Loading...
HomeMy WebLinkAbout17908 Headwaters Drive - SurveyZoning = RS-4FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Draintile connection required. *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________08/22/2023 hdunne