Solar 20 Year Warranty. Material Nylon 6/6 with extended UV Capabilities Flammability Rating 94V-2 Temperature Range Dynamic -4°F (-20°C) to 185°F (85°C) PANEL THICKNESS RANGE WIRE DIAMETER PART NO. DESCRIPTION MOUNTING OVERALL RANGE HOLE DIA. HEIGHT Minimum Maximum 1-2 Wires A C in. mm. in. mm. in. mm. in. mm. 1-2 Wires .028 0,7 .250 6,4 .23 (5,8 mm) - .32 (8,0 mm)S6520 Helios UVX Clip 100 Pack .260 6,6 .96 24,4each cable S6560 Helios UVX Clip Bulk SUGGESTED CLEARANCE HOLE FOR NONTHREADED MOUNTING AD C B E SEALING NUT INTEGRAL SEALING RING ALL NEW PRODUCT! ALL NEW PRODUCT! The 3/4˝ version provides liquid tightpqg entry for up to two Enphase Q Cables –yp p .24 x .38” (6,1 x 9,7 mm) and an (, , ) additional .130” (3,3 mm) dia. hole for(, ) a #8 solid grounding cable. Q Cables 6,1x9,7 2 SMCG 3/4 2-6.1x9.7MMplusM3234GDA-SM 1.040 26,4 2.00 50,8 .62 15,7 .25 6,4 1.30 33,01-3.3MM3,3 1Ground Break-Thru Skinned Over Gland The 3/4˝ version utilizes our skinned- over technology so any unused holes gy y will retain a liquid tight seal. DRAWING NUMBER:SS BLUE RAVEN SOLAR SFM INFINITY REVOLUTIONIZES ROOFTOP SOLAR WITH BENEFITS ACROSS YOUR BUSINESS, FROM DESIGN AND LOGISTICS, THROUGH ARRAY INSTALLATION AND SERVICE. SFM INFINITY 20% FEWER ATTACHMENTS Save time and money on every project: SFM INFINITY requires fewer attachments than rail systems. 2 INSTALLS PER DAY Make two installs per day your new standard. SFM INFINITY has fewer roof attachments, one tool installation, and pre-assembled components to get you off the roof 40% faster. BETTER AESTHETICS Install the system with the aesthetics preferred by homeowners, with integrated front trim, trim end caps, dark components, and recessed hardware. 30% LOGISTICS SAVINGS With fewer SKUs and compact components, SFM INFINITY is easier to stock, easier to transport, and easier to lift to the roof. Plus, make more efficient use of your vehicle fleet. SYSTEM OVERVIEW BONDING AND ACCESSORIES 2MW 3MW PART NAME DESCRIPTION TRIMRAIL ENDCAPS Covers ends of TRIMRAIL for refined aesthetic. TRIMRAIL BONDING CLAMP Electrically bonds TRIMRAIL and modules N/S BONDING CLAMP Electrically bonds rows of modules 2 3 4 5 6 1 1 4 3 5 6 7 SFM INFINITY 15 Attachments RAIL 20 Attachments 87%OF HOMEOWNERS PREFER MAXIMUM POWER DENSITY Easily mix module orientations to achieve optimal power density without incurring the increased bill of materials, labor, and attachments required by rail. 7 2 PART NAME DESCRIPTION TRIMRAIL Structural front trim provides aesthetic and aligns modules. TRIMRAIL SPLICE Connects and electrically bonds sections of TRIMRAIL. TRIMRAIL FLASHKIT Attaches TRIMRAIL to roof. Available for comp shingle or tile. MODULE CLIPS Secure modules to TRIMRAIL. MICRORAIL Connects modules to SLIDERS. Provides post-install array leveling. SPLICE Connects and supports modules. Provides east-west bonding. ATTACHED SPLICE also available. SLIDER FLASHKIT Roof attachment and flashing. Available for comp shingle and tile. DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 19SYSTEM BONDING & GROUNDING E-W BONDING PATH: (:PRGXOHWRPRGXOHERQGLQJLVDFFRPSOLVKHG ZLWKSUHLQVWDOOHGERQGLQJSLQVZKLFKHQJDJH RQWKHVHFXUHVLGHRIWKH0LFURUDLO70DQGVSOLFH TRIMRAIL BONDING PATH: 7ULPUDLOWRPRGXOHERQGLQJLVDFFRPSOLVKHGZLWK ERQGLQJFODPSZLWKLQWHJUDOERQGLQJSLQDQG ERQGLQJ7EROW(refer also to alternate method) N-S BONDING PATH: 16PRGXOHWRPRGXOHERQGLQJLV DFFRPSOLVKHGZLWKERQGLQJFODPSZLWKLQWHJUDO ERQGLQJSLQV(refer also to alternate method) System bonding is accomplished through modules. System grounding accomplished by attaching DJURXQGOXJWRDQ\PRGXOHDWDORFDWLRQRQWKHPRGXOHVSHFLʳHGE\WKHPRGXOHPDQXIDFWXUHU LUG DETAIL & TORQUE INFO Ilsco Lay-In Lug (GBL-4DBT) • PRXQWLQJKDUGZDUH • 7RUTXH IWOE • $:*6ROLGRU6WUDQGHG LUG DETAIL & TORQUE INFO Ilsco Flange Lug (SGB-4) • ȧPRXQWLQJKDUGZDUH • 7RUTXH LQOE • $:*6ROLGRU6WUDQGHG LUG DETAIL & TORQUE INFO Wiley WEEBLug (6.7) • ȧPRXQWLQJKDUGZDUH • 7RUTXH IWOE • $:*6ROLGRU6WUDQGHG NOTE: ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION TERMINAL TORQUE, Install Conductor and torque to the following: 4-6 AWG: 35in-lbs 8 AWG: 25 in-lbs 10-14 AWG: 20 in-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 6-14 AWG: 7ft-lbs TERMINAL TORQUE, Install Conductor and torque to the following: 4-14 AWG: 35in-lbs WEEBLUG Single Use Only Star Washer is Single Use Only Ñ$OWHUQDWHPHWKRG $OWHUQDWHPHWKRG DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 20UL CODE COMPLIANCE NOTES SYSTEM LEVEL FIRE CLASSIFICATION 7KHV\VWHPʳUHFODVVUDWLQJUHTXLUHVLQVWDOODWLRQLQWKHPDQQHUVSHFLʳHGLQWKH 681)5$0(0,&525$,/ 6)0 ,QVWDOODWLRQ*XLGH6)0KDVEHHQFODVVLʳHGWR WKHV\VWHPOHYHOʳUHSRUWLRQRI8/7KLV8/FODVVLʳFDWLRQKDVEHHQ LQFRUSRUDWHGLQWRWKH8/SURGXFWFHUWLʳFDWLRQ6)0KDVDFKLHYHG&ODVV$ % &V\VWHPOHYHOSHUIRUPDQFHIRUORZVORSH VWHHSVORSHGURRIVZKHQXVHG LQFRQMXQFWLRQZLWKW\SHDQGW\SHPRGXOHV&ODVV$% &V\VWHPOHYHOʳUH UL2703 TEST MODULES 6HHSDJHVDQGIRUDOLVWRIPRGXOHVWKDWZHUHHOHFWULFDOO\DQGPHFKDQLFDOO\WHVWHGRU TXDOLʳHGZLWKWKH681)5$0(0,&525$,/ 6)0 FRPSRQHQWVRXWOLQHGZLWKLQWKLV,QVWDOODWLRQ*XLGH •0D[LPXP$UHDRI0RGXOH VTIW •8/'HVLJQ/RDG5DWLQJV D 'RZQZDUG3UHVVXUHȡ36)3D E 8SZDUG3UHVVXUHȡ36)3D F 'RZQ6ORSH/RDGȡ36)3D •7HVWHG/RDGV D 'RZQZDUG3UHVVXUHȡ36)3D E 8SZDUG3UHVVXUHȡ36)3D F 'RZQ6ORSH/RDGȡ36)3D •0D[LPXP6SDQ IW •8VHZLWKDPD[LPXPRYHUFXUUHQWSURWHFWLRQGHYLFH2&3'RI$ •6\VWHPFRQIRUPVWR8/6WGFHUWLʳHGWR/75$( •5DWHGIRUDGHVLJQORDGRI3D3DZLWKLQFKVSDQ •39PRGXOHVPD\KDYHDUHGXFHGORDGUDWLQJLQGHSHQGHQWRIWKH6)0ORDGUDWLQJ3OHDVHFRQVXOW WKH39PRGXOHPDQXIDFWXUHU VLQVWDOODWLRQJXLGHIRUPRUHLQIRUPDWLRQ •'RZQ6ORSHGHVLJQORDGUDWLQJRI36)3DIRUPRGXOHDUHDVRIVTIWRUOHVV Module Type Roof Slope System Level Fire Rating Microrail Direction Module Orientation Mitigation Required Type 1 and Type 2 6WHHS6ORSH /RZ6ORSH &ODVV$% & (DVW:HVW /DQGVFDSH253RUWUDLW None Required SHUIRUPDQFHLVLQKHUHQWLQWKH6)0GHVLJQDQGQRDGGLWLRQDOPLWLJDWLRQPHDVXUHV DUHUHTXLUHG7KHʳUHFODVVLʳFDWLRQUDWLQJLVYDOLGIRUDQ\URRISLWFK7KHUHLVQR UHTXLUHGPLQLPXPRUPD[LPXPKHLJKWOLPLWDWLRQDERYHWKHURRIGHFNWRPDLQWDLQ WKH&ODVV$% &ʳUHUDWLQJIRU6)0681)5$0(0,&525$,/TM FRPSRQHQWVVKDOO EHPRXQWHGRYHUDʳUHUHVLVWDQWURRIFRYHULQJUDWHGIRUWKHDSSOLFDWLRQ DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 22TESTED / CERTIFIED MODULE LIST Aleo P-Series $SWRV '1$ %)0)  '1$ %)0)  $VWURQHUJ\ &+603&+603+9&+600 &+600+9&+600 %/ %)  +)  CHSM72M-HC Auxin $;107$;137 $;107 $;137 $[LWHF $;,EODFNSUHPLXP PP  $;,SRZHU PP  $;,SRZHU PP  $;,SUHPLXP PP  $;,SUHPLXP PP  %RYLHW %90 %90 %<'P6K & MHK-36 Series Canadian Solar &6 +.8< 06 &6 ./8 &6.0%$*&6. 063 &6106&680%$*&68 063 &6: &6$0&6 .8 &6. 03 &6.06 &63 03 &68 03 &690&6;3 &HQWURVRODU$PHULFD C-Series & E-Series &HUWDLQ7HHG &7[[0[[&7[[3[[ &7[[[0[[&7[[[0 &7[[[0[[&7[[[+& 'HKXL '+0 Manufacture Module Model / Series Eco Solargy Orion 1000 & Apollo 1000 ET Solar ET-M672BHxxxTW )UHHGRP)RUHYHU FF-MP-BBB-370 )UHH9ROW Mono PERC GCL GCL-P6 & GCL-M6 Series Hansol 7'$17'$1 8%$18'$1 Heliene 0030 36HULHV +&00RQRIDFLDO%LIDFLDO6HULHV +&06/%LIDFLDO HT Solar +7 0  1'9  )  +7 03 Hyundai .*0*7*5,5*7,0,+, .,6HULHV HiA-SxxxHG ,7(. L7L7+( L76(6HULHV Japan Solar JPS-60 & JPS-72 Series JA Solar -$3[[[-$0[[[6,-$0 .  [[[-$3 N [[[%%-$36<<[[[== -$3 N [[[%%-$36<<[[[== -$0 N [[[==-$06<<[[[== -$0 N [[[==-$06<<[[[== L<< LL==6&35%3+L7,%0:05 -LQNR JKM & JKMS Series Eagle JKMxxxM -.0[[[0+/9 Kyocera KU Series Manufacture Module Model / Series Manufacture Module Model / Series ȫ8QOHVVRWKHUZLVHQRWHGDOOPRGXOHVOLVWHGDERYHLQFOXGHDOOZDWWDJHVDQGVSHFLʳFPRGHOVZLWKLQWKDWVHULHV9DULDEOHZDWWDJHVDUHUHSUHVHQWHGDV[[[ ȫ,WHPVLQSDUHQWKHVLVDUHWKRVHWKDWPD\RUPD\QRWEHSUHVHQWLQDFRPSDWLEOHPRGXOH VPRGHO,' ȫ6ODVKHVEHWZHHQRQHRUPRUHLWHPVLQGLFDWHVWKDWHLWKHURIWKRVHLWHPVPD\EHWKHRQHWKDWLVSUHVHQWLQDPRGXOH VPRGHO,' ȫ3OHDVHVHHWKH6)08/&RQVWUXFWLRQ'DWD5HSRUWDW8QLUDFFRPWRHQVXUHWKHH[DFWVRODUPRGXOHVHOHFWHGLVDSSURYHGIRUXVHZLWK6)0 ȫ6)0,QʳQLW\LVQRWFRPSDWLEOHZLWKPRGXOHIUDPHKHLJKWRIOHVVWKDQPPDQGPRUHWKDQPP6HH0RGXOH0RXQWLQJVHFWLRQSDJHIRUIXUWKHULQIRUPDWLRQ /*(OHFWURQLFV LGxxxN2T-A4 /*[[[ $&(&(.1&1.171: 4&4.6&6: $ LGxxxN2T-B5 LGxxxN1K-B6 /*[[[ $&0&0.1&1.4&4. 4$&4$. $ /*[[[ 1&1.171: ( /*[[[ 1&1.1:6&6: * LGxxxN2T-J5 /*[[[ 1.1:171: / /*[[[ 1&4&4. 1 /*[[[ 1&1.1:4&4. 9 LONGi /5 +,%+,++3%+3+ [[[0 /5 +,++3+ [[[0 /5 %3+%'+,%' [[[0 PP /5 %. 3( +3% +3+ [[[0 PP /5 %. 3( 3% 3+ [[[0 PP /5 %3 +%' +,%' [[[0 PP /5 +9 %. 3( 3+ 3% +3+ [[[0 PP /5 %. +9 3( 3% 3+ [[[0 PP Mission Solar Energy MSE Series 0LWVXELVKL MJE & MLE Series 1HR6RODU3RZHU&R '0 '36HULHV DRAWING NUMBER:SS BLUE RAVEN SOLARSFMSUN FRAME MICRORAIL™INSTALLATION GUIDE PAGE 23TESTED / CERTIFIED MODULE LIST 5(&6RODU FRQW 7ZLQ3HDN6HULHV 7ZLQ3HDN6HULHV 7ZLQ3HDN%/.6HULHV 7ZLQ3HDN6 0  ;9  7ZLQ3HDN6HULHV PP 73 %ODFN Renesola 9LWUXV6HULHV 6HULHV Risen 560 0'*  0 560 SEG Solar 6(*[[[%0'+9 6(*[[[%0'7% S-Energy 61 616HULHV PP Seraphim SEG-6 & SRP-6 Series Sharp NU-SA & NU-SC Series 6LOIDE 6/$6/*%&6HULHV 6,/[[[ %/1/17+/ 0/%.1;18+&  6RODUHYHU86$ 6( [[[01 Solaria 3RZHU;7[[[5 $&3'%' 3RZHU;7[[[&3' 3RZHU;7[[[530 $& SolarWorld 6XQPRGXOH3URWHFW Sunmodule Plus Sonali 660WR6HULHV 660WR6HULHV 660WR6HULHV 660WR%L)DFLDO6HULHV SS 230 - 265 SunEdison )6HULHV56HULHV )/(;);66HULHV Manufacture Module Model / Series 6XQLYD 096HULHV 2SWLPXV6HULHV SunPower $6HULHV$%/.6350$;;;;5 ;6HULHV(6HULHV 36HULHV 6XQWHFK 673673;;;6%:QKE Talesun 73737373 73+LSRU06PDUW Tesla 6&6&%6&%6&% 7[[[+7[[[6 Trina 3$3''''(''3( 3'3('''('('( PE15H Upsolar 830[[[3 %  830[[[0 % 8QLWHG5HQHZDEOH(QHUJ\ 85( '0[[[+$' 0. [[[+$ )$.[[[ &*(* )$0[[[(*%% )$0[[[(* %% FBMxxxMFG-BB 9LNUDP (OGRUD 6ROLYR Somera Waaree AC & Adiya Series Winaico WST & WSP Series Yingli YGE & YLM Series =16KLQH =;0=;01+B Manufacture Module Model / Series Manufacture Module Model / Series ȫ8QOHVVRWKHUZLVHQRWHGDOOPRGXOHVOLVWHGDERYHLQFOXGHDOOZDWWDJHVDQGVSHFLʳFPRGHOVZLWKLQWKDWVHULHV9DULDEOHZDWWDJHVDUHUHSUHVHQWHGDV[[[ ȫ,WHPVLQSDUHQWKHVLVDUHWKRVHWKDWPD\RUPD\QRWEHSUHVHQWLQDFRPSDWLEOHPRGXOH VPRGHO,' ȫ6ODVKHVEHWZHHQRQHRUPRUHLWHPVLQGLFDWHVWKDWHLWKHURIWKRVHLWHPVPD\EHWKHRQHWKDWLVSUHVHQWLQDPRGXOH VPRGHO,' ȫ3OHDVHVHHWKH6)08/&RQVWUXFWLRQ'DWD5HSRUWDW8QLUDFFRPWRHQVXUHWKHH[DFWVRODUPRGXOHVHOHFWHGLVDSSURYHGIRUXVHZLWK6)0 ȫ6)0,QʳQLW\LVQRWFRPSDWLEOHZLWKPRGXOHIUDPHKHLJKWRIOHVVWKDQPPDQGPRUHWKDQPP6HH0RGXOH0RXQWLQJVHFWLRQSDJHIRUIXUWKHULQIRUPDWLRQ Panasonic (939[[[ +.3.  9%+1[[[6$ 6$ 9%+1[[[6$ 6$ 9%+1[[[6$ (*  6$( 9%+1[[[.$ .$ .$ 9%+1[[[=$9%+1[[[=$ 9%+1[[[=$9%+1[[[=$ Peimar 6*[[[0 )%%) Phono Solar 3636 Prism Solar P72 Series 4&HOOV 3OXV3UR3HDN****  **  3UR3HDN/*/*/*/*/* 43($.'82%/.* 43($.'82%/.*76 43($.'82 %/. *  43($.'82/*%)) 43($.'82 %/. 0/*  43($.'82;/*** 43($.'82 %/. 0/*  43($.'82;/* FG 43($.'82%/.0/*W REC Solar $OSKD   %ODFN  3XUH RECxxxAA PURE-R 5(&[[[13%ODFN 13HDN %ODFN 13HDN %ODFN PEAK Energy Series PEAK Energy BLK2 Series PEAK Energy 72 Series DRAWING NUMBER:SS BLUE RAVEN SOLAR DRAWING NUMBER:SS BLUE RAVEN SOLAR DRAWING NUMBER:SS BLUE RAVEN SOLAR Listing Constructional Data Report (CDR) Report Number 102393982LAX-002 Original 11-Apr-2016 Revised: 5-Oct-2022 Standard(s) Applicant Manufacturer 2 Address Address Country Country Contact Contact Phone Phone FAX FAX Email Email Manufacturer 3 Manufacturer 4 Address Address Country Country Contact Contact Phone Phone FAX FAX Email Email Manufacturer 5 Address Country Contact Phone FAX 505-462-2190 505-843-1418 NA klaus.nicolaedis@unirac.com toddg@unirac.com 1411 Broadway Blvd NE Albuquerque, NM 87102 USA Klaus Nicolaedis Todd Ganshaw 1.0 Reference and Address Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels [UL 2703:2015 Ed.1+R:24Mar2021] PV Module and Panel Racking Mounting System and Accessories [CSA TIL No. A-40:2020] Unirac, Inc Page 1 of 138 Listing Constructional Data Report (CDR) Report Number 102393982LAX-002 Original 11-Apr-2016 Revised: 5-Oct-2022 1.0 Reference and Address Email Page 2 of 138 DRAWING NUMBER:SS BLUE RAVEN SOLAR Report No. 102393982LAX-002 Unirac, Inc Page 3 of 138 Issued: 11-Apr-2016 Revised: 5-Oct-2022 Product Brand name 2.0 Product Description Photovoltaic Mounting System, Sun Frame Microrail Installation Guide, PUB2022SEP28 Unirac Description The product covered by this report is the Sun Frame Micro Rail roof mounted Photovoltaic Rack Mounting System. This system is designed to provide bonding and grounding to photovoltaic modules. The mounting system employs anodized or mill finish aluminum brackets that are roof mounted using the slider, outlined in section 4 of this report. There are no rails within this product, whereas the 3" Micro Rail, Floating Splice, and 9" Attached Splice electrically bond the modules together forming the path to ground. The Micro Rails are installed onto the module frame by using a stainless steel bolt anodized with black oxide with a stainless type 300 bonding pin, torqued to 20 ft-lbs, retaining the modules to the bracket. The bonding pin of the Micro Rail when bolted and torqued, penetrate the anodized coating of the photovoltaic module frame (at bottom flange) to contact the metal, creating a bonded connection from module to module. The grounding of the entire system is intended to be in accordance with the latest edition of the National Electrical Code, including NEC 250: Grounding and Bonding, and NEC 690: Solar Photovoltaic Systems or the Canadian Electrical Code, CSA C22.1 Part 1 in accordance to the revision in effect in the jurisdiction in which the project resides. Any local electrical codes must be adhered in addition to the national electrical codes. The Grounding Lug is secured to the photovoltaic module, torqued in accordance with the installation manual provided in this document. Other optional grounding includes the use of the Enphase UL2703 certified grounding system, which requires a minimum of 2 micro-inverters mounted to the same rail, and using the same engage cable. ED 16.3.15 (1-Jul-2022) Mandatory Report No. 102393982LAX-002 Unirac, Inc Page 4 of 138 Issued: 11-Apr-2016 Revised: 5-Oct-2022 2.0 Product Description Models Model Similarity Other Ratings Ratings Fuse Rating: 30A Module Orientation: Portrait or Landscape Maximum Module Size: 17.98 ft² UL2703 Design Load Rating: 33 PSF Downward, 33 PSF Upward, 10 PSF Down-Slope Tested Loads - 50 psf/2400Pa Downward, 50psf/2400Pa Uplift, 15psf/720Pa Down Slope Trina TSM-255PD05.08 and Sunpower SPR-E20-327 used for Mechanical Loading Increased size ML test: Maximum Module Size: 22.3 ft² UL2703 Design Load Rating: 113 PSF Downward, 50 PSF Upward, 30 PSF Down-Slope LG355S2W-A5 used for Mechanical Loading test. Mounting configuration: Four mountings on each long side of panel with the longest span of 24" UL2703 Design Load Rating: 46.9 PSF Downward, 40 PSF Upward, 10 PSF Down-Slope LG395N2W-A5, LG360S2W-A5 and LG355S2W-A5 used for used for Mechanical Loading test. Mounting configuration: Six mountings for two modules used with the maximum span of 74.5" IEC 61646 Test Loads - 112.78 psf/5400Pa Downward, 50psf/2400Pa Uplift Mechanical Load test to add FlashLoc Slider and Trim Assemblies to UL2703 and IEC 61646 Certifications, & Increase SFM System UL2703 Module Size: Maximum Module Size: 27.76 ft² UL2703 Design Load Rating: 113 PSF Downward, 50 PSF Upward, 21.6 PSF Down-Slope Jinko Eagle 72HM G5 used for Mechanical Loading test. Mounting configuration: Four mountings on each long side of panel with the longest span of 24" Mamzimum module size: 21.86 ft2 IEC 61646 Test Loads - 112.78 psf/5400Pa Downward, 75psf/3600Pa Uplift SunPower model SPR-A430-COM-MLSD used for Mechanical Loading Fire Class Resistance Rating: - Class A for Steep Slope Applications when using Type 1 Modules. Can be installed at any interstitial gap. Installations must include Trim Rail. - Class A for Steep Slope Applications when using Type 2 Modules. Can be installed at any interstitial gap. Installations must include Trim Rail. - Class A Fire Rated for Low Slope applications with Type 1 or 2 listed photovoltaic modules. This system was evaluated with a 5” gap between the bottom of the module and the roof’s surface See section 7.0 illustractions # 1, 1a and 1b for a complete list of PV modules evaluated with these racking systems Unirac SFM NA NA ED 16.3.15 (1-Jul-2022) Mandatory ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com To: Blue Raven Solar 1403 North Research Way, Building J Orem, UT. 84097 Subject: Certification Letter McGeel Residence 16133 Dodd Ln Rosemount, MN. 55068 To Whom It May Concern, Design Criteria: භ Applicable Codes = 2020 Minnesota Building Code, ASCE 7-16 භ Roof Dead Load = 7 psf (MP1&2) භ Roof Live Load = 20 psf භ Wind Speed = 115 mph (Vult), Exposure C භ භ Sincerely, John Calvert, P.E. Project Engineer December 29, 2023 The roof structures of (MP1&2) consist of composition shingle on roof plywood that is supported by pre-manufactured trusses that are spaced at @ 24"o.c.. The top chords, sloped at 23 degrees, are 2x4 sections, the bottom chords are 2x4 sections and the web members are 2x4 sections. The truss members are connected by steel gusset plates. The max unsupported projected horizontal top chord span is approximately 6'-8''. The existing roof framing systems of (MP1&2) are judged to be adequate to withstand the loading imposed by the installation of the solar panels. No reinforcement is necessary. Ground Snow Load = 50 psf - Roof Snow Load = 35 psf The spacing of the solar standoffs should be kept at 48" o.c. for landscape and 24" o.c. for portrait orientation, with a staggered pattern to ensure proper distribution of loads. A jobsite observation of the condition of the existing framing system was performed by an audit team of Blue Raven Solar as a request from Domus Structural Engineering. All review is based on these observations and the design criteria listed below and only deemed valid if provided information is true and accurate. On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof. The structural review only applies to the section of the roof that is directly supporting the solar PV system and its supporting elements. The observed roof framing is described below. If field conditions differ, contractor to notify engineer prior to starting construction. The scope of this report is strictly limited to an evaluation of the fastener attachment, underlying framing and supporting structure only. The attachment's to the existing structure are required to be in a staggered pattern to ensure proper distribution of loading. All panels, racking and hardware shall be installed per manufacturer specifications and within specified design limitations. All waterproofing shall be provided by the manufacturer. Domus Structural Engineering assumes no responsibility for misuse or improper installation of the solar PV panels or racking. Please contact me with any further questions or concerns regarding this project. Note: Seismic check is not required since Ss<.4g and Seismic Design Category (SDC) < B Attachment: 1 - 5/16 dia. lag screw with 2.5 inch min. embedment depth, at spacing shown above. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.John A. Calvert, License No. 52823 Expiration Date: 30-June-2024 McGeel Rosemount MN 1 Digitally signed by John A. Calvert Date: 2023.12.29 12:23:00 -07'00' ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com 50.0 psf (ASCE7 - Eq 7-1) 1 (ASCE7 - Table 7-2) 1 (ASCE7 - Table 7-3) 1 35.0 psf (ASCE7 - Eq 7-2) 1 35.0 psf 3.26 psf 3.0 psf 2.00 ft 6.08 ft 12.17 sft 37 lb 4.00 2.00 0.73 0.00 (Ceiling Not Vaulted) 0.27 7.0 psf 7.6 psf Gravity Loading PV System Weight Weight of PV System (Per Blue Raven Solar) X Standoff Spacing = Y Standoff Spacing = Note: PV standoffs are staggered to ensure proper distribution of loading 2x4 Top Chords @ 24"o.c. I = Importance Factor = Cs = Slope Factor = Standoff Tributary Area = ps = Cspf ps = Sloped Roof Snow Load = pf = Flat Roof Snow Load = DL Adjusted to 23 Degree Slope Roof Snow Load Calculations pg = Ground Snow Load = Ce = Exposure Factor = pf = 0.7 Ce Ct I pg Ct = Thermal Factor = Roof Live Load = 20 psf Roof Plywood Roof Dead Load (MP1&2) Composition Shingle Note: Roof live load is removed in area's covered by PV array. DL Adjusted to 23 Degree Slope Point Loads of Standoffs Miscellaneous Vaulted Ceiling Total Roof DL (MP1&2) PV Dead Load = 3 psf (Per Blue Raven Solar) McGeel Rosemount MN 2 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com 115 mph C Gable Roof 23 degrees 20 ft 21.3 ft 0 ft (Eq. 26.10-1) 0.90 (Table 30.3-1) 1.00 (Fig. 26.8-1) 0.85 (Table 26.6-1) 1.00 115 mph (Fig. 26.5-1A) II (Table 1.5-1) qh = 25.95 Zone 1 Zone 2 Zone 3 Positive ya =0.77 0.80 0.80 0.77 GCp =-1.50 -2.50 -3.59 0.52 (Fig. 30.3) Uplift Pressure =-30.0 psf -51.9 psf -74.5 psf 10.3 psf (Eq. 29.4-7) ASD Uplift Pressure =-18.0 psf -31.1 psf -44.7 psf 9.6 psf X Standoff Spacing = 2.00 2.00 1.33 Y Standoff Spacing = 6.08 3.04166667 3.04166667 Tributary Area = 12.17 6.08 4.06 Dead Load on attachment = 37 lb 18 lb 12 lb Footing Uplift (0.6D+0.6W) = -197 lb -179 lb -174 lb Zone 1 Zone 2 Zone 3 Positive ya =0.75 0.80 0.80 0.75 GCp =-1.50 -2.50 -3.49 0.50 (Fig. 30.3) Uplift Pressure =-29.2 psf -51.9 psf -72.5 psf 9.8 psf (Eq. 29.4-7) ASD Uplift Pressure (0.6W)=-17.5 psf -31.1 psf -43.5 psf 9.6 psf X Standoff Spacing = 4.00 4.00 2.67 Y Standoff Spacing = 3.50 1.75 1.75 Tributary Area = 14.00 7.00 4.67 Dead Load on attachment = 42.00 21.00 14.00 Footing Uplift (0.6D+0.6W) = -220 lb -205 lb -195 lb -220 lb 450 lb Therefore, OK Fastener =1 - 5/16" dia. lag Number of Fasteners = 1 Embedment Depth = 2.5 Pullout Capacity Per Inch = 250 lb Fastener Capacity = 625 lb w/ F.S. of 1.5 & DOL of 1.6= 667 lb Therefore, OK Fastener Capacity Check Mean Roof Height Ground Elevation Kd (Wind Directionality Factor) = 667.2 lb capacity > 220 lb demand Ke (Ground Elevation Factor) = V (Design Wind Speed) = Risk Category = Standoff Uplift Calculations-Portrait Standoff Uplift Calculations-Landscape Standoff Uplift Check Standoff Uplift Capacity = 450 lb capacity > 220 lb demand Wind Calculations Maximum Design Uplift = Design Wind Pressure Calculations qh = 0.00256 * Kz * Kzt * Kd * Ke * V^2 Kz (Exposure Coefficient) = Kzt (topographic factor) = Wind Speed Exposure Category Roof Shape Roof Slope Effective Wind Area Per ASCE 7-16 Components and Cladding Input Variables McGeel Rosemount MN 3 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com (MP1&2)PASS Dead Load 7.6 psf PV Load 3.3 psf Snow Load 35.0 psf Governing Load Combo = DL + SL Total Load 45.9 psf Fb (psi) = f'b x Cd x Cf x Cr (NDS Table 4.3.1) 1650 x 1.15 x 1 x 1.15 Allowed Bending Stress = 2182.1 psi (wL^2) / 8 = 509.5956 ft# = 6115.147 in# Actual Bending Stress = (Maximum Moment) / S = 1996.8 psi L/180 (E = 1500000 psi Per NDS) = 0.444 in Deflection Criteria Based on = (w*L^4) / (185*E*I) = = L/380 > L/180 Therefore OK Allowed Deflection (Live Load) =L/240 0.333 in (w*L^4) / (185*E*I) L/497 > L/240 Therefore OK Member Area = Fv (psi) = 135 psi (NDS Table 4A) Allowed Shear = Fv * A = Max Shear (V) = w * L / 2 = 306 lb Framing Check 5.3 in^2 Check Shear w = 92 plf 2x4 Top Chords @ 24"o.c. Member Span = 6' - 8" 709 lb Allowed > Actual -- 43.2% Stressed -- Therefore, OK 1650Fb/1.5E Member Spacing @ 24"o.c. Maximum Moment = Check Deflection I (in^4) 5.36 Lumber Sp/Gr Actual Deflection (Live Load) = Allowed Deflection (Total Load) = Actual Deflection (Total Load) = Allowed > Actual -- 91.6% Stressed -- Therefore, OK Member Properties Member Size 2x4 S (in^3) 3.06 0.161 in Continuous Span 0.211 in Check Bending Stress (True Dimensions) McGeel Rosemount MN 4 ___________________________________________________________________________________________ Domus Structural Engineering, LLC P.O. Box 560 Broomfield, CO 80038 530-864-7055 projects@domusstruc.com Appendix A: General Notes GENERAL Ɣ The contractor shall verify all dimensions, property setbacks, AHJ/HOA CC&R's, elevations and site conditions before starting work and shall notify Domus Structural Engineering, LLC of any discrepancies. Ɣ All report conclusions represent Domus Structural Engineering, LLC's best professional judgment based upon industry standards. Ɣ Resolve any conflicts on the drawings with Domus Structural Engineering, LLC before proceeding with construction. Ɣ The design criteria used for this project & listed on the first page of the report is based on the engineers best judgement and/or provided by the ATC council. AHJ specific requests may differ. Please contact our team if the design criteria needs to be modified. Ɣ A site visit was not physically conducted by Domus Structural Engineering, LLC. The accompanying calculations and certification are provided with the understanding that the site building and construction standards meet an acceptable level of industry standards. It shall be the contractors responsibility to identify any irregularities such as inconsistent framing conditions, water damage, fire damage, cracked, split or noticeably deflecting framing members. Ɣ Domus Structural Engineering, LLC is not responsible for enforcing safety measures or regulations. The contractor shall design, construct, and maintain all safety devices including shoring and bracing, and shall be solely responsible for conforming to all local, state and federal safety and health standards, laws and regulations. The contractor shall take necessary precautions to maintain and insure the integrity of the structure during construction. If a lawsuit is filed by one of the contractor's or subcontractor's employees, or any one else, the contractor will indemnify, defend and hold the owner and Domus Structural Engineering, LLC harmless of any and all such claims. Ɣ Any and all waterproofing shall be provided by the contractor. Domus Structural Engineering, LLC is not responsible for waterproofing. Ɣ All hardware shall be installed per manufacturer specifications and within specified design limitations. Domus Structural Engineering, LLC assumes no responsibility for incorrectly installed hardware or hardware installed outside of the manfacturer specifications. USER RELIANCE Ɣ Domus Structural Engineering, LLC was engaged by Blue Raven Solar (Client) to perform this assessment. This report and the information therein, are for the exclusive use of the Client. This report has no other purpose and shall not be relied upon, or used, by any other person or entity without the written consent of Dous Structural Engineering, LLC. Third parties that obtain this report, or the information within shall have no rights of recourse or recovery against Domus Structural Engineering, LLC, it’s officers or employees. ROOF MOUNTED ARRAYS Ɣ If an analysis of a supporting stucture is included in our scope of work, the structural assessment only applies to the section of the roof that is directly supporting the proposed solar PV system. Ɣ No structural members can be cut for conduit, etc., unless specifically shown. Obtain prior written approval for installation of any additional conduit, etc. Ɣ It is assumed that a standard quality of construction care was used to construct the original building. It shall be the contractors responsibility to field verify any and all framing member supporting the proposed PV array are in adequate condition. The contractor shall field inspect for sub-standard construction means, signs of dry rot, mold, fire damage, etc. and notify engineer if any compromised material is found on site prior to starting construction. Ɣ It is assumed that there have been no additional loads (HVAC or MEP equipment, additional layers of roofing, etc) added to the building over the course of the structures histroy. The contractor and/or client shall verify this with the property owner and notify Domus Structural Engineering, LLC if additional load has been added to the structure already. Ɣ Flexible utility connections must be used at any building seismic joint. Ɣ Care should be taken to ensure that PV arrays do not preclude drainage of rain water. Ɣ Unless otherwise noted, construction material shall be evenly distributed if placed on framed floors or roofs. Loads shall not exceed the allowable loading for the supporting members and their connections. Ɣ All lags or wood screws at the roof shall be stainless steel and installed withing the middle 1/3 of the dimensional width of the framing members. Ɣ All fasteners shall be a minimum of 6" away from any truss panel or hinge joints, truss plates and/or member ends. Field verify location of fasteners prior to starting construction. All fasteners shall be pre-drilled to avoid splitting existing lumber. Ɣ Domus Structural Engineering, LLC is not responsible for downslope effects of snow shedding or sliding off of the PV array nor any damage to downslope decks, roofs, walkways, landscaping, automobiles, pets, people, etc.. If snow guards are requested by the customer, notify Domus Structural Engineering, LLC. McGeel Rosemount MN 5