Loading...
HomeMy WebLinkAboutLA222820 - 17760 Embers Ave-Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ _____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ NAME OF APPLICANT (Please Print)DATE I HEREBY APPLY FOR PERMIT AND ACKNOWLEDGE THAT ALL INFORMATION ON THIS APPLICATION IS COMPLETE AND ACCURATE. THIS IS NOT A PERMIT AND WORK IS NOT TO COMMENCE UNTIL SUCH TIME A PERMIT IS ISSUED. ALL WORK WILL COMPLY WITH LAKEVILLE CITY CODE, THE MINNESOTA STATE BUILDING CODE, AND THE APPROVED PLANS. INTEREST EARNINGS ON ESCROW ACCOUNTS, IF ANY, WILL BE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. OFFICE PHONE #:_ OFFICE PHONE #:_ *Entering your name affirms your intent to comply with the statement above. * Submit Application To: permits@lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT CONDO REROOF RESIDE RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LOWER LEVEL FINISH ADDITION FOUNDATION ONLY MISCELLANEOUS DEMO APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: CITY BUILDING VALUATION: $ BUILDING PERMIT FEES $PERMIT FEE $PLAN CHECK $SURCHARGE $METRO SAC $CITY WATER HOOKUP UNIT $CITY SEWER HOOKUP UNIT $LANDSCAPE ESCROW $TREE ESCROW $MISC ESCROW $PLUMBING $MECHANICAL $SEWER WATER WATER METER PRESSURE REDUCING VALVE $OTHER $TOTAL METER SIZE PRESSURE REDUCING VALVE SEWER/WATER SEWER/WATER FINAL STREET DRAINTILE BUILDING INFORMATION TYPE OF CONSTRUCTION ZONING CODE EDITION FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP MECHANICAL AIR TEST FINAL ROUGH-IN PLUMBING FINAL ROUGH-IN INSULATION LATH DECK FOOTING FIREPLACE FOOTING FOUNDATION FRAMING PORCH FRAMING PORCH FOOTING POURED WALL SITE LOWER LEVEL FINAL OTHER DECK FRAMING LOWER LEVEL FRAMING LANDSCAPING DECK FINAL $ $ ACCESSORY BUILDING EGRESS WINDOW UNDERGROUND 17760 EMBERS AVE, LAKEVILLE*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERRESIDENCE FOR:written consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.cCLAUDIO CHABLA & JENNY MORA#24-004SMA172024STONE COTTAGE CONSTRUCTION, INC. LOT 4, BLOCK 5, PHEASANT RUN OF LAKEVILLE 7TH ADDITION FRONT ELEVATION 1/4" = 1'-0" WOOD PORCHVINYL B & BVINYL B & B712712712712412VINYL B & BVINYL B & B4" TRIM8x7 OVH. DR.16x7 OVH. DR.VINYL SIDING4" TRIMSTONECAPSTONE2'-0"BOXED COLUMNVINYL B & BFRONT ONLYVINYL SIDINGALL SIDES4" TRIMFRONT ONLYSIMONTONWINDOWSSTONE AS SHOWNFRONT ONLYALUM. SOFFIT & FASCIAALL SIDES8'-4" POURED FOUNDATION9' CEILING @ FIRST FLOORTOTAL2nd FLR.1st FLR.1,060 SQ. FT.857 SQ. FT.1,917 SQ. FT.STONEON JOGTOTALBSM'T869 SQ. FT.2,786 SQ. FT.Concept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode03/28/2024jnuetzman VERIFY ALLGRADE LINESPlanco MN, Inc.C#24-004SMA272024 LEFT ELEVATION 1/8" = 1'-0" 712712SIDINGVINYL SIDINGVINYL VINYLCORNERS RIGHT ELEVATION 1/8" = 1'-0" 712712124SIDINGVINYL SIDINGVINYL VINYLCORNERS7/126" REAR ELEVATION 1/8" = 1'-0" 712712SIDINGVINYL VINYLCORNERS ROOF PLAN 1/8" = 1'-0" 1247127127127127127121'-0"6"7127122'-2"2'-0"1'-0"2'-0"1'-0"Secure door closed until deck isconstructed with a separate permit. Planco MN, Inc.C#24-004SMA372024 BASEMENT PLAN 1/4" = 1'-0" UNEXCAVATED UP 16 R42"246828682668WHFURNF.D.92%20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C.*UNFINISHED MECH/STORAGE 53'-0"30'-0"23'-0"11'-0"19'-0"11'-0"12'-0"27'-0"41'-0"47'-0"22'-6"24'-6"2'-0"20'-6" 6'-6" 5'-6"5'-10"14'-8"1'-0"2" LEDGE3'-4"3'-4"20'-2"10"3-2x10 CONT.FLUSH11'-8"5'-5"7'-5"8'-4" POURED FOUNDATIONSUMPTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS(2) TRT. 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG.9"9'-6"9"TRT. 3-2x12 FLUSHTRT. 3-2x12 FLUSHTREATED 2x8 16" O.C.10'-4"3'-6"18" CANT.266840682'-6"27'-2"3'-8"10" FAMILY/REC ROOM *CARPET BEDROOM #4 *CARPET2-9 1/2" LSL9/0x4/0 SL2-9 1/2" LSL5/0x4/0 SL11'-4"9'-3"5'-11"WALKOUT3-2x4(4) TRIMMERS(3) TRIMMERS4-2x448341 PIECE FIB.*VINYLF2x6LOOKOUT WALKOUT3-2x106/0x6/10 P.D.LOOKOUT 10'-0" 10'-0"SD/COSD”),1,6+('64)7 (;&/8'(667$,56 14'-3"12'-0"16'-8"12'-0"4'-0"TRT. 3-2x12 FLUSHTRT. 6x6 POSTON 18"x42" CONC.TUBE FTG.TRT. 2-2x8FLUSHTREATED 2x8 16" O.C. TREATED 2x10 16" O.C.FLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FAN222UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.(4) Trimmers(3) 2X10 Trtd (3) Trimmers Planco MN, Inc.C#24-004SMA472024 FIRST FLOOR PLAN 1/4" = 1'-0" 3068SLREF'G S.B.3-2x106/0x6/10 P.D.3-11 7/8" LSL2-2x103/0x4/0 SHRAIL 2868PED246824682868FIREDOORWD 16" SHLVS.20682868PKT.*CARPET*WOOD8x7 OVH. DR.16x7 OVH. DR.*4" CONC. FLOOR GARAGE *2x6 WALLS3/0x5/0-2 SH3-9 1/2" LSL WOOD PORCH FOYER *WOOD KITCHEN *WOOD*WOOD DINING *CARPET GREAT ROOM W.I.C. *VINYL*VINYL*VINYLFPANTRY*WOODTOP @ 7'-6" 4/0x3/6 SL UP 17 R DN 16 R HOODVENT 1,060 SQ. FT.9' CEILING @ FIRST FLOOR53'-0"30'-0"23'-0"11'-0"19'-0"11'-0"12'-0"5'-6"5'-6"1'-0"6"10'-0"6"27'-0" 12'-2"14'-10"41'-0"18'-0"11'-0"12'-0"6'-6"5'-6"5'-6"5'-6"8'-9"9'-3"47'-0"22'-6"24'-6"2'-0"20'-6"7'-6"4'-6"12'-6"3'-8"3'-10"2-2x102x612'-0"8'-6"5'-6"4'-0"4'-10"3'-8"5'-8"3'-4"3'-4"5'-2" 5'-5" 5'-6"5'-10" 10" 14'-8" 10'-0"3'-11"5'-8"3'-0" 3'-6"SD/CO12" CANT.12" CANT.6'-6" 6'-0"6"BOXEDCOLUMN2-9 1/2" LSL5'-9"5'-3"9'-6"9'-6"22'-0" GIRDER F.T.2-9 1/2" LSL CONT.2-9 1/2" LSL CONT.TRUSSES 24" O.C. GIRDER F.T.2-2x10 CONT.FLUSH6"F.P.GAS2-2x10 1'-6"5'-9" (FRAMING) 5'-10" (FINISHED) 4'-10"4'-8"5'-4" 20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C.CHASE2'-0"1'-8"9/0x5/0 SLTOP @ 7'-6"WALLHUNG LT2-2x10 4 TRIMMERS4-2x62-11 7/8" LSL2-2x12TRUSSES24" O.C.2 TRIMMERS2 TRIMMERS4-2x4(3) TRIMMERS24685'-4"2'-8"3'-9"MICRO5'-6"*12x12 DECK 16'-8"12'-0"4"3'-8"8'-4"2BWPsAbove51222258PFHPFHPFH8522215-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).(2) 7-1/4" LSL CONT.(2) 7-1/4" LSL CONT.4'-0"3'-6" Planco MN, Inc.C#24-004SMA572024 SECOND FLOOR PLAN 1/4" = 1'-0" 857 SQ. FT.DN 17 R 5'-0" TUB & SHOWER 1 PIECE FIB.F266826682668266824681668LIN. 42" 84"LIN.206824682468 W.I.C. *CARPET*CARPET MASTER BEDROOM *CARPET BEDROOM #2 BEDROOM #3 *CARPET4/0x3/0 FXTEMP2-2x106/0x5/0 SL2-2x102-2x106/0x5/0 SL2-2x102/6x3/6 SH2-2x106/0x5/0 SL1/2 WALLW/ WD. CAPSD/COSDSDSDF2x633'-0"14'-1"7'-11"11'-0"7'-2"6'-11"3'-5"4'-6"5'-4"5'-8"25'-0" 11'-0"14'-0"6'-7"2'-2"5'-5"3'-4"3'-4"33'-0"12'-4"7'-0"13'-8"1'-0" 1'-0"6'-2"6'-2"3'-3"3'-9"27'-0" 12'-6"2'-6"12'-0" 7'-2"2'-10"4'-0"2'-0"3'-6"2'-5"8'-4"3'-10"10" 5'-6"5'-10"4'-8"GIRDERACCESS ATTIC TRUSSES 24" O.C. TRUSSES 24" O.C.2-7 1/4" LSLDROPPED*VINYL*VINYL506860341 PIECE FIB. 2/4x3/6 SH 2-2x10 5'-8"5'-4" 3'-10"4-2x4ATTIC ACCESS222 22Temper ifwithin 60"of tub floor2222222-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). Planco MN, Inc.C#24-004SMA672024VENTEDSOFFITFASCIAALUM. ALUM.2'-2" CROSS SECTION 3/8" = 1'-0"  “3 1/2" CONC. FLOOR8'-118"3/4" T & G FLOOR3/4" T & G FLOOR9'-118"2x6- 16" O.C.VB1/2" GYP. BD.R-20 SPRAY FOAMR-21 INSUL.SIDING20" FLOOR TRUSSES @ 24" O.C.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.R-20 SPRAY FOAMSHEATHING5/8" GYP. BD.5/8" GYP. BD.W/ V.B.2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBSIDINGR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.SHEATHING25'-0"1'-0"R-20 SPRAY FOAM5/8" GYP. BD.GRADEMIN. R-301'-0" BATHROOM GREAT ROOM 9 1/2" I JTS. @ 16" O.C.50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTICVENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES2'-0"TRUSSES @ 24" O.C.(DESIGNED BY MFR)712R-49 INSUL.ENERGY HEEL9 516"ALUM.ALUM. FASCIASOFFITVENTED1'-0"ENERGY HEEL2-7 1/4" LSL378"BOXEDCOLUMNTRT. 6x6 POST2-9 1/2" LSL6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS4- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS2-2x103-2x108'-6"7'-0"FLASHINGFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSWATER PROOFINGDRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSR-10 W/ <2.6 ACHINSUL.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED20" FLOOR TRUSSES @ 24" O.C.9 1/2" I JTS. @ 16" O.C.10"75 8"10"7 7 16"DECKING2x8 JTS. @ 16" O.C.TRT. 6x6 POST24x24 PADFOOTING12x16 PIERFOOTINGTRT. 3-2x1241216 RISERS 17 RISERSPOURED WALLGRADE2" FOAM2" FOAM W/“%(9(/4'-0"2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.26'-0"14'-8"3 1/2" CONC. FLOOR2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBR-21 SPRAY FOAMGIRDER F.T.R-49 INSUL.5/8" GYP. BD.W/ V.B.5/8" GYP. BD.W/ V.B.8'-0"8'-11 8"2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB9'-11 8"  “5/8" GYP. BD.20" FLOOR TRUSSES @ 24" O.C. FOYER CROSS SECTION 3/8" = 1'-0" GRADEPER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED Planco MN, Inc.C#24-004SMA772024 CROSS SECTION 3/8" = 1'-0"  “3 1/2" CONC. FLOOR8'-11 8"3/4" T & G FLOOR3/4" T & G FLOOR9'-11 8"2x6- 16" O.C.VB1/2" GYP. BD.R-20 SPRAY FOAMR-21 INSUL.SIDING2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.R-20 SPRAY FOAMSHEATHING5/8" GYP. BD.5/8" GYP. BD.W/ V.B.2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBR-20 SPRAY FOAMR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-20 SPRAY FOAM5/8" GYP. BD. MASTER BEDROOM BEDROOM #2 KITCHEN 50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTICVENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES2'-0"TRUSSES @ 24" O.C.(DESIGNED BY MFR)712ENERGY HEEL9 516"R-49 INSUL.4" CONC. FLOOR5/8" TYPE "X" GYP. BD. GARAGE GRADEPOURED WALL2X6- 16" O.C.SLOPE TO DOORS2'-0"9 5 16"ENERGY HEELTRUSSES @ 24" O.C.(DESIGNED BY MFR)25'-0"22'-0"WATER PROOFINGDRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSR-10 W/ <2.6 ACHINSUL.PER CODEWALL W/ REBAR8'-4" POURED1-2x6 TREATEDFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS“%(9(/20" FLOOR TRUSSES @ 24" O.C.20" FLOOR TRUSSES @ 24" O.C.FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSPOURED WALLGRADE2" FOAM2" FOAM W/“%(9(/4'-0"2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL. 17760 EMBERS AVE, LAKEVILLE*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERRESIDENCE FOR:written consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.cCLAUDIO CHABLA & JENNY MORA#24-004SMA172024STONE COTTAGE CONSTRUCTION, INC. LOT 4, BLOCK 5, PHEASANT RUN OF LAKEVILLE 7TH ADDITION FRONT ELEVATION 1/4" = 1'-0" WOOD PORCHVINYL B & BVINYL B & B712712712712412VINYL B & BVINYL B & B4" TRIM8x7 OVH. DR.16x7 OVH. DR.VINYL SIDING4" TRIMSTONECAPSTONE2'-0"BOXED COLUMNVINYL B & BFRONT ONLYVINYL SIDINGALL SIDES4" TRIMFRONT ONLYSIMONTONWINDOWSSTONE AS SHOWNFRONT ONLYALUM. SOFFIT & FASCIAALL SIDES8'-4" POURED FOUNDATION9' CEILING @ FIRST FLOORTOTAL2nd FLR.1st FLR.1,060 SQ. FT.857 SQ. FT.1,917 SQ. FT.STONEON JOGTOTALBSM'T869 SQ. FT.2,786 SQ. FT. VERIFY ALLGRADE LINESPlanco MN, Inc.C#24-004SMA272024 LEFT ELEVATION 1/8" = 1'-0" 712712SIDINGVINYL SIDINGVINYL VINYLCORNERS RIGHT ELEVATION 1/8" = 1'-0" 712712124SIDINGVINYL SIDINGVINYL VINYLCORNERS7/126" REAR ELEVATION 1/8" = 1'-0" 712712SIDINGVINYL VINYLCORNERS ROOF PLAN 1/8" = 1'-0" 1247127127127127127121'-0"6"7127122'-2"2'-0"1'-0"2'-0"1'-0" Planco MN, Inc.C#24-004SMA372024 BASEMENT PLAN 1/4" = 1'-0" UNEXCAVATED UP 16 R42"246828682668WHFURNF.D.92%20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C.*UNFINISHED MECH/STORAGE 53'-0"30'-0"23'-0"11'-0"19'-0"11'-0"12'-0"27'-0"41'-0"47'-0"22'-6"24'-6"2'-0"20'-6" 6'-6" 5'-6"5'-10"14'-8"1'-0"2" LEDGE3'-4"3'-4"20'-2"10"3-2x10 CONT.FLUSH11'-8"5'-5"7'-5"8'-4" POURED FOUNDATIONSUMPTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS(2) TRT. 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG.9"9'-6"9"TRT. 3-2x12 FLUSHTRT. 3-2x12 FLUSHTREATED 2x8 16" O.C.10'-4"3'-6"18" CANT.266840682'-6"27'-2"3'-8"10" FAMILY/REC ROOM *CARPET BEDROOM #4 *CARPET2-9 1/2" LSL9/0x4/0 SL2-9 1/2" LSL5/0x4/0 SL11'-4"9'-3"5'-11"WALKOUT3-2x4(4) TRIMMERS(3) TRIMMERS4-2x448341 PIECE FIB.*VINYLF2x6LOOKOUT WALKOUT3-2x106/0x6/10 P.D.LOOKOUT 10'-0" 10'-0"SD/COSD”),1,6+('64)7 (;&/8'(667$,56 14'-3"12'-0"16'-8"12'-0"4'-0"TRT. 3-2x12 FLUSHTRT. 6x6 POSTON 18"x42" CONC.TUBE FTG.TRT. 2-2x8FLUSHTREATED 2x8 16" O.C. TREATED 2x10 16" O.C.FLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FAN3-2x10 TrtdOK OK*** Header Spans ***Up to 4' 11" = 1 Trimmer5' 0" and Larger = 2 Trimmers*** Unless Noted Otherwise ****** Header Spans ***Up to 4' 11" = 1 Trimmer5' 0" and Larger = 2 Trimmers*** Unless Noted Otherwise ****** Header Spans ***Up to 4' 11" = 1 Trimmer5' 0" and Larger = 2 Trimmers*** Unless Noted Otherwise ***||[[[[[[[|[OKOKOK4 - TrimmersOK3 - Trimmers Planco MN, Inc.C#24-004SMA472024 FIRST FLOOR PLAN 1/4" = 1'-0" 3068SLREF'G S.B.3-2x106/0x6/10 P.D.3-11 7/8" LSL2-2x103/0x4/0 SHRAIL 2868PED246824682868FIREDOORWD 16" SHLVS.20682868PKT.*CARPET*WOOD8x7 OVH. DR.16x7 OVH. DR.*4" CONC. FLOOR GARAGE *2x6 WALLS3/0x5/0-2 SH3-9 1/2" LSL WOOD PORCH FOYER *WOOD KITCHEN *WOOD*WOOD DINING *CARPET GREAT ROOM W.I.C. *VINYL*VINYL*VINYLFPANTRY*WOODTOP @ 7'-6" 4/0x3/6 SL UP 17 R DN 16 R HOODVENT 1,060 SQ. FT.9' CEILING @ FIRST FLOOR53'-0"30'-0"23'-0"11'-0"19'-0"11'-0"12'-0"5'-6"5'-6"1'-0"6"10'-0"6"27'-0" 12'-2"14'-10"41'-0"18'-0"11'-0"12'-0"6'-6"5'-6"5'-6"5'-6"8'-9"9'-3"47'-0"22'-6"24'-6"2'-0"20'-6"7'-6"4'-6"12'-6"3'-8"3'-10"2-2x102x612'-0"8'-6"5'-6"4'-0"4'-10"3'-8"5'-8"3'-4"3'-4"5'-2" 5'-5" 5'-6"5'-10" 10" 14'-8" 10'-0"3'-11"5'-8"3'-0" 3'-6"SD/CO12" CANT.12" CANT.6'-6" 6'-0"6"BOXEDCOLUMN2-9 1/2" LSL5'-9"5'-3"9'-6"9'-6"22'-0" GIRDER F.T.2-9 1/2" LSL CONT.2-9 1/2" LSL CONT.TRUSSES 24" O.C. GIRDER F.T.2-2x10 CONT.FLUSH6"F.P.GAS2-2x10 1'-6"5'-9" (FRAMING) 5'-10" (FINISHED) 4'-10"4'-8"5'-4" 20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C. 20" FLR.TRUSS 24" O.C.CHASE2'-0"1'-8"9/0x5/0 SLTOP @ 7'-6"WALLHUNG LT2-2x10 4 TRIMMERS4-2x62-11 7/8" LSL2-2x12TRUSSES24" O.C.2 TRIMMERS2 TRIMMERS4-2x4(3) TRIMMERS24685'-4"2'-8"3'-9"MICRO5'-6"*12x12 DECK 16'-8"12'-0"4"3'-8"8'-4"*** Header Spans ***Up to 4' 11" = 1 Trimmer5' 0" and Larger = 2 Trimmers*** Unless Noted Otherwise ****** Header Spans ***Up to 4' 11" = 1 Trimmer5' 0" and Larger = 2 Trimmers*** Unless Noted Otherwise ****** Header Spans ***Up to 4' 11" = 1 Trimmer5' 0" and Larger = 2 Trimmers*** Unless Noted Otherwise ***MFG Roof Trusses by Others ||[[[[[[||[[||||OKOKOKOKOKOK2 - 1 3/4" x 7 1/4" LSL Cont.OKOKOKOKOK||[[[[[[[|X[OKOK 4’3’6” Planco MN, Inc.C#24-004SMA572024 SECOND FLOOR PLAN 1/4" = 1'-0" 857 SQ. FT.DN 17 R 5'-0" TUB & SHOWER 1 PIECE FIB.F266826682668266824681668LIN. 42" 84"LIN.206824682468 W.I.C. *CARPET*CARPET MASTER BEDROOM *CARPET BEDROOM #2 BEDROOM #3 *CARPET4/0x3/0 FXTEMP2-2x106/0x5/0 SL2-2x102-2x106/0x5/0 SL2-2x102/6x3/6 SH2-2x106/0x5/0 SL1/2 WALLW/ WD. CAPSD/COSDSDSDF2x633'-0"14'-1"7'-11"11'-0"7'-2"6'-11"3'-5"4'-6"5'-4"5'-8"25'-0" 11'-0"14'-0"6'-7"2'-2"5'-5"3'-4"3'-4"33'-0"12'-4"7'-0"13'-8"1'-0" 1'-0"6'-2"6'-2"3'-3"3'-9"27'-0" 12'-6"2'-6"12'-0" 7'-2"2'-10"4'-0"2'-0"3'-6"2'-5"8'-4"3'-10"10" 5'-6"5'-10"4'-8"GIRDERACCESS ATTIC TRUSSES 24" O.C. TRUSSES 24" O.C.2-7 1/4" LSLDROPPED*VINYL*VINYL506860341 PIECE FIB. 2/4x3/6 SH 2-2x10 5'-8"5'-4" 3'-10"4-2x4ATTIC ACCESS *** Header Spans ***Up to 4' 11" = 1 Trimmer5' 0" and Larger = 2 Trimmers*** Unless Noted Otherwise ****** Header Spans ***Up to 4' 11" = 1 Trimmer5' 0" and Larger = 2 Trimmers*** Unless Noted Otherwise ****** Header Spans ***Up to 4' 11" = 1 Trimmer5' 0" and Larger = 2 Trimmers*** Unless Noted Otherwise ***OKOKOKOK||[[[[[[||[[||||OKOKOKOK Planco MN, Inc.C#24-004SMA672024VENTEDSOFFITFASCIAALUM. ALUM.2'-2" CROSS SECTION 3/8" = 1'-0"  “3 1/2" CONC. FLOOR8'-118"3/4" T & G FLOOR3/4" T & G FLOOR9'-118"2x6- 16" O.C.VB1/2" GYP. BD.R-20 SPRAY FOAMR-21 INSUL.SIDING20" FLOOR TRUSSES @ 24" O.C.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.R-20 SPRAY FOAMSHEATHING5/8" GYP. BD.5/8" GYP. BD.W/ V.B.2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBSIDINGR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.SHEATHING25'-0"1'-0"R-20 SPRAY FOAM5/8" GYP. BD.GRADEMIN. R-301'-0" BATHROOM GREAT ROOM 9 1/2" I JTS. @ 16" O.C.50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTICVENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES2'-0"TRUSSES @ 24" O.C.(DESIGNED BY MFR)712R-49 INSUL.ENERGY HEEL9 516"ALUM.ALUM. FASCIASOFFITVENTED1'-0"ENERGY HEEL2-7 1/4" LSL378"BOXEDCOLUMNTRT. 6x6 POST2-9 1/2" LSL6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS4- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS2-2x103-2x108'-6"7'-0"FLASHINGFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSWATER PROOFINGDRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSR-10 W/ <2.6 ACHINSUL.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED20" FLOOR TRUSSES @ 24" O.C.9 1/2" I JTS. @ 16" O.C.10"75 8"10"7 7 16"DECKING2x8 JTS. @ 16" O.C.TRT. 6x6 POST24x24 PADFOOTING12x16 PIERFOOTINGTRT. 3-2x1241216 RISERS 17 RISERSPOURED WALLGRADE2" FOAM2" FOAM W/“%(9(/4'-0"2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.26'-0"14'-8"3 1/2" CONC. FLOOR2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBR-21 SPRAY FOAMGIRDER F.T.R-49 INSUL.5/8" GYP. BD.W/ V.B.5/8" GYP. BD.W/ V.B.8'-0"8'-11 8"2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB9'-11 8"  “5/8" GYP. BD.20" FLOOR TRUSSES @ 24" O.C. FOYER CROSS SECTION 3/8" = 1'-0" GRADEPER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED Planco MN, Inc.C#24-004SMA772024 CROSS SECTION 3/8" = 1'-0"  “3 1/2" CONC. FLOOR8'-11 8"3/4" T & G FLOOR3/4" T & G FLOOR9'-11 8"2x6- 16" O.C.VB1/2" GYP. BD.R-20 SPRAY FOAMR-21 INSUL.SIDING2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.R-20 SPRAY FOAMSHEATHING5/8" GYP. BD.5/8" GYP. BD.W/ V.B.2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBR-20 SPRAY FOAMR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-20 SPRAY FOAM5/8" GYP. BD. MASTER BEDROOM BEDROOM #2 KITCHEN 50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTICVENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES2'-0"TRUSSES @ 24" O.C.(DESIGNED BY MFR)712ENERGY HEEL9 516"R-49 INSUL.4" CONC. FLOOR5/8" TYPE "X" GYP. BD. GARAGE GRADEPOURED WALL2X6- 16" O.C.SLOPE TO DOORS2'-0"9 5 16"ENERGY HEELTRUSSES @ 24" O.C.(DESIGNED BY MFR)25'-0"22'-0"WATER PROOFINGDRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSR-10 W/ <2.6 ACHINSUL.PER CODEWALL W/ REBAR8'-4" POURED1-2x6 TREATEDFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS“%(9(/20" FLOOR TRUSSES @ 24" O.C.20" FLOOR TRUSSES @ 24" O.C.FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSPOURED WALLGRADE2" FOAM2" FOAM W/“%(9(/4'-0"2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL. 1.13x 8.90=3.37 min 4" hard pipe, 5" flex Stone Cottage HVAC Load Calculations for Stone Cottage 17760 Embers Ave Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Thursday, February 29, 2024 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Thursday, February 29, 2024 Client Name:Stone Cottage Client Address:17760 Embers Ave Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces West Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,354 CFM Per Square ft.:0.455 Square ft. of Room Area:2,977 Square ft. Per Ton:1,000 Volume (ft³) of Cond. Space:26,793 Building Loads Total Heating Required Including Ventilation Air:47,803 Btuh 47.803 MBH Total Sensible Gain:29,245 Btuh 82 % Total Latent Gain:6,494 Btuh 18 % Total Cooling Required Including Ventilation Air:35,739 Btuh 2.98 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Miscellaneous Report System 1 Whole House Input Data Outdoor Dry Bulb Outdoor Wet Bulb Outdoor Rel.Hum Indoor Rel.Hum Indoor Dry Bulb Grains Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29.27 Duct Sizing Inputs Main Trunk Runouts Calculate:Yes Yes Use Schedule:No No Roughness Factor:0.00300 0.01000 Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft. Minimum Velocity:650 ft./min 450 ft./min Maximum Velocity:900 ft./min 750 ft./min Minimum Height:8 in.6 in. Maximum Height:10 in.6 in. Outside Air Data Winter Summer Infiltration Specified:0.250 AC/hr 0.130 AC/hr 84 CFM 44 CFM Infiltration Actual:0.250 AC/hr 0.130 AC/hr Above Grade Volume:Cu.ft.Cu.ft.X 20,129 X 20,129 5,032 Cu.ft./hr 2,617 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration:84 CFM 44 CFM Total Building Ventilation:140 CFM 70 CFM ---System 1--- Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference) Winter Infiltration Specified:0.250 AC/hr (84 CFM), Construction: Unknown Summer Infiltration Specified:0.130 AC/hr (44 CFM), Construction: Unknown C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.98 1,000 2,977 29,245 6,494 35,739 47,803 901 1,354 1,354 System 1 Yes 2.98 1,000 2,977 29,245 6,494 35,739 47,803 901 1,354 1,354 24x10 Ventilation 340 1,352 1,692 4,550 Zone 1 2,977 28,905 5,142 34,047 43,253 901 1,354 1,354 24x10 1-Main Level 1,060 11,157 1,786 12,943 16,564 345 523 523 6--6 2-Upper Level 857 12,436 2,340 14,776 15,335 319 583 583 7--6 3-Lower Level 1,060 5,312 1,016 6,328 11,354 236 249 249 3--6 C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Duct Size Preview Room or Duct Name Minimum Velocity Maximum Velocity Rough. Factor Design L/100 Actual L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size System 1 Supply Runouts Zone 1 1-Main Level 450 750 0 0.1 0.1 443.7 345 523 523 6--6 2-Upper Level 450 750 0 0.1 0.1 423.9 319 583 583 7--6 3-Lower Level 450 750 0 0.1 0.1 422.5 236 249 249 3--6 Other Ducts Supply Main Trunk 650 900 0 0.1 0.1 812.5 901 1,354 1,354 24x10 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:901 Cooling Flow:1354 C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 - Whole House - Adequate Exposure Diversity Test Test For Adequate Exposure Diversity Average Glass Sensible Gain Over 12 Hours 1.3 x Average Glass Gain Hourly Glass Gain Hourly Total Net GainHeat Gain, Btuh11.7% Diff. from Avg. 0 10,000 20,000 30,000 40,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm AED Calculation Summary --- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 11.7%. AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 System 1 - Whole House - Psychrometric Chart ZC Zone (Room) Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain HRV Heat Recovery Ventilator C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 535 14,894 0 16,243 16,243 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2096 11,852 0 1,812 1,812 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 855 3,645 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 857 1,491 0 823 823 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1060 2,306 0 0 0 Subtotals for structure:35,466 0 19,230 19,230 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 84, Summer CFM: 44 7,787 842 605 1,447 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 Total Building Load Totals:47,803 6,494 29,245 35,739 Check Figures Total Building Supply CFM:1,354 CFM Per Square ft.:0.455 Square ft. of Room Area:2,977 Square ft. Per Ton:1,000 Volume (ft³) of Cond. Space:26,793 Building Loads Total Heating Required Including Ventilation Air:47,803 Btuh 47.803 MBH Total Sensible Gain:29,245 Btuh 82 % Total Latent Gain:6,494 Btuh 18 % Total Cooling Required Including Ventilation Air:35,739 Btuh 2.98 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Building Pie Chart Building Loss 47,803 Btuh Floor 5%Roof 3% Wall 32% Glass 31% Door 3% Infiltration 16% Ventilation 10% Building Gain 35,739 Btuh Roof 2%Wall 5% Glass 45% Door 1% People 11% Equipment 27% Infiltration 4%Ventilation 5% C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 Building Bar Graph Building Loss 47,803 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 32%Door 3%Ventilation 10% Roof 3%Glass 31%Infiltration 16% Building Gain 35,739 Btuh 0 5,000 10,000 15,000 20,000 Roof 2%Glass 45%People 11%Infiltration 4% Wall 5%Door 1%Equipment 27%Ventilation 5% C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 11 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 535 14,894 0 16,243 16,243 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2096 11,852 0 1,812 1,812 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 855 3,645 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 857 1,491 0 823 823 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1060 2,306 0 0 0 Subtotals for structure:35,466 0 19,230 19,230 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 84, Summer CFM: 44 7,787 842 605 1,447 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 System 1 Whole House Load Totals:47,803 6,494 29,245 35,739 Check Figures Supply CFM:1,354 CFM Per Square ft.:0.455 Square ft. of Room Area:2,977 Square ft. Per Ton:1,000 Volume (ft³) of Cond. Space:26,793 System Loads Total Heating Required Including Ventilation Air:47,803 Btuh 47.803 MBH Total Sensible Gain:29,245 Btuh 82 % Total Latent Gain:6,494 Btuh 18 % Total Cooling Required Including Ventilation Air:35,739 Btuh 2.98 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 12 System 1 Whole House Pie Chart System 1 Whole House Loss 47,803 Btuh Floor 5%Roof 3% Wall 32% Glass 31% Door 3% Infiltration 16% Ventilation 10% System 1 Whole House Gain 35,739 Btuh Roof 2%Wall 5% Glass 45% Door 1% People 11% Equipment 27% Infiltration 4%Ventilation 5% C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 13 System 1 Whole House Bar Graph System 1 Whole House Loss 47,803 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 32%Door 3%Ventilation 10% Roof 3%Glass 31%Infiltration 16% System 1 Whole House Gain 35,739 Btuh 0 5,000 10,000 15,000 20,000 Roof 2%Glass 45%People 11%Infiltration 4% Wall 5%Door 1%Equipment 27%Ventilation 5% C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 14 System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms) Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 535 14,894 0 16,243 16,243 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2096 11,852 0 1,812 1,812 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 855 3,645 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 857 1,491 0 823 823 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1060 2,306 0 0 0 Subtotals for structure:35,466 0 19,230 19,230 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 84, Summer CFM: 44 7,787 842 605 1,447 System 1, Zone 1 Load Totals:43,253 5,142 28,905 34,047 Check Figures Supply CFM:1,354 CFM Per Square ft.:0.455 Square ft. of Room Area:2,977 Square ft. Per Ton:1,049 Volume (ft³) of Cond. Space:26,793 Zone Loads Total Heating Required:43,253 Btuh 43.253 MBH Total Sensible Gain:28,905 Btuh 85 % Total Latent Gain:5,142 Btuh 15 % Total Cooling Required:34,047 Btuh 2.84 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 15 System 1, Zone 1 Pie Chart System 1, Zone 1 Loss 43,253 Btuh Floor 5%Roof 3% Wall 36% Glass 34% Door 3% Infiltration 18% System 1, Zone 1 Gain 34,047 Btuh Roof 2%Wall 5% Glass 48% Door 1% People 11% Equipment 28% Infiltration 4% C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 16 System 1, Zone 1 Bar Graph System 1, Zone 1 Loss 43,253 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 36%Door 3% Roof 3%Glass 34%Infiltration 18% System 1, Zone 1 Gain 34,047 Btuh 0 5,000 10,000 15,000 20,000 Roof 2%Glass 48%People 11%Infiltration 4% Wall 5%Door 1%Equipment 28% C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 17 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,060.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,060.0 sq.ft.Supply Air:523 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.3 AC/hr Volume:9,540.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:54 CFM Runout Air:87 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:27 CFM Runout Air Velocity:444 ft./min.Percent of Supply:5 % Runout Air Velocity:444 ft./min.Actual Winter Infil.:38 CFM Actual Loss:0.123 in.wg./100 ft.Actual Summer Infil.:20 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-12F-0sw 41 X 9 267 0.065 5.7 1,510 0.9 0 231 W -Wall-12F-0sw 41 X 9 287 0.065 5.7 1,623 0.9 0 248 N -Wall-12F-0sw 27 X 9 202 0.065 5.7 1,142 0.9 0 175 S -Wall-12F-0sw 27 X 9 199 0.065 5.7 1,125 0.9 0 172 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 E -Gls-4A-1a-o shgc-0.33 0%S 102 0.320 27.8 2,840 35.0 0 3,571 W -Gls-4A-1a-o shgc-0.33 0%S 40 0.320 27.8 1,114 35.0 0 1,400 N -Gls-4A-1a-o shgc-0.33 100%S 41 0.320 27.8 1,141 10.4 0 427 S -Gls-4A-1a-o shgc-0.33 0%S 44 0.320 27.8 1,225 19.2 0 844 Subtotals for Structure:12,998 0 7,420 Infil.: Win.: 38.4, Sum.: 20.0 1,224 2.913 3,566 0.226 386 277 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 3,000 Room Totals:16,564 1,786 11,157 C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 18 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:857.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:857.0 sq.ft.Supply Air:583 CFM Ceiling Height:9.0 ft.Supply Air Changes:4.5 AC/hr Volume:7,713.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:7 Actual Winter Vent.:50 CFM Runout Air:83 CFM Percent of Supply.:9 % Runout Duct Size:6 in.Actual Summer Vent.:30 CFM Runout Air Velocity:424 ft./min.Percent of Supply:5 % Runout Air Velocity:424 ft./min.Actual Winter Infil.:34 CFM Actual Loss:0.113 in.wg./100 ft.Actual Summer Infil.:18 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-12F-0sw 33 X 9 211 0.065 5.7 1,193 0.9 0 182 W -Wall-12F-0sw 33 X 9 212 0.065 5.7 1,199 0.9 0 183 N -Wall-12F-0sw 27 X 9 219 0.065 5.7 1,238 0.9 0 189 S -Wall-12F-0sw 27 X 9 231 0.065 5.7 1,306 0.9 0 200 E -Gls-4A-1a-o shgc-0.33 0%S 86 0.320 27.8 2,394 35.0 0 3,010 W -Gls-4A-1a-o shgc-0.33 0%S 85 0.320 27.8 2,366 35.0 0 2,975 N -Gls-4A-1a-o shgc-0.33 100%S 24 0.320 27.8 668 10.4 0 250 S -Gls-4A-1a-o shgc-0.33 0%S 12 0.320 27.8 334 19.2 0 230 UP-Ceil-16B-50 857 X 1 857 0.020 1.7 1,491 1.0 0 823 Subtotals for Structure:12,189 0 8,042 Infil.: Win.: 33.9, Sum.: 17.6 1,080 2.913 3,146 0.226 340 244 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:15,335 2,340 12,436 C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 19 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,060.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,060.0 sq.ft.Supply Air:249 CFM Ceiling Height:9.0 ft.Supply Air Changes:1.6 AC/hr Volume:9,540.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:3 Actual Winter Vent.:37 CFM Runout Air:83 CFM Percent of Supply.:15 % Runout Duct Size:6 in.Actual Summer Vent.:13 CFM Runout Air Velocity:422 ft./min.Percent of Supply:5 % Runout Air Velocity:422 ft./min.Actual Winter Infil.:12 CFM Actual Loss:0.112 in.wg./100 ft.Actual Summer Infil.:6 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-12F-0sw 41 X 9 268 0.065 5.7 1,516 0.9 0 232 W -Wall-15B0-10sf-10 41 X 9 369 0.049 4.3 1,573 0.0 0 0 N -Wall-15B0-10sf-10 27 X 9 243 0.049 4.3 1,036 0.0 0 0 S -Wall-15B0-10sf-10 27 X 9 243 0.049 4.3 1,036 0.0 0 0 E -Gls-4A-1a-o shgc-0.33 0%S 101 0.320 27.8 2,812 35.0 0 3,536 Floor-21A-24 1 X 1060 1060 0.025 2.2 2,306 0.0 0 0 Subtotals for Structure:10,279 0 3,768 Infil.: Win.: 11.6, Sum.: 6.0 369 2.913 1,075 0.228 116 84 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:11,354 1,016 5,312 C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 20 Room Cooling and Heating Loads Bar Graphs Cooling Heating Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 21 Room Cooling Loads Bar Graphs Sensible Latent Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 22 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,060 16,564 345 6-6 444 11,157 1,786 523 523 2 Upper Level 857 15,335 319 7-6 424 12,436 2,340 583 583 3 Lower Level 1,060 11,354 236 3-6 422 5,312 1,016 249 249 Ventilation 4,550 340 1,352 System 1 total 2,977 47,803 901 29,245 6,494 1,354 1,354 System 1 Main Trunk Size:24x10 in. Velocity:813 ft./min Loss per 100 ft.:0.092 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.98 82% / 18%29,245 6,494 35,739 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\17760 EMBERS LAKEVILLE 02292024.rhv Thursday, February 29, 2024, 10:29 AM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe:Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 29,245Residential Load Calculation SEER /EER Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Fiberglass, Batts Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply Mineral Fiberboard Insulation Location Foam, Closed Cell0.22 Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Non or Not ApplicableAttic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 47,803 Heating Gain Cooling Load Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville17760 Embers Ave BC636874 City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 35,739 Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500