Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA225091 - 17932 Headwaters Dr-Permit Pack
RESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ _____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ NAME OF APPLICANT (Please Print)DATE I HEREBY APPLY FOR PERMIT AND ACKNOWLEDGE THAT ALL INFORMATION ON THIS APPLICATION IS COMPLETE AND ACCURATE. THIS IS NOT A PERMIT AND WORK IS NOT TO COMMENCE UNTIL SUCH TIME A PERMIT IS ISSUED. ALL WORK WILL COMPLY WITH LAKEVILLE CITY CODE, THE MINNESOTA STATE BUILDING CODE, AND THE APPROVED PLANS. INTEREST EARNINGS ON ESCROW ACCOUNTS, IF ANY, WILL BE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. OFFICE PHONE #:_ OFFICE PHONE #:_ *Entering your name affirms your intent to comply with the statement above. * Submit Application To: permits@lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT CONDO REROOF RESIDE RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LOWER LEVEL FINISH ADDITION FOUNDATION ONLY MISCELLANEOUS DEMO APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: CITY BUILDING VALUATION: $ BUILDING PERMIT FEES $PERMIT FEE $PLAN CHECK $SURCHARGE $METRO SAC $CITY WATER HOOKUP UNIT $CITY SEWER HOOKUP UNIT $LANDSCAPE ESCROW $TREE ESCROW $MISC ESCROW $PLUMBING $MECHANICAL $SEWER WATER WATER METER PRESSURE REDUCING VALVE $OTHER $TOTAL METER SIZE PRESSURE REDUCING VALVE SEWER/WATER SEWER/WATER FINAL STREET DRAINTILE BUILDING INFORMATION TYPE OF CONSTRUCTION ZONING CODE EDITION FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP MECHANICAL AIR TEST FINAL ROUGH-IN PLUMBING FINAL ROUGH-IN INSULATION LATH DECK FOOTING FIREPLACE FOOTING FOUNDATION FRAMING PORCH FRAMING PORCH FOOTING POURED WALL SITE LOWER LEVEL FINAL OTHER DECK FRAMING LOWER LEVEL FRAMING LANDSCAPING DECK FINAL $ $ ACCESSORY BUILDING EGRESS WINDOW UNDERGROUND FIRST FLOORTOTAL3,074 SF1,481 SF--GARAGEBASEMENTFLOOR AREA FINISHED-758 SF1,481 SFUNFINISHED200 AMP SERVICEGARAGE LEFTSECOND FLOOR1,593 SF-SIDEWALK53 SFGARAGE SLABBASEMENT SLABFLATWORK SQUARE FOOTAGE1,374 SF828 SF2x4 INTERIOR WALLS2x6 INTERIOR WALLSSHEATHING - INSULATEDCONCRETE WALLSBRICK / BRICK LEDGE2x6 EXTERIOR WALL WITH 1/2"FUTURE FINISHWALL LEGEND-LOOKOUT BASEMENT - UNFINISHEDHIGHVIEW RIDGELOT 4, BLOCK 3 17932 HEADWATERS DRIVEBRAD & MOLLY FISHERLAKEVILLE, MN 55044HEADER HEIGHT SCHEDULEABC6'-11-1/4"8'-0"7'-6"D6'-11-3-8"E9'-6" OFF LANDINGF5'-0"G6'-6"2020 BUILDING CODE2020 ENERGY CODE16'-0"6'-312"2'-3316"4'-638"15'-414"4'-638"1'-434"1'-434"3'-6"2'-3316"9'-11 8" 3'-214"SHEETROCK6'-312"2'-3316"LINE OFLINE OFFIREPLACESHEETROCK4'-518"4'-8" 4'-8"2'-3316"FIREPLACE / ENTERTAINMENT CENTERSCALE: 1/4" = 1'-0"TILE1'-5"24x24 FIXED5'-218"24x24 FIXED6'-0"GreatRoomCARPETBEARING WALLGAS FIREPLACE1'-5"4'-978"6"LINE OF MANTLESCALE: 3/4" = 1'-0"COLUMN #4 - WOOD BASE -STRAIGHT3'-0"2x6 BLOCKINGLINE OF BOXT.O. RIM1x6 LP TRIM1'-10"2'-0"6x6 TREATED POST5/4 CEDAR DECKING1x6 LP TRIMLP PANELW/ CEDARMILL1'-2"LP BASE WITH STRAIGHTLP COLUMNS3/4" LP TRIM LAYEDFLAT x 5-1/2"1'-4"ALUMINUM SOFFITLP PANEL1x6 LP WRAPW/ CEDARMILL2'-0"12" CONC. PIERT.O. FTG.T.O. WALL6x6 POST2 X 10 DROPPEDHEADER2x8 DECK JOIST1x61x63/8" BEAD VULKEM CAULKINGALL 4 SIDES3/8" BEAD VULKEM CAULKINGALL 4 SIDES& BACK OF COLUMN1x3 LP TRIM ON FRONT1x2 ON EACH SIDE& BACK OF COLUMN1x3 LP TRIM ON FRONT1x2 ON EACH SIDEELEV. 107'-0"SIDEWALK 53 SFPorchGarage6'-0"8'-9"66FRAMERS - MAKE SURE THERE IS ICE & WATER SHIELD BEHIND PORCH FRAMERS - 1/2" SHEATHING SHOULD BE FLUSH WITH CONCRETE& DECK LEDGERSYOUNGFIELD SERIESEXTERIOR FOUNDATION INSULATION9'-0" TALL FOUNDATION WALLSSCALE: 1-1/2" = 1'-0"DUCT CHASE AT FLOOR TRUSS1A-11'-8" FLOOR TRUSS 3/4" SUB-FLOOR1-1/2" TOP CHORD8" x 8"DUCT1-1/2" SPRAY FOAM (R-10)1-1/2" BOTTOM CHORDFILL 20" FLOOR TRUSS WITHLOOSE FILL FIBERGLASS INSULATION9" = R-23 6" ROUND PIPECOUNTRY JOE HOMES YOUNGFIELD HOMES 22260 DODD BLVD. LAKEVILLE, MN 55044 PHONE (952) 469-4066 LLC. #BC6276701MAY 21, 2024Concept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode06/27/2024jnuetzman 18" RAKE END OVERHANG6"X6"X6" BRACKETS - BL24618" TRIM BOARD8" FRIEZE BOARD121012106"X6"X6" BRACKETS - BL246118" RAKE END OVERHANG1'-0"1'-0"12108:126.5:128:124:12BUMPED OUT SHED ROOF8'-5"1'-6"8" TRIM BOARD8" FRIEZE BOARD1'-6"BOARD - HARDIE PLANKBATTEN MUST BE 3" W/ TEXTURE8'-0"6" HARDIE FREEZE BD.6" HARDIE FRIEZE BD.BOX OUT GABLE 6"6'-2"2'-7"BOX OUT GABLE 6"1'-0"HARDIE SKIRT BOARDPITCH CHANGESHINGLES OVER 15# BUILDINGPAPER 15/32" OSB ROOF SHEATHING(ICE DAM EAVES2'-0"BOARD - HARDIE COLORPLUS PANELSBATTEN - HARDIE COLORPLUSBATTEN MUST BE 3" W/ TEXTURE6" WINDOW TRIMHARDIE COLORPLUSFASTEN SHEATHING TO HEADER WITH 8d COMMON ORGALVANIZED BOX NAILS IN 3" GRID PATTERN AS SHOWNON ATTACHED DETAILS.T.O. FTG.ELEV.100'8'-11 8"GARAGE WALLPLATE8'-5"SCALE: 1/4" = 1'-0"A-11FRONT ELEVATION - BFOR BRACED WALL REQUIREMENTSBOTH GARAGE PIERSUSE 1/2" OSB SHEATHINGWOOD DECKDOWN 7" FROM SUB-FLOORFRAME WOOD PORCH(6" AFTER DECKING)1ST FLRSUBFLOORELEV.110'-2-1/8"WALL PLATEELEV.119'-3-1/4"2ND FLRSUBFLOORELEV.120'-3-7/8"WALL PLATEELEV.128'-5"1ST FLRSUBFLOORELEV.110'-2-1/8"GARAGE SLAB2'-0 STONE RETURN9'-11 8"T.O. FND. WALLELEV.109'-0"9'-0" TALL FOUNDATION WALLSCOUNTRY JOE HOMES YOUNGFIELD HOMES 22260 DODD BLVD. LAKEVILLE, MN 55044 PHONE (952) 469-4066 LLC. #BC6276701MAY 21, 2024 A-2LEFT ELEVATION2SCALE: 1/8" = 1'-0"A-21REAR ELEVATIONSCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"RIGHT ELEVATION3A-21ST FLOORELEV. 110'-2-1/8"2ND FLRELEV.120'-3-7/8"9'-11 8"WALL PLATEELEV.119'-3 1/4"T.O. SLABELEV.100'-4"1ST FLOOR9'-11 8" 8'-0"T.O. SLABELEV.100'-4"VINYLLAPGAS F.P.VENT1'-6"1281281'-0"1'-0"8:12VINYLLAP1'-6"1'-0"8'-0"8:121'-0"8:12T.O.WALLELEV.103'-6"SCALE: 1/8" = 1'-0"ROOF PLAN A-241'-6"38'-0"TOP OF PLATEELEV.128'-5"1ST FLOORELEV. 110'-2-1/8"2ND FLRELEV.120'-3-7/8"WALL PLATEELEV.119'-3 1/4"T.O.WALLELEV.103'-6"TOP OF PLATEELEV.128'-5"1'-6"11 ROOF VENTS8:1210:128:12 10:128:1210:1210:121'-0"4:12 8:12 MATCH 8:128:12 1'-6"1'-6"6"1'-6"1'-6"1'-0"1'-0"1'-0"1'-6" 1'-6"1'-6"1'-6" 6.5:12 1'-0"1'-6"12810:1212MATCH128126.512810:121'-6"VINYLSIDING1'-6"1'-0"10:12128MATCH 10:121241'-6"6"COUNTRY JOE HOMES YOUNGFIELD HOMES 22260 DODD BLVD. LAKEVILLE, MN 55044 PHONE (952) 469-4066 LLC. #BC6276701MAY 21, 2024Secure door closed until deck isconstructed with a separate permit. 8'-0"18'-0"14'-0"18'-0" 8'-0"9'-1012"6'-10"7'-0"7'-0"DDDROPPED(3) 1-3/4" x 11-7/8" LVL6x6 GLU8'-112"11'-2"(2)9-1/2" LSL(3)9-1/2" LSL(2) 2x1060x42 SLIDER60x42 SLIDER90x42 SLIDERT.O. 8" CONC.T.O. FTG.EL. 103'-6"EL. 100'-0"D46'-0" 20'-0" 54'-0" 15'-11"15'-1014"7'-8" 12'-634"2'-6"6x6 GLU38'-0"FIRE RESISTANT FLOOR SYSTEMOR 1/2" GYPSUM WALL BOARDWITH 80 SQ. FEET UNPROTECTEDHOSEBIBFURN.MechanicalRoom4" CONC. SLAB294 SFFLR.DRN.SUMP28"30"FutureBath45 SF (FLOOR)BEARING WALLBEARING WALLT.O. 6" CURB8"x20" CONCRETEFOOTING - TYPICALT.O. FOOTINGELEV. 100'-0"T.O. 6" CURBUnexcavated4" CONC. SLABFutureFamily RoomFutureBedroom #534'-0"20'-0"6'-0" 5' BI-FOLD 24" LINEN 26'-0" 8" 7'-9"14'-4"HVAC SOFFITUP 15R@ 7-11/32"26'-0"8"2"11'-9" 2'-1134"10'-614"4'-614"3'-1012" 3'-1012"4'-2"SLOPE SLAB FOR DRAINAGE VARIEST.O. SLABT.O. 6" CURBT.O. 8" WALLT.O. FTG.T.O. 6" CURBT.O. 6" CURB2'-0"2'-412"16'-3" M.O.2'-412"2'-412"8'-3" M.O.2'-412"T.O. 2" LEDGET.O. FTG.21'-0"13'-0"1'-512"5'-1134" 4'-0"(2) 2x1048" VAN.4" DRAINTILE ATFOOTINGS ON EACHWALL AS MARKED2'-0"VOID3'-814"10'-614"4'-912"DROPPED5,000 LB. FOOTINGSTRENGTH MIX54'-0"SHOULD BE THEPORCH FOOTINGSSAME HEIGHT AS THEHOUSE FOOTINGSIF SOIL IS UNDISTURBEDMAKE FOOTINGS 42" DEEPStairs9'-614"T.O. FTG.T.O. 8" WALLEL. 100'-0"T.O. FTG.32"28"WATERHEATER2" BRICK LEDGEEL. 108'-4"36"x36"x12" FTG. PAD3x5 PSL(1) 1-3/4" x 11-7/8" LSL 30x30x12 FOOTINGSW/ (3) #5 BARS EACH DIRECTIONHELD 3" FROM BOTTOMHOSEBIBHVACCHASEABOVET.O. 8" WALLT.O. 6" CURB ALLOW FOR SEWER24" VOID TO 14'-4"(2) 1-3/4" x 11-7/8" LSL4'-6"HALF WALL1A-6EL. 108'-4"EL. 109'-0"EL. 109'-0"EL. 109'-0"EL. 109'-0"EL. 105'-0"T.O. FTG.EL. 108'-4"EL. 109'-0"EL. 105'-0"9'-0" TALL TYP. MAIN FOUNDATION WALLEL. 100'-0"EL. 109'-0"T.O. 8" WALL109'-0"6'-0" 6'-0"2x8 PORCH LEDGERP.T. 2x8 DECK JOISTS @ 16" O.C.12" CONC. PIERS1'-0" 5'-0" 4'-10"FTGS. TYP.24"x24"LINE OF PORCH ABOVE9'-4"9'-8"2'-0" 2'-0"12" CONC. PIERS5'-0" P.T. 2x8 DECK JOISTS @ 16" O.C.(3) 2x10(3) 2x101A-7BACKWATERVALVESSCDBEAM POCKET4" WIDE x 12-1/2" TALL 11-7/8" LSL JOISTS - SEE EWP PLAN FOR SPACING 11-7/8" LSL JOISTS - SEE EWP PLAN FOR SPACING 11-7/8" LSL JOISTS - SEE EWP PLAN FOR SPACING 6" CURB ON TOP OFFOOTINGS AT INTERIORBEARING WALLS (TYPICAL)TOP OF CURB FLUSH WITHTOP OF BASEMENT SLAB4" SLEEVE16" BELOW LEDGE48x34 FLOORDRAIN2x4 INTERIOR WALLS2x6 INTERIOR WALLSSHEATHING - INSULATEDCONCRETE WALLSBRICK / BRICK LEDGE2x6 EXTERIOR WALL WITH 1/2"FUTURE FINISHWALL LEGENDMIN. TREAD 10"STAIR REQUIREMENTSMAX. RISE 7-3/4"10"734"MIN. NOSING 3/4"MAX. NOSING 1-1/4"1-1/4"FINISHED ROOM SIZESBEDROOM #5MECHANICALBATH STAIRS TOTAL217 SF294 SF88 SF83 SF1,481 SFFAMILY ROOM799 SFHEADER HEIGHT SCHEDULEABC6'-11-1/4"8'-0"7'-6"D6'-11-3/8"SCALE: 1/8" = 1'-0"BASEMENT PLANA-31COUNTRY JOE HOMES YOUNGFIELD HOMES 22260 DODD BLVD. LAKEVILLE, MN 55044 PHONE (952) 469-4066 LLC. #BC627670UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.3.6666 2'-9316"10'-978"(2) 30"x66" MULLED48x78 FIXED CARPET WOOD DN 15RUP 16R11-7/8" TJI JOISTS - SEEEWP PLAN FOR SPACINGGarageINSULATE COMPLETEUPPER LEVELWALL LINEGreatRoomCARPETDiningRoomWOODFoyerWOODStudyCARPET20 MINUTE FIRERATED DOORRO0F TRUSSES@ 24" O.C.MONO TRUSSES @ 24" O.C.34'-0"28"6'-0"14'-4"7'-8" 38'-0"8'-0" 3'-1012"3'-912"18'-0"14'-0"18'-0"7'-0"7'-0"9'-1012"5'-2" 20'-0" 2'-6" 26'-0" 5'-8"GAS LINE5'-934"7'-012"5'-434"11'-3"20'-0"2A7NEWELPOSTBEARING WALL10'-6"2'-0" 3'-8"7'-8"HVAC20'-6"2'-6"16'-0"21'-0"2'-6"GIRDER TRUSS2'-6"2'-6"8'-0"13'-0"8'-0" 54'-0" 2'-0"(3) 14" LVL36" 5'-218"GAS FIREPLACE1'-5" 6'-0"4'-978"30x66 SH2-2x62-2x6(2) 2x1036x6636x662-2x6E2-2x636x66(2) 1-3/4x 9-1/2" LSLDROPPED11'-134"(2) 2x10(3) 1-3/4" x 14" LVLFLUSH(2) 2x10 OPENING32" SHEETROCK BBBBABR & S 4'-3"WINDOW SILLS MORE THAN 6'-0" ABOVEFINISHED GRADE (SURFACE BELOW) ORLESS THAN 36" FROM FINISHED FLOORSHALL REQUIRE A WINDOW OPENINGCONTROL DEVICE.NO I-JOIST ABOVE2x6 WALL 24x24 FIXED24x24" FIXED (2) 2x10RAILING TOLANDING4-2x64-2x654'-0"6'-0" 6'-0"5'-9"2A766 PorchWOOD9'-4"9'-8"1'-0"5'-0" 6'-0" 5'-0"4'-9"(2) 1-3/4"x7-1/4" LSL66(2) 1-3/4"x7-1/4" LSL8'-112"KitchenWOOD2'-3"4'-0"(+96")32"Stairs5'-434"4'-714"2'-0"2'-0"(+96")63" DRYWALL OPENING23'-7"9"50'-0"360 SERIES 11-7/8"@ 16" O.C.54x66 FIX30x66 SH4'- 0 " 2'-3"9'-634"2'-614" 4'-3"B60x24 FIX.13'-6"7'-414"(2)36x60 MULLED2'-0"9'-414"2'-0" 2'-4" 16'-0" 1'-0" 2'-0" (2) 2x10 (2) 2x10 (2) 1-3/4" x 11-7/8" LSL (2) 2x10(2) 2x10(2) 2x105x5 PSL(3) 20" LVL 3'-9" 3'-9"9'-10"11'-10" 16'-0"REF.2'-9"R & SFlex RoomCARPETMudRoomVINYLW.I.C.VINYLPwdr.BathWOOD26 SFFANPantryWOODDROP ZONELOCKERSROD & SHELF28"30"6'-334"4'-112"5'-334"4'-3"1'-1014"5'-214"32" 28"HallWOODHallWOOD12'-1014"2x4 WALL28"8'-2"CD5'-5" OPENING36" SHEETROCK (+96")BOTTOM OF GARAGEDOOR SHOULD BESET 4" DOWN FROMTOP OF POURED WALL1/2" SHEATHING - EXT.TYPICAL GARAGE WALL2x6 STUD WALLS @ 16" O.C. W/2x6 STUD WALLS @ 16" O.C. W/ (R=21)FIBERGLASS BATT INSULATION 4 MILPOLY VAPOR BARRIER & 1/2" GYP. BD.TYPICAL EXT. WALLINSIDE AND 1/2" SHEATHING - EXT.START SLAB AT TOPOF WALL AT BACK OFGARAGE4'-458"DW24"x 96"ISLANDTOP SIZE 99"x48" OVERHANG - SIDE PANELS 8'-0"4'-0"8'-3" 5'-238" TEMP.(2) 1-3/4"x11 7/8" LSL - CONT.16'x8' O.H. DOORPORTAL FRAME7'-012"5'-934"5'-5" 7'-358"5x5 PSL5x5 PSL30"30"9'-334"13'-514"PANEL ACCESSATTIC22x30 1A-61A-72'-41516"10'-412"4'-614"(1) 11-7/8" LSL10'-6"OPENING36" SHEETROCK (+96") 11-7/8" TJI JOISTS SEE EWP PLAN(2) 9-1/2" LSL8'x8 ' O.H. DOORGARAGE PLATE 8-1/8"LOWER THAN HOUSEPLATE.NO I-JOIST ABOVEOR BELOW WALLSS SHVAC CHASE5/8" TYPE "X" GYP.BD ON ALL WALLSADJACENT TO THE HOUSE EXTENDINGTO 2ND FLOOR PLATESEE TRUSS PLAN 20" FLR TRUSS GAS COOKTOPW/ VENT HOODWALLOVENCOMBOB(2) 2x1036x60 SH6'-0" X 8'-0" PATIO (2) 2x1024"24"WOODFORDSILLCOCKHOT/COLDPOT FILLER(2) 9-1/2" LSL(2) 9-1/2" LSLGIRDER TRUSS FLOORDRAIN2x4 INTERIOR WALLS2x6 INTERIOR WALLSSHEATHING - INSULATEDCONCRETE WALLSBRICK / BRICK LEDGE2x6 EXTERIOR WALL WITH 1/2"FUTURE FINISHMIN. TREAD 10"STAIR REQUIREMENTSMAX. RISE 7-3/4"10"734"MIN. NOSING 3/4"MAX. NOSING 1-1/4"1-1/4"FINISHED ROOM SIZESSTUDY - CARPETGREAT ROOM - CARPET144 SF246 SFKITCHEN/DINE/FOYER - WOOD522 SFMUD ROOM & W.I.C. - VINYL78 SFFLEX ROOM - CARPET150 SFBACK HALL - WOOD21 SFPOWDER BATH - WOOD26 SFSTAIRS - CARPET86 SFPANTRY & HALL - WOOD47 SFHEADER HEIGHT SCHEDULEABC6'-11-1/4"8'-0"7'-6"DE9'-6" OFF LANDINGF5'-0"6'-11-3/8"SCALE: 1/8" = 1'-0"FIRST FLOOR PLANA-41COUNTRY JOE HOMES YOUNGFIELD HOMES 22260 DODD BLVD. LAKEVILLE, MN 55044 PHONE (952) 469-4066 LLC. #BC6276701MAY 21, 2024BWPsAboveBWPsAbove-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.2.252.252.54.2577855PFHPFH653.15555.5LVL SECOND FLOOR PLAN1SCALE: 1/4" = 1'-0"A-5DN 16R36x60 TEMP.48"x48"FIXED(2) 36"x54" CASE-MULLEDLOWER LEVELWALL LINELOWER LEVELWALL LINERO0F TRUSSES @ 24" O.C.PrimaryBedroomCarpetPrimaryBathVINYL78 SF (FLR)W.I.C.CarpetBedroom #2CARPETBedroom #3CARPETBedroom #4CARPETHallwayCARPETR & SR & S 42"HIGH WALL W/W/WOOD CAPRO0F TRUSSES @ 24" O.C.30"30"28"16'-0"7'-7" 11'-11" 14'-5" 38'-0"8'-0"16'-0"10'-3"CENTERED ON RIDGE ABOVE10'-3"5'-812"5'-812"6'-11"4'-0"4'-0"1'-0" 26'-0" 16'-0"2'-6"2'-0"2A73'-91 2"3'-91 2"10'-614"5'-6"4'-334"20'-6"3'-134"2'-0"SAME HEIGHT AS PLATE (8'-1-1/8")(+8") STEP UP CEILING8'-9-1/8")2'-0"72"x36"SLIDE IN TUB(2) 2X10(3) 2X10(2) 2X10(2) 2X10(2) 2X103'-9"50'-0"36x60 TEMP.36x60 4'-612"4'-612"11'-934"2'-11"2'-7"13'-6"AAAAA36x60(2) 2X10TEMP.30"28"W.I.C.CarpetR & S7'-6"S12'-434"20'-0" 12'-21 4"5'-33 4" 2'-2"13'-10"7'-4"8'-11 4"7'-103 4"4'-234"11'-8"10'-414"4'-514"A36x60 (2) 2X10 A R & S8'-0"2'-6"30'-0"4'-614"3'-73 4" 5'-21 2"60"x34"30"3'-334"28"28"5'-1112"7'-312"GIRDER TRUSS(4) 2x6(4) 2x670" VANITYFAN28" 5'-2" 7'-111 2"4'-6"5'-312"LINEN2 8 "LaundryVINYL68 SF (FLR)WD28"LINEN48x34Junior SuiteBathVINYL40 SF (FLR)3'-312"6'-73 4" R & S LINE OFFLR. BELOWJack&JillVINYL81 SF (FLR)2'-11 2"CD28"2'-6" 28" PKT. 3'-5"60"x32"3'-312"3'-534"4'-312"2'-6"CD32"28"5'-101 4" 71 2"28"2 8 "(2) 36x60 MULLED(2) 9-1/2" LSLAWINDOW SILLS MORE THAN 6" ABOVEFINISHED GRADE (SURFACE BELOW) ORLESS THAN 36" FROM FINISHED FLOORSHALL REQUIRE A WINDOW OPENINGCONTROL DEVICE.7'-7"9'-314"11'-034"5'-312"3'-134"1A-66'-53 4"SSSSSSPANELACCESSATTIC22x30LINENCAB.30" 30"C.T. BASE8'-0" C.T. WALLSHALF WALL (+42)W/ GLASS PANEL28" GLS2x4 INTERIOR WALLS2x6 INTERIOR WALLSSHEATHING - INSULATEDCONCRETE WALLSBRICK / BRICK LEDGE2x6 EXTERIOR WALL WITH 1/2"FUTURE FINISHWALL LEGENDMIN. TREAD 10"STAIR REQUIREMENTSMAX. RISE 7-3/4"10"73 4"MIN. NOSING 3/4"MAX. NOSING 1-1/4"1-1/4"HEADER HEIGHT SCHEDULEABC6'-11-1/4"8'-0"7'-6"D6'-11-3/8"FINISHED ROOM SIZESPRIMARY BEDROOM - CARPETLAUNDRY - VINYLPRIMARY BATH - VINYL230 SF52 SF122 SFHALLWAY & LINEN - CARPET170 SFBEDROOM # 2 - CARPET163 SFBEDROOM # 4 - CARPET209 SFBEDROOM # 3 - CARPET181 SFJUNIOR SUITE BATH - VINYL58 SFPRIMARY W.I.C. - CARPET77 SFTHE TOTALS FOR FLOORING ARE ON FLOOR PLANJACK & JILL BATH - VINYL102 SFCOUNTRY JOE HOMES YOUNGFIELD HOMES 22260 DODD BLVD. LAKEVILLE, MN 55044 PHONE (952) 469-4066 LLC. #BC6276701MAY 21, 2024-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).5555662.52.52.52.52.5 SCALE: 1/4" = 1'-0"BUILDING SECTION A-618" x 20" CONC. FTG'S4" CONCRETE SLABTYPICAL11-7/8" LSL JOISTS @ 16" O.C.9'-0"T.O. 4" CURBELEV. 109'-0"BOTTOM OF ALL FOOTINGS TO BE 42" MINIMUMBELOW FINISH GRADE RESTING ON UNDISTURBED SOIL12101ST FLRSUBFLOORELEV.110'-2-1/8"8'-5"1'-0"1'-0"8'-21 8" 9'-101 8" 4'-113 8" 10'-134"8'-11 8"TYPICAL STAIR CONSTRUCTION NOTES:* 6'-10" MINIMUM HEADROOM* (3) 11-7/8" STAIR STRINGERS W/* 11" TREADS* PROVIDE 36" HIGH HANDRAILS & GUARD RAILS PER CODE.~ MINIMUM TREAD DEPTH 10" - MAX RISE 7-3/4"MINIMUM NOSING 34" MAX. NOSING 1-1/4"7'-105 8"StairsStairs5'-07 8"20" FLOOR TRUSSESHVAC SOFFITBEYOND7'-11 4"Bedroom # 3LoftFoyerGarage4" CONCRETE SLAB PITCHEDTOWARDS OVERHEAD DOORS5/8" TYPE X GYP. BRD.ON ALL COMMON WALLS &CEILINGS.MUD ALL JOINTS1/2" SHEATHING - EXT.TYPICAL GARAGE WALL2x6 STUD WALLS @ 16" O.C. W/R-49 ROOF INSULATIONTRUSSES @ 24" O.C.PRE-ENGINEERED ROOFR-49 ROOF INSULATIONTRUSSES @ 24" O.C.PRE-ENGINEERED ROOFBasement11-7/8" TJI JOISTS @ 16" O.C.9'-11 8" 5'-07 8"DROP GARAGE WALL 8-1/8"81 8"5,000 LB. FOOTINGSTRENGTH MIX2x8ELEV. 119'-3-1/4"ELEV. 120'-3-7/8"TOP OF PLATE2ND FLOORELEV. 110'-2-1/8"1ST FLOORELEV. 128'-5"2ND FLOOR CLG.9'-0" 3'-85 8" 9'-6"2x81'-6"1134"MIN. TREAD 10"STAIR REQUIREMENTSMAX. RISE 7-3/4"10"73 4"MIN. NOSING 3/4"MAX. NOSING 1-1/4"1-1/4"COUNTRY JOE HOMES YOUNGFIELD HOMES 22260 DODD BLVD. LAKEVILLE, MN 55044 PHONE (952) 469-4066 LLC. #BC6276701MAY 21, 2024 2x6 STUD WALLS @16" O.C. W/ (R-21) FIBERGLASS BATTINSULATION, 4 MIL POLYVAPOR BARRIER & 1/2"GYPSUM BOARD INSIDE 2x6 STUD WALLS @16" O.C. W/ (R-21) FIBERGLASS BATTINSULATION, 4 MIL POLYVAPOR BARRIER & 1/2"GYPSUM BOARD INSIDE BOISE RIM BOARD (EXTERIOR)1-1/8" OSB RIM BOARD(R-20)8'-118"9'-0" WALLS - (1) 2x6 TOP PLATE 4" CONCRETE SLAB8" x 20" CONC. FTG'SPLATE W/ SILL SEAL INSUL.PRESSURE TREATED 2x6 SILL9'-0"ELEV. 100'-0"TOP OF FOOTINGELEV. 119'-3-1/4"ELEV. 120'-3-7/8"TOP OF PLATE2ND FLOORTOP OF 8" CONC.ELEV. 109'-0"ELEV. 110'-2-1/8"1ST FLOOR9'-118"1178" 34" 34" 1178"ELEV. 128'-5"2ND FLOOR CLG.WATERPROOFING1) COAT EXTERIOR W/ POLYUREA WATER-8" THICK CONC. WALLSBOISE RIM BOARD1-1/8" OSB RIM BOARD11-7/8" TJI JOISTS @ 16" O.C.BLOCKING AT FOUNDATIONWALLS PARALLEL TO FRAMINGSEE DETAIL 3/A-7PROOFINGDUCTSPACEBLOCKBLOCKOR 1/2" SAG-RESISTANT5/8" TYPE "X" GYP. BD.R-49 ROOF INSULATIONPRE-ENGINEERED ROOFTRUSSES @ 24" O.C.OR 1/2" SAG-RESISTANT5/8" TYPE "X" GYP. BD.3/4" OSB FLOOR SHEATHING3/4" OSB FLOOR SHEATHINGMIN. 6" ENERGY HEALSEAL ALL JOINTS, CRACKS, OR OTHEROPENINGS WITH POLYURETHANE CAULKFOR RADON PROTECTION112"(R-20)5,000 LB. FOOTINGSTRENGTH MIXRIGID METAL FLASHING INSTALLED BY SIDERPROTECTION TO6" BELOW GRADE2) FOAM W/ POLYURETHANE (R-15)6 MIL POLY SLIP SHEET OVERFOAM PRIOR TO BACKFILLAS REQUIRED PER CITY3" EXTERIOR FOAM INSULATION ATLOOKOUT/WALKOUT SIDE WALLS. 2" FOAMAT FULL BASEMENT & 4' FROST FOOTINGS.GLUED AND NAILEDGLUED AND NAILEDBUILDING SECTION1A-7SCALE: 3/8" = 1'-0"MAINTAIN A MIN. CL.OF 6" FROM GRADETO BOTTOM OF SIDING1/2" ANCHOR BOLTS@ 6'-0" O.C. (8" EMBED.)1/2" EXTERIOR SHEATHINGTYPICAL UNLESS NOTEDOTHERWISE1/2" EXTERIOR SHEATHINGTYPICAL UNLESS NOTEDOTHERWISESHINGLES OVER 15#15/32" OSB ROOF SHEATHINGBUILDING PAPER(ICE DAM EAVESFIRE RESISTANT FLOOR SYSTEMOR 1/2" GYPSUM WALL BOARD WITH80 SQUARE FEET UNPROTECTED11-7/8" TJI JOISTS(FINISHED BASEMENT)11-7/8" LSL JOISTS(UNFINISHED BASEMENT)3) APPLY ABOVE GRADEFOUNDATION COATINGSCALE: 1/4" = 1'-0"PORCH SECTIONSCALE: 1/4" = 1'-0"PORCH SECTIONA-721'-6"9'-0"MATCH GARAGE PLATE HEIGHTWITH TOP OF PORCH BEAM 5'-0"COLUMN BEYONDSEE ELEVATIONSAND FLOOR PLAN1242'-3"VERIFY: FASCIA TOPLANE OUT WITHGARAGE FASCIA8'-118"FoyerCOVEREDPORCHMECH.ROOMBEDROOM #2TRUSSES @ 24" O.C.PRE-ENGINEERED ROOF6'-0"4 7 16"1'-6"COUNTRY JOE HOMES YOUNGFIELD HOMES 22260 DODD BLVD. LAKEVILLE, MN 55044 PHONE (952) 469-4066 LLC. #BC6276701MAY 21, 2024 ProductsPlotID Length Product Plies Net QtyTJI Blocking 14' 5 11/16" 11 7/8" TJI 210 joist 1 11-11.875" LVL-24' 24' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 1 13-11.875" LVL-14' 14' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 3 33x5 PSL 10' 0" 3 1/2" x 5 1/4" 1.8E Parallam PSL 1 1TS1 28' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 9TS2 24' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 7TS3 20' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 18TS4 16' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 212-11.875" LSL-12' 12' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 21-11.875" LSL-12' 12' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1Rim 16' 0" 1 1/8" x 11 7/8" TJ Rim Board 1 133-2x10 Trtd. 11' 0" 2 X 10 SP No.1 P 3 33-2x10 Trtd. 10' 0" 2 X 10 SP No.1 P 3 3Solid Blocking 1' 0" 5 1/2" x 11 7/8" CS Block 1 6Wall FramingPlotID Length Product Plies Net QtyTSHd1-3 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL3 3TSHd2-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 22TSHd3-2 4' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 22BBOHd1-2 6' 0" 2 x 10 SPF No.1/No.2 2 2 Start Joist Layout Here. 16" o/cFraming Connector SummaryPlotID Qty Manuf Product Face Nails Top Nails Member Nails Web StiffH1 1 Simpson HU9 18- 10dx1.5 - 6- 10dx1.5 NoH2 3 Simpson LUS210 8- 10dx1.5 - 4- 10d NoCSCSCSCSCSTSHd3-22-11.875" LSL-12'TS1TS1TS1RimRimRimRimRimRimRimRimRimRimRimTS1TS3TS3TS3TJI Blocking3-11.875" LVL-14'1-11.875" LVL-24'1' 5"1' 3"3x5 PSLTS31' 4"Solid BlockingSolid Blocking1-11.875" LSL-12'H13-2x10 Trtd.3-2x10 Trtd.TSHd2-2TJI BlockingBBOHd1-2TSHd1-3Solid BlockingSolid BlockingRimSolid BlockingSolid Blocking6x6 GlulamTS416" O.C.TS416" O.C.TS116" O.C.TS316" O.C.TS216" O.C.H22 Trimmers3 Trimmers6x6 Glulam6x6 GlulamCustomer:Job Name:Address/Lot:Youngfield HomesCrandall17932 Headwaters DriveCity, State:Lakeville, MNPlan/Model #:Watkins BJob Number:2399Lyman Lumber Company18900 West 78th StPO Box 130Chanhassen, MN(952) 470-4800Sheet:1of 3A complete Javelin™ framing plan requires the Framer's Pocket GuideSee the Framer's Pocket Guide for Product Trademark InformationDrawn By:Jeff D.Drawn Date:6/12/24Revised By:Revision Date:Revision #:SALES PRESENTATION DRAWING:NO STRUCTURAL OR DIMENSIONAL CHECK HAS BEEN PERFORMED ON THIS DRAWING. LYMAN LUMBER COMPANY IS ONLY RESPONSIBLE FOR INDIVIDUAL MEMBER DESIGN,BASED UPON THE ASSUMED VERTICAL LOADS. BUILDER IS RESPONSIBLE FOROVERALL DESIGN OF THE STRUCTURE AND IT IS STRONGLY RECOMMENDEDTHAT ALL DRAWINGS AND CALCULATIONS BE REVIEWED BY THEENGINEER OF RECORD FOR THIS PARTICULAR PROJECT.Lack of proper bracing during construction can result in serious accidents. Observe the following guidelines: 1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed. 2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also be accomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay. 3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist. Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker or one layer of unnailed sheathing. 5. Ends of cantilevers require safety bracing on both the top and bottom flanges. 6. The flanges must remain straight within 1/2" from true alignment. 4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system. WARNING NOTES: WARNING Joists are unstable until braced laterally Bracing Includes: Blocking Hangers Sheathing Rim Board Strut LinesRim Joist DO NOT stack building materials on unsheathed joists. Stack only over beams or walls. DO NOT walk on joists that are lying flat. DO NOT walk on joists until braced. INJURY MAY RESULT. Weyerhaeuser, iLevel®, Microllam®, Parallam®, Silent Floor®, TimberStrand®, TJI ®, TJ® and Trus Joist® are registered trademarks of Weyerhaeuser NR. © 2012 Weyerhaeuser NR Company. All rights reserved.Header Spans:Up to 4'-11" = 1 Trimmer5'-0" and Bigger = 2 Trimmers*** Unless Noted Otherwise *** Framing Connector SummaryPlotID Qty Manuf Product Face Nails Top Nails Member Nails Web StiffH1 1 Simpson IUS1.81/11.88 10- 10d common - 2- 10d x 1-1/2 NoH2 4 Simpson IUS2.06/11.88 10- 10d x 1-1/2 - - NoH3 1 Simpson IUS2.37/11.88 10- 10d x 1-1/2 - - NoH4 1 Simpson HGUS5.50/12 56- 10d - 20- 10d NoH5 10 Simpson IUS2.06/11.88 10- 10dx1.5 - 2- Strong-Grip NoProductsPlotID Length Product Plies Net QtyF20' 20' 0" 11 7/8" TJI 210 joist 1 25F16' 16' 0" 11 7/8" TJI 210 joist 1 14R38' 38' 0" 11 7/8" TJI 360 joist 1 73-20" LVL-26' 26' 0" 1 3/4" x 20" 2.0E Microllam LVL 333-14" LVL-14' 14' 0" 1 3/4" x 14" 2.0E Microllam LVL 361-11.875" LVL-24' 24' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 1 12-11.875" LSL-22' 22' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 21-11.875" LSL-12' 12' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 12-7.25" LSL-22' 22' 0" 1 3/4" x 7 1/4" 1.55E TimberStrand LSL 2 2Rim 16' 0" 1 1/8" x 11 7/8" TJ Rim Board 1 11Solid Blocking 1' 0" 5 1/2" x 11 7/8" CS Block 1 2Wall FramingPlotID Length Product Plies Net QtyTSHd1-2 12' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL2 2TSHd2-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL2 2TSHd3-2 8' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 24BBOHd1-2 6' 0" 2 x 12 SPF No.1/No.2 2 2BBOHd2-2 10' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd3-2 7' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd4-2 6' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd4-2 5' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd5-2 4' 0" 2 x 10 SPF No.1/No.2 2 6BBOHd5-2 3' 0" 2 x 10 SPF No.1/No.2 2 4 Start Joist Layout Here. 16" o/cCSCS1-11.875" LSL-12'1-11.875" LVL-24'2-11.875" LSL-22'2-7.25" LSL-22'RimRimRimRimRimRimRimRim3-14" LVL-14'RimRimTSHd3-2BBOHd5-2BBOHd5-2BBOHd4-2BBOHd4-23-20" LVL-26'3-14" LVL-14'1' 4"Roof Girder10820#BBOHd2-2BBOHd5-2H18"1' 3"TSHd3-2BBOHd5-2BBOHd1-2BBOHd3-2H31' 4"10"1' 0" 10"BBOHd5-2TSHd1-2Girder TrussRimTSHd2-2Solid BlockingSolid BlockingH4F16'16" O.C.F16'16" O.C.R38'16" O.C.H2H5F20'16" O.C.360 Series TJIs in this area4-2x64-2x64-2x64-2x64-2x6← Floor Trusses →6x6 Glulam3-2x66x6 GlulamCustomer:Job Name:Address/Lot:Youngfield HomesCrandall17932 Headwaters DriveCity, State:Lakeville, MNPlan/Model #:Watkins BJob Number:2399Lyman Lumber Company18900 West 78th StPO Box 130Chanhassen, MN(952) 470-4800Sheet:2of 3A complete Javelin™ framing plan requires the Framer's Pocket GuideSee the Framer's Pocket Guide for Product Trademark InformationDrawn By:Jeff D.Drawn Date:6/12/24Revised By:Revision Date:Revision #:SALES PRESENTATION DRAWING:NO STRUCTURAL OR DIMENSIONAL CHECK HAS BEEN PERFORMED ON THIS DRAWING. LYMAN LUMBER COMPANY IS ONLY RESPONSIBLE FOR INDIVIDUAL MEMBER DESIGN,BASED UPON THE ASSUMED VERTICAL LOADS. BUILDER IS RESPONSIBLE FOROVERALL DESIGN OF THE STRUCTURE AND IT IS STRONGLY RECOMMENDEDTHAT ALL DRAWINGS AND CALCULATIONS BE REVIEWED BY THEENGINEER OF RECORD FOR THIS PARTICULAR PROJECT.Lack of proper bracing during construction can result in serious accidents. Observe the following guidelines: 1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed. 2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also be accomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay. 3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist. Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker or one layer of unnailed sheathing. 5. Ends of cantilevers require safety bracing on both the top and bottom flanges. 6. The flanges must remain straight within 1/2" from true alignment. 4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system. WARNING NOTES: WARNING Joists are unstable until braced laterally Bracing Includes: Blocking Hangers Sheathing Rim Board Strut LinesRim Joist DO NOT stack building materials on unsheathed joists. Stack only over beams or walls. DO NOT walk on joists that are lying flat. DO NOT walk on joists until braced. INJURY MAY RESULT. Weyerhaeuser, iLevel®, Microllam®, Parallam®, Silent Floor®, TimberStrand®, TJI®, TJ® and Trus Joist® are registered trademarks of Weyerhaeuser NR. © 2012 Weyerhaeuser NR Company. All rights reserved.Header Spans:Up to 4'-11" = 1 Trimmer5'-0" and Bigger = 2 Trimmers*** Unless Noted Otherwise *** Wall FramingPlotID Length Product Plies Net QtyBBOHd1-3 7' 0" 2 x 10 SPF No.1/No.2 3 6BBOHd2-2 5' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd3-2 4' 0" 2 x 10 SPF No.1/No.2 2 10BBOHd3-2BBOHd3-2BBOHd3-2BBOHd2-2BBOHd3-2BBOHd3-2BBOHd1-3Girder TrussBBOHd1-32 Trimmers4-2x64-2x6Customer:Job Name:Address/Lot:Youngfield HomesCrandall17932 Headwaters DriveCity, State:Lakeville, MNPlan/Model #:Watkins BJob Number:2399Lyman Lumber Company18900 West 78th StPO Box 130Chanhassen, MN(952) 470-4800Sheet:3of 3A complete Javelin™ framing plan requires the Framer's Pocket GuideSee the Framer's Pocket Guide for Product Trademark InformationDrawn By:Jeff D.Drawn Date:6/12/24Revised By:Revision Date:Revision #:SALES PRESENTATION DRAWING:NO STRUCTURAL OR DIMENSIONAL CHECK HAS BEEN PERFORMED ON THIS DRAWING. LYMAN LUMBER COMPANY IS ONLY RESPONSIBLE FOR INDIVIDUAL MEMBER DESIGN,BASED UPON THE ASSUMED VERTICAL LOADS. BUILDER IS RESPONSIBLE FOROVERALL DESIGN OF THE STRUCTURE AND IT IS STRONGLY RECOMMENDEDTHAT ALL DRAWINGS AND CALCULATIONS BE REVIEWED BY THEENGINEER OF RECORD FOR THIS PARTICULAR PROJECT.Lack of proper bracing during construction can result in serious accidents. Observe the following guidelines: 1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed. 2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also be accomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay. 3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist. Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker or one layer of unnailed sheathing. 5. Ends of cantilevers require safety bracing on both the top and bottom flanges. 6. The flanges must remain straight within 1/2" from true alignment. 4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system. WARNING NOTES: WARNING Joists are unstable until braced laterally Bracing Includes: Blocking Hangers Sheathing Rim Board Strut LinesRim Joist DO NOT stack building materials on unsheathed joists. Stack only over beams or walls. DO NOT walk on joists that are lying flat. DO NOT walk on joists until braced. INJURY MAY RESULT. Weyerhaeuser, iLevel®, Microllam®, Parallam®, Silent Floor®, TimberStrand®, TJI ®, TJ® and Trus Joist® are registered trademarks of Weyerhaeuser NR. © 2012 Weyerhaeuser NR Company. All rights reserved.Header Spans:Up to 4'-11" = 1 Trimmer5'-0" and Bigger = 2 Trimmers*** Unless Noted Otherwise *** ©DescriptionDateRevisionProject Number:Date:S11Sheets: of1Print Name:Signed: License Number:Garrett Brunell52600Date:I hereby certify that this plan, specification or reportwas prepared by me or under my direct supervisionand that I am a duly Licensed Professional Engineerunder the laws of the State of Minnesota.Youngfield Homes, Inc.22260 Dodd BoulevardLakeville, MN 550445851 Cedar Lake RoadSuite 202St. Louis Park, MN 55416Tel 612-708-3572www.hansongroupmn.comPLANS SHOWN LIGHT IN BACKGROUND ARE FORLOCATION REFERENCE ONLY. PLAN NOTES ANDELEMENTS SHOWN LIGHT MAY NOT NECESSARILYSUPPORT THE HANSON GROUP'S DESIGN.S1FRAMING DETAILGARAGE FRONT PORTAL FRAME4NOTEINFO APPLIES SYMMETRICALLY ACROSS DETAIL.POST-INSTALLED HOLDOWN OPTION5S1FRAMING DETAILBRACEDWALL LINE(4-FT)(4-FT)(4-FT)BRACED WALL LINE(6-FT)(4-FT)BRACED WALL LINE (6-FT)(3.66-FT)UPPER LEVEL HOUSE PLAN SHOWNFOR LOCATION REFERENCE ONLY3S1REFERENCE PLANPARTIAL LOWER LEVEL HOUSE PLANSHOWN FOR LOCATION REFERENCE ONLY1S1REFERENCE PLANMAIN LEVEL HOUSE PLAN SHOWNFOR LOCATION REFERENCE ONLY2S1REFERENCE PLANFisher Residence17932 Headwaters DriveLakeville, MN16'-3"±9'-718"±FASTEN TOP PLATE TO HEADER w/ (2)ROWS 16d SINKER NAILS @ 3" O.C.(1) 2x6 BEARING STUD & (1) 2x6 FULLHEIGHT STUD EACH END OF HEADERLOCATE PANEL JOINT WITHIN 2'-0" FROMCENTER OF HEADER HEIGHT AS REQ'D (2xSOLID BLOCKING REQUIRED AT SHEATHINGJOINT)(2) 2x6 BEARING STUDS MIN.(VERIFY w/ SUPPLIER)PROVIDE 2x6 INFILL WALL ABOVE HEADER AS REQ'DSIMPSON STHD14 EMBEDDED HOLDOWNANCHOR AT LOCATIONS SHOWN(REFER TO 5/S1 FOR ALTERNATIVE OPTIONS)FOUNDATION WALL BELOWLENGTH OF CONTINUOUS HEADER(2) 58" Ø ANCHOR BOLTS (7" MIN. EMBED)w/ 2" x 2" x 316" PLATE WASHERSNAIL SHEATHING TO HEADER w/ 8dNAILS @ 3" O.C. EA. WAY TYP.SMALL HATCH AREA INDICATES 716" ORTHICKER PLYWOOD OR OSB SHEATHINGAPPLIED TO EXTERIOR SIDE OF STUDS(NAIL SHEATHING AROUND PERIMETER w/ (2)ROWS 8d NAILS @ 3" O.C. STAGGERED & TOPLATES / BLOCKING @ 3" O.C.)SIMPSON MSTC40 STRAP ON INSIDE FACEOF WALL (PROVIDE SPACER TO FLUSHOUT HEADER TO WALL STUD THICKNESS)FASTEN KING STUD TO HEADER w/(2) ROWS 16d SINKER NAILS @ 3" O.C.LARGE HATCH AREA INDICATES 716" ORTHICKER PLYWOOD OR OSB SHEATHINGAPPLIED TO EXTERIOR SIDE OF STUDSw/ STANDARD 6"/12" NAILINGPROVIDE FASTENING OF ABOVE FRAMING EQUALTO THAT DETAILED FOR BRACED WALL PANELSCONTINUOUS LSL/LVL HEADER TOSUPPORT VERTICAL LOADS BY SUPPLIER(MIN.312" WIDTH & MIN.1114" DEPTH REQ'D)2'-412"±2'-412"±CONCRETEFOUNDATIONBELOWSIMPSON HTT5HOLDOWN ANCHOR ATLOCATIONS SHOWN w/12"Ø x 12" LONGSIMPSON TITEN HDSCREW-IN ANCHORCOPYRIGHT HANSON GROUP, LLC 2024THIS SHEET/S REPRESENTS A COMPLETE DESIGN OF THE "MAIN WINDFORCE RESISTING SYSTEM" FOR THE ENTIRERESIDENTIAL STRUCTURE. THE LOCATION AND LENGTH OF EACH BRACED WALL PANEL AND ENGINEERED WINDRESISTING ELEMENT THAT IS REQUIRED FOR THE HANSON GROUP'S DESIGN IS SHOWN ON THE STRUCTURALDRAWINGS. WALLS NOT SPECIFICALLY LABELED ON THE PLANS MAY BE STANDARD FRAMING.SECTIONS SHOWN DEPICT CONNECTIONS OF BRACED WALL PANELS TOROOF TRUSSES ABOVE, TO JOISTS/TRUSSES/BLOCKING ABOVE, AND TOJOISTS/TRUSSES/BLOCKING BELOW. THESE PANELS ARE NOT NECESSARILYREQUIRED TO ALIGN, BUT MAY DEPENDING ON PLAN LAYOUT.ROOFTRUSSESBRACEDWALL PANELFLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)SIMPSONA35FRAMINGANGLEEACH END(4) 0.131"Øx 3" NAILSPROVIDE 12" WIDTH WEBSTIFFENER FOR ATTACHMENTOF FRAMING ANGLEBRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONA35FRAMINGANGLEEACH ENDFLOORJOISTSPROVIDE 12" WIDTH WEBSTIFFENER FOR ATTACHMENTOF FRAMING ANGLEBRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONA35FRAMINGANGLEEACH ENDFLOORJOISTSBRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONLTP4FRAMINGPLATEEACH ENDFLOORTRUSSESFLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)FLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)FLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)BRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONLTP4FRAMINGPLATEEACH ENDFLOORTRUSSESFLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)BRACED WALL CONNECTIONBRACED WALL CONNECTIONBRACED WALL CONNECTION(ROOF TRUSSES)(FLOOR JOISTS)(FLOOR TRUSSES)DETAILS SHOWN ABOVE AREALTERNATIVE CONNECTIONS TO BEUSED WHEN BRACED WALL PANELDOES NOT ALIGN WITH FRAMING.EXTERIOR NON-BEARING WALLFRAME 2x4 BOXAROUND SPACEBETWEEN TRUSS w/SAME SHEATHINGAND FASTENING ASWALL BELOW(OR REPLACE w/ADEQUATE DEPTH2x MEMBER)#12 x 312" WOODSCREWS @ 16" O.C.INSTALLED INADDITION TO NAILS(MAIN/UPPERLEVEL ROOFTRUSS BEARINGWALLS ONLY)#12 x 312" WOODSCREWS @ 16" O.C.INSTALLED INADDITION TO NAILS(MAIN/UPPERLEVEL ROOFTRUSS BEARINGWALLS ONLY)EXTERIOR BEARING WALLREPRESENTSFIGURER602.10.8.2(3)INDICATES INTERIOR BRACED WALL PANEL w/ GYPSUMSHEATHING BOTH FACES WITH EITHER FASTENER OPTIONLISTED IN NOTE 3, SPACED AT 4" O.C. PROVIDE INCREASEDFASTENING REQUIREMENTS AS SHOWN BELOW.INDICATES ENGINEERED WIND RESISTING ELEMENTS TOBE CONSTRUCTED AS SHOWN IN THE DETAIL SHEETS.(MIN. LENGTH)INDICATES EXTERIOR BRACED WALL PANEL w/ SHEATHING ONEXTERIOR FACE IN ACCORDANCE w/ NOTE 2. PROVIDEINCREASED FASTENING REQUIREMENTS AS SHOWN BELOW.(MIN. LENGTH)w/ JOISTSw/ TRUSSESw/ JOISTSw/ TRUSSESw/ JOISTSw/ TRUSSESw/ JOISTSw/ TRUSSESROOF TRUSSESFASTENED TO PLATESw/ (4) 0.131"Ø x 3"TOENAILS & SIMPSONH2.5 CLIPNAIL BOTTOM PLATETO RIM/JOIST/BLOCKING w/ (3) 16dNAILS EVERY 16"NAIL BOTTOM PLATETO RIBBON BRACE /TRUSS w/ (3) 16dNAILS EVERY 16"NAIL EACH JOIST TOTOP PLATES w/ (3)0.131"Ø x 3" NAILS2x4 BLOCKINGBETWEENTRUSSES NAILEDTO TOP PLATESw/ (3) 0.131"Ø x 3"NAILS EACHNAIL EACH TRUSS TOTOP PLATES w/ (3)0.131"Ø x 3" TOENAILSROOF TRUSSFASTENED TOPLATES w/0.131"Ø x 3"TOENAILS@ 6" O.C.NAIL BOTTOMPLATE TO RIM/JOIST/BLOCKINGw/ (3) 16d NAILSEVERY 16"NAIL RIM TOPPLATES w/0.131"Ø x 3"TOENAILS@ 6" O.C.NAIL BOTTOMPLATE TO LADDERTRUSS w/ (3) 16dNAILS EVERY 16"NAIL LADDERTRUSS TO TOPPLATES w/0.131"Ø x 3"NAILS @ 6" O.C.INTERIOR WALLPERPENDICULAR TO FRAMINGINTERIOR WALLPARALLEL w/ FRAMING2x4 BLOCKING BETWEENROOF TRUSSES NAILEDTO TOP PLATES w/ (3)0.131"Ø x 3" NAILS EACHNAIL BOTTOM PLATE TOBLOCKING w/ (3) 16dNAILS EVERY 16"PROVIDE FULL DEPTHBLOCKING BETWEEN JOISTSNAILED TO TOP PLATES w/(3) 0.131"Ø x 3" NAILS EACHNAIL EACH JOIST TO TOPPLATE w/ (3) 0.131"Ø x 3" NAILSNAIL BOTTOM PLATE TOBLOCKING w/ (3) 16dNAILS EVERY 16"PROVIDE FULL DEPTHBLOCKING BETWEEN TRUSSESNAILED TO TOP PLATES w/(3) 0.131"Ø x 3" NAILS EACHNAIL EACH TRUSS TO TOP PLATEw/ (3) 0.131"Ø x 3" TOENAILSPROVIDE ROOF TRUSSDIRECTLY IN LINE w/BRACED WALL PANELFASTENED TO PLATESw/ 0.131"Ø x 3"TOENAILS @ 6" O.C.NAIL BOTTOM PLATETO BLOCKING w/ (3)16d NAILS EVERY 16"PROVIDE JOIST DIRECTLYIN LINE w/ BRACED WALLPANEL FASTENED TOPLATES w/ 0.131"Ø x 3"TOENAILS @ 6" O.C.NAIL BOTTOM PLATETO BLOCKING w/ (3)16d NAILS EVERY 16"PROVIDE TRUSS DIRECTLYIN LINE w/ BRACED WALLPANEL FASTENED TOPLATES w/ 0.131"Ø x 3"TOENAILS @ 6" O.C.MATERIALSWALL STUDS (10' OR LESS):SPF STUD GRADE OR BETTERWALL STUDS (OVER 10'):SPF NO.2 GRADE OR BETTERDIMENSIONAL LUMBER:SPF NO.2 GRADE OR BETTERTREATED LUMBER:SYP NO.2 GRADE OR BETTERLSL:134" WIDTH - 1.55E OR BETTERLVL:134" WIDTH - 1.9E OR BETTERLOADSROOF SNOW LOAD: 35 PSFROOF DEAD LOAD: 15 PSFFLOOR LIVE LOAD: 40 PSFFLOOR DEAD LOAD: 15 PSFWIND LOAD:115 MPH ULTIMATE EXP. BCODE2020 MINNESOTA RESIDENTIAL CODESCOPEDESIGN AND DETAIL OF THE MAIN WINDFORCE RESISTING SYSTEM FOR A SINGLE-FAMILY RESIDENCE. CONSTRUCTION ISTO BE IN ACCORDANCE WITH THIS DOCUMENT, STANDARD INDUSTRY PRACTICE, AND THE CODE.NOTES1.THESE DOCUMENTS APPLY TO STRUCTURAL ONLY. REFER TO CONSTRUCTION DOCUMENTS FOR MORE INFORMATION.2.ALL EXTERIOR WALLS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA, U.N.O., WHICHMEETS OR EXCEEDS THE REQUIREMENTS OF CODE SECTION R602.10.4-WSP AND CS-WSP.A.2x6 STUDS SPACED @ 16" O.C.B.EXTERIOR SHEATHING: 716" MIN. STRUCTURAL PANEL SHEATHING w/ 8d COMMON NAILS @ 6" O.C AT PANEL EDGESAND 12" O.C. AT INTERMEDIATE SUPPORTS OR 134" 16 GAUGE STAPLES @ 3" / 6" SPACING.3.ALL INTERIOR WALLS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA, U.N.O.A.2x4 OR 2x6 STUDS SPACED @ 16" O.C.B.WALL SHEATHING: 12" MIN. GYPSUM SHEATHING FASTENED TO FRAMING w/ 5d COOLER NAILS @ 8" O.C. MAX. ORTYPE S/W WALLBOARD SCREWS @ 16" O.C. MAX. (58" MINIMUM STUD PENETRATION)4.ALL FLOORS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA.A.FLOOR FRAMING SPACED AT A MAXIMUM OF 24" O.C.B.FLOOR SHEATHING: 34" STRUCTURAL PANEL SHEATHING w/ 8d COMMON NAILS @ 6" O.C AT PANEL EDGES AND 12"O.C. AT INTERMEDIATE SUPPORTS.5.ALL ROOFS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA.A.ROOF FRAMING SPACED AT A MAXIMUM OF 24" O.C.B.FASTEN ALL ROOF FRAMING TO TOP PLATES WITH SIMPSON H2.5 CLIP OR EQUIVALENT AND (4) 0.131"Ø x 3"TOENAILS.C.ROOF SHEATHING: 12" STRUCTURAL PANEL SHEATHING w/ 8d COMMON NAILS @ 6" O.C AT PANEL EDGES AND 12"O.C. AT INTERMEDIATE SUPPORTS OR 134" 16 GAUGE STAPLES @ 3" / 6" SPACING.6.ALONG LENGTH OF WALLS, LAP WALL TOP PLATES A MINIMUM OF 24" AND FASTEN TOGETHER WITH (12) 0.131"Ø x 3" INLAP ZONE. AT CORNERS AND INTERSECTIONS, LAP PLATES AND PROVIDE (3) 0.131"Ø x 3" FACE NAILS.7.CONNECTIONS NOT SPECIFICALLY NOTED ARE TO BE IN ACCORDANCE WITH CODE TABLE R602.3(1).8.TALL WOOD WALL FRAMING IS TO BE DESIGNED BY SUPPLIER FOR GRAVITY AND OUT-OF-PLANE WIND LOADS.9.THE ENTRY PORCH IS CONSIDERED TO BE A PRIMARILY OPEN, NON-ESSENTIAL PORTION OF THE STRUCTURE AND ISEXCLUDED FROM THE OVERALL MAIN WINDFORCE SYSTEM OF THE HOME. PROVIDE CODE REQUIRED UPLIFTCONNECTIONS AT ALL POSTS AND TENSION CONNECTIONS AT LEDGERS.June 4, 20244.2476-4-24BRACED WALL LINE BRACEDWALL LINE BRACED WALL LINE BRACEDWALL LINEBRACEDWALL LINEBRACEDWALL LINE(4-FT)(4-FT)(4-FT)(6-FT)(6-FT) (5-FT)(5-FT) (5-FT)(5-FT)(2.5-FT)BRACED WALL LINE BRACED WALL LINE BRACED WALL LINE BRACEDWALL LINEBRACEDWALL LINEBRACEDWALL LINE(4.25-FT)(5-FT)(5-FT) (5-FT)(5-FT) (7-FT)(2.25-FT)(2.25-FT)(2.5-FT)(5.5-FT)(4-FT)(4-FT)(4-FT)(8-FT)ONE-SIDE(5-FT)CONSTRUCTPORTAL FRAMEAS SHOWN IN 4/S1(6-FT)(5-FT)(3.1-FT)(7-FT)(2.5-FT)(2.5-FT)(2.5-FT)(2.5-FT)(4-FT) Print Name: Signed: Nick Hanson I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. License Number:1-1-24 46665Date: SCOPE OF DRAWINGS: THESE CAST-IN-PLACE CONCRETE FOUNDATION WALL GUIDELINE DRAWINGS ARE PREPARED AND CERTIFIED BY THE HANSON GROUP IN COMPLIANCE WITH THE MINNESOTA RESIDENTIAL CODE. THESE DRAWINGS CONTAIN STRUCTURAL INFORMATION FOR USE IN THE CONSTRUCTION OF STANDARD C.I.P. CONCRETE FOUNDATIONS FOR TYPICAL RESIDENTIAL CONDITIONS. THIS INFORMATION IS RELEVANT TO THE CONCRETE CONTRACTOR, THE GENERAL CONTRACTOR, AND THE FRAMING CONTRACTOR. THESE DRAWINGS EXPIRE ON DECEMBER 31, 2024. 2024 FOUNDATION GUIDE: DRAWING INDEX: SCOPE, INDEX, & CERTIFICATION S0 USE GUIDELINES AND MATERIALS S1 GENERAL NOTES S2 STEP FOOTING DETAIL S3 WALKOUT WALL DETAIL S4 LOOKOUT/KNEE WALL DETAIL S5 EXTERIOR LOW GRADE FOUNDATION DETAIL S6 BASEMENT WALL DETAIL S7 BASEMENT WALL VERTICAL REINFORCING TABLE S8 BRICK LEDGE DETAILS S9 FLOOR MEMBER BEARING DETAIL AND CONNECTION TABLE S10 BASEMENT WALL ANCHOR SPACING TABLE S11 NON-BEARING WALL JOIST BLOCKING DETAIL S12 NON-BEARING WALL TRUSS BLOCKING DETAIL S13 WINDOW WELL DETAIL S14 STEPPING DOWN WALL WITH GRADE S15 COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 150 4.001 January 1, 2024 S0 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS SCOPE, INDEX, & CERTIFICATION Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake RoadSuite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 DRAWING USE GUIDELINES AND LIMITATIONS THE CONTRACTOR LISTED IN THE TITLE BLOCK BELOW IS LICENSED BY THE HANSON GROUP TO USE THIS PACKET WITHIN THESE LIMITATIONS NOTED FOR PROJECTS WHICH THE LICENSEE IS DIRECTLY RESPONSIBLE. THE LICENSEE MAY RELEASE THIS PACKET TO ITS SUB-CONTRACTORS AND CLIENTS FOR USE IN THE PROCUREMENT OF BUILDING PERMITS FOR PROJECTS WHICH THE LICENSEE IS USING THESE DRAWINGS. THE FOUNDATION GUIDELINES ARE TO BE ISSUED TO THE APPROPRIATE BUILDING DEPARTMENT IN ACCORDANCE WITH THEIR APPROVED PROCEDURE FOR USE BY THE BUILDING AGENCY DURING PLAN REVIEW AND INSPECTIONS. LIMITATIONS 1. BASEMENT FOUNDATION WALLS TEN FOOT OR LESS IN CLEAR HEIGHT (FROM TOP OF FLOOR SLAB TO TOP OF CONCRETE WALL AT SILL PLATE BEARING-NOT NECESSARILY BASEMENT CEILING HEIGHT). 2. STRUCTURE HEIGHT IS NOT TO EXCEED TWO STORIES ABOVE THE BASEMENT. 3. OVERALL BUILDING IS ASSUMED TO FALL WITHIN THE PRESCRIPTIVE LIMITATIONS OF THE CODE. A SITE SPECIFIC PLAN REVIEW HAS NOT BEEN PERFORMED. 4. STRUCTURES CONSTRUCTED OF WOOD FLOOR, WOOD ROOF, AND WOOD WALLS ONLY. NO PRECAST OR STRUCTURAL CONCRETE BEARING ON FOUNDATION WALLS IS PERMITTED. 5. EXTERIOR GRADE SLOPING DOWN AND AWAY FROM THE FOUNDATION WALLS. 6. ANY CASE BEYOND THE ABOVE NOTED ITEMS REQUIRES SEPARATE AND SPECIFIC STRUCTURAL ENGINEERING DOCUMENTS. COLD WEATHER GUIDELINES: 1. THE CONTRACTOR AND CONCRETE SUPPLIER ARE TO WORK TO OBTAIN A MIX DESIGN WHICH WILL ADEQUATELY PERFORM UNDER THE EXPECTED CONSTRUCTION CONDITIONS. THE USE OF ADDITIONAL CEMENT, HIGH-EARLY STRENGTH CONCRETE, AND/OR ACCELERATOR IS RECOMMENDED AT TEMPERATURES AND CONDITIONS EXPECTED LESS THAN TWENTY DEGREES F. 2. DELIVER CONCRETE WARM AND IN A TIMELY MANNER. PLACE CONCRETE EARLY IN THE DAY WHEN POSSIBLE. 3. DO NOT ADD ADDITIONAL WATER TO THE CONCRETE. THE USE OF WATER REDUCING AGENTS IS RECOMMENDED WHEN WORKABILITY CONCERNS EXIST. NO CONCRETE IS TO BE PLACED ON SNOW OR IN CONTACT WITH FROZEN MATERIALS. 4. REBAR DOES NOT NEED TO BE PRE-HEATED, BUT IS TO BE FREE OF FROST, SNOW, AND ICE. 5. BLANKETS OR OTHER ACCEPTED PROTECTION IS HIGHLY RECOMMENDED FOR THE TOP 24" OF THE WALLS WHEN THE AIR TEMPERATURE IS LESS THAN TEN DEGREES F AND FOR THE FULL HEIGHT OF THE WALL WHEN THE AIR TEMPERATURE IS LESS THAN ZERO DEGREES F. **THE ABOVE COLD WEATHER GUIDELINES ARE GENERAL RECOMMENDATIONS AND ALL ACI COLD WEATHER REQUIREMENTS ARE TO BE FOLLOWED AT THE RESPONSIBILITY OF THE LICENSEE. MATERIALS CONCRETE WALLS: F'c = 3000 PSI @ 28 DAYS MIX DESIGN AND PROPORTIONED BY CONCRETE SUPPLIER CONCRETE FOOTINGS: F'c = 5000 PSI @ 28 DAYS (OR 3000 PSI WITH AN APPROVED ADMIXTURE THAT PROVIDES A WATER AND VAPOR RESISTANCE AT LEAST OR EQUIVALENT TO 5000 PSI CONCRETE. AGGREGATE: FOOTINGS - 1 12" MAX. WALLS/SLABS - 34" MAX. REINFORCING STEEL: #4- BARS - ASTM A615 GRADE 40 #5+ BARS - ASTM A615 GRADE 60 TREATED SILL PLATE: SYP GRADE #2 OR BETTER ALLOWABLE SOIL BEARING PRESSURE 1,500 PSF MINIMUM EQUIVALENT REBAR TABLE FOR BUNDLED HORIZONTAL BARS (2)#4 = (1)#6 (3)#4 = (2)#5 (3)#5 = (2)#6 COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 151 4.001 January 1, 2024 S1 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS DRAWING LIMITATIONS & MATERIALS Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake RoadSuite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 GENERAL NOTES 1. DO NOT BACKFILL BASEMENT WALLS UNTIL THE CONCRETE HAS REACHED A MINIMUM COMPRESSIVE STRENGTH OF 2,250 PSI. IN ADDITION, DO NOT BACKFILL UNTIL THE BASEMENT WALLS ARE LATERALLY SUPPORTED BY THE FINAL INSTALLED FLOOR CONSTRUCTION AT THE TOP AND BOTTOM, UNLESS ADEQUATE SHORING IS INSTALLED AS REQUIRED. SHORING IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 2. STRIP FOOTING MAY BE PLACED AT ELEVATIONS LOWER THAN SHOWN IN THE DETAILS. 3. 1 12" DEEP BY 312" WIDE BY CONTINUOUS KEYWAYS MAY BE USED IN LIEU OF DOWELS FOR FULL HEIGHT AND FROST WALLS. 4. STRIP FOOTING TO WALL CENTERLINES MAY BE OFFSET UP TO 2", HOWEVER, A MINIMUM OF 2" OF STRIP FOOTING IS TO EXTEND BEYOND THE WALL FACE ON EACH SIDE. 5. PROVIDE CODE REQUIRED FROST PROTECTION TO THE BOTTOM OF ALL FOOTINGS. 6. SLOPE GRADE DOWN AND AWAY FROM THE STRUCTURE A MINIMUM OF 6" WITHIN THE FIRST TEN FEET UNLESS ADEQUATE DRAINAGE OR SWALES ARE PROVIDED. 7. BOTH MATERIALS AND INSTALLATION OF DRAIN TILE, WATER-PROOFING, CONTROL JOINTS, FLASHING, AND INSULATION ARE TO BE IN ACCORDANCE WITH THE CODE BY THE GENERAL CONTRACTOR, UNLESS NOTED OTHERWISE. 8. ALL WALL WIDTHS SHOWN ARE NOMINAL DIMENSIONS, UNLESS NOTED OTHERWISE. OVERALL WALL THICKNESS MAY VARY BY UP TO 12" FROM THAT SHOWN ON THE DRAWINGS. 9. REINFORCING PLACEMENT TOLERANCE IS NOT TO EXCEED 12". BARS BEING SPLICED ARE TO BE WITHIN 2" OFCENTERLINE. MINIMUM SPLICE LENGTHS ARE 30 BAR DIAMETERS FOR GRADE 40 STEEL AND 48 BAR DIAMETERS FOR GRADE 60 STEEL. TYING IS NOT REQUIRED PROVIDED THESE TOLERANCES ARE MET. 10.PROVIDE MATCHING HOOK BARS FOR ALL HORIZONTAL BARS AT WALL CORNERS AND INTERSECTIONS. HORIZONTAL BARS MAY BE PLACED ANYWHERE WITHIN THE WALL AS LONG AS A 2" MINIMUM CLEAR COVER IS ACHIEVED ON ALL SIDES. 11.REINFORCING MAY BE BUNDLED UP TO A MAXIMUM OF THREE BARS. 12.DOWELS MAY BE DRILLED AND GROUTED IN PLACE. VERTICAL BARS AND DOWELS DO NOT NEED TO ALIGN. VERTICAL BARS MAY BE DRILLED AND EMBEDDED 5" INTO THE STRIP FOOTING IN LIEU OF DOWELS. 13.THE BOND BETWEEN CONCRETE AND REINFORCING WILL NOT BE APPRECIABLY REDUCED IF VERY MINOR FORM OIL IS PRESENT FOR THE CONDITIONS CONTAINED WITHIN THESE DRAWINGS. 14.SILL PLATES ARE TO BE ANCHORED WITH A MINIMUM OF TWO ANCHORS PER SILL SECTION. ALL SECTIONS ARE TO HAVE AN ANCHOR WITHIN 4" TO 12" OF EACH END. AN ANCHOR IS TO BE PLACED AT ALL WALL CORNERS AND INTERSECTIONS ON WALLS MORE THAN TWO FEET IN LENGTH. WALLS TWO FEET OR LESS IN LENGTH REQUIRE A MINIMUM OF ONE ANCHOR. REQUIREMENTS FOR SHEAR WALLS AND BRACED PANELS MAY BE IN EXCESS OF THESE REQUIREMENTS. TWO INCH WASHERS ARE ONLY REQUIRED AT FULL HEIGHT FOUNDATION WALLS. BUILDING DESIGNER IS TO ACCOMMODATE LOAD PATH FOR ANY VERTICAL LOAD TRANSFER OVER A SILL PLATE OVERHANG CONDITION. 15.ANCHOR BOLTS 12" DIAMETER OR LARGER ARE NOT REQUIRED TO BE CORROSION PROTECTED INACCORDANCE WITH CODE SECTION R317.3.1 EXCEPTION 1. 16.ALL PRE-MANUFACTURED FASTENERS AND CONNECTORS ARE TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS. 17.FLOOR BLOCKING IS ONLY REQUIRED AT FULL HEIGHT FIRST FLOOR NON-BEARING FOUNDATION WALLS. 18.CARE IS TO BE TAKEN DURING CONCRETE PLACEMENT TO MINIMIZE INADEQUATE HORIZONTAL AND DIAGONAL COLD JOINTS, AND TO PREVENT THESE JOINTS ENTIRELY IN WALLS WITHOUT VERTICAL REINFORCEMENT. ADEQUATELY VIBRATE CONCRETE AT POTENTIAL JOINT LOCATIONS AS REQUIRED, BASED ON PLACEMENT CONDITIONS TO ELIMINATE HONEYCOMBING AND TO ENSURE SUFFICIENT BONDING IS ACHIEVED. 19.TOP AND BOTTOM OF FOUNDATION WALLS ARE TO BE LATERALLY SUPPORTED PRIOR TO BACKFILLING. MEANS AND METHODS OF LATERAL SUPPORT ARE BY OTHERS. 20.THESE DRAWINGS ARE INTENDED TO BE A LIMITED COMPONENT DESIGN TO RESIST LATERAL SOIL PRESSURES FOR SINGLE FAMILY RESIDENCES. VERTICAL LOADS AND FOOTING DESIGNS ARE TO BE THE RESPONSIBILITY OF THE BUILDING DESIGNER. NO SUPPLEMENTAL ENGINEERING OR COMPONENT DESIGN FOR THE FOUNDATION SYSTEM SHALL BE INCLUDED WITH THIS PACKET WITHOUT THE PRIOR REVIEW AND CONSENT OF THE HANSON GROUP. COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 152 4.001 January 1, 2024 S2 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS GENERAL NOTES Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com & T G Y U % Q P E T G V G + P E 21$QZ 5JCMQRGG/0 (2) #4 HORIZONTAL BARS BOTH TOP & BOTTOM EXTENDED AT LEAST 24" BEYOND EACH END OF STEP STABLE BANK HIGH FOOTING MAY BE EXTENDED PROVIDED BARS ARE PLACED AS SHOWN HORIZ. BARS TOP & BOTTOM 6" MIN THICK CONCRETE FOUNDATION, SEE OTHER DETAILS FOR MORE INFO OPTIONAL CONTROL JOINT AT EACH END OF STEP 72" MAX SPAN EQ.EQ.24" MINDETAIL B 3" MIN TYPCONCRETE STRIP FOOTING 11B DETAIL A 36" MIN STEP 2 x STEP STEPNOTE: DO NOT LOCATE CONCENTRATED LOADS IN EXCESS OF 2,000 PLF OR 10,000 POUNDS ABOVE STEP LOCATIONS SHOWN REAR FROST WALL LOOKOUT WALL FULL HEIGHT WALL GARAGE FROST WALL ELEVATION SHOWN FOR REPRESENTATION PURPOSES ONLY -MAY NOT APPLYELEVATION STEP SPACING REQUIREMENTS A TYP. COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 153 4.001 January 1, 2024 S3 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS STEP FOOTING DETAIL Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 6" MIN. WOOD FRAMING ABOVE BY OTHERS12"Ø x 10" LONG ANCHORBOLTS (7" MIN. EMBED) @ 72" O.C. MAX. OR EQUIVALENT METAL STRAP ANCHORS SLOPE GRADE AWAY FROM FOUNDATION OPTIONAL STEM WALL MINIMUM THICKNESS TO MATCH SILL PLATE SILL PLATE TO MATCH FRAME WALL ABOVE 16" MAX FOR 4" THICK STEM 24" MAX. FOR 6" THICK STEM SLAB-ON-GRADE BY OTHERS (1) #4 x CONTINUOUS HORIZONTAL BAR AT TOP OF WALL 6" MIN. C.I.P. CONCRETE FOUNDATION WALL UNREINFORCED CONCRETE STRIP FOOTING SEE S7 #4x2'-0" DOWELS @ 72" O.C. MAX (5" MIN. EMBED) DOWELS ARE NOT REQUIRED IF BACKFILL IS PLACED EQUALLY ON BOTH SIDES IN LIFTS NOT TO EXCEED 24"-ALTERNATE EACH SIDE COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 154 4.001 January 1, 2024 S4 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS WALKOUT WALL DETAIL Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 6" MIN.3'-0" MAX GRADE HEIGHTABOVE TOP OF SLAB#4 x 2'-0" DOWELS (5" MIN. EMBED) CENTERED IN WALL @ 48" O.C. (SAND SOIL) OR 36" O.C. (SANDY-CLAY SOIL) OR 24" O.C. (CLAY SOIL) DOWELS MUST BE WET SET OR DRILLED AND EPOXY GROUTED 6" MIN. THICK C.I.P. CONCRETE FOUNDATION WALL SLOPE GRADE AWAY FROM FOUNDATION 12"Ø x 10" LONG ANCHORBOLTS (7" MIN. EMBED) @ 72" O.C. MAX. OR EQUIVALENT METAL STRAP ANCHORS (1) #4 x CONT HORIZONTAL BAR AT TOP OF WALL FRAMING & SILL PLATE BY OTHERS SLAB-ON-GRADE BY OTHERS UNREINFORCED CONCRETE STRIP FOOTING SEE S7 (18" MIN WIDTH FOR CLAY BACKFILL OR 16" MIN WIDTH IF 2'-6" MAX UNBALANCED BACKFILL) COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 155 4.001 January 1, 2024 S5 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS LOOKOUT/KNEE WALL DETAIL Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 6'-0" MAXWOOD FRAMING ABOVE BY OTHERS 12"Ø x 10" LONG ANCHORBOLTS (7" MIN. EMBED) @ 72" O.C. MAX. OR EQUIVALENT METAL STRAP ANCHORS SLOPE GRADE AWAY FROM FOUNDATION AT A GRADUAL 2% SLOPE PER GENERAL NOTE 6 SILL PLATE TO MATCH FRAME WALL ABOVE #4 x CONTINUOUS HORIZONTAL BARS @ 24" O.C. TYP. OPTIONAL 2" RIGID INSULATION ON INSIDE FACE AND UNDER SLAB-ON-GRADE FOR 24" MIN. UNREINFORCED CONCRETE STRIP FOOTING SEE S7 (DROP FOR FROST AS REQUIRED PER SITE DESIGN) #4x2'-0" DOWELS @ 48" O.C. MAX (5" MIN. EMBED) (1) #4 x CONTINUOUS HORIZONTAL BAR AT TOP OF WALL OPTIONAL SLAB LEDGE CONCRETE SLAB-ON-GRADE 8" MIN. C.I.P. CONCRETE FOUNDATION WALL #4 x 5'-0" HOOKS @ 24" O.C. EMBEDDED IN FOUNDATION WALL & CAST INTO SLAB (MAY REDUCE 2'-0" LEG LENGTH & DRILL IN & EPOXY 8" MIN. INTO FOUNDATION WALL) 3'-0"NO HOOKS @ 3'-0" OR LESSGRANULAR MATERIAL (SAND) DETAIL ABOVE MAY ONLY BE UTILIZED FOR A LENGTH OF 15'-0" #5 VERTICAL BARS @ 24" O.C. CENTERED IN WALL TO AID IN THE REDUCTION OF CRACKING AND BACKFILLING ISSUES PRIOR TO TOP OF WALL PINNING CONTRACTOR IS TO PROVIDE TEMPORARY TOP OF WALL BRACING UNTIL GARAGE SLAB-ON-GRADE IS IN PLACE (HOOKS INTO GARAGE SLAB PROVIDE REQUIRED TOP OF WALL LATERAL SUPPORT)2'-0" COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 156 4.001 January 1, 2024 S6 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS UNBALANCED FOUNDATION DETAIL Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 6" MIN. CLEAR HEIGHTBACKFILL HEIGHT112" CLEAR UNREINFORCED CONCRETE STRIP FOOTING PER CODE OR BY BUILDING DESIGNER, AS AN ALTERNATIVE GUIDE USE TABLE SHOWN BELOW 8" MIN. C.I.P. CONCRETE FOUNDATION WALL-SEE REBAR TABLE S8 FOR VERTICAL REBAR ANCHOR BOLTS SEE WALL ANCHOR INFO ON S11 FLOOR TO SILL CONNECTION SEE S10 WOOD FLOOR SYSTEM BY OTHERS SLOPE GRADE AWAY FROM FOUNDATION 2x6 MIN SILL PLATE CLEAR HEIGHT OF 8'-0" OR LESS (2)#4xCONT. HORIZONTAL BARS CLEAR HEIGHT OF 8'-0" OR MORE (3)#4xCONT. HORIZONTAL BARS CONCRETE SLAB-ON-GRADE PLACED TIGHT TO FOUNDATION WALL #4x2'-0" DOWELS @ 72" O.C. MAX (5" MIN. EMBED) GENERAL STRIP FOOTING SIZE GUIDE SOIL ONE-STORY STRUCTURE TWO-STORY STRUCTURE 2000 PSF 16" WIDE x 8" THICK 20" WIDE x 8" THICK 1500 PSF 20" WIDE x 8" THICK 26" WIDE x 8" THICK THIS TABLE IS A GENERAL FOOTING SIZE GUIDE FOR TRIBUTARY UNIFORM LOADING ONLY BASED ON MAXIMUM 25'-0" FLOOR SPANS & 50'-0" ROOF SPANS AND IS TO BE VERIFIED BY HOME DESIGNER. FURTHER CONSIDERATION IS TO BE TAKEN BY HOME DESIGNER FOR VENEER WEIGHT, WALL THICKNESSES OVER 10", AND FLOOR AND ROOF DEAD LOADS OVER 15 PSF. CONCENTRATED LOADS FROM GIRDER TRUSSES, BEAMS, HEADERS, ETC. ARE TO BE ACCOUNTED FOR AND SIZED INDEPENDENTLY OF THIS GUIDE BY OTHERS. COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 157 4.001 January 1, 2024 S7 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS BASEMENT WALL DETAIL Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 GRADE 60 #6 VERTICAL BAR SPACING FOR FULL HEIGHT WALLS w/ F'c = 3000 PSIALTERNATIVE TO CODE TABLE R404.1.2EQUIVALENT VERTICAL REBARSUBSTITUTION TABLEBACKFILL TYPECLEAR HEIGHT(SEE S7)BACKFILL HEIGHT(SEE S7)7'-6"7'-0" OR LESS8'-6"8'-0"7'-0"6'-0" OR LESS9'-6"9'-0"8'-0"7'-0"6'-0" OR LESS8"10" 12"8"10" 12"8"10" 12"NONE NONE NONENONE NONENONE NONENONE NONENONENONENONENONENONENONENONENONE NONENONE NONENONENONENONENONENONENONENONENONENONENONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONENONE NONE NONE* = NONE IF F'c = 4,000 PSI*36"*36"*36"*36"*36"*36"36"36"36"36"36"36"36"36"24"24" 24"24"SAND (30 PSF/FT)WALL THICKNESSSANDY CLAY (45 PSF/FT)WALL THICKNESSCLAY (60 PSF/FT)WALL THICKNESS#6 @ 24" = #5 @ 18" = #4 @ 12" (GRADE 60) = #4 @ 8" (GRADE 40)(1)#6 = (2)#4 (GRADE 60)#6 @ 36" = #5 @ 24" = #4 @ 18" (GRADE 60) = #4 @ 12" (GRADE 40)8'-0" OR LESS9'-0" MAX.10'-0" MAX. COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 158 4.001 January 1, 2024 S8 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS VERTICAL REINFORCING TABLE Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 2 1 $ Q Z 5 J C M Q R G G / 0 VENEER OR SLAB-ON-GRADE BY OTHERS FOUNDATION WALL SEE S7 WOOD FLOOR SYSTEM BY OTHERS FRAMING BY OTHERS 16" HIGH MAX x 6" THICK MIN STEM6"MINWOOD FLOOR SYSTEM BY OTHERS FRAMING BY OTHERS 6" MIN THICK STEM #4 DOWELS @ 36" O.C. EMBEDDED 24" INTO LOWER WALL FOUNDATION WALL SEE S7 VENEER OR SLAB-ON-GRADE BY OTHERS 12"VENEER OR SLAB-ON-GRADE BY OTHERS FOUNDATION WALL SEE S4 OR S5 FRAMING BY OTHERS 16" HIGH MAX x 4" THICK MIN STEM THICKNESS TO MATCH SILL PLATE6"3'-0" MAXVENEER OR SLAB-ON-GRADE BY OTHERS FOUNDATION WALL SEE S6 SLAB-ON-GRADE FRAMING BY OTHERS 6" MIN THICK STEM DETAIL @ HIGH GRADE SIM @ NON-BEARING DETAIL @ LOOKOUT SIM @ FROST WALL DETAIL @ FROST WALLS w/ LOW GRADE DETAIL @ LOW GRADE SIM @ NON-BEARING 112" CLEAR MINMAX#4 DOWELS @ 36" O.C. EMBEDDED 24" INTO LOWER WALL (CENTER IN STEMWALL) SLOPE GRADE AWAY FROM FOUNDATION SLOPE GRADE AWAY FROM FOUNDATION SLOPE GRADE AWAY FROM FOUNDATION SLOPE GRADE AWAY FROM FOUNDATION NOTE: INCREASE STRIP FOOTING WIDTH AT ALL WALLS SUPPORTING MORE THAN 6'-0" OF VENEER. WIDTH TO INCREASE BY THICKNESS OF VENEER MULTIPLIED BY NUMBER OF STORIES. COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 159 4.001 January 1, 2024 S9 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS BRICK LEDGE DETAILS Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 6"12"Ø ANCHOR BOLTS w/ NUT & 18" THICKx 2"Ø OR SQUARE WASHER SEE S11 FOR SPACING (7" EMBED MIN) -METAL STRAP ANCHORS TO BE INSTALLED AT MANUFACTURER EQUIVALENT SPACING FLOOR SYSTEM, TYPE, SIZE, AND SPACING TO BE DETERMINED BY OTHERS RIM BOARD OR BRACING MATERIAL BY OTHERS 2x6 SILL PLATE MINIMUM FLOOR TO SILL CONNECTION AT EACH MEMBER SEE TABLE BELOW WASHER TO BE COUNTERSUNK FLUSH w/ TOP OF SILL PLATE SEE FULL HEIGHT WALL SECTION ON S7 FOR FOUNDATION WALL REQUIREMENTS SLOPE GRADE AWAY FROM FOUNDATION MINTRUSS/JOIST CONNECTION FOR FULL HEIGHT WALLS**** BACKFILL TYPECLEAR HEIGHT (SEE S7) FLOOR MEMBER SPACING 16" 19.2" A (4) 0.131"Ø x 3" TOP NAILS AT EACH MEMBER SAND (30 PSF/FT)SANDY CLAY (45 PSF/FT) CLAY (60 PSF/FT) 24" 16" 19.2" 24" 16" 19.2" 24" A A A A A A A B A A B B B B B C C C D D D D D D D C CONNECTION A (4) 0.148"Ø x 3" TOP NAILS AT EACH MEMBERCONNECTION B (2) 0.131"Ø x 3" TOP NAILS & MECHANICAL CLIPS : SIMPSON A35/USP MPA1 OR USP LJC AT EACH MEMBER CONNECTION C CONNECTION D (2) 0.131"Ø x 3" TOP NAILS & MECHANICAL CLIPS : SIMPSON FWANZ* OR USP LJQ** OR (2) SIMPSON A35s***/(2) USP MPA1s*** AT EACH MEMBER * FWANZ TO BE USED WITH A MIN. 118" OSB RIM AND LOCATED w/IN 5" OF EACH MEMBER. WITH FLOOR TRUSSES, FWANZ MUST BE IN CONTACT WITH A TRUSS OR A MINIMUM 2x4 CONTINUOUS BOTTOM BRACE MUST BE IN PLACE. ** LJQ IS TO BE APPROPRIATELY SIZED BASED ON MEMBER WIDTH. *** MEMBER MUST BE A MINIMUM OF 3" WIDE FOR PLACEMENT OF (2) SIMPSON A35s/(2) USP MPA1s. ****CONNECTIONS ARE CLASSIFIED A TO D, WITH D BEING THE STRONGEST. IT IS ACCEPTABLE TO USE A STRONGER CLASS CONNECTION THAN NOTED IN THE TABLE ABOVE. 2x8 SILL PLATE TO BE USED w/ MAXIMUM OF 112" OVERHANG (MAINTAIN 234" EDGE DISTANCE TO BOTH CONCRETE AND INSIDE OF SILL PLATE) - VERTICAL LOAD TRANSFER BY SUPPLIER 8'-0" OR LESS 9'-0" MAX. 10'-0" MAX. COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 1510 4.001 January 1, 2024 S10 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS FLOOR BEARING CONNECTIONS Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 12"Ø ANCHOR BOLT AND NON-BEARING WALL BLOCKING SPACING FOR FULL HEIGHT WALLS* ALTERNATIVE TO CODE TABLE R404.1.(1) BACKFILL TYPE CLEAR HEIGHT (SEE S7) BACKFILL HEIGHT (SEE S7) 7'-6" 7'-0" 8'-6" 8'-0" 7'-0" OR LESS 9'-6" 9'-0" 8'-0" 7'-0" OR LESS 72" * 12"Ø EPOXIED THREADED ROD w/ 6" EMBED MAY BE USED AT SPACING SHOWN SAND (30 PSF/FT)SANDY CLAY (45 PSF/FT) CLAY (60 PSF/FT) 6'-0" OR LESS 72" 72" 72" 72" 72" 72" 72" 72" 72" 72" 72" 72" 48" 60" 72" 48" 60" 72" 36" 48" 72" 36" 36" 72" 72"72" 48" 24" 24" ALTERNATIVE ANCHOR SPACING FOR FULL HEIGHT WALLS** ALTERNATIVE TO CODE TABLE R404.1.(1) BACKFILL TYPECLEAR HEIGHT (SEE S7) BACKFILL HEIGHT (SEE S7) 7'-6" 7'-0" 8'-6" 8'-0" 7'-0" OR LESS 9'-6" 9'-0" 8'-0" 7'-0" OR LESS 48" ** APPLIES TO 12"Ø EXPANSION BOLT w/ 6" EMBED, 12"Ø SELF-CUTTINGANCHOR BOLT w/ 4" EMBED, OR SIMPSON FWAZ ANCHOR SAND (30 PSF/FT) SANDY CLAY (45 PSF/FT) CLAY (60 PSF/FT) 6'-0" OR LESS 60" 72" 30" 36" 72" 18" 24" 42" 72" 72" 24" 18" 20" 24" 18" 24" 24" 30" 42" 16" 12" 14" 16" 12" 16" 36" 36" N/A N/A 8'-0" OR LESS 9'-0" MAX. 10'-0" MAX. 8'-0" OR LESS 9'-0" MAX. 10'-0" MAX. COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 1511 4.001 January 1, 2024 S11 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS ANCHOR SPACING TABLES Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 NAIL SHEATHING TO BLOCKING/JOISTS0.131 Ø x 3" LONG NAILS @ 6" O.C.STRUCTURAL RIM BOARD BY OTHERSTYPE D CONNECTOR @ BLOCKING SEES102 x 6 MINSILL PLATEFOUNDATION WALL SEE OTHER SHEETSFOR ANCHORS & WALL INFOSLOPE GRADE AWAY FROMFOUNDATIONIF REQUIRED, PROVIDE 2 x 4 MINSPACERS UNTIL SPACES IN WHICH FULLHEIGHT BLOCKING CAN BE INSTALLED,TOE NAIL TO FLOOR MEMBERS EACH ENDw/ (12) 0.131"Øx3" LONG NAILSFRAMINGBY OTHERSOPTIONAL OPEN SPACE AS SHOWN ORSHIFT FULL HEIGHT BLOCKINGPROVIDE BLOCKINGAS REQUIRED TO ACHIEVENAILING SHOWN. (MIN 2SPACES) BLOCKING HEIGHTTO MATCH JOIST DEPTH &BE OF LUMBER, I-JOIST, OROTHER MANUFACTUREDMATERIAL ATTACHBLOCKING TO JOISTS w/ TOENAILS EACH ENDJOISTS BY OTHERSSEE S11 FOR SPACING OFBLOCKING SYSTEM SHOWNNOTES:1. MAIN LEVEL FLOOR SHEATHING TO BE 34" PLYWOOD/OSB PLACED IN STAGGERED PATTERN NAILED w/ 0.131"Ø x3" LONG NAILS @ 6" O.C. AT PANELS EDGES & @ 12" O.C. @ PANEL INTERIOR SUPPORTS OF EQUIVALENT.2. NAILS IN BLOCKING ARE TO BE PLACED SUCH THAT THE WOOD DOES NOT SPLIT.3. BLOCKING MEMBERS SHOWN MAY BE REPLACED WITH PRE-MANUFACTURED TRUSS STYLE OR FULL DEPTHMEMBER BLOCKING SUCH AS I-JOIST OR LVL DESIGNED FOR 1,500 POUND LATERAL COMPRESSIVE LOAD.NAILING SHOWN IS TO BE USED AT MINIMUM.4. BLOCKING DOES NOT HAVE TO BE PLACED IN ADJACENT BAYS. IF REQUIRED USE ADDITIONAL 2x4 SPACERS ASSHOWN IN FIRST SPACE.5. HOLES MAY BE INSTALLED IN BLOCKING IF REQUIRED UP TO 4" IN DIAMETER, MAINTAIN 3" EDGE DISTANCE. COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 1512 4.001 January 1, 2024 S12 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS NON BEARING JOIST BLOCKING DETAIL Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 NAIL SHEATHING TO BLOCKING/TRUSSESw/ (12) 0.131"Øx3" LONG NAILSDUCT/MECHANICAL (AS REQUIRED)BY OTHERSFRAMINGBY OTHERS0.131 Ø x 3" LONGNAILS @ 6" O.C.RIM TRUSSBY OTHERSTOP NAIL RIM TO SILLw/ MIN OF (12)0.131 Ø x3" LONG NAILS EACHSIDE OF BLOCKING ORTYPE D CONNECTOR @BLOCKING SEE S102 x 6 MINSILL PLATEFOUNDATION WALL SEEOTHER SHEETS FORANCHORS & WALL INFOSLOPE GRADE AWAY FROMFOUNDATIONIF REQUIRED, PROVIDE 2 x 4 MIN SPACERSTOP & BOTTOM AT MECHANICAL UNTILSPACES IN WHICH BLOCKING CAN BEINSTALLED, TOE NAIL TO FLOOR MEMBERSw/ (2) 0.131 Ø x 3" LONG NAILS3/4" PLYWOOD/OSB ONE SIDEOF BLOCKING w/ (6) 0.131 Ø x 3" LONG NAILS TOP & BOTTOMOR 1/2" PLYWOOD/OSB EACHSIDE OF BLOCKING EACH w/(4) 0.131 Ø x 3" LONG NAILS TOP & BOTTOMPROVIDE 2 x 4 MIN BLOCKINGTOP & BOTTOM OF TRUSSESAS REQUIRED TO ACHIEVENAILING SHOWN.INSTALL w/ (2) 0.131 Ø x 3"LONG TOE NAILSTRUSSES BY OTHERSNOTES:1. MAIN LEVEL FLOOR SHEATHING TO BE 34" PLYWOOD/OSB PLACED IN STAGGERED PATTERN NAILED w/ 0.131"Ø x 3"LONG NAILS @ 6" O.C. AT PANELS EDGES & @ 12" O.C. @ PANEL INTERIOR SUPPORTS OF EQUIVALENT.2. NAILS IN BLOCKING ARE TO BE PLACED SUCH THAT THE WOOD DOES NOT SPLIT.3. BLOCKING MEMBERS SHOWN MAY BE REPLACED WITH PRE-MANUFACTURED TRUSS STYLE OR FULL DEPTH MEMBERBLOCKING SUCH AS I-JOIST OR LVL DESIGNED FOR 1,500 POUND LATERAL COMPRESSIVE LOAD. NAILING SHOWN IS TOBE USED AT MINIMUM.4. BLOCKING DOES NOT HAVE TO BE PLACED IN ADJACENT BAYS. IF REQUIRED USE ADDITIONAL 2x4 SPACERS ASSHOWN IN FIRST SPACE.5. HOLES MAY BE INSTALLED IN BLOCKING IF REQUIRED UP TO 4" IN DIAMETER, MAINTAIN 3" EDGE DISTANCE.SEE S11 FOR SPACING OFBLOCKING SYSTEM SHOWN COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 1513 4.001 January 1, 2024 S13 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS NON-BEARING TRUSS BLOCKING DETAIL Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 10'-0" MAX3'-0" MAX GRADE HEIGHTABOVE TOP OF SLAB1'-6" MIN3'-0" EACH WAY MIN 112" TYPSLOPE GRADE AWAY FROM FOUNDATION #4 HORIZONTAL BARS @ 12" O.C. CENTERED IN WALLS LAP AROUND CORNERS AND HOOK INTO FOUNDATION WALL @ EACH SIDE (REFER TO S7 FOR HORZ. BAR REQUIREMENTS w/ 8" C.I.P. WALLS) 6" MIN C.I.P. CONCRETE WALL #4 VERTICAL BARS @ EACH OUTSIDE CORNER OF WELL (1)#4 x2'-0" DOWEL @ EACH OUTSIDE CORNER OF WELL (5" MIN EMBED) 12" WIDE x 8" THICK MIN STRIP FOOTING (1) #4 HORIZONTAL BAR AT TOP OF WALL (2) #4 HORIZONTAL BARS TOP & BOTTOM OF LINTEL EXTEND 24" MIN PAST OPENING EACH END (WOOD OR STEEL OPTION BY OTHERS) WALL BEYOND PLACE (2) #4 VERTICAL BARS FULL HEIGHT AND ONE ANCHOR w/IN 12" OF OPENING EACH END 8" MIN C.I.P. CONCRETE WALL SLAB-ON-GRADE UNREINFORCED CONCRETE STRIP FOOTING SEE FULL HEIGHT WALL SECTION S7 LOOKOUT WALL SEE S5 GRANULAR MATERIAL (SAND) SLOPE WINDOW WELL LADDER/ ESCAPE MEANS BY OTHERS 5'-0" EACH WAY MAX FLOOR SYSTEM BY OTHERS (DO NOT PLACE GIRDERS OR BEAMS OVER CONCRETE LINTEL DESIGNED FOR 1500 PLF)IF CONCRETEOPTIONAL RIGID INSULATION w/IN WINDOW WELL AT THE DISCRETION OF THE BUILDER FOR ADDITIONAL FROST PROTECTION AS REQUIRED PER SITE DESIGN 6" MIN. COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 1514 4.001 January 1, 2024 S14 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS WINDOW WELL DETAIL Project: Client: RevDateSITE ADDRESS: State:Zip:MN 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 21$QZ 5JCMQRGG/0 6'-0" MAX. 8" MIN. GRAD E L I N E 9'-4" MAX.6'-0" MAX.4'-0" MAX.SEE BASEMENT WALL DETAILSEE LOOKOUT WALL DETAILSIM.CONSTRUCT SIM. LOOKOUT WALLw/ MIN. (2) #4 HORIZ. BARS3 MIN. 1 S7S5S5SLAB-ON-GRADE BEYOND CONCRETE STRIP FOOTING STEP DOWN AS REQ'D FOR FROST PROTECTION AT NON-BEARING WALLS, LOCATE BLOCKING DETAILS (S12 / S13) AT END OF FULL HEIGHT WALL PROVIDE (2) ADDITIONAL #4 BARS @ END OF FULL HEIGHT WALL SEGMENT LOCATED 2" FROM INSIDE WALL FACE FLOOR FRAMING ABOVE BY OTHERS INFILL WOOD FRAMING BY OTHERS COPYRIGHT HANSON GROUP LLC 2024© City: ofSheet: Drawing Date: Project Number: 1515 4.001 January 1, 2024 S15 Project: Client: RevDateSITE ADDRESS: State:Zip:MN 2024 C.I.P. CONCRETE FOUNDATION GUIDELINE DRAWINGS STEPPING DOWN WALL WITH GRADE 5851 Cedar Lake Road Suite 202St. Louis Park, MN 55416 Tel 612-708-3572www.hansongroupmn.com &TGYU%QPETGVG+PE 2 1 $ Q Z 5 J C M Q R G G / 0 TOTAL INPUT OF APPLIANCES1, THOUSANDS OF Btu/hr (kW) REQUIRED FREE AREA OF AIR-SUPPLY OPENING OR DUCT, SQUARE INCHES (sq mm) ACCEPTABLE APPROXIMATE ROUND DUCT EQUIVALENT DIAMETER2, INCH (mm) 25 (8)7 (4,500)3 (75) 50 (15)7 (4,500)3 (75) 75(23)11 (7,000)4 (100) 100 (30)14 (9,000)4 (100) 125 (37)18 (12,000)5 (125) 150 (45)22 (14,000)5 (125) 175 (53)25 (16,000)6 (150) 200 (60)29 (19,000)6 (150) 225 (68)32 (21,000)6 (150) 250 (75)36 (23,000)7 (175) 275 (83)40 (26,000)7 (175) 300 (90)43 (28,000)7 (175) 325 (98)47 (30,000)8 (200) 350 (105)50 (32,000)8 (200) 375 (113)54 (35,000)8 (200) 400 (120)58 (37,000)9 (225) 1. For total inputs falling between listed capacities, use next largest listed input. 2. If flexible duct is used, increase the duct diameter by one inch. * *Flexible duct shall be stretched with minimal sags. TABLE 304.1 COMBUSTION AIR REQUIREMENTS FOR GAS-FIRED APPLIANCES WHEN THE COMBINED INPUT IS UP TO AND INCLUDING 400,000 Btu/hr BTU Amount for Non-direct vent appliances_____________________ 1 2 3 4 5 6 2 Conditioned space1 (in sq. ft.) Total/ Continuous Total/ Continuous Total/ Continuous Total/ Continuous Total/ Continuous Total/ Continuous 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 2501-3000 90/45 105/53 120/60 135/68 150/75 165/83 3001-3500 100/50 115/58 130/65 145/73 160/80 175/88 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 4501-5000 130-65 145/73 160/80 175/88 190/95 205/103 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 5501-6000 2 150/75 165/83 180/90 195/98 210/105 225/113 1. Conditioned space includes the basement and conditioned crawl spaces. 2. If conditioned space exceeds 6000 sq. ft. or there are more than 6 bedrooms, use Equation R403.5.2 R403.5.2 Total Ventilation rate. The mechanical ventilation system shall rovide sufficient outdoor air to equal the total ventilation rate average for each 1- hour period in accordance with Table R403.5.2, or Equation 403.5.2, based on the number of bedrooms and square footage of conditioned space, including the basement and conditioned crawl spaces. For the purposes of Table R403.5.2 and Section R403.5.3, the following applies: a. Equation R403.5.2 Total ventilation rate: Total ventilation rate (cfm) = (0.02 x square feet of conditioned space) + (15 x (number of bedrooms +1)) b. Equation R403.5.2.1 Continuous ventilation rate: Continuous ventilation rate (cfm) = Total ventiation rate/2 Amount Total _________________________ Amount Continuous____________________ TABLE R403.5.2 NUMBER OF BEDROOMS VENTILATION REQUIREMENTS ONE OR MULTIPLE POWER VENT OR DIRECT VENT APPLIANCES OR NO COMBUSTION APPLIANCESA ONE OR MULTIPLE FAN- ASSISTED APPLIANCES AND POWER VENT OR DIRECT VENT APPLIANCESB ONE ATMOSPHERICALLY VENTED GAS OR OIL APPLIANE OR ONE SOLID FUEL APPLIANCEC MULTIPLE APPLIANCES THAT ARE ATMOSPHERICALLY VENTED GAS OR OIL APPLIANCES OR SOLID FUEL APPLIANCESD 1. Use the Appropriate Column to Estimate House Infiltration a) pressure factor (cfm/sf) b) conditioned floor area (sf) (including unfinished basements) Estimated House Infiltration (cfm): [1a x 1b] 2. Exhaust Capacity a) clothes dryer b) 80% of largest exhaust rating (cfm): (not applicable if recirculating system or if powered makeup air is electrically interlocked and matched to exhaust) c) 80% of next largest exhaust rating (cfm):not applicable (not applicable if recirculating system or if powered makeup air is electrically interlocked and matched to exhaust) Total Exhaust Capacity (cfm): [2a+2b+2c] 3. Makeup Air Requirement a) Total Exhaust Capacity (from above) b) Estimated House Infiltration (from above) Makeup Air Quality (cfm): [3a - 3b] (if value is negative, no makeup air is needed 4. For Makeup Air Opening Sizing, refer to Table 501.4.2. A. Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliances or if there are no combustion appliances. B. Use this column if there is one fan-assisted appliance per venting system. Other than atmospherically vented appliances may also be included. C. Use this column if there is one atmospherically vented (other than fan-assisted) gas or oil appliance per venting system or one solid fuel appliance. D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fuel appliances. Table 501.4.1 Procedure to Determine Makeup Air Quantity for Exhaust Appliances in Dwelling Units Choose Which Applies TYPE OF OPENING ONE OR MULTIPLE POWER VENT OR DIRECT VENT APPLIANCES OR NO COMBUSTION APPLIANCESA ONE OR MULTIPLE FAN- ASSISTED APPLIANCES AND POWER VENT OR DIRECT VENT APPLIANCESB ONE ATMOSPHERICALLY VENTED GAS OR OIL APPLIANCE OR ONE SOLID FUEL APPLIANCEC MULTIPLE APPLIANCES THAT ARE ATMOSPHERICALLY VENTED GAS OR OIL APPLIANCES OR SOLID FUEL APPLIANCESD PASSIVE MAKEUP AIR OPENING DUCT DIAMETERE,F,G OR SYSTEM (cfm)(cfm)(cfm)(cfm)(inches) Passive opening 1-36 1-22 1-15 1-9 3 Passive opening 37-66 23-41 16-28 10-17 4 Passive opening 67-109 42-66 29-46 18-28 5 Passive opening 110-163 67-100 47-69 29-42 6 Passive opening 164-232 101-143 70-99 43-61 7 Passive opening 233-317 144-195 100-135 62-83 8 Passive opening with motorized damper 318-419 196-258 136-179 84-110 9 Passive opening with motorized damper 420-539 259-332 180-230 111-142 10 Passive opening with motorized damper 540-679 333-419 231-290 143-179 11 Powered makeup airH >679 >419 >290 >179 Not applicable A. Use this column if there are other than fan-assisted or atmospherically vented gas or oil appliances or if there are no combustion appliances. B. Use this column if there is one fan-assisted appliance per venting system. Other than atmospherically vented appliances may also be included. C. Use this column if there is one atmospherically vented (ther than fan-assisted) gas or oil appliance per venting system or one solid fuel appliance. D. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fuel appliances. E. An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90-degree elbow to determine the remaining length of straight duct allowable. F. If flexible duct is used, increase the duct diameter by one inch. Flexible duct shall be stretched with minimal sags. G. Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed. H. Powered makeup air shall be electrically interlocked with the largest exhaust system. Table 501.4.2 Makeup Air Opening Sizing Table for New and Existing Dwelling Units IFGC Appendix E, Worksheet E-1 Residential Combustion Air Calculation Method (for Furnace, Boiler, and/or Water Heater in the Same Space) Step 1: Complete vented combution appliace information: Furnace/Boiler: Draft Hood Fan Assisted Direct Vent Input: Btu/hr (Not fan Assisted) & Power Vent Water Heater: Draft Hood Fan Assisted Direct Vent Input: Btu/hr ( Not fan Assisted) & Power Vent Step 2: Calculate the volume of the Combustion Appliance Space (CAS) containing combustion appliances. The CAS includes all spaces connected to one another by code compliant openings. CAS volume: ft3 Step 3: Determine air Changes per Hour (ACH)1 Default ACH values have been incorporated into Table E-1 for use with Method 4b (KAIR Method). If the year of construction or ACH is not known, use method 4a (Standard Method). Step 4: Determine Required Volume for Combustion Air. 4a. Standard Method Total Btu/hr input of all combustion appliances (DO NOT COUNT DIRECT VENT APPLIANCES) Input: Btu/hr Use Standard Method column in Table E-1 to find Total Required Volume (TRV) TRV: ft3 If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then go to STEP 5. 4b. Known Air Infiltration Rate (KAIR) Method Total Btu/hr input of all fan-assisted and power vent appliances (DO NOT COUNT DIRECT VENT APPLIANCES) Input: Btu/hr Use Fan-Assisted Appliances column in Table E-1 to find Required Volume Fan Assisted (RVFA) RVFA: ft3 Total Btu/hr input of all non-fan-assisted appliances Input: Btu/hr Use Non-Fan-Assisted Appliances column in Table E-1 to find Required Volume Non-Fan-Assisted (RVNFA) RVNFA: ft3 Total Required Volume (TRV) = RVFA + RVNFA TRV = + = ft3 If CAS Volume (from Step 2) is greater than TRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then go to STEP 5. Step 5: Calculate the ratio of available interior volume to the total required volume. Ratio = CAS Volume (from Step 2) divided by TRV (from Step 4a or Step 4b) Ratio = Step 6: Calculate Reduction Factor (RF). RF = 1 minus Ratio RF = - = Step 7: Calculate single outdoor opening as if all combustion air is from outside. Total Btu/hr input of all Combustion Appliances in the same CAS (EXCEPT DIRECT VENT) Input: Btu/hr Combustion Air Opening Area (CAOA): Total Btu/hr divided by 3000 Btu/hr per in2 / Btu/hr per in 2 = in2 Step 8: Calculate Minimum CAOA. Minimum CAOA = CAOA multiplied by RF Minimum CAOA = x = in2 Step 9: Calculate Combustion Air Opening Diameter (CAOD) CAOD = 1.13 multiplied by the square root of Minimum CAOA CAOD = 1.13 x Minimum CAOA = in 1If desired, ACH can be determined using ASHRAE calculation or blower door test. Follow procedures in Section 304. CAOA = IFGC Appendix E, Table E-1 Residential Combustion Air Required Volume (Required Interior Volume Based on Input Rating of Appliances) Known Air Infiltration Rate (KAIR) Method (ft3) Input Rating Standard Method Fan Assisted Non-Fan-Assisted (Btu/hr) (ft3) 19941 to Present Pre 19942 19941 to Present Pre 19942 5,000 250 375 188 525 263 10,000 500 750 375 1,050 525 15,000 750 1,125 563 1,575 788 20,000 1,000 1,500 750 2,100 1,050 25,000 1,250 1,875 938 2,625 1,313 30,000 1,500 2,250 1,125 3,150 1,575 35,000 1,750 2,625 1,313 3,675 1,838 40,000 2,000 3,000 1,500 4,200 2,100 45,000 2,250 3,375 1,688 4,725 2,363 50,000 2,500 3,750 1,875 5,250 2,625 55,000 2,750 4,125 2,063 5,775 2,888 60,000 3,000 4,500 2,250 6,300 3,150 65,000 3,250 4,875 2,438 6,825 3,413 70,000 3,500 5,250 2,625 7,350 3,675 75,000 3,750 5,625 2,813 7,875 3,938 80,000 4,000 6,000 3,000 8,400 4,200 85,000 4,250 6,375 3,188 8,925 4,463 90,000 4,500 6,750 3,375 9,450 4,725 95,000 4,750 7,125 3,563 9,975 4,988 100,000 5,000 7,500 3,750 10,500 5,250 105,000 5,250 7,875 3,938 11,025 5,513 110,000 5,500 8,250 4,125 11,550 5,775 115,000 5,750 8,625 4,313 12,075 6,038 120,000 6,000 9,000 4,500 12,600 6,300 125,000 6,250 9,375 4,688 13,125 6,563 130,000 6,500 9,750 4,875 13,650 6,825 135,000 6,750 10,125 5,063 14,175 7,088 140,000 7,000 10,500 5,250 14,700 7,350 145,000 7,250 10,875 5,438 15,225 7,613 150,000 7,500 11,250 5,625 15,750 7,875 155,000 7,750 11,625 5,813 16,275 8,138 160,000 8,000 12,000 6,000 16,800 8,400 165,000 8,250 12,375 6,188 17,325 8,663 170,000 8,500 12,750 6,375 17,850 8,925 175,000 8,750 13,125 6,563 18,375 9,188 180,000 9,000 13,500 6,750 18,900 9,450 185,000 9,250 13,875 6,938 19,425 9,713 190,000 9,500 14,250 7,125 19,950 9,975 195,000 9,750 14,625 7,313 20,475 10,238 200,000 10,000 15,000 7,500 21,000 10,500 205,000 10,250 15,375 7,688 21,525 10,763 210,000 10,500 15,750 7,875 22,050 11,025 215,000 10,750 16,125 8,063 22,575 11,288 220,000 11,000 16,500 8,250 23,100 11,550 225,000 11,250 16,857 8,438 23,625 11,813 230,000 11,500 17,250 8,625 24,150 12,075 1The 1994 date refers to dwellings constructed under the 1994 Minnesota Energy Code. The default KAIR used in this section of the table is 0.20 ACH. 2This section of the table is to be used for dwellings constructed prior to 1994. The default KAIR used in this section of the table is 0.40 ACH. 17932 Headwaters Drive, Lakeville HVAC Load Calculations for Country Joe Homes 22260 Dodd Blvd Lakeville, MN 55044 Prepared By: Jake Ryan Silver Tree Plumbing & Heating 1335 Mendota Heights Rd Mendota Heights, MN 55120 651-900-7053 Thursday, May 30, 2024 Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2.50, and ACCA Manual D. Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 17932 Headwaters Drive, Lakeville Eagan, MN 55121 Page 2 Project Report General Project Information Project Title:17932 Headwaters Drive, Lakeville Designed By:Jake Ryan Project Date:5/30/2024 Project Comment:Watkins - Lookout Client Name:Country Joe Homes Client Address:22260 Dodd Blvd Client City:Lakeville, MN 55044 Client Phone:(952) 469-4066 Company Name:Silver Tree Plumbing & Heating Company Representative:Jake Ryan Company Address:1335 Mendota Heights Rd Company City:Mendota Heights, MN 55120 Company Phone:651-900-7053 Company E-Mail Address:jaker@silvertreepandh.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces Southwest Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 n/a 30%72 33.90 Summer:88 73 50%50%72 42 Check Figures Total Building Supply CFM:1,021 CFM Per Square ft.:0.224 Square ft. of Room Area:4,555 Square ft. Per Ton:2,076 Volume (ft³):37,921 Building Loads Total Heating Required Including Ventilation Air:63,536 Btuh 63.536 MBH Total Sensible Gain:22,344 Btuh 85 % Total Latent Gain:3,986 Btuh 15 % Total Cooling Required Including Ventilation Air:26,330 Btuh 2.19 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2.50, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. F:\ ...\17932 Headwaters Dr, Lakeville - Heat Calc.rh9 Thursday, May 30, 2024, 10:14 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 17932 Headwaters Drive, Lakeville Eagan, MN 55121 Page 3 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Min Htg CFM Min Clg CFM Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.19 2,076 4,555 22,344 3,986 26,330 63,536 805 1,021 805 1,021 1,021 System 1 Main Floor Yes 2.19 2,076 4,555 22,344 3,986 26,330 63,536 805 1,021 805 1,021 1,021 11x16 Ventilation 552 2,693 3,245 3,367 98 98 98 Supply Duct Latent 79 79 Return Duct 7 15 21 36 Humidification 5,724 Zone 1 4,555 21,785 1,200 22,985 54,410 805 1,021 805 1,021 1,021 11x16 1-Basement 1,481 2,261 0 2,261 13,216 196 106 196 106 106 1--6 2-Main Level 1,481 12,212 1,200 13,412 21,175 313 572 313 572 572 5--6 3-Second Floor 1,593 7,312 0 7,312 20,018 296 343 296 343 343 3--6 F:\ ...\17932 Headwaters Dr, Lakeville - Heat Calc.rh9 Thursday, May 30, 2024, 10:14 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 17932 Headwaters Drive, Lakeville Eagan, MN 55121 Page 4 Duct Size Preview Room or Duct Name Source Minimum Velocity Maximum Velocity Rough. Factor Design L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size Reg Size System 1 Supply Runouts Zone 1 1-Basement Built-In 450 750 0.01 0.1 539.5 196 106 106 1--6 2-Main Level Built-In 450 750 0.01 0.1 582.8 313 572 572 5--6 3-Second Floor Built-In 450 750 0.01 0.1 581.6 296 343 343 3--6 Other Ducts in System 1 Supply Main Trunk Built-In 650 900 0.003 0.1 835 805 1,021 1,021 11x16 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:805 Cooling Flow:1021 F:\ ...\17932 Headwaters Dr, Lakeville - Heat Calc.rh9 Thursday, May 30, 2024, 10:14 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 17932 Headwaters Drive, Lakeville Eagan, MN 55121 Page 5 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain Anderson 100: Glazing-Anderson 100, ground reflectance = 0.23, indoor insect screen with 100% coverage, U-value 0.27, SHGC 0.28 460.5 10,816 0 10,485 10,485 11D: Door-Wood - Solid Core, U-value 0.39 20 679 0 211 211 11J: Door-Metal - Fiberglass Core, U-value 0.6 17.8 928 0 288 288 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs, U-value 0.065 2950.7 16,688 0 3,127 3,127 15B0-10sf-4: Wall-Basement, , R-10 board insulation to floor, no interior finish, 4' floor depth, U-value 0.054, above grade U-value 0.083 231 1,086 0 0 0 15B0-10sf-8: Wall-Basement, , R-10 board insulation to floor, no interior finish, 8' floor depth, U-value 0.05, above grade U-value 0.083 1008 4,384 0 0 0 RJ R-20: Wall-Frame, Custom, RJ R-20 RIM JOIST R20 SPRAY FOAM, U-value 0.05 192 836 0 196 196 RJ R-20 RIM JOIST: Wall-Frame, Custom, RJ R-20 RIM JOIST R-20 SPRAY FOAM, U-value 0.05 199 866 0 203 203 R49 Attic: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Custom, R-49 Blown insulation in attic, U- value 0.02 1705 2,967 0 1,784 1,784 21A-32: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 32' wide, U-value 0.02 1481 2,577 0 0 0 20P-30: Floor-Over open crawl space or garage, Passive, R-30 blanket insulation, any cover, U-value 0.035 224 682 0 86 86 Subtotals for structure:42,509 0 16,380 16,380 People:6 1,200 1,380 2,580 Equipment:0 2,400 2,400 Lighting:450 1,535 1,535 Ductwork:429 93 97 190 Infiltration: Winter CFM: 124, Summer CFM: 0 11,508 0 0 0 Ventilation: Winter CFM: 98, Summer CFM: 98 3,367 2,693 552 3,245 Humidification (Winter) 15.61 gal/day :5,724 0 0 0 Total Building Load Totals:63,536 3,986 22,344 26,330 Check Figures Total Building Supply CFM:1,021 CFM Per Square ft.:0.224 Square ft. of Room Area:4,555 Square ft. Per Ton:2,076 Volume (ft³):37,921 Building Loads Total Heating Required Including Ventilation Air:63,536 Btuh 63.536 MBH Total Sensible Gain:22,344 Btuh 85 % Total Latent Gain:3,986 Btuh 15 % Total Cooling Required Including Ventilation Air:26,330 Btuh 2.19 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2.50, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. F:\ ...\17932 Headwaters Dr, Lakeville - Heat Calc.rh9 Thursday, May 30, 2024, 10:14 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 17932 Headwaters Drive, Lakeville Eagan, MN 55121 Page 6 Building Rotation Report All rotation degree values in this report are clockwise with respect to the project's original orientation. Building orientation as entered (zero degrees rotation): Front door faces Southwest Individual Rooms Rm. No. Room Name 0° Rot. CFM 45° Rot. CFM 90° Rot. CFM 135° Rot. CFM 180° Rot. CFM 225° Rot. CFM 270° Rot. CFM 315° Rot. CFM High Duct Size System 1: Zone 1: 1 Basement 106 130 121 95 126 *137 108 70 2--5 2 Main Level 572 581 598 551 *623 614 582 509 5--7 3 Second Floor 343 368 340 278 357 *394 352 282 4--6 * Indicates highest CFM of all rotations. Whole Building Rotation Degrees Front door Faces Supply CFM Sensible Gain Latent Gain Net Tons 0°Southwest 1,021 22,344 3,986 2.19 45°West 1,078 23,579 3,986 2.30 90°Northwest 1,058 23,149 *3,987 2.26 135°North 924 20,280 3,986 2.02 180°Northeast 1,106 24,172 3,986 2.35 225°East *1,145 *24,992 3,986 *2.41 270°Southeast 1,041 22,787 3,986 2.23 315°South 861 18,937 3,986 1.91 * Indicates highest value of all rotations. 1.8 1.9 2.0 2.1 2.2 2.3 2.4 Southwest West Northwest North Northeast East Southeast SouthCooling TonsDirection Front door Faces Building Rotation Tonnage Building Net Tonnage F:\ ...\17932 Headwaters Dr, Lakeville - Heat Calc.rh9 Thursday, May 30, 2024, 10:14 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 17932 Headwaters Drive, Lakeville Eagan, MN 55121 Page 7 Building Rotation Report (cont'd) 20,000 21,000 22,000 23,000 24,000 25,000 26,000 27,000 28,000 29,000 30,000 31,000 32,000 33,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pmBuilding Net Gain, BtuhTime of Day Building Rotation Hourly Net Gain Front door faces Southwest Front door faces West Front door faces Northwest Front door faces North Front door faces Northeast Front door faces East Front door faces Southeast Front door faces South F:\ ...\17932 Headwaters Dr, Lakeville - Heat Calc.rh9 Thursday, May 30, 2024, 10:14 AM Passive (No Fan) Active (With fan and monitoring device ) Location (or future location) of Fan: Other Please Describe Here Not applicable, all ducts located in conditioned space Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS: Capacity in Gallons: Other, describe: AFUE or HSPF% Cfm's " round duct OR " metal duct Not required per mech. code Passive Low: Other, describe: Low: Location of fan(s), describe: Cfm's " round duct OR " metal duct Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. New Construction Energy Code Compliance Certificate Name of Residential Contractor MN License Number City Mailing Address of the Dwelling or Dwelling Unit Rigid, Extruded PolystyreneHeat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: Combustion Air Select a Type Location of duct or system: Rim Joist (2nd Floor+) Building envelope air tightness: Below Entire Slab Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area THERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Total R-Value of all Types of InsulationType: Check All That Apply Mineral FiberboardInsulation Location Foam, Closed Cell Describe other insulated areas Ceiling, flat Non or Not ApplicableFiberglass, BlownFiberglass, Batts Foundation Wall Output in Tons: Appliances Cooling System Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Make-up Air Select a Type Domestic Water Heater Model Heating System Rim Joist (1st Floor) Average U-Factor (excludes skylights and one door ) U: Duct system air tightness: Rating or Size Efficiency Heating Gain Cooling Load Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Residential Load Calculation SEER /EER Capacity continuous ventilation rate in cfms: Heating Loss Manufacturer Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Date Cert. Posted R-value MECHANICAL SYSTEMS Builders Associaton of Minnesota version 101014 NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. A National Pollutant Discharge Elimination System (NPDES) Construction Stormwater Permit is required for “Construction activity that results in land disturbance of equal to or greater than one (1) acre or if a project is part of a common plan of development that will ultimately disturb greater than one (1) acre,” (NPDES Permit, Section 1.2). Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ *Primary Company Contact: _________________________________________________________________ *Should a site be deemed noncompliant, this individual will be notified Phone #: ____________________________ Email: ______________________________________________ If you are not covered under a NPDES Construction Stormwater Permit administered by the Minnesota Pollution Control Agency (MPCA), an erosion and sediment control plan MUST be approved as part of the residential building permit application. “Permittees must ensure a trained person will inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than ½ inch in 24 hours,” (NPDES Permit, Section 11.2). The City of Lakeville reserves the right to request weekly inspection logs. The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name: ____________________________________ Company: ___________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: __________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed I understand the above information to be accurate and I have read, understood, and accepted all terms and conditions of the NPDES Permit (MN R 100001). Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 952-215-6391 rjarvi@countryjoehomes.com Rob Jarvi Youngfield Homes Rob Jarvi Youngfield Homes 952-215-6391 rjarvi@countryjoehomes.com University of Minnesota Steve Sauber 12/21/23 17932 HEADWATERS DRIVE 05/31/27 6/27/24 X PM