HomeMy WebLinkAbout17799 Empire Trail - SurveyEM
P
I
R
E
T
R
A
I
L
P
RO
P
O
S
E
D
H
O
U
S
E
S
P
LI
T
E
N
T
R
Y
B
A
S
E
= 9
2
0.4
G
A
R
AG
E
F
F
=
9
2
3
.
6
E
N
T
R
Y
9
2
3.2
9
2
3.6
9
1
9.9
921.6
LOT 6
BLOCK 1
NEW DRIVE
W ALK922.9
922.3
922.1
917.9
917.9
922.725.010.0
13.3
Jeff Nivala
612-978-2865
ARROWS SHOW DIRECTION OF SURFACE FLOW.
BENCHMARK - MNDOT MARKER
PROPOSED DRIVE SLOPE = 5.1%
921.0
ALL ITEMS ARE PROPOSED:
TOP OF FOUNDATION = 923.9
GARAGE FLOOR = 923.6
BASEMENT FLOOR = 920.4
FINISHED GRADE AT REAR OF
HOUSE = 919.9
FINISHED GRADE AT FRONT OF
HOUSE = 923.2SITE ADDRESS:
17799 Empire Trail
Lakeville, MN 55044
Zoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' Corner
RY - 30'SY Buffer - 30'RY Buffer - 50'
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL
MUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________09/20/2023 lritchie