Loading...
HomeMy WebLinkAbout17799 Empire Trail - SurveyEM P I R E T R A I L P RO P O S E D H O U S E S P LI T E N T R Y B A S E = 9 2 0.4 G A R AG E F F = 9 2 3 . 6 E N T R Y 9 2 3.2 9 2 3.6 9 1 9.9 921.6 LOT 6 BLOCK 1 NEW DRIVE W ALK922.9 922.3 922.1 917.9 917.9 922.725.010.0 13.3 Jeff Nivala 612-978-2865 ARROWS SHOW DIRECTION OF SURFACE FLOW. BENCHMARK - MNDOT MARKER PROPOSED DRIVE SLOPE = 5.1% 921.0 ALL ITEMS ARE PROPOSED: TOP OF FOUNDATION = 923.9 GARAGE FLOOR = 923.6 BASEMENT FLOOR = 920.4 FINISHED GRADE AT REAR OF HOUSE = 919.9 FINISHED GRADE AT FRONT OF HOUSE = 923.2SITE ADDRESS: 17799 Empire Trail Lakeville, MN 55044 Zoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' Corner RY - 30'SY Buffer - 30'RY Buffer - 50' The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________09/20/2023 lritchie