HomeMy WebLinkAbout18196 Hounds DrCITY OF LAKEVILLE
CERTIFICATION OF GRADING AND
FINAL PLACEMENT OF IRON MONUMENTS
Building Permit #: LA219059
Legal Description: Lot 26 Block 5
Subdivision:
Address: 18
I hereby certify that on 9th day of August 2024 an inspection of
this property was conducted by me or under my direct supervision and that the as -built
grades, elevations and drainage patterns of the site and building are in conformance
with the grading plan approved by the City Engineer or amendments previously
approved by the City Engineer. In addition, all property corner monuments are in place
as of this date.
I hereby certify that this survey, plan or report was prepared by me or under my direct
supervision and that I am a duly Licensed Land Surveyor under the laws of the State of
Minnesota.
Print Name: Mark A. Schwarz
Signature: J ° i � a �
Date: 10i3i2024 MN License #:
NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS -
BUILT GRADES, ELEVATIONS AND DRAINAGE PATTERNS
Approved subdivision grading plans should be obtained from the property owner or
developer. General questions relating to the building permit should be directed to the
Building Inspections Department at 952-985-4440. Questions relating to grading should
be directed to the Engineering Department at 952-985-4500.
Prior to release of the Grading Security, this document shall be filed with:
City of Lakeville
Engineering Department
20195 Holyoke Avenue
Lakeville, MN 55044
RECEIVED
By Alanna Sobottka at 9:26 am, Oct 11, 2024
x 1 , .i 1ege x�
f as SIA050 es ,"fl eta � 5° EM x 1oe'y9 ,�-
=1o0e 6] ( y ,°q 5 N�'88 0� ge'St1'
1=1038 81 q I C 1gg0 %\
GENERAL NOTES : / , ,�'11 1N:177696 fit ao�v, ±_' x,g4ge6 ( ii/,'l%r/`,I/1 L", �� I 'e"
1. Grading plan by ED last dated May g, 2022 was / / //� \ \/ E520,44"81 � /Ep x 1gegAs qp3� x 1peq_ I #
used to determine proposed elevations shown u peq Q
hereon. '° / / 85 %� /\ \cj�� k �a
2. This survey does not purport to shove EONS RCP) //�Ed ����` 4gr q6,
Improvements or encroachments, except as shown, / '///� $ F ,y$ 3q
as surveyed by ISO or under my direct supervision. // / '¢ / tl'" n /��\ �`105� ��� �° -24 1p'q x1ge1
3. No specific soil investigation has been performed / / , y ,q qe,� % 'y'
on this lot by the surveyor. The suitability of soils to / ,a,x /75g, / ,g _os nc 1q \ �y1°`SIGIS e,qe k1
/H N:1*/fi90.34`�'x� ,q
support the specific house proposed is not the / -� x ```\ SQ
responsibility ofthe surveyor. / / iW E920038.36
4. This certificate does not purport to show / \ ames, p0q� .fie
easements other than those shown on the recorded de91 _ -_% ee:�' '%N LIE
plat. UVl s1 s3H/_ 612
5. Bearings shown are based on the Final Plat. /� 3sed(18 / / 18196 Hounds Dr
6 Site address is 18196 Hounds Drive, Lakeville, MN t/ / DRIVEWAY / 10
55044 05203 i 4.5%SLOPE = % gl. ` B e
7. House/Basement type: Washburn EH05 E3-Right / WALKOUT p1
- Walkout I \ i Ito walk) GARAGE p® 1p 2
8. Topographic surveywas completed on August 9, z,, RRHFE. i S°` I 2B i DID 1peeee l
/ `�14 L x Si IN FEET
j 0
BENCHMARK: ,� �•�` e� E_ ,o00
10530 5
rg Ad,
Top nut fire hydrant located in the N E quadrant of 11q 0/ { ] po - � i k j pet
HideawayTrail and Highview Avenue. ° ` `tip •`1'1 OHMOTANTINIS
,q -` 1op1'� Ol PREMO�-4wASTaw��NDF�ELAST ESTUR
Elevation = 1038 03 feet \ / �� / �?� - �d' °
1e bl� 34 k 1gee� x1p0316 I W �MARK A SCHWANZ
m 7 aR
H0115E ELEVATIONS: Pmposetl/As-Built ��� MUFBI pdsen
r \ ] 0�,•56 � ee3q tie?' I t0 THI DOCUMENT IS THE Garage Floor 1053.0/1053.W ,d' x1 } �1q e3� I ourucn
Top F Floor -ion= 1053 \ k .• 3e -- k o` O 1 o oawai..Ex voos'E„oo
Lowest Floor= 1045.3 \ kv&P \ ! cry mEcr
L4042
owest Opening 1045.3 \ � ��, � 20x ______30--r---
\ \ LENNAR
CORPORATION
CASLANO
0 x'de LOT 26e BLOCK 6
43
\ IAI�VILLE LEGEND � \ \ 12'12 °� o MINNESOTA
NP
ON
Existing Building rJ < > Deciduous Tree \ ` x1gg_ q4T-
�
PC Air Conditioner \ IXS4N MIT--- a --- Sanitary Line \ I� R=10d53] e
EM EeCIIIC Meter /=103]32118"PJC)E
--- --- Water Line =BS,LU ffu: wc)w N PROJECT NO 21 25303
cm Gas Meter _->___CAN FILE UNME 25303 OR 95 GAS
--- as --- Storm Line _
Light Pole DESIGNED By
- - - Landscape Edge T_ > _ ORGIH ISSUE WE
m Roof Drain I _->__
CLIENT PROJECT NO
O Catch Basin/Manhole
d Cleanout TITLE
® Curb Stop
Existing Spot Elevation GRADING
0 Roof Drain f`
--� Surface Drainage Direction AS -BUILT
Water Shut Off
• Iron Monument Found SURVEY
Fire Hydrant RLS 45817
p4 Water Valve FHEEr
1 OF 1