Loading...
HomeMy WebLinkAboutLV24-00448 - Electrical Permit App ELECTRICAL PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only ___________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total DATE YOUR E-MAIL ADDRESS SITE ADDRESS TENANT SUITE NO. THE APPLIANT IS: RESIDENT OWNER CONTRACTOR RESIDENT OWNER NAME_________________________________________________________________________ ADDRESS______________________________________________________________________ CITY _____________________________ STATE_____________ ZIP _____________________ DAYTIME PHONE # WHERE YOU CAN BE REACHED ______________________________ CONTRACTOR Company name must be as appears on State License COMPANY NAME_______________________________________LICENSE #EA___________ ADDRESS_____________________________________________________________________ CITY _____________________________ STATE_____________ ZIP _____________________ OFFICE PHONE # ________________________ FAX #_______________________________ CONTACT NAME______________________________________ PHONE__________________ PERMIT TYPE SINGLE FAMILY TWO FAMILY TOWNHOUSE Meter Bank Single Meter MULTI-FAMILY COMMERCIAL / INDUSTRIAL MANUFACTURED HOME (Contractor Only) INSTITUTIONAL SWIMMING POOL UNDEFINED FIRE ALARM POWER SIGN OTHER (see description) Residential Addition/ Remodel Permits Available on-line TYPE OF WORK NEW MAINTENANCE/REPAIR ADDITION TENANT FINISH ALTER / REMODEL DEMOLITION Only Licensed Electrical Contractors can do work in a Townhouse that has meter bank instead of single meters attached to the units. Only Licensed Electrical Contractors can do work in Manufactured Home Parks. RESIDENTIAL FEES: New Construction: $135.00 + $1.00 State Surcharge (up to three trips) Repairs: + $1.00 State Surcharge (one trip) Additions, Remodel, Lower Level: $70.00 + $1.00 State Surcharge (two trips) COMMERCIAL FEES: Minimum of + $1.00 State Surcharge (one trip) JOB COST: $ Example: $12,000 Job Cost 1-1/2% of contract cost up to $10,000 $10,000.00 x 1.5% = $150.00 1% of cost above $10,000 plus surcharge + $ 2,000.00 x 1% = + 20.00 (Surcharge = Contract Cost x .0005) + $12,000 x.0005 = + 6.00 TOTAL = = $176.00 PLEASE NOTE: SEPARATE PERMITS ARE REQUIRED FOR ANY BUILDING, MECHANICAL & PLUMBING WORK www.lakevillemn.gov $40.00 $40.00 Submit to: permits@lakevillemn.gov NAME OF APPLICANT (Please Print)* DETAILED DESCRIPTION OF WORK: $0.00 0.00 I HEREBY APPLY FOR PERMIT AND ACKNOWLEDGE THAT ALL INFORMATION ON THIS APPLICATION IS COMPLETE AND ACCURATE. THIS IS NOT A PERMIT AND WORK IS NOT TO COMMENCE UNTIL SUCH TIME A PERMIT IS ISSUED. ALL WORK WILL COMPLY WITH LAKEVILLE CITY CODE, THE MINNESOTA STATE BUILDING CODE, AND THE APPROVED PLANS. INTEREST EARNINGS ON ESCROW ACCOUNTS, IF ANY, WILL BE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. *Entering your name affirms your intent to comply with the statement above. *DATE 2024-10-07 picminneapolis@purelightpower.com 20504 Gunnison Drive Lakeville Minnesota 55044 Molyka Mao 20504 Gunnison Dr. Lakeville MN 55044 (612) 207-8036 PowerfullyGreen EA714757 2380 WATERTOWN RD. LONG LAKE 859-659-1359 PowerfullyGreen MN 55356 859-659-1359 13.94kW solar installation on customer's house. 2024-10-07 Document Ref: ENARH-M85HR-GZ8F2-NRD8W Page 1 of 1