HomeMy WebLinkAboutLA224889-19669 Harbor Dr Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
_____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
NAME OF APPLICANT (Please Print)DATE
I HEREBY APPLY FOR PERMIT AND ACKNOWLEDGE THAT ALL INFORMATION ON THIS
APPLICATION IS COMPLETE AND ACCURATE. THIS IS NOT A PERMIT AND WORK IS NOT TO
COMMENCE UNTIL SUCH TIME A PERMIT IS ISSUED. ALL WORK WILL COMPLY WITH
LAKEVILLE CITY CODE, THE MINNESOTA STATE BUILDING CODE, AND THE APPROVED
PLANS. INTEREST EARNINGS ON ESCROW ACCOUNTS, IF ANY, WILL BE RETAINED BY THE
CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE
ESCROW APPLICATION AND REFUND.
OFFICE PHONE #:_
OFFICE PHONE #:_
*Entering your name affirms your intent to comply with the statement above.
*
Submit Application To: permits@lakevillemn.gov
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT
CONDO
REROOF
RESIDE
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES
LOWER LEVEL FINISH
ADDITION
FOUNDATION ONLY
MISCELLANEOUS
DEMO
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
CITY BUILDING VALUATION: $
BUILDING PERMIT FEES
$PERMIT FEE
$PLAN CHECK
$SURCHARGE
$METRO SAC
$CITY WATER HOOKUP UNIT
$CITY SEWER HOOKUP UNIT
$LANDSCAPE ESCROW
$TREE ESCROW
$MISC ESCROW
$PLUMBING
$MECHANICAL
$SEWER WATER
WATER METER
PRESSURE REDUCING VALVE
$OTHER
$TOTAL
METER SIZE
PRESSURE REDUCING VALVE
SEWER/WATER
SEWER/WATER
FINAL
STREET DRAINTILE
BUILDING INFORMATION
TYPE OF CONSTRUCTION
ZONING
CODE EDITION
FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
MECHANICAL
AIR TEST
FINAL
ROUGH-IN
PLUMBING
FINAL
ROUGH-IN
INSULATION
LATH
DECK FOOTING
FIREPLACE
FOOTING
FOUNDATION
FRAMING
PORCH FRAMING
PORCH FOOTING
POURED WALL
SITE
LOWER LEVEL FINAL
OTHER
DECK FRAMING
LOWER LEVEL FRAMING
LANDSCAPING
DECK FINAL
$
$
ACCESSORY BUILDING
EGRESS WINDOW
UNDERGROUND
LOT 13, BLOCK 1, BERRES RIDGE 8TH ADDITION*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERRESIDENCE FOR:written consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.cJIM & RHONDA BEARD#24-027SMA182024STONE COTTAGE CONSTRUCTION, INC.
19669 HARBOR DRIVE, LAKEVILLE FRONT ELEVATION 1/4" = 1'-0" 16x7 OVH. DR.9x8 OVH. DR.STONEON JOG8127127124" TRIM4" TRIMVINYLB & B6/128121'-6"6"WOOD PORCH4" TRIM8'-4" POURED FOUNDATION9' CEILING @ FIRST FLOORTOTAL2nd FLR.1st FLR.1,278 SQ. FT.1,485 SQ. FT.2,763 SQ. FT.4" LP TRIMTHERMO-TECH WDWS.STONE AS SHOWNFRONT ONLYGRIDS IN WDWS.FRONT ONLYFRONT ONLYVINYL B & BFRONT ONLY4" EXPOSURE VINYL SIDINGALL SIDES16x16 BOXEDLP COLUMNSWRAPSTONE 12"WRAPSTONE 12"4/12TOTALBSM'T887 SQ. FT.3,650 SQ. FT.4" VINYL TRIMFRONT ONLYVINYLB & B4" VINYL SIDING4" VINYL SIDINGVINYLB & BVINYLB & B4" VINYL SIDING4" VINYL SIDINGConcept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode06/11/2024jnuetzman
VERIFY ALLGRADE LINESPlanco MN, Inc.C#24-027SMA282024 LEFT ELEVATION 1/8" = 1'-0" 7128128121'-6"SIDINGVINYL VINYLCORNERS6128/12WRAPSTONE 12"WDW. WELLEGRESS RIGHT ELEVATION 1/8" = 1'-0" 812712812SIDINGVINYL VINYLCORNERS1'-0"1'-9"1'-0"WRAPSTONE 12"SIDINGVINYL REAR ELEVATION 1/8" = 1'-0" 812712SIDINGVINYL VINYLCORNERS1'-6" ROOF PLAN 1/8" = 1'-0" 8/121'-6"1'-9"1'-0"1'-9"1271271278128128126/12GIRDERGIRDERGIRDER1'-6"8/121'-0"8124/12GIRDER
GIRDER1'-6"Secure door closed until deck isconstructed with a separate permit.
Planco MN, Inc.C#24-027SMA382024 BASEMENT PLAN 1/4" = 1'-0" UP15 R UNEXCAVATED WHFURNF.D.92%SUMP4834 FAMILY/REC ROOM *CARPET MECH/STORAGE *UNFINISHED2-2x102868TREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS54'-0"17'-0"15'-0"12'-0"45'-0"23'-6"30'-6"11'-0"19'-6"11'-6"12'-0"38'-0"3'-0"35'-0"11'-8"7'-4"13'-2"
1'-0"44'-0"22'-6"22'-6"
2'-0"20'-6"19'-6"3'-0"4'-6"5'-10"13'-8"3'-8"3'-8"
14'-0"8'-0"20'-0"10'-0"2" LEDGE8'-4" POURED FOUNDATIONWALLEDGEWALLEDGE42"
14" I JOIST
19.2" O.C.
14" I JOIST
19.2" O.C.
14" LSL JOIST
19.2" O.C.
14" I JOIST
19.2" O.C.10"5'-0"RADONVENT7'-0"12" CANT.@ F.P.6'-0"1 PIECH FIB.F*VINYL BEDROOM #5 *CARPET10'-4"),1,6+('64)7127,1&/8',1*67$,564'-0"1-14" LVLFLUSH1-14" LVL
FLUSH
7'-0"3'-9"3'-9"4'-8"2-2x105/0x3/6 SL(2) TRT. 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG.5'-6"6"9"10'-6"9"TREATED
2x8
16" O.C.TRT. 3-2x10 FLUSHTRT. 3-2x10 FLUSH24682468266824682x62'-10"8'-10"3'-6"5'-5"10'-6"-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).SmokeSmokeCOUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.
Planco MN, Inc.C#24-027SMA482024 FIRST FLOOR PLAN 1/4" = 1'-0" 1,278 SQ. FT.9' CEILING @ FIRST FLOOR54'-0"17'-0"15'-0"12'-0"PED
45'-0"MICROOVEN/REF'GUP17 RDN15 R30682/0x5/0 SH9x7 OVH. DR.16x7 OVH. DR.26682868FIREDOOR FOYER *WOOD*WOOD DINING KITCHEN *WOOD*WOOD GREAT ROOM OFFICE *CARPET*4" CONC. FLOOR GARAGE WOOD PORCH 23'-6"30'-6"11'-0"19'-6"14'-2"12'-0"38'-0"3'-0"35'-0"11'-8"7'-4"16'-0"6'-0"5'-6"6"
1'-0"44'-0"9'-4"7'-8"7'-6"7'-6"22'-6"22'-6"
2'-0"20'-6"19'-6"3'-0"20'-0"10'-0"5'-11"5'-1"9'-9"9'-9"2'-10"3'-8"3'-8"4'-6"6'-8"10"WALLEDGEWALLEDGE2x62x6RAIL2'-6"3'-6"GYP. BD.6'-3"9"FSD14'-0"CHASE30" COOKTOPW/ HOODVENT5/0x5/0 SL2-2x1020" FLR.TRUSS
24" O.C.
GIRDER F.T.2-2x102-2x102-9 1/2" LSL DROPPED2-2x10 FLUSH3-7 1/4" LVL3-7 1/4" LVL2-11 7/8" LSL2-2x12RADONVENT*2x6 WALLSTRUSSES24" O.C.4'-6"3'-9"16" SH'S24682468406840681'-10"PANTRYREF'G
U.C.10" S.B.*L.V.T.*L.V.T.*L.V.T.2868 C.O.
13'-2"8'-2"3'-6"3'-1012"6'-2"13'-4"5'-9"8'-0"7'-6"2'-7"REF'G
RECESS
2-2x102/6x2/6 AWN2-2x10
2/6x4/0 SH
20" FLR.TRUSS
24" O.C.11'-8"9'-6"TRASH
ACCESSATTIC1'-11"1'-11"
FLR. TRUSSES
24" O.C.FLUSH2-11 7/8" LSL FLUSH2-11 7/8" LSL2-2x103"2/0x5/0 SH2-2x103"20" FLR.TRUSS
24" O.C.
12" SH'S
9'-4"2x62x62-9 1/2" LVL90610 P.D.9/0x5/0 SL3-9 1/2" LVLTOP @ 6'-10"1'-0"F.P.GAS2-2x101'-0"5'-9" (FRAMING)
5'-10" (FINISHED)
5'-8"4'-8"5'-8"7'-6"16x16 BOXEDCOLUMNSGIRDERGIRDER
GIRDER
20" FLR.TRUSS
24" O.C.
10'-2"
3'-8"6'-0"2'-0"22'-0"20" FLR.TRUSS
24" O.C.
2-9 1/2" LSL FLUSH
FLUSH
2-11 7/8" LSL
3'-0"
5'-6"
(2) FLOATING
SH'S12" FALSE BACK20682068*612 SQ. FT.9"*COMPOSITE DECKING-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).BWPsAboveCS-WSPCS-WSPCS-WSPCS-WSP8LSTHD8CS-PFCS-PF8CS-WSPCS-WSP12Balloon Framed Wall atStairway - See Detail onPage FR-03.1BWPsAbovePFHVerify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.
Planco MN, Inc.C#24-027SMA582024 SECOND FLOOR PLAN 1/4" = 1'-0" 1,485 SQ. FT.DN17 R5/0x6/0 FIXED2-2x10
40" OFF LANDING
TEMP
44'-0"17'-0"15'-0"12'-0"42'-6"1'-6"38'-0"3'-0"12'-0"7'-4"13'-2"WALLEDGEWALLEDGE44'-0"30'-0"14'-0"14'-8"11'-10"4'-6"5'-10"3'-8"3'-8"2x6RADONVENT20'-0"
2'-8"*CARPET3'-8"3'-8"3'-6"2468PKT.246824682468246826685'-0" TUB
& SHOWER
1 PIECE FIB.2'-6"F74"16'-0"9'-6"2'-7"14'-5"LTWD2468246824688'-0"20682068286826682668LIN.LIN.166824682668246824682'-10"483442"1 PIECE FIB.32x60FREESTANDINGTUB12'-11"7'-1"
72"24682468 C.O.*C.T.FFF*VINYL*VINYL*VINYL9/0x5/0 SL2-2x103-2x106/0x5/0 SL2-2x105/0x2/0 FX6/0x4/6 SL2-2x106/0x4/6 SL2-2x102/0x2/0 AWN2-2x107'-6"7'-6"5'-2"11'-10"4'-0"6'-1"5'-9"3'-0"2x6*CARPET MASTER BEDROOM *CARPET BEDROOM #2 BEDROOM #3 *CARPET BEDROOM #4 *CARPET*CARPET W.I.C. *VINYL LNDRY 19'-6"11'-6"6'-6"12'-0"5'-11"5'-11"1'-6"2'-0"7'-5"9"9"
5'-8"5'-3"10'-0"1'-10"4'-2"8'-4"3'-6"10"4"8'-0"8'-9"5'-3"2'-6"2x61'-6"2'-6"8'-2"GIRDERTRUSSES24" O.C.TRUSSES
24" O.C.GIRDERACCESS
ATTIC
TRUSSES
24" O.C.SD/COSDSDSDSD7'-3"4'-0"*BOX VAULT3'-0"2'-6"1/2 WALL W/WD. CAP(2) FLOATINGSHLVS.27"60362468*C.T.2068LIN.FIB. BASE
C.T. WALLS
TO CLG.2x67'-3"5'-8"2'-6"3'-8"3'-11"4"TemperTemper ifwithin 60"of tub floor-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).CS-WSPCS-WSPCS-WSPCS-WSPCS-WSPCS-WSPCS-WSPVerify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.
Planco MN, Inc.C#24-027SMA682024 CROSS SECTION 3/8" = 1'-0" 17 RISERS
9'-11
8"3/4" T & G FLOORCURBTREATED 4x415 RISERS
14" I JTS. @ 19.2" O.C.CURB2X6- 16" O.C.TREATED 4x63 1/2" CONC. FLOOR2X4- 16" O.C.CURB2X6- 16" O.C.TREATED 4x6SIDING5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.11'-8"2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOOR2x42x6VBR-21 INSUL.W/ V.B.5/8" GYP. BD.VBSIDING3'-0"1'-0"PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDPROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE SHEATHINGR-20 SPRAY FOAMR-20 SPRAY FOAMSHEATHINGENERGY HEELENERGY HEEL6'-0"(DESIGNED BY MFR)TRUSSES @ 24" O.C.GRADE34'-0"4'-0"GIRDERR-20 SPRAY FOAMVENTEDFASCIAALUM. ALUM.3-7 1/2" LVL1261'-6"5'-6"5 1
16"SOFFIT50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTICVENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES1'-9"712HOUSE WRAPHOUSE WRAPR-30 INSUL.MIN.20" FLOOR TRUSSES @ 24" O.C.8'-11
8"TRT. 6x6 POST2-11 7/8" LSL2-11 7/8" LSLR-20 SPRAY FOAM16x16 BOXEDCOLUMNS75
8"2X6- 16" O.C.14" LSL JTS. @ 19.2" O.C.5/8" GYP. BD.FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS OFFICE GREAT ROOM BEDROOM #4 BEDROOM #3 FAMILY/REC RM MECH/STORAGE 71
2"DECKING2x8 JTS. @ 16" O.C.TRT. 6x6 POST24x24 PADFOOTING12x16 PIERFOOTINGTRT. 3-2x10PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDPROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSGRADECOMPOSITE
Planco MN, Inc.C#24-027SMA7820244" CONC. FLOOR GARAGE GRADEPOURED WALL2X6- 16" O.C.SLOPE TO DOORS CROSS SECTION 3/8" = 1'-0" 9'-118"3/4" T & G FLOOR
3 1/2" CONC. FLOOR8'-11
8"5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOORVBR-21 INSUL.W/ V.B.5/8" GYP. BD.VBR-20 SPRAY FOAMR-20 SPRAY FOAMPER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDPROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE R-20 SPRAY FOAMR-20 SPRAY FOAM1/2" SHTG.15# FELTSHINGLES10'-53
8"(DESIGNED BY MFR)TRUSSES @ 24" O.C.20'-0"22'-0"4'-0"71212'-101116"1/2" GYP. BD.SIDINGSHEATHINGHOUSE WRAPSIDINGSHEATHINGHOUSE WRAP20" FLOOR TRUSSES @ 24" O.C.14" I JST. @ 19.2" O.C. (DESIGNED BY MFR)TRUSSES @ 24" O.C.5/8" GYP. BD.3'-0"GIRDER MASTER BEDROOM DINING KITCHEN FAMILY/REC RM FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS16'-0"2'-6"1'-0"3'-0"PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDPROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSGRADEFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS
Planco MN, Inc.C#24-027SMA882024 GARAGE 9'-11
8"3/4" T & G FLOOR CROSS SECTION 3/8" = 1'-0"
14" LSL @ 19.2" O.C. 3 1/2" CONC. FLOORPROOFINGWATER5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED4" CONC. FLOORSLOPE TO DRAIN1/2" GYP. BD.R-10 W/ <2.6 ACHINSUL.20" FLOOR TRUSSES @ 24" O.C.R-20 SPRAY FOAMGRADEPOURED WALL2X6- 16" O.C.10'-53
8"FASCIAALUM. SOFFITVENTEDALUM.1/2" SHTG.15# FELTSHINGLES1'-6"812(DESIGNED BY MFR)TRUSSES @ 24" O.C.711
16"GIRDER6'-0"5/8" GYP. BD.R-20 SPRAY FOAMR-30 INSUL.MIN.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.ROOF VENTS @ 1/300 ATTIC50% ROOF 50% SOFFIT24'-0"CLEAT15'-3"SIDINGSHEATHINGHOUSE WRAP MECH/STORAGE FOYER BEDROOM #2 2'-0"FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FAN
6/3/2024
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Signed:___________________________________
Print Name:_______________________________
Date:____________License Number:___________54690
Tim M. Lipasek BYDESCRIPTIONDATEREVISIONS---------------------COPYRIGHT, 2005, DPIS ENGINEERING, LLC.DPIS ENGINEERING,LLC.19450 STATE HIGHWAY 249HOUSTON, TEXAS 77070PH: 281.351.0048 FAX: 281.351.0148SECTION:LOT:BLOCK:UNAUTHORIZED USE OR REPRODUCTION OF THIS DRAWING MAY BE AN INFRINGMENT OF THE FEDERAL COPYRIGHT ACT. THIS DRAWING IS PROTECTED UNDER THE FEDERAL COPYRIGHT ACT BY DPIS ENGINEERING, LLC.DRAWN:DESIGNED:CHECKED:CUSTOMER:SUBDIVISION / ADDRESS:PROJECT TITLE:DRAWING SCALE:ISSUE DATE:
DRAWING NUMBER:WALL BRACING PLAN 19669 HARBOR DRIVE, ROSEMOUNT, MN 55068STONE COTTAGE CONSTRUCTIONAL AR TML
1/8" = 1'-0"05/31/2024
WB-2-
6/3/2024
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Signed:___________________________________
Print Name:_______________________________
Date:____________License Number:___________54690
Tim M. Lipasek BYDESCRIPTIONDATEREVISIONS---------------------COPYRIGHT, 2005, DPIS ENGINEERING, LLC.DPIS ENGINEERING,LLC.19450 STATE HIGHWAY 249HOUSTON, TEXAS 77070PH: 281.351.0048 FAX: 281.351.0148SECTION:LOT:BLOCK:UNAUTHORIZED USE OR REPRODUCTION OF THIS DRAWING MAY BE AN INFRINGMENT OF THE FEDERAL COPYRIGHT ACT. THIS DRAWING IS PROTECTED UNDER THE FEDERAL COPYRIGHT ACT BY DPIS ENGINEERING, LLC.DRAWN:DESIGNED:CHECKED:CUSTOMER:SUBDIVISION / ADDRESS:PROJECT TITLE:DRAWING SCALE:ISSUE DATE:
DRAWING NUMBER:WALL BRACING PLAN 19669 HARBOR DRIVE, ROSEMOUNT, MN 55068STONE COTTAGE CONSTRUCTIONAL AR TML
1/8" = 1'-0"05/31/2024
WB-3-
·
·
·
·
·
6/3/2024
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Signed:___________________________________
Print Name:_______________________________
Date:____________License Number:___________54690
Tim M. Lipasek BYDESCRIPTIONDATEREVISIONS---------------------COPYRIGHT, 2005, DPIS ENGINEERING, LLC.DPIS ENGINEERING,LLC.19450 STATE HIGHWAY 249HOUSTON, TEXAS 77070PH: 281.351.0048 FAX: 281.351.0148SECTION:LOT:BLOCK:UNAUTHORIZED USE OR REPRODUCTION OF THIS DRAWING MAY BE AN INFRINGMENT OF THE FEDERAL COPYRIGHT ACT. THIS DRAWING IS PROTECTED UNDER THE FEDERAL COPYRIGHT ACT BY DPIS ENGINEERING, LLC.DRAWN:DESIGNED:CHECKED:CUSTOMER:SUBDIVISION / ADDRESS:PROJECT TITLE:DRAWING SCALE:ISSUE DATE:
DRAWING NUMBER:WALL BRACING NOTES & DETAILSMINNESOTA 2020 IRC - 115 MPH ULTIMATE 3-SEC GUST 19669 HARBOR DRIVE, ROSEMOUNT, MN 55068STONE COTTAGE CONSTRUCTIONAL TML TML
1/8" = 1'-0"05/31/2024
FR-02-
6/3/2024
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Signed:___________________________________
Print Name:_______________________________
Date:____________License Number:___________54690
Tim M. Lipasek BYDESCRIPTIONDATEREVISIONS---------------------COPYRIGHT, 2005, DPIS ENGINEERING, LLC.DPIS ENGINEERING,LLC.19450 STATE HIGHWAY 249HOUSTON, TEXAS 77070PH: 281.351.0048 FAX: 281.351.0148SECTION:LOT:BLOCK:UNAUTHORIZED USE OR REPRODUCTION OF THIS DRAWING MAY BE AN INFRINGMENT OF THE FEDERAL COPYRIGHT ACT. THIS DRAWING IS PROTECTED UNDER THE FEDERAL COPYRIGHT ACT BY DPIS ENGINEERING, LLC.DRAWN:DESIGNED:CHECKED:CUSTOMER:SUBDIVISION / ADDRESS:PROJECT TITLE:DRAWING SCALE:ISSUE DATE:
DRAWING NUMBER:WALL BRACING NOTES & DETAILSMINNESOTA 2020 IRC - 115 MPH ULTIMATE 3-SEC GUST 19669 HARBOR DRIVE, ROSEMOUNT, MN 55068STONE COTTAGE CONSTRUCTIONAL TML TML
1/8" = 1'-0"05/31/2024
FR-03-
6/3/2024
I hereby certify that this plan, specification or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
Signed:___________________________________
Print Name:_______________________________
Date:____________License Number:___________54690
Tim M. Lipasek BYDESCRIPTIONDATEREVISIONS---------------------COPYRIGHT, 2005, DPIS ENGINEERING, LLC.DPIS ENGINEERING,LLC.19450 STATE HIGHWAY 249HOUSTON, TEXAS 77070PH: 281.351.0048 FAX: 281.351.0148SECTION:LOT:BLOCK:UNAUTHORIZED USE OR REPRODUCTION OF THIS DRAWING MAY BE AN INFRINGMENT OF THE FEDERAL COPYRIGHT ACT. THIS DRAWING IS PROTECTED UNDER THE FEDERAL COPYRIGHT ACT BY DPIS ENGINEERING, LLC.DRAWN:DESIGNED:CHECKED:CUSTOMER:SUBDIVISION / ADDRESS:PROJECT TITLE:DRAWING SCALE:ISSUE DATE:
DRAWING NUMBER:WALL BRACING NOTES & DETAILSMINNESOTA 2020 IRC - 115 MPH ULTIMATE 3-SEC GUST 19669 HARBOR DRIVE, ROSEMOUNT, MN 55068STONE COTTAGE CONSTRUCTIONAL TML TML
1/8" = 1'-0"05/31/2024
FR-03.1-
Stone Cottage
HVAC Load Calculations
for
Beard
19669 Harbor Dr
Lakeville,mn
Prepared By:
Randy Andrews
Lofgren Heating
5708 Upper 147th Street West
Apple Vallley, MN 55124
Tuesday, May 21, 2024
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Stone Cottage
Project Date:Tuesday, May 21, 2024
Client Name:Beard
Client Address:19669 Harbor Dr
Client City:Lakeville,mn
Company Name:Lofgren Heating
Company Representative:Randy Andrews
Company Address:5708 Upper 147th Street West
Company City:Apple Vallley, MN 55124
Company E-Mail Address:rrandrews@lofgrenheating-ac.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces Northeast
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,273 CFM Per Square ft.:0.315
Square ft. of Room Area:4,041 Square ft. Per Ton:1,413
Volume (ft³) of Cond. Space:36,369
Building Loads
Total Heating Required Including Ventilation Air:55,212 Btuh 55.212 MBH
Total Sensible Gain:27,517 Btuh 80 %
Total Latent Gain:6,804 Btuh 20 %
Total Cooling Required Including Ventilation Air:34,321 Btuh 2.86 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 3
Miscellaneous Report
System 1 Whole House
Input Data
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Outdoor
Rel.Hum
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29.27
Duct Sizing Inputs
Main Trunk Runouts
Calculate:Yes Yes
Use Schedule:No No
Roughness Factor:0.00300 0.01000
Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft.
Minimum Velocity:650 ft./min 450 ft./min
Maximum Velocity:900 ft./min 750 ft./min
Minimum Height:8 in.6 in.
Maximum Height:10 in.6 in.
Outside Air Data
Winter Summer
Infiltration Specified:0.250 AC/hr 0.130 AC/hr
115 CFM 60 CFM
Infiltration Actual:0.250 AC/hr 0.130 AC/hr
Above Grade Volume:Cu.ft.Cu.ft.X 27,532 X 27,532
6,883 Cu.ft./hr 3,579 Cu.ft./hr
X 0.0167 X 0.0167
Total Building Infiltration:115 CFM 60 CFM
Total Building Ventilation:140 CFM 70 CFM
---System 1---
Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference)
Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference)
Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference)
Winter Infiltration Specified:0.250 AC/hr (115 CFM), Construction: Unknown
Summer Infiltration Specified:0.130 AC/hr (60 CFM), Construction: Unknown
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 4
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.86 1,413 4,041 27,517 6,804 34,321 55,212 1,055 1,273 1,273
System 1 No 2.86 1,413 4,041 27,517 6,804 34,321 55,212 1,055 1,273 1,273 21x10
Ventilation 340 1,352 1,692 4,550
Zone 1 4,041 27,177 5,452 32,629 50,662 1,055 1,273 1,273 21x10
1-Main Level 1,278 11,088 1,905 12,993 18,361 382 519 519 6--6
2-Upper Level 1,485 14,214 2,530 16,744 21,671 451 666 666 8--6
3-Lower Level 1,278 1,875 1,017 2,892 10,630 221 88 88 1--6
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 5
Duct Size Preview
Room or
Duct Name
Minimum
Velocity
Maximum
Velocity
Rough.
Factor
Design
L/100
Actual
L/100
SP
Loss
Duct
Velocity
Duct
Length Htg
Flow
Clg
Flow
Act.
Flow
Duct
Size
System 1
Supply Runouts
Zone 1
1-Main Level 450 750 0 0.1 0.1 440.9 382 519 519 6--6
2-Upper Level 450 750 0 0.1 0.1 423.9 451 666 666 8--6
3-Lower Level 450 750 0 0.1 0.1 447.4 221 88 88 1--6
Other Ducts
Supply Main Trunk 650 900 0 0.1 0.1 873.1 1,055 1,273 1,273 21x10
SummarySummarySummarySummarySummarySummarySummarySummary
System 1
Heating Flow:1055
Cooling Flow:1273
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 6
System 1 - Whole House - Adequate Exposure Diversity Test
Test For Adequate Exposure Diversity
Average Glass
Sensible Gain
Over 12 Hours
1.3 x Average
Glass Gain
Hourly Glass Gain Hourly Total Net
GainHeat Gain, Btuh34.2% Diff. from Avg. (509 Btuh Excursion)
0
10,000
20,000
30,000
40,000
8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm
AED Calculation Summary
--- SYSTEM DOES NOT HAVE ADEQUATE EXPOSURE DIVERSITY. ---
System is on NE, SE, SW, NW rosette.
Peak load exceeds 12-hour average load by 34.2%.
AED Excursion (amount by which peak exceeds 1.3 x average): 509 Btuh
Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not
exceed the average glass load for the entire conditioned space by more than 30 percent.
(System Concept Warning for excursion greater than 1.3 x baseline and less than 1.5 x baseline) This application has
glass areas that produced relatively large heat gains for part of the day. Variable air volume devices may be required to
overcome spikes in solar gain for one or more rooms. A zoned system may be required, or some rooms may require zone
control (provided by individual, motorized, thermostatically controlled dampers).
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 7
System 1 - Whole House - Psychrometric Chart
ZC Zone (Room) Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain
HRV Heat Recovery Ventilator
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 8
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
439 12,221 0 12,498 12,498
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2885 16,313 0 2,494 2,494
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1134 4,834 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1485 2,584 0 1,426 1,426
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1278 2,780 0 0 0
Subtotals for structure:40,010 0 16,770 16,770
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 115, Summer CFM: 60 10,652 1,152 828 1,980
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
AED Excursion:0 0 509 509
Total Building Load Totals:55,212 6,804 27,517 34,321
Check Figures
Total Building Supply CFM:1,273 CFM Per Square ft.:0.315
Square ft. of Room Area:4,041 Square ft. Per Ton:1,413
Volume (ft³) of Cond. Space:36,369
Building Loads
Total Heating Required Including Ventilation Air:55,212 Btuh 55.212 MBH
Total Sensible Gain:27,517 Btuh 80 %
Total Latent Gain:6,804 Btuh 20 %
Total Cooling Required Including Ventilation Air:34,321 Btuh 2.86 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 9
Building Pie Chart
Building
Loss
55,212
Btuh
Floor 5%Roof 5%
Wall 38%
Glass 22%
Door 2%
Infiltration 19%
Ventilation 8%
Building
Gain
34,321
Btuh
Roof 4%
Wall 7%
Glass 36%
Door 1%People 11%
Equipment 28%
Infiltration 6%
Ventilation 5%AED Excursion 1%
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 10
Building Bar Graph
Building
Loss
55,212
Btuh
0
5,000
10,000
15,000
20,000
25,000
Floor 5%Wall 38%Door 2%Ventilation 8%
Roof 5%Glass 22%Infiltration 19%
Building
Gain
34,321
Btuh
0
5,000
10,000
15,000
Roof 4%Glass 36%People 11%Infiltration 6%AED Excursion 1%
Wall 7%Door 1%Equipment 28%Ventilation 5%
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 11
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
439 12,221 0 12,498 12,498
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2885 16,313 0 2,494 2,494
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1134 4,834 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1485 2,584 0 1,426 1,426
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1278 2,780 0 0 0
Subtotals for structure:40,010 0 16,770 16,770
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 115, Summer CFM: 60 10,652 1,152 828 1,980
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
AED Excursion:0 0 509 509
System 1 Whole House Load Totals:55,212 6,804 27,517 34,321
Check Figures
Supply CFM:1,273 CFM Per Square ft.:0.315
Square ft. of Room Area:4,041 Square ft. Per Ton:1,413
Volume (ft³) of Cond. Space:36,369
System Loads
Total Heating Required Including Ventilation Air:55,212 Btuh 55.212 MBH
Total Sensible Gain:27,517 Btuh 80 %
Total Latent Gain:6,804 Btuh 20 %
Total Cooling Required Including Ventilation Air:34,321 Btuh 2.86 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 12
System 1 Whole House Pie Chart
System
1 Whole
House
Loss
55,212
Btuh
Floor 5%Roof 5%
Wall 38%
Glass 22%
Door 2%
Infiltration 19%
Ventilation 8%
System
1 Whole
House
Gain
34,321
Btuh
Roof 4%
Wall 7%
Glass 36%
Door 1%People 11%
Equipment 28%
Infiltration 6%
Ventilation 5%AED Excursion 1%
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 13
System 1 Whole House Bar Graph
System
1 Whole
House
Loss
55,212
Btuh
0
5,000
10,000
15,000
20,000
25,000
Floor 5%Wall 38%Door 2%Ventilation 8%
Roof 5%Glass 22%Infiltration 19%
System
1 Whole
House
Gain
34,321
Btuh
0
5,000
10,000
15,000
Roof 4%Glass 36%People 11%Infiltration 6%AED Excursion 1%
Wall 7%Door 1%Equipment 28%Ventilation 5%
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 14
System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms)
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
439 12,221 0 12,498 12,498
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2885 16,313 0 2,494 2,494
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
1134 4,834 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1485 2,584 0 1,426 1,426
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1278 2,780 0 0 0
Subtotals for structure:40,010 0 16,770 16,770
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 115, Summer CFM: 60 10,652 1,152 828 1,980
System 1, Zone 1 Load Totals:50,662 5,452 27,177 32,629
Check Figures
Supply CFM:1,273 CFM Per Square ft.:0.315
Square ft. of Room Area:4,041 Square ft. Per Ton:1,486
Volume (ft³) of Cond. Space:36,369
Zone Loads
Total Heating Required:50,662 Btuh 50.662 MBH
Total Sensible Gain:27,177 Btuh 83 %
Total Latent Gain:5,452 Btuh 17 %
Total Cooling Required:32,629 Btuh 2.72 Tons (Based On Sensible + Latent)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 15
System 1, Zone 1 Pie Chart
System
1, Zone
1
Loss
50,662
Btuh
Floor 5%
Roof 5%
Wall 42%
Glass 24%
Door 3%
Infiltration 21%
System
1, Zone
1
Gain
32,629
Btuh
Roof 4%
Wall 8%
Glass 38%
Door 1%People 12%
Equipment 29%
Infiltration 6%AED Excursion 2%
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 16
System 1, Zone 1 Bar Graph
System
1, Zone
1
Loss
50,662
Btuh
0
5,000
10,000
15,000
20,000
25,000
Floor 5%Wall 42%Door 3%
Roof 5%Glass 24%Infiltration 21%
System
1, Zone
1
Gain
32,629
Btuh
0
5,000
10,000
15,000
Roof 4%Glass 38%People 12%Infiltration 6%
Wall 8%Door 1%Equipment 29%AED Excursion 2%
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 17
Detailed Room Loads - Room 1 - Main Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,278.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,278.0 sq.ft.Supply Air:519 CFM
Ceiling Height:9.0 ft.Supply Air Changes:2.7 AC/hr
Volume:11,502.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:6 Actual Winter Vent.:51 CFM
Runout Air:87 CFM Percent of Supply.:10 %
Runout Duct Size:6 in.Actual Summer Vent.:29 CFM
Runout Air Velocity:441 ft./min.Percent of Supply:5 %
Runout Air Velocity:441 ft./min.Actual Winter Infil.:50 CFM
Actual Loss:0.122 in.wg./100 ft.Actual Summer Infil.:26 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
SE-Wall-12F-0sw 38 X 9 309 0.065 5.7 1,747 0.9 0 267
NW-Wall-12F-0sw 38 X 9 332 0.065 5.7 1,877 0.9 0 287
SW-Wall-12F-0sw 44 X 9 290 0.065 5.7 1,640 0.9 0 251
NE-Wall-12F-0sw 44 X 9 309 0.065 5.7 1,747 0.9 0 267
NE-Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
NE-Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
SE-Gls-4A-1a-o shgc-0.33 0%S 33 0.320 27.8 919 31.0 0 1,022
NW-Gls-4A-1a-o shgc-0.33 0%S 10 0.320 27.8 278 24.1 0 241
SW-Gls-4A-1a-o shgc-0.33 0%S 106 0.320 27.8 2,951 31.0 0 3,284
NE-Gls-4A-1a-o shgc-0.33 0%S 45 0.320 27.8 1,253 24.1 0 1,086
Subtotals for Structure:13,690 0 7,057
Infil.: Win.: 50.3, Sum.: 26.2 1,476 3.165 4,671 0.246 505 363
AED Excursion:208
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,000 3,000
Room Totals:18,361 1,905 11,088
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 18
Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,485.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,485.0 sq.ft.Supply Air:666 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.0 AC/hr
Volume:13,365.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:8 Actual Winter Vent.:60 CFM
Runout Air:83 CFM Percent of Supply.:9 %
Runout Duct Size:6 in.Actual Summer Vent.:37 CFM
Runout Air Velocity:424 ft./min.Percent of Supply:5 %
Runout Air Velocity:424 ft./min.Actual Winter Infil.:53 CFM
Actual Loss:0.113 in.wg./100 ft.Actual Summer Infil.:27 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
SE-Wall-12F-0sw 42 X 9 324 0.065 5.7 1,832 0.9 0 280
NW-Wall-12F-0sw 42 X 9 330 0.065 5.7 1,866 0.9 0 285
SW-Wall-12F-0sw 44 X 9 311 0.065 5.7 1,759 0.9 0 269
NE-Wall-12F-0sw 44 X 9 338 0.065 5.7 1,911 0.9 0 292
SE-Gls-4A-1a-o shgc-0.33 0%S 54 0.320 27.8 1,503 31.0 0 1,673
NW-Gls-4A-1a-o shgc-0.33 0%S 48 0.320 27.8 1,336 24.1 0 1,159
SW-Gls-4A-1a-o shgc-0.33 0%S 85 0.320 27.8 2,366 31.0 0 2,633
NE-Gls-4A-1a-o shgc-0.33 0%S 58 0.320 27.8 1,615 24.1 0 1,400
UP-Ceil-16B-50 1485 X 1 1485 0.020 1.7 2,584 1.0 0 1,426
Subtotals for Structure:16,772 0 9,417
Infil.: Win.: 52.8, Sum.: 27.4 1,548 3.165 4,899 0.246 530 381
AED Excursion:266
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 3,000
Room Totals:21,671 2,530 14,214
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 19
Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,278.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,278.0 sq.ft.Supply Air:88 CFM
Ceiling Height:9.0 ft.Supply Air Changes:0.5 AC/hr
Volume:11,502.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:1 Actual Winter Vent.:29 CFM
Runout Air:88 CFM Percent of Supply.:33 %
Runout Duct Size:6 in.Actual Summer Vent.:5 CFM
Runout Air Velocity:447 ft./min.Percent of Supply:5 %
Runout Air Velocity:447 ft./min.Actual Winter Infil.:12 CFM
Actual Loss:0.125 in.wg./100 ft.Actual Summer Infil.:6 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
SE-Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0
NW-Wall-12F-0sw 38 X 9 342 0.065 5.7 1,934 0.9 0 296
SW-Wall-15B0-10sf-10 44 X 9 396 0.049 4.3 1,688 0.0 0 0
NE-Wall-15B0-10sf-10 44 X 9 396 0.049 4.3 1,688 0.0 0 0
Floor-21A-24 1 X 1278 1278 0.025 2.2 2,780 0.0 0 0
Subtotals for Structure:9,548 0 296
Infil.: Win.: 11.7, Sum.: 6.1 342 3.164 1,082 0.246 117 84
AED Excursion:35
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:500 1,000
Room Totals:10,630 1,017 1,875
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 20
Room Cooling and Heating Loads Bar Graphs
Cooling
Heating
Btuh
Lower Level
Upper Level
Main Level
0 5,000 10,000 15,000 20,000 25,000
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 21
Room Cooling Loads Bar Graphs
Sensible
Latent
Btuh
Lower Level
Upper Level
Main Level
0 5,000 10,000 15,000 20,000
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 22
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Main Level 1,278 18,361 382 6-6 441 11,088 1,905 519 519
2 Upper Level 1,485 21,671 451 8-6 424 14,214 2,530 666 666
3 Lower Level 1,278 10,630 221 1-6 447 1,875 1,017 88 88
Ventilation 4,550 340 1,352
System 1 total 4,041 55,212 1,055 27,517 6,804 1,273 1,273
System 1 Main Trunk Size:21x10 in.
Velocity:873 ft./min
Loss per 100 ft.:0.112 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.86 80% / 20%27,517 6,804 34,321
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\19669 HARBOR LAKEVILLE 05212024.rhv Tuesday, May 21, 2024, 8:57 AM
Builders Associaton of Minnesota version 101014
Date Certificate Posted
x Passive (No Fan)
Active (With fan and monometer
or other system monitoring
Location (or future location) of Fan:
Other Please Describe Here
x
10/15 x x
x
20 x
20 x
21 x
49 x
x
x
x
x Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:Input in
BTUS:
70,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
x Passive
Low: Other, describe:
x Low:
Location of fan(s), describe: Cfm's
4" " round duct OR Flex
" metal duct
ML193UH070
Heating Loss
Manufacturer Lennox
Natural Gas
Output in
Tons:
3 Ton50
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Capacity continuous ventilation rate in cfms:
200CFM
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
27,517Residential Load Calculation
SEER
/EER
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Electric
Make-up Air Select a Type
AO Smith
Domestic Water
Heater
MECHANICAL SYSTEMS
Rating or Size
Efficiency 13 Seer
Building envelope air tightness:
Rim Joist (1st Floor)
GPVL-50 13ACXN042-230 Model
Heating System
Natrual Gas
Lennox Fiberglass, Batts Foundation Wall
R-value
Average U-Factor (excludes skylights and one door) U:
Duct system air tightness:
Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply
Mineral Fiberboard Insulation Location
Foam, Closed Cell0.22
Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Non or Not ApplicableAttic
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Rim Joist (2nd Floor+)
0.30
Appliances
Mech Room
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
55,212
Heating Gain Cooling Load
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Place your
logo here
New Construction Energy Code Compliance Certificate
Name of Residential Contractor
Stone Cottage Construction Inc.
MN License Number
Lakeville19669 Harbor Dr
BC636874
City Mailing Address of the Dwelling or Dwelling Unit
Combustion Air Select a Type
Location of duct or system:
34,321
Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500
6/7/24 X
PM