Loading...
HomeMy WebLinkAbout17931 Exeter Circle - Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by KJ Walk, Inc.6.Grading plan date/revision date: 4/26/2021.NOTESLot= 17,663 sq. ft.House/Garage= 1,766 sq. ft.Porch= 113 sq. ft.Driveway= 745 sq. ft.Total Impervious= 2,624 sq. ft. or 14.9% of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front= 954.0Garage Top of Block= 954.4House Top of Block= 954.4Lowest Floor= 946.4Lot 6, Block 1, KNOB HILL OF LAKEVILLE 3RD ADDITION, Dakota County,MinnesotaPROPERTY DESCRIPTION17931 Exeter Circle, Lakeville, MinnesotaPROPERTY ADDRESSSURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lots 6 and 7, Block 1 = 952.91BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc. PHONE: 952.890.6044 www.jrhinc.com PLANNERS / ENGINEERS / SURVEYORS CERTIFICATE OF SURVEY FOR ONE TEN TEN HOMESDRAWN BYDATEREVISIONSTAMCAD FILEPRO-ECT NO.SHEET 1 OF 1Lot 6, Block 1, KNOB HILL OF LAKEVILLE 3RD ADDITION, Dakota County, MinnesotaI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 28th day of July, 2023Marcus F. Hampton, MN L.S. No. 474817/28/2023A. 8/3/23: Added hse dim.430621.dwg4306212999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306Zoning = RS-4FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________08/14/2023hdunne