HomeMy WebLinkAboutLA222865Date:
2024 City of Lakeville
Zoning Permit Application
Community Development Department
20195 Holyoke Avenue, Lakeville, MN 55044
zoning@lakevillemn.gov
Job Site Address:
Property Owner: Phone:
Property Owner Email:
Street Address: City: Zip:
Contractor: Phone:
Contractor Email
Street Address: City: Zip:
PLEASE COMPLETE APPLICABLE SECTION(S)
Fences: Materials: Wood Type:
Chain-link
Plastic
Iron
Boundary Setbacks Front Height:
Pool Enclosure from Side
Kennel property Side
Sport Court line Rear
Setback Setbacks Side Sheds: Size:
(200 square feet or less) Width from from Side
Height existing property Rear
structures line
Construction Type: Wood Aluminum Other
Do you have an existing detached accessory building on your property? No
Above-ground pools: Size: Dimensions Enclosure: Deck / gated entrance Setbacks Side______
(Under 5,000 gallons) Depth Fence (around pool) from Side______
Wall Height ________ Fence (around ladder) property Rear______
Gated Ladder line
Applicant must submit an approved survey of the property at the time of application that indicates the location and
setbacks of the fence, accessory building or swimming pool. Click here for a survey.
THE UNDERSIGNED HEREBY AGREES THAT, IN CASE SUCH PERMIT IS GRANTED, ALL WORK TO BE DONE AND ALL
MATERIALS USED SHALL COMPLY WITH THE PLANS AND SPECIFICATIONS HEREWITH SUBMITTED AND WITH ALL
THE ORDINANCES OF SAID CITY OF LAKEVILLE APPLICABLE HERETO.
BY SIGNING BELOW, THE APPLICANT RECOGNIZES THAT IT IS SOLELY THE APPLICANT'S RESPONSIBILITY TO
ASSURE THAT THE FENCE, SHED OR POOL AS INSTALLED, DOES NOT ENCROACH ONTO ADJACENT PROPERTY,
OR VIOLATE ANY PRIVATE CONDITIONS, COVENANTS OR RESTRICTIONS THAT MAY APPLY. IF A FENCE IS
LOCATED WITHIN A DRAINAGE AND UTILITY EASEMENT AND CITY ACCESS IS REQUIRED THE CITY IS NOT
RESPONSIBLE FOR ANY DAMAGE OR REMOVAL OF THE FENCE CAUSED BY ACCESSING THE DRAINAGE AND
UTILITY EASEMENT.
Applicant is: Contractor Property Owner Other (Please check one)
Please have the approved permit: mailed to me e-mailed to me (Please check one)
Applicant’s Signature: Date:
Zoning Permit Fee: $50.00
We accept cash, check and
credit card (includes a 3% processing fee)
Payment required at time of application
THIS PAGE TO BE COMPLETED BY THE CITY
City of Lakeville Zoning Permit Application Page 2
Job Site Address:
Permit Type:
Zoning ZN
Permit Sub-Type:
Fences (93)
Accessory buildings, 200 S.F. or less (71)
Above-ground pool, between 2250 & 5000 gal (91)
Work Type:
New (81) X
Zoning District:
Permit Fee: $50
Approved By: Date:
Zoning Administrator
Comments:_______________________________________________________________________________________________________
_________________________________________________________________________________________________________________
Shed - Accessory structure including roof overhangs may not be located in easements.
-Materials used must be architecturally similar to the
home. Sheds must not impede drainage.
Fence -- All of fence construction, including post foundation, must be located entirely on fence owner’s property.
Pool
Fence
-Fences connecting to an adjacent fence must get neighbor’s
permission. Fences must not impede drainage.
-The finished side/face of the fence shall face the abutting property or street.
-Fencing surrounding swimming pools must meet pool enclosure requirements of section 11-22-5. G of the City Code as well
as general fencing requirements.
-Pool enclosure requirements include a minimum height of 4 feet, maximum 4-in ch openings, and self-closing and self-
latching gates.
PH
O
N
E
:
9
5
2
.8
90
.
6
0
4
4
w
w
w.
j
rh
in
c
.
c
o
m
PL
A
N
N
E
R
S
/
E
N
G
I
N
E
E
R
S
/
S
U
R
V
E
Y
O
R
S
DRAWN BY
DATE
REVISIONS
CAD FILE
PROJECT NO.
SHEET 1 OF 1
29
9
9
W
E
ST
C
.
R.
4
2
,
S
U
I
T
E
1
0
0,
B
UR
NS
V
I
L
L
E
,
M
N
5
53
0
6
CE
R
T
I
F
I
C
A
T
E
O
F
S
U
R
V
E
Y
FO
R
SHP
12/09/2020
401538.dwg
401538
Lo
t
2
,
B
l
o
c
k
3
,
C
E
D
A
R
C
R
O
S
S
I
N
G
S
2N
D
A
D
D
I
T
I
O
N
,
Da
k
o
t
a
C
o
u
n
t
y
,
M
i
n
n
e
s
o
t
a
1. Bearings are based on the recorded plat.
2. Building dimensions shown are for horizontal and vertical placement of
structure only. See architectural plans for building and foundation
dimensions.
3. No specific soils investigation has been completed on this lot by James
R. Hill, Inc. the suitability of soils to support the specific house proposed
is not the responsibility of James R. Hill, Inc. or the surveyor.
4. No specific title search for existence or non-existence of recorded or
un-recorded easements has been conducted by the surveyor as a part
of this survey. Only easements per the recorded plat are shown.
5. Proposed grades shown were taken from the grading &/or
development plan prepared by James R. Hill, Inc.
6. Grading plan date/revision date: July 13, 2018
7. Plan No. 3035-B 'FINNEGAN'
NOTES
Lot = 10,129 sq. ft.
House/Garage = 2,461 sq. ft.
Porch = 122 sq. ft.
Driveway = 706 sq. ft.
Sidewalk = 70 sq. ft.
Patio = 18 sq. ft.
Total Impervious = 3,377 sq. ft. or 33.34% of lot
HARD COVER CALCULATIONS
Proposed
Garage Floor @ Front = 974.1
Garage Top of Foundation = 974.5
House Top of Foundation = 974.5
Lowest Floor = 971.3
Lot 2, Block 3, CEDAR CROSSINGS 2ND ADDITION, Dakota County, Minnesota
PROPERTY DESCRIPTION
20617 Gosford Way, Lakeville, Minnesota
PROPERTY ADDRESS
I hereby certify that this survey, plan or report was prepared by me or under
my direct supervision and that I am a duly Licensed Land Surveyor under the
laws of the State of Minnesota. That this survey does not purport to show all
improvements, easements or encroachments, to the property except as
shown thereon.
Signed this 9th day of December, 2020
Marcus F. Hampton, MN L.S. No. 47481
SURVEYOR'S CERTIFICATE
FLOOR ELEVATIONS
Top nut of hydrant located at Lot 1, Block 4 = 971.85
BENCHMARK
Denotes set spike
Denotes set iron monument
Denotes found iron monument
Denotes found scribed "x"
Denotes set hub
Denotes proposed drainage
Denotes top of curb
Denotes existing elevation
Denotes proposed elevation
Zoning = RST-2
FY - 20' House, 25' Garage
SY - 7' Interior, 20' Corner
RY - 30'
SY Buffer - 30'
RY Buffer - 50'
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________12/30/2020 lvlasaty
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected and
accepted before AsBuilt escrow monies will
be released. All structures must be flush
with the sod. This will be scheduled with the
landscape inspection.
EROSION CONTROL
MUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
3-25-24