Superior Sand & Gravel Interim Use Permit
June 19, 2024
Representatives of Superior Sand & Gravel have submitted an application for an Interim Use
Permit (IUP) to allow mining and excavation, grading, filling, and aggregate processing
operations on property located in the northeast quadrant of Kenrick Avenue and 195th Street at
19250 Kenrick Avenue. Superior Sand & Gravel proposes to excavate the aggregate deposit
within the 100-foot-wide high pressure gas main easement that runs north and south through the
approximate west one-third of the property that was recently abandoned by Centerpoint Energy.
An Interim Use Permit is required to allow grading, filling and processing on the property. The
applicant requests active mining and excavation within the easement area and final site
rehabilitation and grading through December 31, 2029.
A. Location Map
B. Zoning Map
C. MUSA Staging Area Plan
D. Area of Proposed Mining
E. Aggregate Resources Area 2040 Comprehensive Land Use Plan
F. Applicant Plan Narrative
G. Proposed Mining and Site Rehabilitation Plan
H. Resident email dated April 12, 2024
The property is owned by Ashbury, LP and is approximately 63 acres in area. Superior Sand &
Gravel has been the site operator since 2020 to complete the final stages of filling and
rehabilitation of the property as outlined in the approved 2011 Interim Use Permit, which
expired December 31, 2021 without site rehabilitation being completed. Superior Sand & Gravel
applied for an interim use permit in 2022 to allow continuation of mining and processing that
included crushing and sorting of demolition bituminous and concrete, but the City Council
denied that request.
North – Lake Marion
South – 195th Street/Casperson Park/Gopher Outside Storage
East – Lake Marion
West – Kenrick Avenue and Interstate 35
The property has operated as a sand and gravel mine at various times since 1965, and the
property has been owned by the Bury family since 1968. Approximately 709,358 cubic yards of
compactable soil has been imported and compacted between 2011 and 2021. Approximately
334,000 cubic yards of additional fill material remains to be imported to complete site
rehabilitation to the grades required to bring the property to an elevation to allow gravity flow
sewer flow at the time of future property development. Between 2011 and the end of 2023,
approximately 893,358 cubic yards of fill material have been imported for finished grades and
site rehabilitation.
The 2040 Comprehensive Land Use Guide Plan guides the property
between medium/high density and low density residential with low density comprising the
approximate east two-thirds of the property. The property is within Municipal Urban Service
Area (MUSA) B, which guides the property to be outside the MUSA no sooner than 2029 or as
late as 2038 depending on when the property is brought into the current MUSA when sanitary
sewer is available to the property as development occurs from the south on the east side of
Kenrick Avenue. City sanitary sewer and water to serve the property is approximately seven-
tenths of a mile to the south.
Natural Resources - 2040 Comprehensive Land Use Plan. The 2040 Comprehensive Land Use
Plan identifies sand and gravel aggregate deposits as natural resources consistent with the
Metropolitan Council identification of sand and gravel as a regional resource to be protected for
extraction in support of anticipated regional growth. The Minnesota DNR has mapped a
generalized inventory of sand and gravel deposits within the Twin Cities Metropolitan Area. The
map illustrates scattered deposits within Lakeville with larger concentrations in the northeast and
southwest areas of the city. While a number of gravel pits have existed within the city, only one is
currently active. This active gravel mining operation is in southeast quadrant of I-3 and 185th
Street (CSAH 60) adjacent to Lake Marion. Extraction of sand and gravel deposits must be
regulated in a manner so as to be compatible with existing and planned development of the
surrounding area. The intent of such regulations is to allow for the use without negatively
impacting the natural environment or City infrastructure. New gravel mining operations will be
limited to an interim use in areas designated as MUSA Expansion Areas, Urban Reserve, or
Permanent Rural on the MUSA Staging Plan map so as not to interfere with planned urban
growth. The city will also continue to regulate gravel mining through the Extraction and Mining
Ordinance included within the City Code. The City utilizes this ordinance to evaluate gravel
mining plans and operations in issuing an annual license after the interim use permit is
approved.
The west one-third of the property is zoned RM-2, Medium Density Residential District,
consistent with the 2040 Comprehensive Land Use Guide Plan. The west two-thirds of the
property is zoned RS-3, Single Family Residential District. Both zoning categories are consistent
with the 2040 Comprehensive Land Use Guide Plan. The property is also located within the
RAO, Rural Agriculture Overlay District and the Shoreland Overlay District of Lake Marion.
Mining and Excavation is an allowed use in these zoning districts subject to approval of an
interim use permit.Interim use permit applications must conform to the standards listed in Title
7, Chapter 4 of the City Code.
The plans submitted with the interim use permit application outline the proposed materials
processing and rehabilitation in detail. The plans have addressed the information required by
Title 7, Chapter 4 of the City Code.
Superior Sand & Gravel proposes to excavate, crush, and sort the various aggregate deposits in
the vicinity of the former gas main easement. Sorted materials would be shipped from the site as
necessary for area building and road construction needs. Superior Sand & Gravel estimates a
two-year timeframe to excavate and sort the various aggregate by size in preparation for export.
The hours of operation shall be limited to 7:00 AM to 7:00 PM Monday through Friday. No
crushing operations may occur on Saturdays and Sundays. Noise generated from the site must
be in compliance with the Minnesota Pollution Control Agency and the Federal Environmental
Protection Agency rules and regulations.
Dust will be controlled as necessary by using water and a pumping truck from the water available
in the settling ponds. Any water obtained from a city water hydrant will require a permit from
the City. Gravel and dust tracked onto Kenrick Avenue must be promptly removed by the
operator.
The finished grades will include a minimum of three inches of topsoil as proposed in the
rehabilitation plan. Slopes, graded areas and backfill areas shall be surfaced with adequate topsoil
to secure and hold ground cover. Such ground cover shall be tended as necessary until it is self-
sustained.
Superior Sand & Gravel is required to apply for an annual mining and excavation (rehabilitation)
permit at which time staff determines whether the mine is complying with the stipulations of the
approved interim use permit. The site is inspected periodically during the year to confirm
compliance with the approved permit. Failure to comply with the approved plans may result in
the annual permit not being issued whereby the operator cannot continue to operate until any
noted irregularities are addressed.
Superior Sand & Gravel been allowed to import fill material to the property after
the interim use permit extension was not approved by the City Council in 2022. Superior Sand &
Gravel shall promptly address within one working day of receiving complaints. Community
Development Department staff has not received complaints regarding site operations, primarily
import and grading of fill material since 2022. The city is typically notified if calls are made to
the site operator.
The Zoning Ordinance
for interim use permit administration and the City Code require the submittal of a site
improvement performance agreement to guarantee the completion of work as allowed by the
approved interim use permit. A finance guarantee will be required as surety for the completion
of the property rehabilitation as required by the City Code and as outlined in the planning
report.
A cash escrow or bond must be submitted in favor of the City of Lakeville in accordance with
City Code in the sum of $1,500.00 per acre for the remaining acreage yet to be rehabilitated
according to the proposed mining and excavation and rehabilitation plan if the interim use
permit is approved.
Neighborhood Meeting. Superior Sand & Gravel representatives hosted a neighborhood
meeting March 12, 2024, at Hampton Inn on Keokuk Avenue. Two residents attended the
neighborhood meeting. Questions were primarily regarding days and hours of operation, how
many years of mining and site rehabilitation, is concrete crushing be proposed and noise and
dust control measures.
. Decision
making authority for the City is limited by the
various categories noted in the pyramid below. The
city may apply some conditions provided there is a
nexus between the conditions specific request. An
interim use permit falls under the same category as
conditional use permits (yellow).
Community Development Department staff recommends approval of the interim use permit
subject to the stipulations noted in the April 19, 2024 planning report and approval of the
findings of fact:
1. The boundaries of the processing, grading, and rehabilitation areas shall be limited to the
areas identified in the approved plans.
2. Rehabilitation, grading, drainage, erosion and sedimentation control, and finished grades
shall occur consistent with the Excavation and Grading plan prepared by Sathre-Berquist,
Inc., dated October 23, 2023.
3. Perimeter side slopes shall be back filled to a maximum grade of 3:1 (33%). No
Trespassing signs shall be installed and maintained at regular intervals at the perimeter of
the mine adjacent to Kenrick Avenue and 195th Street.
4. Vegetation shall be reestablished as an ongoing part of the site rehabilitation. Ground
vegetation shall consist of grass seed mixture.
5. Only clean compactable fill shall be imported to property.
6. Demolition concrete and bituminous shall not be imported to the property nor shall
crushing of such materials be permitted.
7. The on-site stormwater basins constructed in 2011 shall be inspected and certified to be
functional per the approved design to prevent soil and sand sediment from discharging to
Lake Marion.
8. A site improvement performance agreement and annual permits shall be submitted by
the applicant along with security as required by Title 7, Chapter 4 of the City Code and
Section 11-5-13 of the Zoning Ordinance. A security deposit shall be submitted by the
operator for each acre of land remaining to be rehabilitated in an amount approved by
the City Council to complete the approved rehabilitation plan. The annual permit
application shall include figures stating the amount of aggregate material exported from
the property and fill material imported to the property.
9. Abandoned or inoperable machinery or equipment and rubbish shall not be stored on the
site.
10. The maximum noise level at the perimeter of the site shall be within the limits set by the
Minnesota Pollution Control Agency and the Federal Environmental Protection Agency.
11. Grading and hauling operations may occur between 7:00 a.m. and 7:00 p.m., Monday
through Saturday. Crushing and processing operations shall not occur on Saturdays and
Sundays.
12. Operators shall comply with all applicable city, county, state, and federal regulations for
the protection of water quality, including the Minnesota Pollution Control Agency and
Federal Environmental Protection Agency regulations for the protection of water quality.
No waste products or processed residue shall be deposited in any lake, stream or natural
drainage system.
13. All topsoil shall be retained at the site until complete rehabilitation of the site has taken
place according to the rehabilitation plan. Slopes, graded areas and backfill areas shall be
surfaced with adequate topsoil to secure and hold ground cover. Such ground cover shall
be tended as necessary until it is self-sustained.
14. Earthen screening berms along Kenrick Avenue and 195th Street shall remain in place
during the life of the grading and rehabilitation operation. Earthen berms shall not be
located within 50 feet of 195th Street and Kenrick Avenue.
15. Access to and from the site shall be exclusive to Kenrick Avenue.
16. Any flammable liquids stored on the site shall be in above ground storage containers and
shall meet Minnesota Pollution Control and Fire Code requirements.
17. The first 400 feet of the access road shall remain paved with bituminous and shall be
swept regularly to keep gravel off of Kenrick Avenue. Kenrick Avenue shall be swept
regularly as needed. Any water used by the operator that is acquired from a City water
hydrant will require a permit from the City.
18. Excavation is prohibited below an elevation of 1004 (sea level datum). The mining plan
shall be revised to comply with this stipulation prior to City Council consideration of the
interim use permit.
19. Rehabilitation of the property shall occur no later than December 31, 2029.
1
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
SUPERIOR SAND & GRAVEL
INTERIM USE PERMIT
The Lakeville Planning Commission met at its regularly scheduled meeting on April 25, 2024 to
consider the application of Superior Sand & Gravel for an interim use permit to allow mining,
excavation and rehabilitation operations on property located at 19250 Kenrick Avenue. The
Planning Commission conducted a public hearing on the application preceded by published and
mailed notice. The applicant was present, and the Planning Commission heard testimony from all
interested persons wishing to speak.
1. The subject property is guided for both Medium/High Density Residential and Low-Density
Residential land use by the 2040 Comprehensive Plan.
2. The subject site is zoned RM-2, Medium Density Residential District and RS-3, Single Family
Residential District, and is included in the RAO, Rural Overlay District and the Shoreland
Overlay District.
3. The legal description of the property is as follows:
That part of Government Lots 6 and 7, Section 24, Township 114, Range 21, lying East of the
Easterly right of way line of Trunk Highway No. 35, northerly of the east – west quarter line of
said Section 24 and southerly and westerly of the shore line of Lake Marion. Subject to a street or
road easement for 195th Street West. Except the following described property: That part of
Government Lot 7 of Section 24, Township 114, Range 21, Dakota County, Minnesota lying
Easterly of the Easterly right of way line of Trunk Highway Number 35 (as now located and
established) including the accretions and relictions and all other riparian rights thereto; which lies
Westerly of a line run parallel with and distant 135 feet Easterly of line 1 described below: Line 1:
Beginning at a point on the West and East quarter line of Section 13, Township 114, Range 21,
distant 1421 feet East of the West quarter corner thereof; thence run Southerly at an angle of 92
degrees 6 minutes 00 seconds from said East and West quarter line (measured from East to South)
for 3707.3 feet and there terminating.
2
4. Chapter 11-5-3 of the City of Lakeville Zoning Ordinance provides that an interim use
permit shall comply with the same criteria as a conditional use permit. The criteria and our
findings regarding them are:
Finding: Mining and excavation activity on the subject property predated most residential
and commercial uses in the area. The 2040 Comprehensive Land Use Plan states that gravel
resources be accessed in a manner that protects Lakeville’s environment, is compatible with
adjoining land uses, and is consistent with the City’s long-range planning. The proposed
grading, filling, processing, and rehabilitation operations are consistent with the 2040
Lakeville Comprehensive Plan, which establishes objectives and criteria for these types of
activities in areas located within MUSA Expansion Area B. The operational activities
associated with site rehabilitation on the property are considered compatible with the
nearby residential uses and the natural environment.
Finding: The proposed use will be compatible with nearby existing land uses given
compliance with the stipulations listed in the April 19, 2024 planning report. The proposed
grading, filling and rehabilitation plans have been developed to incorporate future low
density residential and medium/high density residential land uses consistent with the 2040
Comprehensive Land Use Plan.
Finding: The proposed development will comply with requirements of the Zoning
Ordinance and City Code in accordance with the stipulations outlined in the April 19, 2024
planning report.
Finding: The subject site is located in MUSA Expansion Area B of the 2040 Comprehensive
Land Use Plan and is not served by City sanitary sewer and water services.
3
e. Traffic generated by the proposed use is within capabilities of streets serving the
property.
Finding: Traffic generated by the proposed use can be accommodated by Kenrick Avenue,
a minor arterial street as designated in the 2040 Transportation Plan.
5. The report dated April 19, 2024 prepared by Frank Dempsey, Associate Planner is incorporated
herein.
The Planning Commission recommends that the City Council approve the interim use permit
based upon the foregoing information, findings, and the considerations outlined in the Planning
Report dated April 19, 2024 prepared by Frank Dempsey, Associate Planner.
BY: __________________________
Jenna Majorowicz, Chair
EXHIBIT A
EXHIBIT B
EXHIBIT C
EXHIBIT D
EXHIBIT E
EXHIBIT F
EXHIBIT G
April 12, 2024
City of Lakeville Planning Commission,
I am writing to ask about the details regarding the Superior Sand and Gravel mining expansion
proposal at the Lake Marian gravel pit.
I have been a Lake Marian neighborhood resident since 1994, and a homeowner on Lake
Marian since 2012. I do have concerns regarding ramifications of further mining. The gravel pit
is in the center of Lakeville, so close to the lake, and surrounding greenspace, along with the
surrounding population, including neighborhoods, and schools. Obviously, this has been going
on since the 1980’s, however the air quality and population growth have both changed
significantly since then. In the 1990’s when you drove across the river, the cityscape had a
bright blue backdrop. Now the blue backdrop of the skyline is instead hazy and gray. The
population of Lakeville in 1980, when the mining first started, was under 15,000. Now the
population exceeds 70,000.
These are some questions.
● What is the environmental impact of removing the gas line and the gas berm itself? ●
What are the possible complications?
● Which part of the mining/filling process releases the most particles?
● What percent of the mining/filling does this include?
● What are the radon levels in these pits? Is the release a concern?
● Climate change with hotter, drier, sometimes windeyer conditions, are there any
provisions being made?
I understand that the DNR has regulations regarding the lake. I wonder about the EPA and the
regulations regarding mining within city limits and surrounding populations? Unfortunately I am
out of town for this meeting. I trust these questions and others will be answered at the City
Council meeting. Once the information is gathered the Council can decide “do we really want a
gravel pit in the center of Lakeville?”
Sincerely,