Loading...
HomeMy WebLinkAboutsurvey fencef: \ j o b s \ 7 7 6 1 - 7 7 8 0 \ 7 7 6 9 - a v o n l e a 4 t h a d d i t i o n \ c a d c 3 d \ s u r v e y \ 7 7 6 9 . 0 4 7 . d w g Sa v e D a t e : 11 / 1 9 / 1 9 3890 Pheasant Ridge Drive NE, Suite 100, Blaine, MN 55449 Phone: 763-489-7900 Fax: 763-489-7959 ENVIRONMENTAL ENGINEERING SURVEYING The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected and accepted before As-Built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________12/26/2019 corlowsky EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. 4-18-24