HomeMy WebLinkAboutLA223234 - 17701 Emerald Ct-Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
_____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
NAME OF APPLICANT (Please Print)DATE
I HEREBY APPLY FOR PERMIT AND ACKNOWLEDGE THAT ALL INFORMATION ON THIS
APPLICATION IS COMPLETE AND ACCURATE. THIS IS NOT A PERMIT AND WORK IS NOT TO
COMMENCE UNTIL SUCH TIME A PERMIT IS ISSUED. ALL WORK WILL COMPLY WITH
LAKEVILLE CITY CODE, THE MINNESOTA STATE BUILDING CODE, AND THE APPROVED
PLANS. INTEREST EARNINGS ON ESCROW ACCOUNTS, IF ANY, WILL BE RETAINED BY THE
CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE
ESCROW APPLICATION AND REFUND.
OFFICE PHONE #:_
OFFICE PHONE #:_
*Entering your name affirms your intent to comply with the statement above.
*
Submit Application To: permits@lakevillemn.gov
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT
CONDO
REROOF
RESIDE
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES
LOWER LEVEL FINISH
ADDITION
FOUNDATION ONLY
MISCELLANEOUS
DEMO
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
CITY BUILDING VALUATION: $
BUILDING PERMIT FEES
$PERMIT FEE
$PLAN CHECK
$SURCHARGE
$METRO SAC
$CITY WATER HOOKUP UNIT
$CITY SEWER HOOKUP UNIT
$LANDSCAPE ESCROW
$TREE ESCROW
$MISC ESCROW
$PLUMBING
$MECHANICAL
$SEWER WATER
WATER METER
PRESSURE REDUCING VALVE
$OTHER
$TOTAL
METER SIZE
PRESSURE REDUCING VALVE
SEWER/WATER
SEWER/WATER
FINAL
STREET DRAINTILE
BUILDING INFORMATION
TYPE OF CONSTRUCTION
ZONING
CODE EDITION
FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
MECHANICAL
AIR TEST
FINAL
ROUGH-IN
PLUMBING
FINAL
ROUGH-IN
INSULATION
LATH
DECK FOOTING
FIREPLACE
FOOTING
FOUNDATION
FRAMING
PORCH FRAMING
PORCH FOOTING
POURED WALL
SITE
LOWER LEVEL FINAL
OTHER
DECK FRAMING
LOWER LEVEL FRAMING
LANDSCAPING
DECK FINAL
$
$
ACCESSORY BUILDING
EGRESS WINDOW
UNDERGROUND
17701 EMERALD CT, LAKEVILLE*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERwritten consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.cPHEASANT RUN MODEL #5#24-011SMA162024LOT 34, BLOCK 3, PHEASANT RUN OF LAKEVILLE 7TH ADDITION
STONE COTTAGE CONSTRUCTION, INC. FRONT ELEVATION 1/4" = 1'-0" VINYLB & B1'-0"VINYLSIDING4" TRIMSTONECAPSTONE4" TRIMCONC. PORCH8128128'-4" POURED FOUNDATION9' CEILING @ FIRST FLOORVINYL B & BTHERMO-TECH WDWS.STONE AS SHOWNFRONT ONLYGRIDS IN WDWS.FRONT & RIGHT SIDEFRONT ONLY4" VINYL SIDINGALL SIDESALUM. SOFFIT & FASCIAALL SIDESSTONEON JOGFLOWER BOXTOTALBSM'T1st FLR.1,463 SQ. FT.1,053 SQ. FT.2,516 SQ. FT.9x7 OVH. DR.16x7 OVH. DR.VINYLB & BVINYLB & B8/122/0x3/0 SHBLACKED OUT8/1218'-0"Concept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode04/17/2024jnuetzman
VERIFY ALLGRADE LINESPlanco MN, Inc.C#24-011SMA262024 LEFT ELEVATION 1/8" = 1'-0" VINYLCORNERSSIDINGVINYL SIDINGVINYLWDW. WELLEGRESS RIGHT ELEVATION 1/8" = 1'-0" VINYLCORNERSSIDINGVINYL SIDINGVINYL 5/128/128/128122'-0" REAR ELEVATION 1/8" = 1'-0" VINYLCORNERSSIDINGVINYL 1'-6"8121258/122'-6" ROOF PLAN 1/8" = 1'-0" 8122'-6"1'-0"1'-0"1'-0"1'-6"1'-0"8128125128128121'-6"1'-6"812Secure door closed until deck isconstructed with a separate permit.
Planco MN, Inc.C#24-011SMA362024 BASEMENT PLAN 1/4" = 1'-0" ),1,6+('64)7(;&/8'(667$,56UP
15 R UNEXCAVATED 30681/2 WALLBM.PKT.2-2x10
6/0x3/6 SL
*UNFINISHED MECH/STORAGE WHFURN92%SUMP11 7/8" I JTS.
16" O.C.
11 7/8" I JTS.
16" O.C.
11 7/8" LSL
16" O.C.
11 7/8" I JTS.
16" O.C.
11 7/8" LSL
16" O.C.*CARPET FAMILY/REC ROOM 42'-0"
2'-0"50'-6"21'-0"18'-6"12'-0"54'-0"
22'-6"31'-6"
15'-6"16'-0"6'-6"39'-6"3'-6"24'-6"3'-0"2" LEDGE27'-4"14'-6"4'-0"4'-2"4'-2"
9'-2"3'-8" I.D.19'-2"9'-0"10'-10"SD/CORADONVENT1-11 7/8" LSL
FLUSH
2-11 7/8" LSLFLUSH26682668F48"24682068LIN.*VINYL2x650685068SDSD BEDROOM #4 BEDROOM #3 *CARPET*CARPET2-2x102-2x102'-6"8'-3"2'-7"14'-2"7'-8"6'-6"2-2x102-2x108'-8"3'-6"4'-6"8'-4" POURED FOUNDATION5'-8"13'-4"12'-2"19'-0"4'-0"2'-6"60341 PIECE FIB.2-7 1/4" LSLDROPPED6'-6"12'-0"13'-4"7'-8"3-2x106/0x4/0 SL3-9 1/2" LSL9/0x4/0 SLWALKOUTWALKOUT7'-6"11'-0"32'-0"5'-0"F.D.LOOKOUT
LOOKOUT
3-2x106/0x6/10 P.D.TREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS1-11 7/8" LSLFLUSHUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.2226666
Planco MN, Inc.C#24-011SMA462024 FIRST FLOOR PLAN 1/4" = 1'-0" GASF.P.1'-8"4'-10"6'-4"8'-0"3'-8" I.D.RAIL10"DN15 R11'-4"286850682868 C.O.2868FIREDOOR2868PKT.WD24682468 C.O.78"24682-2x106/0x8/0 P.D.5'-0" TUB
& SHOWER
1 PIECE FIB.54"2'-6"F*VINYL18"x21"LIN.CAB.246850682668306812" SOFFIT6"6'-0"10'-93
4"12'-31
4"5'-5"2'-6"11'-0"
1'-0"*CARPET MASTER BEDROOM *WOOD GREAT ROOM *WOOD DINING FOYER *WOOD OFFICE/BEDROOM #2 *CARPET W.I.C. *CARPET MUD RM *VINYL LNDRY *VINYL*L.V.T.FSDSD/COTRUSSES24" O.C. GARAGE *4" CONC. FLOOR*2x6 WALLSTRUSSES24" O.C.16x7 OVH. DR.2-11 7/8" LSL 21' LONG42'-0"2x65'-0"3'-0"3'-6"4'-8"8'-2"3'-6"50'-6"21'-0"18'-6"12'-0"10'-6"10'-6"54'-0"
22'-6"31'-6"
15'-6"16'-0"6'-6"6/0x5/0 SL2-2x101,463 SQ. FT.9' CEILING @ FIRST FLOOR7'-31
4"5'-0"39'-6"26'-0"13'-6"6'-11"6'-7"7'-6"12'-0"6'-6"24'-6"11'-0"5'-6"2-2x102-2x106'-6"3'-0"
6'-6"2'-8"
7'-0"3'-4"9'-4"4'-2"ACCESS
ATTIC 2x2WALLHUNG LTGYP. BD.SDSD2-2x107/6x5/0 SLREF'G12" S.B. KITCHEN *WOOD30" RANGE
HOODVENT
2-2x10TRASH3'-0" CAB.3'-6"24"PANT.2x66'-6" CAB.
3'-6"MICRO5'-8"246816'-0"FRADONVENT603436" LIN.
CAB.
3'-9"1'-11"
2/6x2/6 FX
2-2x10
FIB. BASE
C.T. WALLS48"BENCH7'-6"3'-3"CONC. PORCH9x7 OVH. DR.2-11 7/" LSL 11' LONG3'-6"7'-6"11'-0"32'-0"5'-1"5'-11"2'-0"
19'-0"*L.V.T.6'-4"2'-0"20'-6"
TRUSSES
24" O.C.
GIRDER 2-2x82-2x102/6x6/0 SHTOP @ 8'4/0x6/0 FX2/6x6/0 SHFLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FAN6’-0”2)2x122) STHD14 STRAPS SmokeCO3.52.53227.5233PFHPFHPFH332-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).
Planco MN, Inc.C#24-011SMA562024 CROSS SECTION 3/8" = 1'-0" SHEATHINGSIDING1-2x6 TREATEDR-21 INSUL.9'-11
8"3 1/2" CONC. FLOORR-20 SPRAY FOAM1/2" GYP. BD.VB11 7/8" LSL JTS. @ 16" O.C.8-'4" POURED
WALL W/ REBARPER CODE3/4" T & G FLOORSILL PLATE2x6- 16" O.C.35'-0"5/8" GYP. BD.W/ V.B.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.SIDINGSHEATHING(DESIGNED BY MFR)TRUSSES @ 24" O.C.R-49 INSUL.WATERPROOFINGGRADE5'-0"5'-0"R-10 W/ <2.6 ACHINSUL. GREAT ROOM HOUSEWRAPHOUSEWRAPFASCIAALUM. 2-2x8CONC. PORCHTRT. 4x4 CURB2x4- 16" O.C. FOYER DRAIN TILE 11 7/8" I JTS. @ 16" O.C.5/8" GYP. BD.ALUM.SOFFITVENTEDPOUREDWALL812POURED WALLGRADE2" FOAM758"2" FOAM W/%(9(/512"4'-0"R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS
Planco MN, Inc.C#24-011SMA662024 CROSS SECTION 3/8" = 1'-0" SHEATHINGSIDING1-2x6 TREATEDR-20 SPRAY FOAMR-21 INSUL.9'-11
8"3 1/2" CONC. FLOORR-20 SPRAY FOAM1/2" GYP. BD.VB11 7/8" I JTS. @ 16" O.C.8'-4" POURED
WALL W/ REBARPER CODE3/4" T & G FLOORSILL PLATE2x6- 16" O.C.32'-0"5/8" GYP. BD.W/ V.B.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.R-49 INSUL.WATERPROOFING4" CONC. FLOOR GARAGE GRADEPOURED WALL2X6- 16" O.C.22'-0" N.T.S.SLOPE(DESIGNED BY MFR)TRUSSES @ 24" O.C.R-10 W/ <2.6 ACHINSUL.1/2" GYP. BD.HOUSEWRAPSIDINGSHEATHINGHOUSEWRAPTRT. 4x4 CURB2x4- 16" O.C.DRAIN TILE 73
8"
15 RISERSTRT. 4x4 CURB2x4- 16" O.C. GREAT ROOM MUD ROOM 6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS4- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS11 7/8" LSL JTS. @ 16" O.C.5/8" GYP. BD.(DESIGNED BY MFR)TRUSSES @ 24" O.C.POURED WALLGRADE2" FOAM758"2" FOAM W/%(9(/512"4'-0"R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS
Stone Cottage
HVAC Load Calculations
for
Stone Cottage
17701 Emerald Ct
Lakeville,mn
Prepared By:
Randy Andrews
Lofgren Heating
5708 Upper 147th Street West
Apple Vallley, MN 55124
Tuesday, March 26, 2024
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Stone Cottage
Project Date:Tuesday, March 26, 2024
Client Name:Stone Cottage
Client Address:17701 Emerald Ct
Client City:Lakeville,mn
Company Name:Lofgren Heating
Company Representative:Randy Andrews
Company Address:5708 Upper 147th Street West
Company City:Apple Vallley, MN 55124
Company E-Mail Address:rrandrews@lofgrenheating-ac.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces East
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,177 CFM Per Square ft.:0.402
Square ft. of Room Area:2,926 Square ft. Per Ton:1,150
Volume (ft³) of Cond. Space:26,334
Building Loads
Total Heating Required Including Ventilation Air:43,100 Btuh 43.100 MBH
Total Sensible Gain:25,605 Btuh 84 %
Total Latent Gain:4,936 Btuh 16 %
Total Cooling Required Including Ventilation Air:30,541 Btuh 2.55 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 3
Miscellaneous Report
System 1 Whole House
Input Data
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Outdoor
Rel.Hum
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29.27
Duct Sizing Inputs
Main Trunk Runouts
Calculate:Yes Yes
Use Schedule:No No
Roughness Factor:0.00300 0.01000
Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft.
Minimum Velocity:650 ft./min 450 ft./min
Maximum Velocity:900 ft./min 750 ft./min
Minimum Height:8 in.6 in.
Maximum Height:10 in.6 in.
Outside Air Data
Winter Summer
Infiltration Specified:0.250 AC/hr 0.130 AC/hr
68 CFM 35 CFM
Infiltration Actual:0.250 AC/hr 0.130 AC/hr
Above Grade Volume:Cu.ft.Cu.ft.X 16,337 X 16,337
4,084 Cu.ft./hr 2,124 Cu.ft./hr
X 0.0167 X 0.0167
Total Building Infiltration:68 CFM 35 CFM
Total Building Ventilation:140 CFM 70 CFM
---System 1---
Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference)
Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference)
Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference)
Winter Infiltration Specified:0.250 AC/hr (68 CFM), Construction: Unknown
Summer Infiltration Specified:0.130 AC/hr (35 CFM), Construction: Unknown
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 4
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.55 1,150 2,926 25,605 4,936 30,541 43,100 762 1,177 1,177
System 1 No 2.55 1,150 2,926 25,605 4,936 30,541 43,100 762 1,177 1,177 21x10
Ventilation 486 1,352 1,837 6,500
Zone 1 2,926 25,120 3,584 28,704 36,600 762 1,177 1,177 21x10
1-Upper Level 1,463 18,927 2,551 21,478 23,160 482 887 887 10--6
2-Lower Level 1,463 6,193 1,033 7,226 13,440 280 290 290 3--6
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 5
Duct Size Preview
Room or
Duct Name
Minimum
Velocity
Maximum
Velocity
Rough.
Factor
Design
L/100
Actual
L/100
SP
Loss
Duct
Velocity
Duct
Length Htg
Flow
Clg
Flow
Act.
Flow
Duct
Size
System 1
Supply Runouts
Zone 1
1-Upper Level 450 750 0 0.1 0.1 451.6 482 887 887 10--6
2-Lower Level 450 750 0 0.1 0.2 492.5 280 290 290 3--6
Other Ducts
Supply Main Trunk 650 900 0 0.1 0.1 807 762 1,177 1,177 21x10
SummarySummarySummarySummarySummarySummarySummarySummary
System 1
Heating Flow:762
Cooling Flow:1177
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 6
System 1 - Whole House - Adequate Exposure Diversity Test
Test For Adequate Exposure Diversity
Average Glass
Sensible Gain
Over 12 Hours
1.3 x Average
Glass Gain
Hourly Glass Gain Hourly Total Net
GainHeat Gain, Btuh61.1% Diff. from Avg. (3,037 Btuh Excursion)
0
10,000
20,000
30,000
40,000
8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm
AED Calculation Summary
--- SYSTEM DOES NOT HAVE ADEQUATE EXPOSURE DIVERSITY. ---
System is on N, E, S, W rosette.
Peak load exceeds 12-hour average load by 61.1%.
AED Excursion (amount by which peak exceeds 1.3 x average): 3,037 Btuh
Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not
exceed the average glass load for the entire conditioned space by more than 30 percent.
(System Concept Warning for excursion equal to or exceeding 1.5 x baseline) This application has glass areas that
produced large heat gains for part of the day. Variable air volume devices are required to overcome large spikes in solar
gain for one or more rooms. Install a zoned system or provide zone control (individual, motorized, thermostatically
controlled dampers) for problem rooms. Single speed equipment may not be suitable for the application.
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 7
System 1 - Whole House - Psychrometric Chart
ZC Zone (Room) Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain
HRV Heat Recovery Ventilator
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 8
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
386 10,747 0 11,032 11,032
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
1381 7,809 0 1,194 1,194
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1107 4,718 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1463 2,546 0 1,404 1,404
21A-24-c: Floor-Basement, Concrete slab, any thickness,
2 or more feet below grade, no insulation below floor,
carpet covering, shortest side of floor slab is 24' wide
1463 3,182 0 0 0
Subtotals for structure:30,280 0 13,982 13,982
People:7 1,400 1,610 3,010
Equipment:1,500 6,000 7,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 68, Summer CFM: 35 6,320 684 491 1,175
Ventilation: Winter CFM: 140, Summer CFM: 70 6,500 1,352 486 1,837
AED Excursion:0 0 3,037 3,037
Total Building Load Totals:43,100 4,936 25,605 30,541
Check Figures
Total Building Supply CFM:1,177 CFM Per Square ft.:0.402
Square ft. of Room Area:2,926 Square ft. Per Ton:1,150
Volume (ft³) of Cond. Space:26,334
Building Loads
Total Heating Required Including Ventilation Air:43,100 Btuh 43.100 MBH
Total Sensible Gain:25,605 Btuh 84 %
Total Latent Gain:4,936 Btuh 16 %
Total Cooling Required Including Ventilation Air:30,541 Btuh 2.55 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 9
Building Pie Chart
Building
Loss
43,100
Btuh
Floor 7%
Roof 6%
Wall 29%
Glass 25%
Door 3%
Infiltration 15%
Ventilation 15%
Building
Gain
30,541
Btuh
Roof 5%Wall 4%
Glass 36%
Door 1%People 10%
Equipment 25%
Infiltration 4%
Ventilation 6%
AED Excursion 10%
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 10
Building Bar Graph
Building
Loss
43,100
Btuh
0
5,000
10,000
15,000
Floor 7%Wall 29%Door 3%Ventilation 15%
Roof 6%Glass 25%Infiltration 15%
Building
Gain
30,541
Btuh
0
5,000
10,000
15,000
Roof 5%Glass 36%People 10%Infiltration 4%AED Excursion 10%
Wall 4%Door 1%Equipment 25%Ventilation 6%
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 11
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
386 10,747 0 11,032 11,032
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
1381 7,809 0 1,194 1,194
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1107 4,718 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1463 2,546 0 1,404 1,404
21A-24-c: Floor-Basement, Concrete slab, any thickness,
2 or more feet below grade, no insulation below floor,
carpet covering, shortest side of floor slab is 24' wide
1463 3,182 0 0 0
Subtotals for structure:30,280 0 13,982 13,982
People:7 1,400 1,610 3,010
Equipment:1,500 6,000 7,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 68, Summer CFM: 35 6,320 684 491 1,175
Ventilation: Winter CFM: 140, Summer CFM: 70 6,500 1,352 486 1,837
AED Excursion:0 0 3,037 3,037
System 1 Whole House Load Totals:43,100 4,936 25,605 30,541
Check Figures
Supply CFM:1,177 CFM Per Square ft.:0.402
Square ft. of Room Area:2,926 Square ft. Per Ton:1,150
Volume (ft³) of Cond. Space:26,334
System Loads
Total Heating Required Including Ventilation Air:43,100 Btuh 43.100 MBH
Total Sensible Gain:25,605 Btuh 84 %
Total Latent Gain:4,936 Btuh 16 %
Total Cooling Required Including Ventilation Air:30,541 Btuh 2.55 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 12
System 1 Whole House Pie Chart
System
1 Whole
House
Loss
43,100
Btuh
Floor 7%
Roof 6%
Wall 29%
Glass 25%
Door 3%
Infiltration 15%
Ventilation 15%
System
1 Whole
House
Gain
30,541
Btuh
Roof 5%Wall 4%
Glass 36%
Door 1%People 10%
Equipment 25%
Infiltration 4%
Ventilation 6%
AED Excursion 10%
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 13
System 1 Whole House Bar Graph
System
1 Whole
House
Loss
43,100
Btuh
0
5,000
10,000
15,000
Floor 7%Wall 29%Door 3%Ventilation 15%
Roof 6%Glass 25%Infiltration 15%
System
1 Whole
House
Gain
30,541
Btuh
0
5,000
10,000
15,000
Roof 5%Glass 36%People 10%Infiltration 4%AED Excursion 10%
Wall 4%Door 1%Equipment 25%Ventilation 6%
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 14
System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms)
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
386 10,747 0 11,032 11,032
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
1381 7,809 0 1,194 1,194
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1107 4,718 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1463 2,546 0 1,404 1,404
21A-24-c: Floor-Basement, Concrete slab, any thickness,
2 or more feet below grade, no insulation below floor,
carpet covering, shortest side of floor slab is 24' wide
1463 3,182 0 0 0
Subtotals for structure:30,280 0 13,982 13,982
People:7 1,400 1,610 3,010
Equipment:1,500 6,000 7,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 68, Summer CFM: 35 6,320 684 491 1,175
System 1, Zone 1 Load Totals:36,600 3,584 25,120 28,704
Check Figures
Supply CFM:1,177 CFM Per Square ft.:0.402
Square ft. of Room Area:2,926 Square ft. Per Ton:1,223
Volume (ft³) of Cond. Space:26,334
Zone Loads
Total Heating Required:36,600 Btuh 36.600 MBH
Total Sensible Gain:25,120 Btuh 88 %
Total Latent Gain:3,584 Btuh 12 %
Total Cooling Required:28,704 Btuh 2.39 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 15
System 1, Zone 1 Pie Chart
System
1, Zone
1
Loss
36,600
Btuh
Floor 9%
Roof 7%
Wall 34%
Glass 29%
Door 3%
Infiltration 17%
System
1, Zone
1
Gain
28,704
Btuh
Roof 5%Wall 4%
Glass 38%
Door 1%People 10%
Equipment 26%
Infiltration 4%
AED Excursion 11%
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 16
System 1, Zone 1 Bar Graph
System
1, Zone
1
Loss
36,600
Btuh
0
5,000
10,000
15,000
Floor 9%Wall 34%Door 3%
Roof 7%Glass 29%Infiltration 17%
System
1, Zone
1
Gain
28,704
Btuh
0
5,000
10,000
15,000
Roof 5%Glass 38%People 10%Infiltration 4%
Wall 4%Door 1%Equipment 26%AED Excursion 11%
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 17
Detailed Room Loads - Room 1 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,463.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,463.0 sq.ft.Supply Air:887 CFM
Ceiling Height:9.0 ft.Supply Air Changes:4.0 AC/hr
Volume:13,167.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:10 Actual Winter Vent.:89 CFM
Runout Air:89 CFM Percent of Supply.:10 %
Runout Duct Size:6 in.Actual Summer Vent.:53 CFM
Runout Air Velocity:452 ft./min.Percent of Supply:6 %
Runout Air Velocity:452 ft./min.Actual Winter Infil.:55 CFM
Actual Loss:0.127 in.wg./100 ft.Actual Summer Infil.:29 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0sw 42 X 9 290 0.065 5.7 1,640 0.9 0 251
S -Wall-12F-0sw 42 X 9 358 0.065 5.7 2,024 0.9 0 309
E -Wall-12F-0sw 39 X 9 263 0.065 5.7 1,487 0.9 0 227
W -Wall-12F-0sw 39 X 9 224 0.065 5.7 1,267 0.9 0 194
E -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
E -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
N -Gls-4A-1a-o shgc-0.33 100%S 88 0.320 27.8 2,450 10.4 0 916
S -Gls-4A-1a-o shgc-0.33 0%S 20 0.320 27.8 557 19.2 0 384
E -Gls-4A-1a-o shgc-0.33 0%S 46 0.320 27.8 1,281 35.0 0 1,610
W -Gls-4A-1a-o shgc-0.33 0%S 127 0.320 27.8 3,536 35.0 0 4,446
UP-Ceil-16B-50 1463 X 1 1463 0.020 1.7 2,546 1.0 0 1,404
Subtotals for Structure:18,066 0 10,093
Infil.: Win.: 54.9, Sum.: 28.5 1,458 3.494 5,094 0.272 551 396
AED Excursion:2,288
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 5,000
Room Totals:23,160 2,551 18,927
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 18
Detailed Room Loads - Room 2 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,463.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,463.0 sq.ft.Supply Air:290 CFM
Ceiling Height:9.0 ft.Supply Air Changes:1.3 AC/hr
Volume:13,167.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:3 Actual Winter Vent.:51 CFM
Runout Air:97 CFM Percent of Supply.:18 %
Runout Duct Size:6 in.Actual Summer Vent.:17 CFM
Runout Air Velocity:493 ft./min.Percent of Supply:6 %
Runout Air Velocity:493 ft./min.Actual Winter Infil.:13 CFM
Actual Loss:0.151 in.wg./100 ft.Actual Summer Infil.:7 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
W -Wall-12F-0sw 39 X 9 246 0.065 5.7 1,391 0.9 0 213
E -Wall-15B0-10sf-10 39 X 9 351 0.049 4.3 1,496 0.0 0 0
N -Wall-15B0-10sf-10 42 X 9 378 0.049 4.3 1,611 0.0 0 0
S -Wall-15B0-10sf-10 42 X 9 378 0.049 4.3 1,611 0.0 0 0
W -Gls-4A-1a-o shgc-0.33 0%S 105 0.320 27.8 2,923 35.0 0 3,676
Floor-21A-24 1 X 1463 1463 0.025 2.2 3,182 0.0 0 0
Subtotals for Structure:12,214 0 3,889
Infil.: Win.: 13.2, Sum.: 6.9 351 3.493 1,226 0.271 133 95
AED Excursion:749
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:500 1,000
Room Totals:13,440 1,033 6,193
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 19
Room Cooling and Heating Loads Bar Graphs
Cooling
Heating
Btuh
Lower Level
Upper Level
0 5,000 10,000 15,000 20,000 25,000
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 20
Room Cooling Loads Bar Graphs
Sensible
Latent
Btuh
Lower Level
Upper Level
0 5,000 10,000 15,000 20,000 25,000
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 21
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Upper Level 1,463 23,160 482 10-6 452 18,927 2,551 887 887
2 Lower Level 1,463 13,440 280 3-6 493 6,193 1,033 290 290
Ventilation 6,500 486 1,352
System 1 total 2,926 43,100 762 25,605 4,936 1,177 1,177
System 1 Main Trunk Size:21x10 in.
Velocity:807 ft./min
Loss per 100 ft.:0.096 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.55 84% / 16%25,605 4,936 30,541
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\17701 EMERALD LAKEVILLE 03262024.rhv Tuesday, March 26, 2024, 10:49 AM
Builders Associaton of Minnesota version 101014
Date Certificate Posted
x Passive (No Fan)
Active (With fan and monometer
or other system monitoring
Location (or future location) of Fan:
Other Please Describe Here
x
10/15 x x
x
20 x
20 x
21 x
49 x
x
x
x
x Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:Input in
BTUS:
70,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
x Passive
Low: Other, describe:
x Low:
Location of fan(s), describe: Cfm's
4" " round duct OR Flex
" metal duct
ML193UH070
Heating Loss
Manufacturer Lennox
Natural Gas
Output in
Tons:
3 Ton50
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Capacity continuous ventilation rate in cfms:
200CFM
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
25,605Residential Load Calculation
SEER
/EER
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Electric
Make-up Air Select a Type
AO Smith
Domestic Water
Heater
MECHANICAL SYSTEMS
Rating or Size
Efficiency 13 Seer
Building envelope air tightness:
Rim Joist (1st Floor)
GPVL-50 13ACXN042-230 Model
Heating System
Natrual Gas
Lennox Fiberglass, Batts Foundation Wall
R-value
Average U-Factor (excludes skylights and one door) U:
Duct system air tightness:
Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply
Mineral Fiberboard Insulation Location
Foam, Closed Cell0.22
Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Non or Not ApplicableAttic
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Rim Joist (2nd Floor+)
0.30
Appliances
Mech Room
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
43,100
Heating Gain Cooling Load
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Place your
logo here
New Construction Energy Code Compliance Certificate
Name of Residential Contractor
Stone Cottage Construction Inc.
MN License Number
Lakeville17701 Emerald Ct
BC636874
City Mailing Address of the Dwelling or Dwelling Unit
Combustion Air Select a Type
Location of duct or system:
30,541
Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500
4/15/24 X
PM