Loading...
HomeMy WebLinkAbout18154 Hounds Dr-SurveyD R I V E 33 18160 Hounds Dr 18154 Hounds Dr 18148 Hounds Dr II>>>>>>>> >> >> >> >> >>>>>>>>>>>> > > > >>>>>>>>>>IIII>>>>>>>>>>>>>IPROPOSED WALKOUT PROPOSED GARAGE 1028 Buildin g S et b a c kDrainage and Utility EasementN:178113.79 E:520012.27 N:178116.44 E:520028.91 Curb Stop Drain Tile Cleanout 1028. 7 2 102 5 .8 8 WWWW 1026. 4 3 1038. 6 8 1037.861037. 1 5 1037. 0 41037.961037.00 E 1031. 9 4 1038. 4 3 1027. 0 8 U Pla n n e d Sid e w a l k 4 5 . 2 1 S59° 5 5' 2 9" W 1 3 7. 8 0 P O R C H 2 2 . 0 9 17.17 2 7 . 1 4 5.83 6.0050.0071025.521037.771039.301039.301030.021031.801027.0011.83 S6 0 ° 1 6 ' 1 0 " E 5 2 . 5 7 L = 9 3.8 7 R= 1 4 0 . 0 0 Δ = 3 8 ° 2 4' 5 7 "N29°43'50"E 126.14L = 7 4.55 R = 1 7 9 . 9 1 Δ =23 ° 4 4 ' 2 9 " 30 2 8 2 0 9. 7 5 1 0 . 0 0 6.0 2.0 6.00 63.51031.801040.00 1038.571038.76 1039.651040.001040.0010 3 0103210341036 1038 103 8 1036 103 4 1030 102610 3 0 10381 0 3 0 10 3 6 1032 10261026 1 0 3 7 . 3 0 10 3 9 . 0 2 H.P . PROPOSED DRIVEWAY 7.9% SLOPE (to walk)1040.0010 3 7 . 7 8 10 2 9 . 2 9 1027.79 1026.881026.34 1025.0 2 R=1038.38 EX SAN MH I=1025.21 (18" PVC) NW I=1025.23 (18" PVC) SE I=1025.21 (18" PVC) NE T/C=1037.12 EX CB I=1033.12 (12" RCP) W I=1033.41 (6" PVC) E T/C=1037.15 EX CB I=1033.12 (12" RCP) S I=1033.04 (12" RCP) W I=1033.66 (6" PVC) N I=1032.37 (24" RCP) SE I=1032.14 (24" RCP) NW R=1024.49 EX CB R=1026.14 EX CB I=1022.89 (12" PVC) NW I=1022.80 (12" PVC) SE 10 5 101 7 . 5 25.7H O U N D S 1029.913 0 . 0 0 1 2 . 9 9 6.00 1 2 . 4 6 2 0 . 0 0 50.0 0 5 0 . 0 0 42.0 0 5. 5 46.00 4.00 1 2 . 0 0 1037.90 10 3 7 . 3 4 103 8 . 1 1 1032.27 1031.541031.301031.3025303 L33 B5 DATE REVISION SCHEDULE DESCRIPTION BY PROJECT NO. CAD FILE NAME DRAWN BY DESIGNED BY ORIGINAL ISSUE DATE CLIENT PROJECT NO. REVIEWED BY PROJECT SHEET TITLE WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,FILE LOCATION: S:\PROJECTS\25000 PROJ\25300-25399\25303 STREEFLAND PROPERTY - LENNAR - LAKEVILLE MN\25303 CIVIL-SURVEY\SURVEY PRODUCTION DRAWINGS\LOT CERTS\BLOCK 5\LOT 33\25303 L33 B5.DWG 1OF CERTIFICATE OF SURVEY 1 21-25303 1/5/24 LAKEVILLE MINNESOTA JW MAS LENNAR CORPORATION CASLANO LOT 33, BLOCK 5 982 982. 5 985.0 5 I HEREBY CERTIFY THAT THIS SURVEY, PLAN, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE LIC. NO.1/5/24 45817 MARK A. SCHWANZ CONSTRUCTION NOTES: 1.Install rock construction entrance. 2.Install silt fence as needed for erosion. 3.Sidewalks shall drain away from house a minimum of 1%. 4.Contractor must verify driveway design. 5.Contractor must verify service elevation prior to construction. 6.Add or remove foundation ledge as required. GENERAL NOTES: 1.Grading plan by ISG last dated May 9, 2022 was used to determine proposed elevations shown hereon. 2.This survey does not purport to show improvements or encroachments, except as shown, as surveyed by ISG or under my direct supervision. 3.Proposed building dimensions shown are for horizontal location of structures on the lot only. Contact builder prior to construction for approved construction plans. 4.No specific soil investigation has been performed on this lot by the surveyor. The suitability of soils to support the specific house proposed is not the responsibility of the surveyor. 5.If building footprint exceeds the building pad, additional earthwork and testing will be required to meet the requirements as outlined within the geotechnical report. 6.This certificate does not purport to show easements other than those shown on the recorded plat. 7.Bearings shown are based on the Final Plat. 8.Site address is 18154 Hounds Drive, Lakeville, MN 55044 9.House/Basement type: Itasca EH09 B3 - Left - Walkout - Garage Bump 10.Building dimensions shown are based on First Floor Plan. 11.Proposed Contours are shown hereon. 12.Topographic survey was completed on January 3, 2024. 0 SCALE IN FEET 10 20 Note: Cut and fill quantities include building excavation, driveway, and lot grading. GRADING QUANTITIES (CY) Calc Common Cut -274 Calc Common Fill 296 Driveway*-22 Basement Slab -37 Contracted Amount -50 Additional Amount -0 Sand -7 Swell 20%45 Total Cut -390 Total Fill 341 Total (±)-49 LEGEND Proposed Building Sanitary Line Water Line Storm Line Set Lath at Property Corner Cleanout Curb Stop Manhole/Catch Basin Utility Pedestal Light Pole Offset Iron Existing Contour Proposed Contour Proposed Spot Elevation Existing Spot Elevation Surface Drainage Direction > >> I U BENCHMARK: Top nut fire hydrant located in the NE quadrant of Hideaway Trail and Highview Avenue. Elevation = 1038.03 feet AREA TABLE: House/Garage Area = 2,263 sq. ft. Porch Area = 156 sq. ft. Driveway/Walk Area = 829. ft. Total Impervious Area = 3,248q. ft. Lot Area = 14,881 sq.ft. Impervious Coverage = 21.8% HOUSE ELEVATIONS:Proposed/As-Built Garage Floor = 1040.0 Top of Foundation = 1040.3 Lowest Floor = 1032.3 Lowest Opening = 1032.3 *Raised elevations 0.5' 1/22/24 House Re-staking JW 1/26/24 Raised House 0.5'JW Zoning = RS-4 FY - 20' House, 25' Garage SY - 7' Interior, 20' Corner RY - 30' SY Buffer - 30' RY Buffer - 50' The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. *Draintile connection required.ENGINEERING REVIEWED Date:__________________01/29/2024 asobottka