HomeMy WebLinkAboutItem 05b - Sundance Lakeville Second Addition1
City of Lakeville
Community Development Dept
Memorandum
To: Planning Commission
Frank Dempsey, AICP, Associate Planner
July 12, 2024
Packet Material for the July 18, 2024 Planning Commission Meeting
: 1)Preliminary and final plat of one townhome lot to include nine buildings and 167
dwelling units, one common club building, nine single family rental residential lots and
homes, and one outlot to be known as Sundance Lakeville Second Addition;
2) A conditional use permit to allow multiple family dwellings (townhome buildings) on a
single parcel.
August 23, 2024
Ryan Sailer, representing Timberland Partners, Inc. has submitted applications and plans for a
preliminary plat, final plat, and conditional use permit for Sundance Lakeville Second Addition,
which proposes one lot and one block with 13 townhome buildings and 167 dwelling units and
nine single family home lots with rental homes all totaling 15.75 acres north of 162nd Street (CSAH
46), west of Buck Hill Road and east of Kendale Avenue.
The 18.75 acre property had been agricultural property until approximately 2000, after which time
the property had been an aggregate mining operation for approximately five years.
This is the second phase of the proposed Sundance Lakeville development. At their June 20
meeting the Planning Commission recommended approval of the first phase of development,
which proposes two medical office buildings.
The preliminary and final plat plans have been submitted to:
1. The Engineering Division
2
2. The Parks and Recreation Department
3. Dakota County Plat Commission
A. Zoning Map
B. Aerial Photo
C. Project Narrative
D. Property Survey
E. Preliminary Plat
F. Final Plat
G. Site Plans
H. Grading, Drainage, Utility Plans
I. Tree Preservation Plan and Tree Inventory
J. Landscaping Plan
K. Townhome Architectural Plans
L. Single Family Architectural Plans
M. May 23, 2024 Traffic Study
The subject property on which the townhomes and single-family
homes will be located is zoned M-1, Mixed Use I-35 Corridor District and RST-1, Single and Two
Family Residential District. The proposed preliminary plat is surrounded by the following land
uses:
and I-35 right of way of-Way
family homes on Kendale Drive and
Dupont Avenue and a single family
Residential Two Family
Residential District
On November 23, 2023, the City Council approved an amendment to the 2040 Comprehensive
Land Use Plan for 14 acres of the 18.75 acre property from Commercial and Medium Density
3
Residential to high density residential and low to medium density residential and to rezone the 14
acres from C-3, General Commercial and RM-1, Medium Density Residential to M-1, Mixed Use
I-35 Corridor District and RST-2, Single and Two Family Residential District. Following the
amended land use plan and zoning, an application and plans for the proposed medical buildings
was submitted for consideration of approval on the south three acres of the commercial zoned
property abutting 162nd Street and Buck Hill Road. On June -20, 2024, the Planning Commission
held a public hearing to consider the preliminary and final plat of Sundance Lakeville for two
commercial medical office buildings abutting 162nd Street and Buck Hill Road. The City Council
approved the preliminary plat of Sundance Lakeville that included two commercial (medical)
buildings adjacent to 162nd Street at its July 1, 2024 meeting.
The property is located in Planning District No. 1 of the 2040
Comprehensive Land Use Plan and is within the current Metropolitan Urban Service Area
(MUSA). City municipal services, including sanitary sewer service, are available to serve the
property. The subject property is guided -CMU, Corridor Mixed Use in the 2040 Comprehensive
Land Use Plan. The proposed Sundance Lakeville Second Addition preliminary and final plat
meets the recommended goals and objectives outlined in Planning District No. 1 of the 2040
Comprehensive Plan.
The proposed lots exceed the minimum lot area and lot width requirements
of the M-1 and RST-2 Districts.
Sundance Lakeville abuts 162nd Street (CSAH 46) and will have a shared private drive
access at Buck Hill Road. The private street will be extended west to Kendale Drive when the
residential area to the north is developed. The private drive will include an easement to allow the
commercial and residential portions of the development as well as the public to use the private
street connection between Kendale Drive and Buck Hill Road. No parking signs shall be installed
on both sides of the private street between Kendale Drive and Buck Hill Road.
162nd Street (CSAH 46) is classified as a minor arterial road in the City’s Transportation Plan and
is constructed as a 4-lane divided road. The Dakota County Plat Commission review of the
preliminary and final plat indicated that no additional road right-of-way is required with the
4
proposed final plat. There will be no private driveway access to 162nd Street with the proposed
medical buildings site plan.
Buck Hill Road is classified as a major collector road providing access via a signalized intersection
at 162nd Street. No additional right-of-way is required for Buck Hill Road.
Kendale Drive is classified as a local street with a 32-foot-wide street constructed temporarily as a
rural section road until such time the remaining undeveloped properties adjacent to Kendale Drive
are developed. Kendale Drive was constructed as a rural section road in 2001 as part of the
Streefland Addition development to the west and is between 60 and 80-feet wide and partly within
a temporary roadway easement. The road width is suitable for the commercial and residential
development proposed for the 18.75 acre property. Kendale Drive to the west is 60 feet wide within
the single-family residential development. Kendale Drive will be platted as right-of-way and
developed as an urban street (curb, gutter and sidewalks) at the time of development of the
remaining properties in this area.
The Dakota County Plat Commission met at its April 10, 2024 meeting to review the Sundance
Lakeville preliminary plat under the terms of the Contiguous Plat Ordinance (plats adjacent to
County Roads). The Plat Commission determined that the development of the combined
residential and commercial portions of the 18.75 acre property in addition to the existing and
projected traffic along 162nd Street necessitates the construction of a restricted turning movement
median in 162nd Street (CSAH 46). Left turns from southbound Kendale Drive to eastbound 162nd
Street will not be allowed. Right turning movements to and from Kendale Drive from 162nd Street
will remain. The restricted access at Kendale Drive will require vehicles to use the shared private
road across the Sundance Lakeville development to access the signalized intersection at Buck Hill
Road.
A traffic study was completed by Alliant Engineering on in 2023 with a final traffic
study report prepared May 23, 2024 to determine the existing and post-development conditions of
and anticipated traffic volumes between Buck Hill Road, 162nd Street (CSAH 46) and Kendale
Drive. The study identified traffic volumes in 2017, 2021 and adjustments to 2021 traffic to account
for lingering impacts to traffic volumes during the COVID pandemic. The study concluded that
all intersections impacted by the development of the 18.75 acre Sundance Lakeville commercial
and residential developments, future low-medium density residential to the west, and the existing
neighborhoods utilizing Kendale Drive and Buck Hill Road will operate under a high grade (A &
C) level of service or better through year 2045 anticipated peak hours of traffic. Traffic volumes on
162nd Street (CSAH 46) are presently 8,300 Average Daily Traffic (ADT) vehicles per day and
anticipated to be 11,800 ADT by 2040.
City sanitary sewer and water is currently
available to the site, which is within the current MUSA. All public utilities will be constructed by
the developer to serve the proposed preliminary and final plat following final plat approval.
5
City sanitary sewer lift station No. 26 is under construction to provide sanitary sewer service for
the development of the 18.75 acre property and other future property developments within the
Crystal Lake watershed that services this area. Sanitary sewer now going through the Crystal Lake
lift station in Burnsville will be diverted to the lift station under constructed in conjunction with
Sundance commercial and residential plats. The Developer shall pay a cash fee for construction of
sanitary sewer lift station No. 26. The construction of lift station No. 26 was anticipated upon
determination that the Crystal Lake lift station was very near capacity.
Grading and utility plans have been submitted with the Sundance Lakeville Second Addition
preliminary and final plat plans. Grading, drainage, erosion control, utility, and tree preservation
review comments are addressed in the engineering report prepared by Jon Nelson, Assistant City
Engineer and Mac Cafferty, Environmental Resources Manager, dated July 8, 2024. A copy of the
engineering report is attached for reference.
The City’s Comprehensive Parks, Trails, and Open
Space Plan does not identify any future park land needs in the area of the plat. A bituminous trail
is in place along the north side of 162nd Street (CSAH 46). Concrete sidewalk will be installed along
Kendale Drive in conjunction with development of the residential Sundance Lakeville project. Park
dedication will be satisfied with a cash fee in effect at the time of final plat approval. The 2024 park
dedication cash fee rate in lieu of park land is $9,383 per dwelling unit for high density residential
and $5,774 per dwelling unit for low density residential.
There are no wetlands associated with the Sundance Lakeville Second Addition
preliminary and final plat property.
The tree preservation plan identifies 738 significant trees on the entire 18.75
acre site. Due to the high-density residential development proposed, most trees will be removed
with the residential development phase of construction. A tree preservation plan for Sundance
Lakeville Second Addition shall be submitted prior to issuance of a city grading permit. The
proposed landscape plan outlines the tree replacement proposed as part of the site development.
The preliminary plat is not premature under the terms of the
Subdivision Ordinance. All utilities and public streets are in place to serve the subject property.
All proposed improvements necessary for the
development of Sundance Lakeville Second Addition will be privately funded by the developer.
Section 11-65-7 of the Zoning Ordinance allows multi-family buildings on a single parcel subject
to approval of a conditional use permit. The purpose of this requirement is to compliance with
development density, building height, floor area ratio, exterior design, and building height
requirements as well as establishment of a ownership requirement for the for uniform property
and building exterior maintenance.
6
Lot Area. Section 11-65-7.L.1.a(1) of the Zoning Ordinance requires multiple family uses to
provide a minimum of 1,675 square feet of net lot area per dwelling unit. The area Lot 1, Block 1
is 14.74 acres or 642,074 square feet. Based on 167 dwelling units, the lot area per unit for the
proposed multiple family use is 3,844 square feet per dwelling unit, which complies with the
Zoning Ordinance.
Section 11-65-7.L.1.a(2) of the Zoning Ordinance limits the floor area ratio for
the proposed multiple family building to 0.7 as the subject site abuts single family lots zoned RST-
2 District to the west. The gross floor area of the proposed buildings range between 18,019 and
20,490 square feet and the area of the proposed lot is 642,074 square feet. The floor area ratio of
the proposed development is between 0.28 and 0.32, which fall within the limits established by the
Zoning Ordinance.
The table below outlines the setbacks required for development of the subject site by
Section 11-65-13 of the Zoning Ordinance. The locations of the proposed multiple family buildings
within the lot meets or exceeds the minimum setbacks required by the Zoning Ordinance.
The proposed building has a mix of 1-bedroom, 2-bedroom and 3-bedroom
dwelling units summarized in the table below:
Area Floor Area Units Total
The proposed dwelling units comply with the minimum floor area requirements specified in
Section 11-17-13.B of the Zoning Ordinance.
The exterior materials for the proposed building must comply with Section 11-65-
7.R.3.c of the Zoning Ordinance requiring minimum of 25 percent of each building elevation shall
have an exterior finish of brick, stucco, and/or natural or artificial stone and shall have more than
60% of all elevations of one type of exterior finish. The submitted building elevation plans identify
the type of all exterior finish materials and include a schedule indicating the percent of the total
area of the exterior of the principal building using required materials. The use of brick or stone for
7
the exterior finish of all proposed buildings complies with the requirements of the Zoning
Ordinance.
Multiple family buildings within the M-1 District are limited to a height of four
stories or 48 feet by Section 11-65-7.N.2 of the Zoning Ordinance. Illustrations of the proposed
townhome buildings indicate a gable roof design with heights between 28 and 31.4 feet.
The proposed building is to have 167 dwelling units and 240 total bedrooms equal to 1.44
bedrooms per dwelling unit. Section 11-19-13 of the Zoning Ordinance requires multiple family
dwellings to provide 2.0 parking stalls per dwelling unit if there are less than 2.0 bedrooms per
dwelling unit. Section 11-65-7.R.d of the Zoning Ordinance further requires that a minimum of
1.0 of the required parking stalls per dwelling unit be provided within an enclosed garage attached
to the principal building. Based on 167 dwelling units, 334 parking stalls are required and 338
parking spaces are proposed in addition to 41 guest parking spaces and ADA accessible parking
spaces. The breakdown of surface and garage parking shown on the submitted plans is summarized
below:
The site plan shall provide the required number of ADA accessible parking spaces on site.
The proposed off-street parking areas and drive aisles are setback more than 15 feet from the west
property line abutting the RST-2 lots. Section 11-19-7.I.1 of the Zoning Ordinance requires off-
street parking stalls to have minimum dimensions of 9 feet by 20 feet. The proposed driveway aisles
are 20 feet in width as allowed in the M-1 District. The townhome driveway setback from the
private driveways is 20 feet as allowed by the M-1 District and consistent with other similar
townhome developments in Sprit of Brandtjen Farms and numerous Dakota County CDA
townhomes developed in Lakeville. The proposed surface parking stalls comply with these
minimum dimensions. The parking stalls must striped as required by Section 11-19-7.I.13 of the
Zoning Ordinance. The parking area must be surrounded by perimeter concrete curb as required
by Section 11-19-7.I.15 of the Zoning Ordinance.
The site plan provides a location for outdoor recreation
amenities including a swimming pool, patio area, grilling stations and a 5,000+ square foot
clubhouse building as a benefit to tenants of the townhomes and single family homes within the
development. The clubhouse and pool area are located at the southwest corner of the site and are
setback not less than 33 feet from the south property line (162nd Street) as required by the Zoning
Ordinance. The building elevation plans show a community building consistent with the exterior
building materials as the townhome buildings and in compliance with Zoning ordinance
requirements. Section 11-21-5.A of the Zoning Ordinance requires details regarding fencing for
8
the patio and pool area to be submitted for review and approval by the Zoning Administrator,
including compliance with Section 11-21-5.G of the Zoning Ordinance related to pools.
The landscape plan proposes 219 overstory, evergreen, and ornamental
trees as noted in the table below:
The site and landscape plan propose a minimum 30-foot landscaped buffer between the townhome
property and the single-family homes to the north. A 30-foot landscaped buffer is consistent with
the 30-foot required landscaped buffer between single family homes and commercial zoned
property. The landscape plan design along the north boundary of Lot 1 shall be amended to include
a row of evergreen trees planted south of the utility easement to provide additional year-round
screening of the townhome buildings from the north.
All landscaped areas shall be irrigated in compliance with Zoning Ordinance requirements.
Evergreen trees shall be a minimum of eight feet in height. Deciduous trees shall be a minimum of
2.5-inch caliper. All shrubs shall comply with minimum size/height requirements, not container
sizes. The landscape plan shall be amended to identify minimum shrub heights in accordance with
Zoning Ordinance requirements, not container size as shown. A landscape security based on the
contractor estimate shall be submitted with the final plat consideration as financial security for
installation of the approved landscaping.
Plans for exterior lighting have not yet been submitted but will be submitted by
the developer and reviewed and administered during the building permit process. All exterior
lighting shall comply with Zoning Ordinance requirements, shall be downcast and not glare onto
public right of way or other residential properties. The developer shall submit a lighting plan
showing the location, height, type, and illumination pattern of all exterior lighting. The intensity
of exterior lighting is limited to one foot-candle measured at the right of way or property line.
Any signage shall comply with Section 11-23-19.D of the Zoning Ordinance allowing uses
within the M-1 District one freestanding sign per lot not to exceed 100 square feet in area and 20
feet in height. A sign permit is required to be issued prior to placement of any sign upon the
property in accordance with Section 11-23-5 of the Zoning Ordinance.
Individual units will be responsible for indoor trash and recycling storage in each
unit as required by the Zoning Ordinance.
Findings of Fact in consideration of the conditional use permit are attached.
9
SITE PLAN
RST-2 Lots. Nine single family home lots are proposed at the northwest corner of the property
with a 230 foot long cul-de-sac street accessed from Kendale Drive.
lot width prior to approval of the
The lots comply with minimum lot area and lot width requirements except for Lot 2 and 4 which
do not clearly determine lot width at the 20 foot garage setback line. The preliminary plat shall be
revised to demonstrate compliance with minimum lot width prior to City Council consideration
of the preliminary plat.
The proposed Sundance Lakeville Second Addition townhome and single family home
development is consistent with the goals and policies of the 2040 Comprehensive Plan for inclusion
of multiple family land uses within mixed use residential and commercial developments adjacent
to the I-35 corridor in proximity to transit facilities to provide market support for surrounding
business and expand housing choices within Lakeville. Furthermore, the proposed development
complies with the performance standards applicable to multiple family uses within the M-1
District established by the Zoning Ordinance and Subdivision Ordinance. Findings of fact
supporting the approval of a conditional use permit to allow for the proposed multiple family use
has been drafted for consideration by the Planning Commission.
Community Development Department staff recommends approval of the preliminary and final
plat of Sundance Lakeville Second Addition, subject to the following stipulations:
1. Implementation of the recommendations listed in the July 8, 2024 engineering report.
10
2. Lots 2-10 shall confirm compliance with minimum lot width requirements of the RST-2
District prior to City Council consideration of the preliminary plat.
3. Park dedication must be paid at the time of final plat approval.
4. The landscape plan design along the north boundary of Lot 1 shall be amended to include
a row of evergreen trees planted south of the utility easement to provide additional year-
round screening of the townhome buildings from the north.
5. All landscaped areas shall be irrigated. Trees and shrubs shall not be planted in street
right-of-way or within the transmission line utility easement and shall comply with
minimum size requirements.
6. The developer shall submit a financial security to guarantee installation of the approved
landscaping at the time of final plat approval.
7. All signs shall comply with the Zoning Ordinance requirements. A sign permit shall be
issued by the Planning Department prior to the installation of any signs.
8. Snow storage shall not take place in required parking spaces.
9. A site lighting plan shall be submitted prior to issuance of a building permit. Site lighting
shall not exceed one foot candle at the property line adjacent to public right-of-way. All
exterior light fixtures shall be down-cast design so as not to glare onto public right-of-
way.
10. The trash enclosures shall be constructed of materials consistent with the principal
building and shall include a durable, maintenance free gate.
11. A private easement allowing shared public access over the private street between Buck
Hill Road and Kendale Drive shall be submitted prior to final plat approval. The private
easement shall include commitments to street construction to City of Lakeville standards,
maintenance and repair, and maintenance and repair of the private storm sewer system
within the private street.
12. No parking signs shall be installed on both sides of the private street between Kendale
Drive and Buck Hill Road.
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
BU
C
K
H
I
L
L
R
D
KE
N
D
A
L
E
D
R
(
P
U
B
L
I
C
)
(P
U
B
L
I
C
)
5' SIDEWALK
5' SIDEWALK24
'
20'20'20'
24
'
32
'
19
.
8
'
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
BUILDING 4
12-UNITS
BUILDING 6
12-UNITS
BUILDING 8
12-UNITS
BUILDING 11
12-UNITS
BUILDING 9
12-UNITS
BUILDING 10
12-UNITS
BUILDING 7
16-UNITS
BUILDING 1
14-UNITS
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
BUILDING 3
16-UNITS
12,500 SF
SINGLE STORY SINGLE STORY
14,000 SF
11
'
BUILDING 5
16-UNITS
Community Room 110
Game Room109
Lobby100
Office101
Office102
Work Room103
Mech104
Womens105Mens106
Yoga108
Fitness107
Concrete Pool Deck
Pool Equip112Mech/Storage111
Pool
CLUBHOUSE
PROPERTY LINE
5' INTERIOR PARKING SETBACK
BUILDING SETBACK/
EASEMENT TRASH
ENCLOSURE
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bik
e
F
i
x
i
t
M1
Pet
W
a
s
h
M2
MAINT.DOG RUN
BUILDING 3
16-UNITS
BUILDING 1
12-UNITS
PROPERTY ZONING
M-1 MIXED USE I-35
CORRIDOR DISTRICT
485,781 SF (11.15 AC)
RST-2, SINGLE AND TWO FAMILY
RESIDENTIAL DISTRICT
156,508 SF (3.59 AC)
FUTURE R.O.W DEDICATION:
21,682 SF (.49 AC)
INCLUDED IN 3.59 AC .
C-3, GENERAL COMMERCIAL
130,933 SF (3.01 AC)
R.O.W DEDICATION:
43,932 SF (1.01 AC)
EXHIBIT A
Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community
158TH ST
City of Burnsville
KENDALE DR
Sundance
Lakeville
Second
Addition
City of Lakeville
Sundance Lakeville
Second Addition
Location Map
EXHIBIT B
BUCK HILL R
D
162ND ST (CSAH 46)
Sundance
Lakeville
DUPONT AVE
KENYON AVE
KENT TRL
SUNDANCE LAKEVILLE
CUP, ADMINISTRATIVE PERMIT, PRELIMINARY AND FINAL PLAT APPLICATION
SUBMITTAL NARRATIVE
Timberland Partners and Davis Medical Group are proposing to construct a mix of multifamily
residential, single-family residential, and medical office on a currently vacant 18.75 parcel of land
located north of 162nd Street (CSAH 46) and west of Buck Hill Road. The existing zoning on the site
includes a mix of RST-2, M-1, and C-3.
More specifically, Timberland Partners proposes to construct 167 townhome-style apartments and 9
single-family rental homes on approximately 14.25 acres of the parcel. Both the multifamily and single-
family project components will be branded as Sundance Lakeville and will include 100% market rate
rentals targeting young couples, with and without children, and empty nesters looking to downsize. No
public subsidy or assistance is requested.
Sundance will contain thirteen (13) two-story buildings, each containing 8-16 flats, or dwelling units, on
11.15 acres that has been rezoned to M-1. The nine (9) single-family homes are located on
approximately 3.10 acres that has been rezoned to RST-2.
The multifamily buildings will include a mix of one-, two-, and three-bedroom units. All units will have
direct access entries and at least one dedicated attached garage space. There are no common corridors
or common entries associated with any of the units, allowing residents increased privacy and sense of
safety. The single-family homes will be a mix of 3- and 4-bedroom homes on sizable lots, each with their
own individual yard. Both the single-family and multifamily components will be constructed as one
cohesive development through connectivity and shared amenities including a 5,000+ square foot
clubhouse which will include a full kitchen, community room, game lounge, and fitness center. It will
also contain offices for our award-winning on-site management team. Connected to the clubhouse will
be a large outdoor pool with an outdoor kitchen, including grilling stations, and a fire pit. Site amenities
will also include natural wetland buffers, ample green space, and a dog run and dog spa.
The proposed plan includes ample resident and guest parking which exceeds city code and is
thoughtfully designed in a manner to provide residents with a true neighborhood feel. All interior roads
are proposed to be private, with the main east-west road that will traverse the site from Kendale Drive
to Buck Hill Road serving as shared access to both the Sundance development and the Davis project.
Both parties will execute a Private Roadway, Stormwater Retention and Utility Easement Agreement
which will outline care and maintenance requirements of the shared road roadway and stormwater
system.
Lakeville-based RT Residential, a division of the Tradition Companies, will be the general contractor for
Sundance Lakeville ensuring that the project will be built to the highest quality and integrity.
Sundance Lakeville will be developed, owned, and managed by Timberland Partners. Timberland is
based in Bloomington, Minnesota, and currently owns and manages over 20,000 apartment homes
located in 18 states. Timberland does not provide any third-party management services, managing only
what we own and focusing on providing a safe, clean, and quality living experience for our residents.
EXHIBIT C
EXHIBIT D
Community Room 110
Game Room
109
Lobby100
Office101
Office102
Work Room 103
Mech
104
Womens
105
Mens106
Yoga108
Fitness
107
Concrete Pool Deck
Pool Equip112Mech/Storage111
Pool
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
R=410.00
L=101.31
Δ=14°09'25"
C.Brg=S33°41'44"W
C=101.05
S88°40'52"E 263.48
S0
0
°
4
5
'
5
0
"
W
2
9
4
.
6
5
N89°45'28"W 1064.56
N0
0
°
3
9
'
1
9
"
E
5
0
7
.
7
1
R=390.00
L=16.13
Δ=2°22'13"
C.Brg=S41°57'34"W
C=16.13
S49°13'36"E
20.00
DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO.145
2
3
4
5
6
7
8
9
10
N0
1
°
3
0
'
0
1
"
E
1
9
7
.
3
4
S40
°
0
6
'
5
3
"
W
2
2
5
.
7
7
N40
°
0
6
'
5
3
"
E
1
3
4
.
3
4
N0
2
°
3
9
'
3
6
"
W
72
.
7
2
N08°29'31"W
19.15
R=271.45L=326.69
Δ=68°57'24"
C.Brg=N35°58'23"W
C=307.33
58
.
6
4
96
.
9
9
13
9
.
0
2
97.35 658.24137.43171.54
N40
°
0
6
'
5
3
"
E
1
6
4
.
9
4
N90°00'00"E 128.20
N0
0
°
0
0
'
0
0
"
E
3
7
1
.
4
9
S1
8
°
0
9
'
4
0
"
W
1
1
8
.
6
6
S34
°
1
1
'
4
9
"
E
1
4
6
.
1
3
N49
°
5
3
'
0
7
"
W
2
0
6
.
0
7
N49
°
5
3
'
0
7
"
W
1
7
4
.
3
6
N49
°
5
3
'
0
7
"
W
1
2
0
.
1
1
N49
°
5
3
'
0
7
"
W
1
2
0
.
1
1
N49
°
5
3
'
0
7
"
W
1
2
0
.
9
6
26.
4
1
138
.
5
3
14
0
.
8
4
R=60.00 L=259.7 3 Δ=248°01'16"
C.Brg=N87°28 '3 5 "W C=99.47
43.
9
9
90.
3
5
82.
7
3
68.
0
4
75.
0
0
R=27.50
L=34.37
=71°36'05"
L=12.04
=11°29'54"
L=79.37
Δ=75°47'30"
L=54.8 3
Δ=52°21'2 8 "L=45.70
Δ=43°38'44"
L=60.77
Δ=58°01'
37"
L=7.02
=6°42'03"
KE
N
Y
O
N
C
O
U
R
T
L=133.79
Δ=28°14'23"
L=44.31
Δ=9
°21'08"
N0
0
°
0
0
'
0
0
"
E
1
7
2
.
7
5
R=170.00
L=153.02
Δ=51°34'27"
N90°00'00"E 185.01 R=414.00L=159.33Δ=22°03'01"C .B r g=N78°58'29"WC=158.35
R=99.04
L=73.58
=42°34'12"
C.Brg=N59°42'39"E
C=71.90
BLOCK 1
N90°00'00"E 140.23
N40
°
0
6
'
5
3
"
E
1
9
8
.
9
6
OU
T
L
O
T
A
48.
5
9
75.
0
0
75.
3
7
15
2
.
1
6
78
.
4
9
1
L=60.30
Δ=12°43'43"
L=88.29Δ=18°38'11"
PARCEL AREA TABLE
PARCEL
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 9
Lot 10
Outlot A
Right of Way
Total
AREA SF
485,781
12,562
9,008
9,011
13,879
21,921
12,936
17,570
15,129
13,056
9,753
21,683
642,290
AREA AC
11.15
0.29
0.21
0.21
0.32
0.50
0.30
0.40
0.35
0.30
0.22
0.50
14.74
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
4
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
PR
E
L
I
M
I
N
A
R
Y
P
L
A
T
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
LEGEND:
EXHIBIT E
R=410.00
L=101.31
Δ=14°09'25"
C.Brg=S33°41'44"W
C=101.05
S88°40'52"E 263.48
S0
0
°
4
5
'
5
0
"
W
2
9
4
.
6
5
N89°45'28"W 1064.56
N0
0
°
3
9
'
1
9
"
E
5
0
7
.
7
1
R=390.00
L=16.13
Δ=2°22'13"
C.Brg=S41°57'34"W
C=16.13
S49°13'36"E
20.00
DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO.145
2
3
4
5
6
7
8
9
10
N0
1
°
3
0
'
0
1
"
E
1
9
7
.
3
4
S40
°
0
6
'
5
3
"
W
2
2
5
.
7
7
N40
°
0
6
'
5
3
"
E
1
3
4
.
3
4
N0
2
°
3
9
'
3
6
"
W
72
.
7
2
N08°29'31"W
19.15
R=271.45L=326.69
Δ=68°57'24"
C.Brg=N35°58'23"W
C=307.33
58
.
6
4
96
.
9
9
13
9
.
0
2
97.35 658.24137.43171.54
N40
°
0
6
'
5
3
"
E
1
6
4
.
9
4
N90°00'00"E 128.20
N0
0
°
0
0
'
0
0
"
E
3
7
1
.
4
9
S1
8
°
0
9
'
4
0
"
W
1
1
8
.
6
6
S34
°
1
1
'
4
9
"
E
1
4
6
.
1
3
N49
°
5
3
'
0
7
"
W
2
0
6
.
0
7
N49
°
5
3
'
0
7
"
W
1
7
4
.
3
6
N49
°
5
3
'
0
7
"
W
1
2
0
.
1
1
N49
°
5
3
'
0
7
"
W
1
2
0
.
1
1
N49
°
5
3
'
0
7
"
W
1
2
0
.
9
6
26.
4
1
138
.
5
3
14
0
.
8
4
R=60.00 L=259.7 3 Δ=248°01'16"
C.Brg=N87°28 '3 5"W C=99.47
43.
9
9
90.
3
5
82.
7
3
68.
0
4
75.
0
0
R=27.50
L=34.37
=71°36'05"
L=12.04
=11°29'54"
L=79.37
Δ=75°47'30"
L=54.8 3
Δ=52°21'2 8 "L=45.70
Δ=43°38'44"
L=60.77
Δ=58°
01'37"
L=7.02
=6°42'03"
KEN
Y
O
N
C
O
U
R
T
L=133.79
Δ=28°14'23"
L=4
4.31
Δ=9°21'08"
N89°45'28"W 1568.22
N0
0
°
0
0
'
0
0
"
E
1
7
2
.
7
5
R=170.00
L=153.02
Δ=51°34'27"
N90°00'00"E 185.01 R=414.00L=159.33Δ=22°03'01"C .B r g=N7 8°58'29"WC=158.35
R=99.04
L=73.58
=42°34'12"
C.Brg=N59°42'39"E
C=71.90
BLOCK 1
N90°00'00"E 140.23
N40
°
0
6
'
5
3
"
E
1
9
8
.
9
6
OU
T
L
O
T
A
48.
5
9
75.
0
0
75.
3
7
15
2
.
1
6
78
.
4
9
1
L=60.30
Δ=12°43'43"
L=88.29Δ=18°38'11"
BLO
C
K
1
1
SUNDANCE LAKEVILLE SECOND ADDITION
EXHIBIT F
R=410.00
L=265.91
Δ=37°09'37"
R=4 6 81.6 6
L=8 7 .5 3
Δ=1°0 4 '16 "
S88°40'52"E 712.12
S0
1
°
1
9
'
0
8
"
W
3
0
7
.
1
5
R=140.00
L=183.39
Δ=75°03'19"
C.Brg=S36°12'31"E
S0
0
°
4
5
'
5
0
"
W
3
8
5
.
5
0
N89°45'28"W 1064.56
N0
0
°
3
9
'
1
9
"
E
5
0
7
.
7
1
R=
3
9
0
.
0
0
L=
1
6
.
1
3
=2°
2
2
'
1
3
"
S49°13'36"E
20.00
N0
3
°
3
6
'
5
0
"
E
73
.
3
8
S86°23'10"E
40.00
N03°36'50"E
25.68
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
BU
C
K
H
I
L
L
R
D
KE
N
D
A
L
E
D
R
(
P
U
B
L
I
C
)
DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO.145
(P
U
B
L
I
C
)
Community Room 110
Game Room 109
Lobby
100
Office101
Office102
Work Room103
Mech
104
Womens
105
Mens
106
Yoga
108
Fitness107
Concrete Pool Deck
Pool Equip112Mech/Storage111
Pool
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
1
BLOCK 1
2
3
4
5
6
7
8
9
10
OUTLOT AKEN
Y
O
N
C
O
U
R
T
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
BUILDING 4
12-UNITS
BUILDING 6
12-UNITS
BUILDING 8
12-UNITS
BUILDING 11
12-UNITS
BUILDING 9
12-UNITS
BUILDING 10
12-UNITS
BUILDING 7
16-UNITS
INFILTRATION
BASIN
BUILDING 3
16-UNITS
BUILDING 5
16-UNITS
CLUBHOUSE
BUILDING 1
12-UNITS
INFILTRATION
BASIN
INFILTRATION
BASIN
INFILTRATION
BASIN
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
8
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
SI
T
E
P
L
A
N
O
V
E
R
A
L
L
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
EXHIBIT G
R=410.00
L=265.91
Δ=37°09'37"
R=4 6 81.6 6
L=8 7 .5 3
Δ=1°0 4 '16 "
S88°40'52"E 712.12
R=
3
9
0
.
0
0
L=
1
6
.
1
3
=2°
2
2
'
1
3
"
S49°13'36"E
20.00
N0
3
°
3
6
'
5
0
"
E
73
.
3
8
S86°23'10"E
40.00
N03°36'50"E
25.68
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
BU
C
K
H
I
L
L
R
D
DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO.145
(P
U
B
L
I
C
)
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 4
12-UNITS
BUILDING 3
16-UNITS
BUILDING 5
16-UNITS
INFILTRATION
BASIN
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
SI
T
E
P
L
A
N
-
V
I
E
W
1
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
7
S88°40'52"E 712.12
S0
1
°
1
9
'
0
8
"
W
3
0
7
.
1
5
R=140.00
L=183.39
Δ=75°03'19"
C.Brg=S36°12'31"E
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
KE
N
D
A
L
E
D
R
(
P
U
B
L
I
C
)
DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO.145
Community Room
110
Game Room
109
Lobby
100
Office
101
Office
102
Work Room
103
Mech
104
Womens
105
Mens
106
Yoga
108
Fitness
107
Concrete Pool Deck
Pool Equip
112
Mech/Storage
111
Pool
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
2
3 OUTLOT AKEN
Y
O
N
C
O
U
R
T
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
INFILTRATION
BASIN
CLUBHOUSE
BUILDING 1
12-UNITS
INFILTRATION
BASIN
INFILTRATION
BASIN
8
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
SI
T
E
P
L
A
N
-
V
I
E
W
2
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
N89°45'28"W 1064.56
N0
0
°
3
9
'
1
9
"
E
5
0
7
.
7
1
R=
3
9
0
.
0
0
L=
1
6
.
1
3
=2°
2
2
'
1
3
"
S49°13'36"E
20.00
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
1
BLOCK 1
OUTLOT A
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 4
12-UNITS
BUILDING 6
12-UNITS
BUILDING 8
12-UNITS
BUILDING 11
12-UNITS
BUILDING 9
12-UNITS
BUILDING 10
12-UNITS
BUILDING 7
16-UNITS
BUILDING 3
16-UNITS
BUILDING 5
16-UNITS
INFILTRATION
BASIN 9
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
SI
T
E
P
L
A
N
-
V
I
E
W
3
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
R=140.00L=183.39
Δ=75°03'19"
C.Brg=S36°12'31"E
S0
0
°
4
5
'
5
0
"
W
3
8
5
.
5
0
N89°45'28"W 1064.56
FD
Bi
k
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
2
3
4
5
6
7
8
9
10
OUTLOT AKEN
Y
O
N
C
O
U
R
T
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
BUILDING 11
12-UNITS
BUILDING 10
12-UNITS
INFILTRATION
BASIN
INFILTRATION
BASIN
10
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
SI
T
E
P
L
A
N
-
V
I
E
W
4
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
R=410.00
L=265.91
Δ=37°09'37"
R=4 6 81.6 6
L=8 7 .5 3
Δ=1°0 4 '16 "
S88°40'52"E 712.12
S0
1
°
1
9
'
0
8
"
W
3
0
7
.
1
5
R=140.00
L=183.39
Δ=75°03'19"
C.Brg=S36°12'31"E
S0
0
°
4
5
'
5
0
"
W
3
8
5
.
5
0
N89°45'28"W 1064.56
N0
0
°
3
9
'
1
9
"
E
5
0
7
.
7
1
R=
3
9
0
.
0
0
L=
1
6
.
1
3
=2°
2
2
'
1
3
"
S49°13'36"E
20.00
N0
3
°
3
6
'
5
0
"
E
73
.
3
8
S86°23'10"E
40.00
N03°36'50"E
25.68
Δ
Δ
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
BU
C
K
H
I
L
L
R
D
KE
N
D
A
L
E
D
R
(
P
U
B
L
I
C
)
(P
U
B
L
I
C
)
Community Room 110
Game Room 109
Lobby
100
Office
101
Office102
Work Room103
Mech104
Womens105
Mens
106
Yoga
108
Fitness107
Concrete Pool Deck
Pool Equip
112
Mech/Storage
111
Pool
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
1
BLOCK 1
2
3
4
5
6
7
8
9
10
OUTLOT AKEN
Y
O
N
C
O
U
R
T
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
BUILDING 4
12-UNITS
BUILDING 6
12-UNITS
BUILDING 8
12-UNITS
BUILDING 11
12-UNITS
BUILDING 9
12-UNITS
BUILDING 10
12-UNITS
BUILDING 7
16-UNITS
INFILTRATION
BASIN
BUILDING 3
16-UNITS
BUILDING 5
16-UNITS
CLUBHOUSE
BUILDING 1
12-UNITS
INFILTRATION
BASIN
INFILTRATION
BASIN
INFILTRATION
BASIN
W/O
W/O
W/O
C W
/
O
L/O
SOG
SOG
W/
O
C L/
O
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
11
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
GR
A
D
I
N
G
A
N
D
E
R
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
O
V
E
R
A
L
L
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
EXHIBIT H
R=410.00
L=265.91
Δ=37°09'37"
R=4 6 81.6 6
L=8 7 .5 3
Δ=1°0 4 '16 "
S88°40'52"E 712.12
R=
3
9
0
.
0
0
L=
1
6
.
1
3
=2°
2
2
'
1
3
"
S49°13'36"E
20.00
N0
3
°
3
6
'
5
0
"
E
73
.
3
8
S86°23'10"E
40.00
N03°36'50"E
25.68
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
BU
C
K
H
I
L
L
R
D
DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO.145
(P
U
B
L
I
C
)
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 4
12-UNITS
BUILDING 3
16-UNITS
BUILDING 5
16-UNITS
INFILTRATION
BASIN
FFE:1008.00
FFE:1009.00
FFE:1008.70
FFE:1009.30
FFE:1007.70
FFE:
1007.00
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
GR
A
D
I
N
G
A
N
D
E
R
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
-
V
I
E
W
1
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
12
S88°40'52"E 712.12
S0
1
°
1
9
'
0
8
"
W
3
0
7
.
1
5
R=140.00
L=183.39
Δ=75°03'19"
C.Brg=S36°12'31"E
Δ
Δ
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
KE
N
D
A
L
E
D
R
(
P
U
B
L
I
C
)
DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO.145
Community Room
110
Game Room
109
Lobby
100
Office
101
Office
102
Work Room
103
Mech
104
Womens
105
Mens
106
Yoga
108
Fitness
107
Concrete Pool Deck
Pool Equip
112
Mech/Storage
111
Pool
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bi
k
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
2
3 OUTLOT AKEN
Y
O
N
C
O
U
R
T
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
INFILTRATION
BASIN
CLUBHOUSE
BUILDING 1
12-UNITS
INFILTRATION
BASIN
INFILTRATION
BASIN
W/O
W/O
FFE:1008.50
FFE:1008.70
FFE:1008.00
FFE:1009.00
FFE:1008.70
FFE:
1007.00
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
GR
A
D
I
N
G
A
N
D
E
R
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
-
V
I
E
W
2
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
13
N89°45'28"W 1064.56
N0
0
°
3
9
'
1
9
"
E
5
0
7
.
7
1
R=
3
9
0
.
0
0
L=
1
6
.
1
3
=2°
2
2
'
1
3
"
S49°13'36"E
20.00
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
1
BLOCK 1
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 4
12-UNITS
BUILDING 6
12-UNITS
BUILDING 8
12-UNITS
BUILDING 11
12-UNITS
BUILDING 9
12-UNITS
BUILDING 10
12-UNITS
BUILDING 7
16-UNITS
BUILDING 3
16-UNITS
BUILDING 5
16-UNITS
INFILTRATION
BASIN
FFE:1008.00
FFE:1009.00
FFE:1011.20 FFE:1010.70 FFE:1010.7
FFE:1009.70
FFE:1010.00
FFE:1008.70
FFE:1009.30
FFE:1010.70
FFE:1007.70
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
GR
A
D
I
N
G
A
N
D
E
R
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
-
V
I
E
W
3
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
14
R=140.00L=183.39
Δ=75°03'19"
C.Brg=S36°12'31"E
S0
0
°
4
5
'
5
0
"
W
3
8
5
.
5
0
N89°45'28"W 1064.56
Δ
Δ
FD
Bi
k
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
2
3
4
5
6
7
8
9
10
OUTLOT AKEN
Y
O
N
C
O
U
R
T
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
BUILDING 11
12-UNITS
BUILDING 10
12-UNITS
INFILTRATION
BASIN
INFILTRATION
BASIN
W/O
W/O
W/O
C W
/
O
L/O
SOG
SOG
W/
O
C L/
O
FFE:1008.00
FFE:1009.00
FFE:1011.20
FFE:1010.00
FFE:1008.70
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
GR
A
D
I
N
G
A
N
D
E
R
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
-
V
I
E
W
4
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
15
R=410.00
L=265.91
Δ=37°09'37"
R=4 6 81.6 6
L=8 7 .5 3
Δ=1°0 4 '16 "
S88°40'52"E 712.12
S0
1
°
1
9
'
0
8
"
W
3
0
7
.
1
5
R=140.00
L=183.39
Δ=75°03'19"
C.Brg=S36°12'31"E
S0
0
°
4
5
'
5
0
"
W
3
8
5
.
5
0
N89°45'28"W 1064.56
N0
0
°
3
9
'
1
9
"
E
5
0
7
.
7
1
R=
3
9
0
.
0
0
L=
1
6
.
1
3
=2°
2
2
'
1
3
"
S49°13'36"E
20.00
N0
3
°
3
6
'
5
0
"
E
73
.
3
8
S86°23'10"E
40.00
N03°36'50"E
25.68
Δ
Δ
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
BU
C
K
H
I
L
L
R
D
KE
N
D
A
L
E
D
R
(
P
U
B
L
I
C
)
(P
U
B
L
I
C
)
Community Room 110
Game Room 109
Lobby
100
Office
101
Office102
Work Room103
Mech104
Womens105
Mens
106
Yoga
108
Fitness107
Concrete Pool Deck
Pool Equip
112
Mech/Storage
111
Pool
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
1
BLOCK 1
2
3
4
5
6
7
8
9
10
OUTLOT AKEN
Y
O
N
C
O
U
R
T
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
BUILDING 4
12-UNITS
BUILDING 6
12-UNITS
BUILDING 8
12-UNITS
BUILDING 11
12-UNITS
BUILDING 9
12-UNITS
BUILDING 10
12-UNITS
BUILDING 7
16-UNITS
INFILTRATION
BASIN
BUILDING 3
16-UNITS
BUILDING 5
16-UNITS
CLUBHOUSE
BUILDING 1
12-UNITS
INFILTRATION
BASIN
INFILTRATION
BASIN
INFILTRATION
BASIN
W/O
W/O
W/O
C W
/
O
L/O
SOG
SOG
W/
O
C L/
O
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
16
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
ST
O
R
M
W
A
T
E
R
P
O
L
L
U
T
I
O
N
P
R
E
V
E
N
T
I
O
N
(
S
W
P
P
P
)
P
L
A
N
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
Community Room 110
Game Room109
Lobby
100
Office101
Office102
Work Room 103
Mech104
Womens105
Mens
106
Yoga
108
Fitness107
Concrete Pool Deck
Pool Equip112Mech/Storage111
Pool
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bik
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
1
BLOCK 1
2
3
4
5
6
7
8
9
10
OUTLOT AKEN
Y
O
N
C
O
U
R
T
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
BU
C
K
H
I
L
L
R
D
KE
N
D
A
L
E
D
R
(
P
U
B
L
I
C
)
(P
U
B
L
I
C
)
TREE PROTECTION FENCE
NOT TO SCALE
42
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
TR
E
E
P
R
E
S
E
R
V
A
T
I
O
N
P
L
A
N
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
EXHIBIT I
43
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
TR
E
E
I
N
V
E
N
T
O
R
Y
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
44
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
TR
E
E
I
N
V
E
N
T
O
R
Y
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
BU
C
K
H
I
L
L
R
D
DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO.145
(P
U
B
L
I
C
)
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bi
k
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 4
12-UNITS
STORMWATER
POND
BUILDING 3
16-UNITS
BUILDING 5
16-UNITS
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 16 UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 16 UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
LA
N
D
S
C
A
P
E
P
L
A
N
-
V
I
E
W
1
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
36
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
EXHIBIT J
COUNTY HWY NO. 46 (PUBLIC) (AKA 162ND ST W)
KE
N
D
A
L
E
D
R
(
P
U
B
L
I
C
)
DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO.145
Community Room
110
Game Room
109
Lobby
100
Office
101
Office
102
Work Room
103
Mech
104
Womens
105
Mens
106
Yoga
108
Fitness
107
Concrete Pool Deck
Pool Equip
112
Mech/Storage
111
Pool
FD
Ma
i
n
t
.
S
t
o
r
a
g
e
M3
Bi
k
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
MAINT.DOG RUN
2
3 OUTLOT AKEN
Y
O
N
C
O
U
R
T
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
STORMWATER
POND
STORMWATER
POND
CLUBHOUSE
BUILDING 1
12-UNITS
STORMWATER
POND
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 11 UNIT TYPICAL FOUNDATION PLANTING,
SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
37
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
LA
N
D
S
C
A
P
E
P
L
A
N
-
V
I
E
W
2
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
Bi
k
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
1
BLOCK 1
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 4
12-UNITS
BUILDING 6
12-UNITS
BUILDING 8
12-UNITS
BUILDING 11
12-UNITS
BUILDING 9
12-UNITS
BUILDING 10
12-UNITS
BUILDING 7
16-UNITS
STORMWATER
POND
BUILDING 3
16-UNITS
BUILDING 5
16-UNITS
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-B UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 16 UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 16 UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 16 UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
38
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
LA
N
D
S
C
A
P
E
P
L
A
N
-
V
I
E
W
3
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
FD
Bi
k
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
2
3
4
5
6
7
8
9
10
OUTLOT AKEN
Y
O
N
C
O
U
R
T
BUILDING 2
12-UNITS
BUILDING 12
12-UNITS
BUILDING 13
11-UNITS
BUILDING 11
12-UNITS
BUILDING 10
12-UNITS
STORMWATER
POND
STORMWATER
POND
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 12-A UNIT TYPICAL
FOUNDATION PLANTING, SHEET 41
SEE 11 UNIT TYPICAL FOUNDATION PLANTING,
SHEET 41
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
39
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
LA
N
D
S
C
A
P
E
P
L
A
N
-
V
I
E
W
4
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
40
MULCH AT SOD DETAIL
NOT TO SCALE
5
MULCH AT SIDEWALK DETAIL
NOT TO SCALE
4
3 PERENNIAL PLANTINGS
NOT TO SCALE
SHRUB PLANTING
NOT TO SCALE
2
TREE PLANTING
NOT TO SCALE
1
PLANTING NOTES:
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
LA
N
D
S
C
A
P
E
S
C
H
E
D
U
L
E
,
N
O
T
E
S
A
N
D
D
E
T
A
I
L
S
LANDSCAPE SCHEDULE:
SEEDING NOTES:
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
BUILDING 9
12-UNITSBUILDING 13
11-UNITS
BUILDING 7
16-UNITS
FD
Bi
k
e
F
i
x
i
t
M1
Pe
t
W
a
s
h
M2
BUILDING 2
12-UNITS
733 Marquette Avenue
Minneapolis, MN 55402
612.758.3080
www.alliant-inc.com
Suite 700
41
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
CU
P
/
P
R
E
L
I
M
I
N
A
R
Y
&
F
I
N
A
L
P
L
A
T
TY
P
I
C
A
L
L
A
N
D
S
C
A
P
E
P
L
A
N
S
16 UNIT TYPICAL FOUNDATION PLANTING
SCALE: 1" = 20'
4
11 UNIT TYPICAL FOUNDATION PLANTING
SCALE: 1" = 20'
1 12-B UNIT TYPICAL FOUNDATION PLANTING
SCALE: 1" = 20'
2
LEGEND:
LANDSCAPE SCHEDULE:
12-A UNIT TYPICAL FOUNDATION PLANTING
SCALE: 1" = 20'
3
FOR RE
V
I
E
W
O
N
L
Y
PRELIM
I
N
A
R
Y
NOT FO
R
C
O
N
S
T
R
U
C
T
I
O
N
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
Cover Sheet
SUNDANCE LAKEVILLE
Gross Square Footage Building
Site Count Level -1 Level 1 Level 2 Level 3
Building Total
Gross Area
Total Gross Building
Areas
11-Unit Building (11A) 1 -9,134ft² 8,885ft² -18,019ft²18,019ft²
12-Unit Building (12A) 8 -8,384ft² 8,315ft² 1,190ft² 17,709ft²141,672ft²
12-Unit Building (12B) 1 -10,374ft² 10,115ft² -20,490ft²20,490ft²
16-Unit Building (16A) 3 -11,803ft² 11,454ft² -23,257ft²69,771ft²
Clubhouse 1 -5,120ft² --5,120ft²5,120ft²
Maintenance 1 -1,014ft² --1,014ft²1,014ft²
x Grand Total 15 256,086ft²
Unit Mix
Name
Garage
Stalls
Total Unit
Count
Unit Area
w/ Mezz
Unit A1 1 45 797 ft²
Unit A2 1 14 813 ft²
Unit A3 - Type A 1 2 728 ft²
Unit A7 1 6 855 ft²
Unit B2 1 50 1,221 ft²
Unit B2 2 2 1,221 ft²
Unit B3 1 2 1,134 ft²
Unit B4 1 2 1,188 ft²
Unit B4 2 1 1,188 ft²
Unit B5 - Type A 2 1 1,098 ft²
Unit B6 1 2 1,305 ft²
Unit B7 1 32 1,111 ft²
Unit C2 2 1 1,433 ft²
Unit C3 - Type A 2 1 1,422 ft²
Unit C4 1 6 1,660 ft²
Grand total 167
Residential Unit Mix - 12-Unit Building (12A) - 8 Buildings on Site
Name
Garage
Stalls Count
HUD Gross Square Footage HUD Net Rentable Square Footage Rooms
Unit
Type
Main
Floor Mezzanine Stairs
Garage
Area
Total Unit
Gross
Total Gross
Area
Main
Floor
Net
Stairs
Net
Mezzanine
Net
Garage
Net
Total
Unit Net
Total Net
Area Bed Bath
Level 1
Unit A1 1 4 797 ft² 0 ft²0 ft² 381 ft² 1,178 ft² 4,713 ft² 740 ft² 0 ft² 0 ft²339 ft² 1,079 ft² 4,316 ft² 1 1 Type B
Level 2
Unit B2 1 4 1,221 ft² 0 ft²92 ft² 318 ft² 1,631 ft² 6,524 ft² 1,153 ft² 68 ft² 0 ft²289 ft² 1,510 ft² 6,040 ft² 2 2 -
Unit B7 1 4 813 ft² 298 ft² 96 ft² 411 ft² 1,618 ft² 6,471 ft² 759 ft² 83 ft² 321 ft² 367 ft² 1,529 ft² 6,117 ft² 2 2 -
Grand total 12 17,709 ft²16,473 ft²
Residential Unit Mix - 11-Unit Building w/ Type A (11A)
Name
Garage
Stalls Count
HUD Unit Gross Square Footage HUD Net Rentable Square Footage Rooms
Unit
Type
Main
Floor Stairs
Garage
Area
Total Unit
Area Total Area
Main
Floor Stairs Garage Net Total
Total Net
Area Bed Bath
Level 1
Unit A1 1 1 797 ft² 0 ft² 381 ft² 1,178 ft² 1,178 ft² 740 ft² 0 ft² 339 ft²1,079 ft² 1,079 ft² 1 1 Type B
Unit B3 1 1 1,134 ft² 0 ft² 419 ft² 1,554 ft² 1,554 ft² 1,070 ft² 0 ft² 372 ft²1,442 ft² 1,442 ft² 2 2 Type B
Unit B5 - Type A 2 1 1,098 ft² 0 ft² 723 ft² 1,820 ft² 1,820 ft² 1,035 ft² 0 ft² 676 ft²1,711 ft² 1,711 ft² 2 2 Type A
Level 2
Unit A2 1 1 813 ft² 96 ft² 412 ft² 1,321 ft² 1,321 ft² 759 ft² 83 ft² 367 ft²1,208 ft² 1,208 ft² 1 1 -
Unit A2 1 1 813 ft² 132 ft² 412 ft² 1,357 ft² 1,357 ft² 759 ft² 83 ft² 337 ft²1,178 ft² 1,178 ft² 1 1 -
Unit B2 1 2 1,221 ft² 92 ft² 318 ft² 1,631 ft² 3,262 ft² 1,153 ft² 68 ft² 289 ft²1,510 ft² 3,020 ft² 2 2 -
Unit B2 1 1 1,221 ft² 114 ft² 379 ft² 1,714 ft² 1,714 ft² 1,153 ft² 68 ft² 346 ft²1,567 ft² 1,567 ft² 2 2 -
Unit B2 2 1 1,221 ft² 114 ft² 716 ft² 2,051 ft² 2,051 ft² 1,153 ft² 68 ft² 669 ft²1,890 ft² 1,890 ft² 2 2 -
Unit B4 1 1 1,188 ft² 95 ft² 412 ft² 1,695 ft² 1,695 ft² 1,125 ft² 88 ft² 367 ft²1,579 ft² 1,579 ft² 2 2 -
Unit B4 2 1 1,188 ft² 132 ft² 748 ft² 2,068 ft² 2,068 ft² 1,125 ft² 88 ft² 696 ft²1,908 ft² 1,908 ft² 2 2 -
Grand total 11 18,019 ft²16,583 ft²
Residential Unit Mix - 16-Unit Building (16A)
Name
Garage
Stalls Count
HUD Unit Gross Square Footage HUD Net Rentable Square Footage Rooms
Unit
Type
Main
Floor Stairs
Garage
Area
Total Unit
Area Total Area
Main
Floor Stairs Garage Net Total
Total Net
Area Bed Bath
Level 1
Unit A1 1 4 797 ft² 0 ft² 381 ft² 1,178 ft² 4,713 ft² 740 ft² 0 ft² 339 ft²1,079 ft² 4,316 ft² 1 1 Type B
Unit A7 1 2 855 ft² 0 ft² 385 ft² 1,240 ft² 2,479 ft² 798 ft² 0 ft² 346 ft²1,144 ft² 2,288 ft² 1 1 Type B
Level 2
Unit A2 1 2 813 ft² 96 ft² 412 ft² 1,321 ft² 2,642 ft² 753 ft² 83 ft² 337 ft²1,173 ft² 2,346 ft² 1 1 -
Unit A2 1 2 813 ft² 96 ft² 373 ft² 1,282 ft² 2,564 ft² 753 ft² 83 ft² 352 ft²1,188 ft² 2,376 ft² 1 1 -
Unit B2 1 4 1,221 ft² 92 ft² 318 ft² 1,631 ft² 6,524 ft² 1,148 ft² 86 ft² 287 ft²1,521 ft² 6,084 ft² 2 2 -
Unit C4 1 2 1,660 ft² 96 ft² 412 ft² 2,168 ft² 4,335 ft² 1,502 ft² 76 ft² 337 ft²1,915 ft² 3,829 ft² 3 2 -
Grand total 16 23,257 ft²21,239 ft²
Residential Unit Mix - 12-Unit Building (12B) - 1 Building on Site
Name
Garage
Stalls Count
HUD Unit Gross Square Footage HUD Net Rentable Square Footage Rooms
Unit
Type
Main
Floor Stairs
Garage
Area
Total Unit
Area Total Area
Main
Floor Stairs Garage Net Total
Total Net
Area Bed Bath
Level 1
Unit A3 - Type A 1 2 728 ft² 0 ft² 491 ft² 1,219 ft² 2,437 ft² 675 ft² 0 ft² 454 ft²1,129 ft² 2,258 ft² 1 1 Type A
Unit B3 1 1 1,134 ft² 0 ft² 419 ft² 1,553 ft² 1,553 ft² 1,070 ft² 0 ft² 372 ft²1,442 ft² 1,442 ft² 2 2 Type B
Unit C3 - Type A 2 1 1,422 ft² 0 ft² 699 ft² 2,121 ft² 2,121 ft² 1,336 ft² 0 ft² 653 ft²1,989 ft² 1,989 ft² 3 2 Type A
Level 2
Unit B2 1 1 1,221 ft² 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,153 ft² 68 ft² 289 ft²1,510 ft² 1,510 ft² 2 2 -
Unit B2 1 1 1,221 ft² 92 ft² 336 ft² 1,649 ft² 1,649 ft² 1,153 ft² 68 ft² 302 ft²1,523 ft² 1,523 ft² 2 2 -
Unit B2 1 1 1,221 ft² 92 ft² 437 ft² 1,750 ft² 1,750 ft² 1,153 ft² 68 ft² 397 ft²1,618 ft² 1,618 ft² 2 2 -
Unit B2 2 1 1,221 ft² 92 ft² 773 ft² 2,086 ft² 2,086 ft² 1,153 ft² 68 ft² 722 ft²1,943 ft² 1,943 ft² 2 2 -
Unit B4 1 1 1,188 ft² 95 ft² 412 ft² 1,695 ft² 1,695 ft² 1,125 ft² 76 ft² 367 ft²1,568 ft² 1,568 ft² 2 2 -
Unit B6 1 2 1,305 ft² 96 ft² 412 ft² 1,813 ft² 3,627 ft² 1,102 ft² 76 ft² 367 ft²1,545 ft² 3,090 ft² 2 2 -
Unit C2 2 1 1,433 ft² 96 ft² 412 ft² 1,941 ft² 1,941 ft² 1,366 ft² 76 ft² 367 ft²1,809 ft² 1,809 ft² 3 2 -
Grand total 12 20,490 ft²18,751 ft²
EXHIBIT K1
UP
UP
UP
UP
412 ft²
Unit B7-Garage
381 ft²
Unit A1-Garage
318 ft²
Unit B2-Garage
96 ft²
Unit B7 - Stairs
412 ft²
Unit B7-Garage
381 ft²
Unit A1-Garage
318 ft²
Unit B2-Garage
96 ft²
Unit B7 - Stairs
412 ft²
Unit B7-Garage
381 ft²
Unit A1-Garage
318 ft²
Unit B2-Garage
96 ft²
Unit B7 - Stairs
412 ft²
Unit B7-Garage
381 ft²
Unit A1-Garage
318 ft²
Unit B2-Garage
96 ft²
Unit B7 - Stairs
ME
C
H
797 ft²
Unit A1
797 ft²
Unit A1
797 ft²
Unit A1
797 ft²
Unit A1
A501 2
A5013
SD_312
4
SD_312
1
SD_312 2
SD_3123
SD_311
5
SD_311
2
SD_311 3
SD_3114
118'-8"
83
'
-
8
"
813 ft²
Unit B7
1,221 ft²
Unit B2
1,221 ft²
Unit B2
1,221 ft²
Unit B2
1,221 ft²
Unit B2
A501 2
A5013
SD_312
4
SD_312
1
SD_312 2
SD_3123
SD_311
5
SD_311
2
SD_311 3
SD_3114
813 ft²
Unit B7
813 ft²
Unit B7
813 ft²
Unit B7
A501
1
A501 2
A501
4
A5013
SD_312
4
SD_312
1
SD_312 2
SD_3123
SD_311
5
SD_311
2
SD_311 3
SD_3114
298 ft²
Unit B7-Mezzanine
298 ft²
Unit B7-Mezzanine
298 ft²
Unit B7-Mezzanine
298 ft²
Unit B7-Mezzanine
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
12-Unit Building (12A) - Floor Plans
1/8" = 1'-0"1 Level 1 - 12-Unit Building
1/8" = 1'-0"2 Level 2 - 12-Unit Building
Residential Unit Mix - 12-Unit Building (12A) - 8 Buildings on Site
Name
Garage
Stalls Count
HUD Gross Square Footage HUD Net Rentable Square Footage Rooms
Unit
Type
Main
Floor Mezzanine Stairs
Garage
Area
Total Unit
Gross
Total Gross
Area
Main
Floor
Net
Stairs
Net
Mezzanine
Net
Garage
Net
Total
Unit Net
Total Net
Area Bed Bath
Level 1
Unit A1 1 4 797 ft² 0 ft²0 ft² 381 ft² 1,178 ft² 4,713 ft² 740 ft² 0 ft² 0 ft²339 ft² 1,079 ft² 4,316 ft² 1 1 Type B
Level 2
Unit B2 1 4 1,221 ft² 0 ft²92 ft² 318 ft² 1,631 ft² 6,524 ft² 1,153 ft² 68 ft² 0 ft²289 ft² 1,510 ft² 6,040 ft² 2 2 -
Unit B7 1 4 813 ft² 298 ft² 96 ft² 411 ft² 1,618 ft² 6,471 ft² 759 ft² 83 ft² 321 ft² 367 ft² 1,529 ft² 6,117 ft² 2 2 -
Grand total 12 17,709 ft²16,473 ft²
1/8" = 1'-0"3 Level 3 Copy 1 - 12-Unit Building (12A)
6 12-Unit Building - 3D Exteriors - 1
7 12-Unit Building - 3D Exteriors - 2
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
12-Unit Building (12A)
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
4.17.37.7
4.17.8
4.1 7.3 7.7
4.1 7.8 High Truss Brg.
130'-4 7/8"
7.6
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 1,078 SF = 47%
-STONE VENEER = 1,197 SF = 53%
TRANSPARENCY
-GLAZING/DOORS = 773 SF = 33%
7.3 7.7 7.37.7
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
7.1 7.6 26.1 4.1
7.7 6.17.6
4.1 7.76.1 7.6
High Truss Brg.
130'-4 7/8"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 448 SF = 38%
-STONE VENEER = 728 SF = 62%
TRANSPARENCY
-GLAZING/DOORS = 600 SF = 33% 5.27.3
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
4.17.7 7.6 6.1
26.17.67.1
4.1 7.77.66.1
High Truss Brg.
130'-4 7/8"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 448 SF = 38%
-STONE VENEER = 728 SF = 62%
TRANSPARENCY
-GLAZING/DOORS = 600 SF = 33%
7.3 5.2
7.3
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
7.6 4.1 7.3 7.7
4.1
7.37.7
4.1 7.87.8
4.1
High Truss Brg.
130'-4 7/8"
7.3 7.7 7.37.7
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 1,078 SF = 47%
-STONE VENEER = 1,197 SF = 53%
TRANSPARENCY
-GLAZING/DOORS = 773 SF = 33%
EXTERIOR MATERIALS TAG KEY
5.1 ALUMINUM RAILINGS - COLOR: BLACK
4.1 CULTURED STONE - COLOR: TBD
5.3 METAL FENCE POST - COLOR: BLACK
6.1 CEDAR TIMBER - COLOR: STAINED
5.2 CORRUGATED METAL ROOFING - COLOR: BLACK
7.5 PVC SKIRTBOARD - COLOR: WHITE
7.1 LAP SIDING - COLOR: SW 7006 EXTRA WHITE
7.3 BOARD & BATTEN SIDING - SW 7006 EXTRA WHITE
7.4 TRIM - COLOR: SW 7006 EXTRA WHITE
7.6 ASPHALT SHINGLES - COLOR: CHARCOAL
26.1 EXTERIOR LIGHTING - COLOR: BLACK
8.1 GLAZING
7.7 DECORATIVE 12"x36" LOUVER - COLOR: BLACK
5.4 PREFINISHED ALUMINUM GUTTERS & DOWNSPOUTS -
COLOR: WHITE
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
12-Unit Building (12A) - Exteriors
3/16" = 1'-0"1 12-Unit Building (12A) - Front Elevation
3/16" = 1'-0"2 12-Unit Building (12A) - Side Elevation 1
3/16" = 1'-0"3 12-Unit Building (12A) - Side Elevation 2
3/16" = 1'-0"4 12-Unit Building (12A) - Back Elevation
UP
UP
UP
UP
UP
UP
UP
UP
1,134 ft²
Unit B3
797 ft²
Unit A1
1,098 ft²
Unit B5 - Type A
412 ft²
Unit B4-Garage
419 ft²
Unit B3-Garage
318 ft²
Unit B2-Garage
95 ft²
Unit B4 - Stairs
748 ft²
Unit B4-Garage
379 ft²
Unit B2-Garage
132 ft²
Unit B4 - Stairs
412 ft²
Unit A2-Garage
381 ft²
Unit A1-Garage
318 ft²
Unit B2-Garage
96 ft²
Unit A2 - Stairs
716 ft²
Unit B2-Garage
412 ft²
Unit A2-Garage
132 ft²
Unit A2 - Stairs
723 ft²
Unit B5 - Type A -
Garage
ME
C
H
SD_3313
SD_331 2
SD_331
1
SD_331
4
696 ft²
Unit B4-Garage 2
346 ft²
Unit B2-Garage 1
289 ft²
Unit B2-Garage 1
372 ft²
Unit B3-Garage
367 ft²
Unit B4-Garage 1
337 ft²
Unit A2-Garage
669 ft²
Unit B2-Garage 3
289 ft²
Unit B2-Garage 1
339 ft²
Unit A1-Garage
367 ft²
Unit A2-Garage
676 ft²
Unit B5 - Type A -Garage
131'-4"
83
'
-
8
"
1,221 ft²
Unit B2
1,221 ft²
Unit B2
1,188 ft²
Unit B4
1,188 ft²
Unit B4
1,221 ft²
Unit B2
1,221 ft²
Unit B2
813 ft²
Unit A2
813 ft²
Unit A2
SD_3313
SD_331 2
SD_331
1
SD_331
4
40'-0"
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
11-Unit Building - Floor Plans
1/8" = 1'-0"1 Level 1 - 11-Unit Building
1/8" = 1'-0"2 Level 2 - 11-Unit Building
3 11-Unit Building - 3D Exteriors - 1
4 11-Unit Building - 3D Exteriors - 2
Residential Unit Mix - 11-Unit Building w/ Type A (11A)
Name
Garage
Stalls Count
HUD Unit Gross Square Footage HUD Net Rentable Square Footage Rooms
Unit
Type
Main
Floor Stairs
Garage
Area
Total Unit
Area Total Area
Main
Floor Stairs Garage Net Total
Total Net
Area Bed Bath
Level 1
Unit A1 1 1 797 ft² 0 ft² 381 ft² 1,178 ft² 1,178 ft² 740 ft² 0 ft² 339 ft²1,079 ft² 1,079 ft² 1 1 Type B
Unit B3 1 1 1,134 ft² 0 ft² 419 ft² 1,554 ft² 1,554 ft² 1,070 ft² 0 ft² 372 ft²1,442 ft² 1,442 ft² 2 2 Type B
Unit B5 - Type A 2 1 1,098 ft² 0 ft² 723 ft² 1,820 ft² 1,820 ft² 1,035 ft² 0 ft² 676 ft²1,711 ft² 1,711 ft² 2 2 Type A
Level 2
Unit A2 1 1 813 ft² 96 ft² 412 ft² 1,321 ft² 1,321 ft² 759 ft² 83 ft² 367 ft²1,208 ft² 1,208 ft² 1 1 -
Unit A2 1 1 813 ft² 132 ft² 412 ft² 1,357 ft² 1,357 ft² 759 ft² 83 ft² 337 ft²1,178 ft² 1,178 ft² 1 1 -
Unit B2 1 2 1,221 ft² 92 ft² 318 ft² 1,631 ft² 3,262 ft² 1,153 ft² 68 ft² 289 ft²1,510 ft² 3,020 ft² 2 2 -
Unit B2 1 1 1,221 ft² 114 ft² 379 ft² 1,714 ft² 1,714 ft² 1,153 ft² 68 ft² 346 ft²1,567 ft² 1,567 ft² 2 2 -
Unit B2 2 1 1,221 ft² 114 ft² 716 ft² 2,051 ft² 2,051 ft² 1,153 ft² 68 ft² 669 ft²1,890 ft² 1,890 ft² 2 2 -
Unit B4 1 1 1,188 ft² 95 ft² 412 ft² 1,695 ft² 1,695 ft² 1,125 ft² 88 ft² 367 ft²1,579 ft² 1,579 ft² 2 2 -
Unit B4 2 1 1,188 ft² 132 ft² 748 ft² 2,068 ft² 2,068 ft² 1,125 ft² 88 ft² 696 ft²1,908 ft² 1,908 ft² 2 2 -
Grand total 11 18,019 ft²16,583 ft²
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 1,054 SF = 49%
-STONE VENEER = 1,086 SF = 51%
TRANSPARENCY
-GLAZING/DOORS = 768 SF = 26%
4.17.37.74.17.8 7.8 4.1 7.3 7.7 4.1 7.87.3 6.1 7.1 6.17.6
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 564 SF = 41%
-STONE VENEER = 803 SF = 59%
TRANSPARENCY
-GLAZING/DOORS = 565 SF = 29%
7.1 7.6 26.1 4.1 7.7 6.17.64.17.76.1 7.6
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 564 SF = 41%
-STONE VENEER = 803 SF = 59%
TRANSPARENCY
-GLAZING/DOORS = 565 SF = 29%
4.1 7.626.17.67.14.17.6 7.76.1 7.7 6.1
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 1,076 SF = 49%
-STONE VENEER = 1,107 SF = 51%
TRANSPARENCY
-GLAZING/DOORS = 738 SF = 25%
4.1 7.3 7.77.6
4.1 7.8
4.17.37.7 7.6
4.17.8
7.3 6.1 7.1 6.17.6 7.8
EXTERIOR MATERIALS TAG KEY
5.1 ALUMINUM RAILINGS - COLOR: BLACK
4.1 CULTURED STONE - COLOR: TBD
5.3 METAL FENCE POST - COLOR: BLACK
6.1 CEDAR TIMBER - COLOR: STAINED
5.2 CORRUGATED METAL ROOFING - COLOR: BLACK
7.5 PVC SKIRTBOARD - COLOR: WHITE
7.1 LAP SIDING - COLOR: SW 7006 EXTRA WHITE
7.3 BOARD & BATTEN SIDING - SW 7006 EXTRA WHITE
7.4 TRIM - COLOR: SW 7006 EXTRA WHITE
7.6 ASPHALT SHINGLES - COLOR: CHARCOAL
26.1 EXTERIOR LIGHTING - COLOR: BLACK
8.1 GLAZING
7.7 DECORATIVE 12"x36" LOUVER - COLOR: BLACK
5.4 PREFINISHED ALUMINUM GUTTERS & DOWNSPOUTS -
COLOR: WHITE
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
11-Unit Building - Exteriors
3/16" = 1'-0"1 11-Unit Building (11A) - Front Elevation
3/16" = 1'-0"2 11-Unit Building (11A) - Side Elevation 1
3/16" = 1'-0"3 11-Unit Building (11A) - Side Elevation 2
3/16" = 1'-0"4 11-Unit Building (11A) - Back Elevation
SD_342
3
SD_342
4
SD_342 1
SD_3422
412 ft²
Unit A2-Garage
381 ft²
Unit A1-Garage
318 ft²
Unit B2-Garage
318 ft²
Unit B2-Garage
381 ft²
Unit A1-Garage
412 ft²
Unit C4-Garage
797 ft²
Unit A1
797 ft²
Unit A1
385 ft²
Unit A7-Garage
373 ft²
Unit A2-Garage 3
373 ft²
Unit A2-Garage 3
855 ft²
Unit A7
412 ft²
Unit A2-Garage
381 ft²
Unit A1-Garage
318 ft²
Unit B2-Garage
318 ft²
Unit B2-Garage
381 ft²
Unit A1-Garage
412 ft²
Unit C4-Garage
797 ft²
Unit A1
385 ft²
Unit A7-Garage
855 ft²
Unit A7
1
2
797 ft²
Unit A1
173'-4"
83
'
-
8
"
SD_342
3
SD_342
4
SD_342 1
SD_3422
1,221 ft²
Unit B2
1,221 ft²
Unit B2
1,660 ft²
Unit C4
813 ft²
Unit A2
813 ft²
Unit A2
1,221 ft²
Unit B2
1,221 ft²
Unit B2
1,660 ft²
Unit C4
813 ft²
Unit A2
813 ft²
Unit A2
1
2
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
16-Unit Building - Floor Plans
1/8" = 1'-0"1 Level 1 - 16-Unit Building
1/8" = 1'-0"2 Level 2 - 16-Unit Building
Residential Unit Mix - 16-Unit Building (16A)
Name
Garage
Stalls Count
HUD Unit Gross Square Footage HUD Net Rentable Square Footage Rooms
Unit
Type
Main
Floor Stairs
Garage
Area
Total Unit
Area Total Area
Main
Floor Stairs Garage Net Total
Total Net
Area Bed Bath
Level 1
Unit A1 1 4 797 ft² 0 ft² 381 ft² 1,178 ft² 4,713 ft² 740 ft² 0 ft² 339 ft²1,079 ft² 4,316 ft² 1 1 Type B
Unit A7 1 2 855 ft² 0 ft² 385 ft² 1,240 ft² 2,479 ft² 798 ft² 0 ft² 346 ft²1,144 ft² 2,288 ft² 1 1 Type B
Level 2
Unit A2 1 2 813 ft² 96 ft² 412 ft² 1,321 ft² 2,642 ft² 753 ft² 83 ft² 337 ft²1,173 ft² 2,346 ft² 1 1 -
Unit A2 1 2 813 ft² 96 ft² 373 ft² 1,282 ft² 2,564 ft² 753 ft² 83 ft² 352 ft²1,188 ft² 2,376 ft² 1 1 -
Unit B2 1 4 1,221 ft² 92 ft² 318 ft² 1,631 ft² 6,524 ft² 1,148 ft² 86 ft² 287 ft²1,521 ft² 6,084 ft² 2 2 -
Unit C4 1 2 1,660 ft² 96 ft² 412 ft² 2,168 ft² 4,335 ft² 1,502 ft² 76 ft² 337 ft²1,915 ft² 3,829 ft² 3 2 -
Grand total 16 23,257 ft²21,239 ft²
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
16-Unit Building - Exteriors
1 16-Unit Building - 3D Exteriors - 1
2 16-Unit Building - 3D Exteriors - 2
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 785 SF = 42%
-STONE VENEER = 1,094 SF = 58%
TRANSPARENCY
-GLAZING/DOORS = 567 SF = 30%
6.1 7.6 7.7 4.1 7.1 7.6 26.1 6.17.67.74.1
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
6.1 7.6 7.7 4.1 7.1 7.6 26.1 6.17.67.74.1
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 785 SF = 42%
-STONE VENEER = 1,094 SF = 58%
TRANSPARENCY
-GLAZING/DOORS = 567 SF = 30%
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
4.1
7.3 7.7
7.6
26.1 4.15.1 6.1 7.37.1 7.6 6.1 4.1 26.1
4.1
7.3
7.7
7.6
26.14.1 5.16.17.3 7.17.66.14.126.1
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 1,843 SF = 49%
-STONE VENEER = 1,950 SF = 51%
TRANSPARENCY
-GLAZING/DOORS = 1,168 SF = 31%
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 1,843 SF = 49%
-STONE VENEER = 1,950 SF = 51%
TRANSPARENCY
-GLAZING/DOORS = 977 SF = 26%
7.6 4.1
7.3 7.7
7.64.1
7.37.74.16.17.3 7.17.6 6.1 26.14.1
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
16-Unit Building - Exteriors
3/16" = 1'-0"1 16-Unit Building- Side Elevation 2
3/16" = 1'-0"2 16-Unit Building - Side Elevation 1
3/16" = 1'-0"3 16-Unit Building - Front Elevation1
3/16" = 1'-0"4 16-Unit Building - Back Elevation1
SD_353
5
SD_353 4
SD_3536
1,422 ft²
Unit C3 - Type A1,134 ft²
Unit B3
412 ft²
Unit B6-Garage
773 ft²
Unit B2-Garage
318 ft²
Unit B2-Garage
419 ft²
Unit B3-Garage
412 ft²
Unit B4-Garage
412 ft²
Unit C2-Garage
699 ft²
Unit C3 Type A -
Garage 2
437 ft²
Unit B2-Garage
336 ft²
Unit B2-Garage
412 ft²
Unit B6-Garage
2
3
491 ft²
Unit A3 Type A-Garage
728 ft²
Unit A3 - Type A
728 ft²
Unit A3 - Type A
491 ft²
Unit A3 Type A-Garage
96 ft²
Unit B6-Stairs
95 ft²
Unit B4 - Stairs
96 ft²
Unit B6-Stairs
96 ft²
Unit C2 - Stairs
92 ft²
Unit B2- Stairs
152'-5 1/2"
83
'
-
8
"
SD_353
5
SD_353 4
SD_3536
1,305 ft²
Unit B6
1,305 ft²
Unit B6
1,221 ft²
Unit B2
1,221 ft²
Unit B2
1,221 ft²
Unit B2
1,221 ft²
Unit B2
1,188 ft²
Unit B4
1,433 ft²
Unit C2
4
2
3
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
12-Unit Building (12B) - Floor Plans
1/8" = 1'-0"1 Level 1 - Floor Plans - 12B - 12-Unit Building (Type A)
1/8" = 1'-0"2 Level 2 - Floor Plans - 12B - 12-Unit Building (Type A)
Residential Unit Mix - 12-Unit Building (12B) - 1 Building on Site
Name
Garage
Stalls Count
HUD Unit Gross Square Footage HUD Net Rentable Square Footage Rooms
Unit
Type
Main
Floor Stairs
Garage
Area
Total Unit
Area Total Area
Main
Floor Stairs Garage Net Total
Total Net
Area Bed Bath
Level 1
Unit A3 - Type A 1 2 728 ft² 0 ft² 491 ft² 1,219 ft² 2,437 ft² 675 ft² 0 ft² 454 ft²1,129 ft² 2,258 ft² 1 1 Type A
Unit B3 1 1 1,134 ft² 0 ft² 419 ft² 1,553 ft² 1,553 ft² 1,070 ft² 0 ft² 372 ft²1,442 ft² 1,442 ft² 2 2 Type B
Unit C3 - Type A 2 1 1,422 ft² 0 ft² 699 ft² 2,121 ft² 2,121 ft² 1,336 ft² 0 ft² 653 ft²1,989 ft² 1,989 ft² 3 2 Type A
Level 2
Unit B2 1 1 1,221 ft² 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,153 ft² 68 ft² 289 ft²1,510 ft² 1,510 ft² 2 2 -
Unit B2 1 1 1,221 ft² 92 ft² 336 ft² 1,649 ft² 1,649 ft² 1,153 ft² 68 ft² 302 ft²1,523 ft² 1,523 ft² 2 2 -
Unit B2 1 1 1,221 ft² 92 ft² 437 ft² 1,750 ft² 1,750 ft² 1,153 ft² 68 ft² 397 ft²1,618 ft² 1,618 ft² 2 2 -
Unit B2 2 1 1,221 ft² 92 ft² 773 ft² 2,086 ft² 2,086 ft² 1,153 ft² 68 ft² 722 ft²1,943 ft² 1,943 ft² 2 2 -
Unit B4 1 1 1,188 ft² 95 ft² 412 ft² 1,695 ft² 1,695 ft² 1,125 ft² 76 ft² 367 ft²1,568 ft² 1,568 ft² 2 2 -
Unit B6 1 2 1,305 ft² 96 ft² 412 ft² 1,813 ft² 3,627 ft² 1,102 ft² 76 ft² 367 ft²1,545 ft² 3,090 ft² 2 2 -
Unit C2 2 1 1,433 ft² 96 ft² 412 ft² 1,941 ft² 1,941 ft² 1,366 ft² 76 ft² 367 ft²1,809 ft² 1,809 ft² 3 2 -
Grand total 12 20,490 ft²18,751 ft²
1 12-Unit Type A Building - 3D Exteriors - 1
2 12-Unit Type A Building - 3D Exteriors 2
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
12-Unit Building (12B) - 3D Views
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 1,025 SF = 44%
-STONE VENEER = 1,303 SF = 56%
TRANSPARENCY
-GLAZING/DOORS = 977 SF = 29%
4.1
7.77.3 26.1 4.1 7.8 5.1 7.4 7.3 6.1 7.1 6.17.6 5.1 7.8 4.1 8.1 7.3 7.7 26.1
4.1
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 438 SF = 36%
-STONE VENEER = 728 SF = 64%
TRANSPARENCY
-GLAZING/DOORS = 599 SF = 33%
4.1 7.7 6.17.67.47.3 7.1 26.1 8.1 4.1 7.7 7.37.87.2
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 1,025 SF = 44%
-STONE VENEER = 1,303 SF = 56%
TRANSPARENCY
-GLAZING/DOORS = 977 SF = 29%
7.3 26.17.7 7.8 5.14.1
4.1
6.16.1 7.3 7.6 4.1 7.85.1 7.3 7.7 26.1
4.1
Level 1
100'-0"
Level 2
110'-7 7/8"
Truss Brg.
119'-9"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 438 SF = 36%
-STONE VENEER = 728 SF = 64%
TRANSPARENCY
-GLAZING/DOORS = 599 SF = 33%
7.3 4.1 6.17.67.7 7.1 26.1 7.2 8.1 4.1 7.7 7.3 7.8
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
12-Unit Building (12B) - Exteriors
3/16" = 1'-0"3 12-Unit Building (Type A) - Front
3/16" = 1'-0"4 12-Unit Building (Type A) - Left
3/16" = 1'-0"5 12-Unit Building (Type A) - Rear
3/16" = 1'-0"6 12-Unit Building (Type A) - Right
EXTERIOR MATERIALS TAG KEY
5.1 ALUMINUM RAILINGS - COLOR: BLACK
4.1 CULTURED STONE - COLOR: TBD
5.3 METAL FENCE POST - COLOR: BLACK
6.1 CEDAR TIMBER - COLOR: STAINED
5.2 CORRUGATED METAL ROOFING - COLOR: BLACK
7.5 PVC SKIRTBOARD - COLOR: WHITE
7.1 LAP SIDING - COLOR: SW 7006 EXTRA WHITE
7.3 BOARD & BATTEN SIDING - SW 7006 EXTRA WHITE
7.4 TRIM - COLOR: SW 7006 EXTRA WHITE
7.6 ASPHALT SHINGLES - COLOR: CHARCOAL
26.1 EXTERIOR LIGHTING - COLOR: BLACK
8.1 GLAZING
7.7 DECORATIVE 12"x36" LOUVER - COLOR: BLACK
5.4 PREFINISHED ALUMINUM GUTTERS & DOWNSPOUTS -
COLOR: WHITE
Level 1
100'-0"
CH Truss Brg.
112'-6"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 476 SF = 39%
-STONE VENEER = 735 SF = 61%
TRANSPARENCY
-GLAZING = 472 SF = 28%
7.3 4.126.17.75.25.2 7.4 7.1 7.6
Level 1
100'-0"
CH Truss Brg.
112'-6"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 648 SF = 50%
-STONE VENEER = 631 SF = 50%
TRANSPARENCY
-GLAZING = 253 SF = 17%
6.1
7.1
7.6 6.1 7.3 5.24.17.7 7.4 5.2 4.1
28
'
-
0
8
3
/
2
5
6
"
Level 1
100'-0"
CH Truss Brg.
112'-6"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 550 SF = 50%
-STONE VENEER = 558 SF = 50%
TRANSPARENCY
-GLAZING = 300 SF = 27%7.3 4.1 7.3 4.1
Level 1
100'-0"
CH Truss Brg.
112'-6"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 688 SF = 50%
-STONE VENEER = 694 SF = 50%
TRANSPARENCY
-GLAZING/DOORS = 291 SF = 21%
7.34.1 5.2 4.1 7.3 7.74.1 5.2 5.2
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
Clubhouse - Exterior Elevations
3/16" = 1'-0"1 Clubhouse - North Elevation
3/16" = 1'-0"2 Clubhouse - West Elevation
3/16" = 1'-0"3 Clubhouse - East Elevation
3/16" = 1'-0"4 Clubhouse - South Elevation
EXHIBIT K2
FD FD
FITNESS MEN'S
LOBBY
VESTIBULE
OFFICE
WORK
ROOM
MECH
COFFEE BAR
WOMEN'SYOGA
A500 2
OUTDOOR PATIO
CO
V
E
R
E
D
S
E
A
T
I
N
G
GRILL STATIONS
GAME
ROOM
COMMUNITY
ROOM
OFFICE
TRELLIS
AREA
A500386
'
-
4
"
39'-4"
SD_301 2
SD_301
4
SD_301
1
SD_3013
106'-0"
33
'
-
0
"
43
'
-
4
"
68'-0"
POOL
2'
-
6
"
4'
-
0
"
7'-6"
6'
-
6
"
SUNDANCE
LAKEVILLE
ADHERED CONCRETE
MASONRY VENEER TO
MATCH THE BUILDINGS
ROCKFACE LIMESTONE
SILL CAP
CAST IN PLACE CONCRETE
FOUNDATION -SEE STRUCT
DOUBLE SIDED SIGN
CABINET AND GRAPHIC
DESIGN TO BE
DETERMINED w/ SIGN
VENDOR
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
Clubhouse - Floor Plans
3/16" = 1'-0"1 SD-Level 1 - Clubhouse
3/4" = 1'-0"3 Monument Sign - SD
FD
FD
Level 1
100'-0"
Maint. Truss Brg
109'-1 1/8"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 142 SF = 50%
-STONE VENEER = 144 SF = 50%
TRANSPARENCY
-GLAZING = 44 SF = 13%
5.47.34.17.6
Level 1
100'-0"
Maint. Truss Brg
109'-1 1/8"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 64 SF = 48%
-STONE VENEER = 70 SF = 52%
TRANSPARENCY
-GLAZING = 50 SF = 19%
7.34.1 7.6
Level 1
100'-0"
Maint. Truss Brg
109'-1 1/8"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 149 SF = 48%
-STONE VENEER = 162 SF = 52%
TRANSPARENCY
-GLAZING = 18 SF = 1%
4.1 7.3 7.6
Level 1
100'-0"
Maint. Truss Brg
109'-1 1/8"
EXTERIOR MATERIALS
PRIMARY MATERIALS
-FIBER CEMENT SIDING/TRIM = 59 SF = 54%
-STONE VENEER = 50 SF = 46%
TRANSPARENCY
-GLAZING = 76 SF = 28%
7.64.1 7.3
499 ft²
Pool Equip. & Maint.
Storage
M3
77 ft²
Bike Fixit
M1
77 ft²
Pet Wash
M2
SD_302
1
SD_302 2
SD_302
4
SD_3023
36'-0"
20
'
-
0
"
EXTERIOR MATERIALS TAG KEY
5.1 ALUMINUM RAILINGS - COLOR: BLACK
4.1 CULTURED STONE - COLOR: TBD
5.3 METAL FENCE POST - COLOR: BLACK
6.1 CEDAR TIMBER - COLOR: STAINED
5.2 CORRUGATED METAL ROOFING - COLOR: BLACK
7.5 PVC SKIRTBOARD - COLOR: WHITE
7.1 LAP SIDING - COLOR: SW 7006 EXTRA WHITE
7.3 BOARD & BATTEN SIDING - SW 7006 EXTRA WHITE
7.4 TRIM - COLOR: SW 7006 EXTRA WHITE
7.6 ASPHALT SHINGLES - COLOR: CHARCOAL
26.1 EXTERIOR LIGHTING - COLOR: BLACK
8.1 GLAZING
7.7 DECORATIVE 12"x36" LOUVER - COLOR: BLACK
5.4 PREFINISHED ALUMINUM GUTTERS & DOWNSPOUTS -
COLOR: WHITE
kaas
wilson
architects Timberland Partners Lakeville, MN
Sundance Lakeville
Maintenance - Exterior Elevations
3/16" = 1'-0"1 Maintenance Building - 1 Copy 1
3/16" = 1'-0"2 Maintenance Building - 2 Copy 1
3/16" = 1'-0"4 Maintenance Building - 3 Copy 1
3/16" = 1'-0"3 Maintenance Building - 4 Copy 1
3/16" = 1'-0"5 SD-Level 1 - Maintenance
OF
SHEET
SI
N
G
L
E
F
A
M
I
L
Y
TH
R
E
E
B
E
D
R
O
O
M
R
A
M
B
L
E
R
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
DATE ISSUED:
BID SET:
PERMIT:
REVISIONS:
6/18/21
----
..
7/23/21 - 3 BEDRM.
Copyright of these documents is owned by
RT RESIDENTIAL, INC.
and reserves ALL rights.
These plans may not be re-used, copied or
assigned to another party nor shall they be
modified or used in part in other designs
without the prior written consent of
RT RESIDENTIAL, INC.
GE
N
E
R
A
L
C
O
N
T
R
A
C
T
O
R
:
RT
R
E
S
I
D
E
N
T
I
A
L
,
I
N
C
.
16
9
7
2
B
R
A
N
D
T
J
E
N
F
A
R
M
D
R
I
V
E
LA
K
E
V
I
L
L
E
,
M
N
5
5
0
4
4
TE
L
-
(
9
5
2
)
3
2
2
-
8
7
0
0
TI
M
B
E
R
L
A
N
D
P
A
R
T
N
E
R
S
85
0
0
N
O
R
M
A
N
D
A
L
E
L
A
K
E
B
L
V
D
.
SU
I
T
E
7
0
0
MI
N
N
E
A
P
O
L
I
S
,
M
N
5
5
4
3
7
1 1
APPROXIMATE SQUARE FOOTAGE
ABOVE GRADE FINISHED
BELOW GRADE FINISHED
Square footages are measured to the exterior finished surface of the outside walls.
Square footage calculations were made based on plan dimensions only and may
vary from the finished square footage of the house as built. In addition, plan
dimensions are not exact and are subject to some variance. However, all
construction shall be in substantial compliance with the Contract Documents.
BELOW GRADE UNFINISHED
GARAGE
SQ. FT.
SQ. FT.
SQ. FT.
SQ. FT.
1,866
0
1,866
692 EXHIBIT L
OF
SHEET
SI
N
G
L
E
F
A
M
I
L
Y
TH
R
E
E
B
E
D
R
O
O
M
P
L
A
N
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
DATE ISSUED:
BID SET:
PERMIT:
REVISIONS:
6/18/21
----
..
----
Copyright of these documents is owned by
RT RESIDENTIAL, INC.
and reserves ALL rights.
These plans may not be re-used, copied or
assigned to another party nor shall they be
modified or used in part in other designs
without the prior written consent of
RT RESIDENTIAL, INC.
GE
N
E
R
A
L
C
O
N
T
R
A
C
T
O
R
:
RT
R
E
S
I
D
E
N
T
I
A
L
,
I
N
C
.
16
9
7
2
B
R
A
N
D
T
J
E
N
F
A
R
M
D
R
I
V
E
LA
K
E
V
I
L
L
E
,
M
N
5
5
0
4
4
TE
L
-
(
9
5
2
)
3
2
2
-
8
7
0
0
TI
M
B
E
R
L
A
N
D
P
A
R
T
N
E
R
S
85
0
0
N
O
R
M
A
N
D
A
L
E
L
A
K
E
B
L
V
D
.
SU
I
T
E
7
0
0
MI
N
N
E
A
P
O
L
I
S
,
M
N
5
5
4
3
7
1 1
APPROXIMATE SQUARE FOOTAGE
ABOVE GRADE FINISHED
BELOW GRADE FINISHED
Square footages are measured to the exterior finished surface of the outside walls.
Square footage calculations were made based on plan dimensions only and may
vary from the finished square footage of the house as built. In addition, plan
dimensions are not exact and are subject to some variance. However, all
construction shall be in substantial compliance with the Contract Documents.
BELOW GRADE UNFINISHED
GARAGE
SQ. FT.
SQ. FT.
SQ. FT.
SQ. FT.
2,210
0
972
695
OF
SHEET
SI
N
G
L
E
F
A
M
I
L
Y
FO
U
R
B
E
D
R
O
O
M
P
L
A
N
SU
N
D
A
N
C
E
L
A
K
E
V
I
L
L
E
DATE ISSUED:
BID SET:
PERMIT:
REVISIONS:
6/18/21
----
..
----
Copyright of these documents is owned by
RT RESIDENTIAL, INC.
and reserves ALL rights.
These plans may not be re-used, copied or
assigned to another party nor shall they be
modified or used in part in other designs
without the prior written consent of
RT RESIDENTIAL, INC.
GE
N
E
R
A
L
C
O
N
T
R
A
C
T
O
R
:
RT
R
E
S
I
D
E
N
T
I
A
L
,
I
N
C
.
16
9
7
2
B
R
A
N
D
T
J
E
N
F
A
R
M
D
R
I
V
E
LA
K
E
V
I
L
L
E
,
M
N
5
5
0
4
4
TE
L
-
(
9
5
2
)
3
2
2
-
8
7
0
0
TI
M
B
E
R
L
A
N
D
P
A
R
T
N
E
R
S
85
0
0
N
O
R
M
A
N
D
A
L
E
L
A
K
E
B
L
V
D
.
SU
I
T
E
7
0
0
MI
N
N
E
A
P
O
L
I
S
,
M
N
5
5
4
3
7
1 1
APPROXIMATE SQUARE FOOTAGE
ABOVE GRADE FINISHED
BELOW GRADE FINISHED
Square footages are measured to the exterior finished surface of the outside walls.
Square footage calculations were made based on plan dimensions only and may
vary from the finished square footage of the house as built. In addition, plan
dimensions are not exact and are subject to some variance. However, all
construction shall be in substantial compliance with the Contract Documents.
BELOW GRADE UNFINISHED
GARAGE
SQ. FT.
SQ. FT.
SQ. FT.
SQ. FT.
2,802
0
1,380
691
Sundance Lakeville
Traffic Impact Study
Lakeville, MN
Prepared For:
Timberland Partners, Inc.
8500 Normandale Lake Blvd.
Suite 700
Minneapolis, MN 55437
Prepared By:
Nick Grage, PE, PTOE, RSP1
Alliant Engineering, Inc.
733 Marquette Ave, Suite 700
Minneapolis, MN 55402
Final Report
May 23, 2024
EXHIBIT M
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 i
May 23, 2024
Table of Contents
List of Figures ................................................................................................................................ ii
List of Tables ................................................................................................................................. ii
1.0 Introduction ........................................................................................................................1
2.0 Existing Conditions ............................................................................................................1
2.1 STUDY AREA INTERSECTIONS .......................................................................................... 1
2.2 DATA COLLECTION .......................................................................................................... 1
2.2.1 Traffic Volumes ...................................................................................................................................... 1
2.2.2 Roadway/Intersection Characteristics ................................................................................................... 4
2.2.3 Pedestrian/Bicycle Accommodations ..................................................................................................... 4
2.3 TRAFFIC OPERATIONS ANALYSIS ..................................................................................... 4
3.0 Proposed Development ......................................................................................................6
3.1 TRIP GENERATION ........................................................................................................... 6
4.0 Future Conditions ..............................................................................................................9
4.1 PLANNED DEVELOPMENTS AND INFRASTRUCTURE IMPROVEMENTS ................................ 9
4.1.1 Planned Developments .......................................................................................................................... 9
4.1.2 Planned Infrastructure Improvements ................................................................................................... 9
4.2 BACKGROUND TRAFFIC GROWTH .................................................................................. 10
4.3 TRAFFIC OPERATIONS ANALYSIS ................................................................................... 13
4.3.1 Year 2025 Conditions ........................................................................................................................... 13
4.3.2 Year 2045 Conditions ........................................................................................................................... 13
4.4 ADDITIONAL CONSIDERATIONS ..................................................................................... 14
4.4.1 Development Site Through Traffic ....................................................................................................... 14
4.4.2 Residential Neighborhood Through Traffic .......................................................................................... 14
5.0 Site Plan/Access Review ..................................................................................................14
5.1 SIGHT LINE ANALYSIS ................................................................................................... 15
6.0 Conclusions and Recommendations ...............................................................................16
Appendix A – Collected Turning Movement Counts ................................................................ A
Appendix B – Detailed Operations and Queuing Analysis ....................................................... B
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 ii
May 23, 2024
List of Figures
Figure 1 – Project Location............................................................................................................. 2
Figure 2 – Existing Conditions ....................................................................................................... 3
Figure 3 – Proposed Site Plan ......................................................................................................... 7
Figure 4 – Trip Directional Distribution ......................................................................................... 8
Figure 5 – CSAH 46 Historical AADT Volume ........................................................................... 10
Figure 6 – Year 2025 Conditions .................................................................................................. 11
Figure 7 – Year 2045 Conditions .................................................................................................. 12
List of Tables
Table 1 – Roadway Characteristics................................................................................................. 4
Table 2 – Intersection Characteristics ............................................................................................. 4
Table 3 – Level of Service Criteria ................................................................................................. 5
Table 4 – Existing Traffic Operations Analysis ............................................................................. 5
Table 5 – Trip Generation Estimates – Sundance Lakeville........................................................... 6
Table 6 – Year 2025 Traffic Operations Analysis ........................................................................ 13
Table 7 – Year 2045 Traffic Operations Analysis ........................................................................ 13
Table 8 – Sight Line Analysis ....................................................................................................... 15
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 1
May 23, 2024
1.0 Introduction
Alliant Engineering has completed a traffic impact study for the proposed Sundance Lakeville
residential development located in the northwest quadrant of the County State Aid Highway 46
(CSAH 46) & Buck Hill Road intersection in Lakeville, MN (see Figure 1). The main objectives
of this study are to evaluate existing traffic operations within the study area, identify potential
traffic impacts to the adjacent roadway network due to development generated trips, and
recommend improvements to address identified issues. The assumptions, analysis, and study
conclusions/recommendations offered for consideration are as follows.
2.0 Existing Conditions
The existing conditions were reviewed to establish a baseline for identifying any future impacts
associated with the proposed development. The evaluation of existing conditions includes
intersection turning movement counts, field observations, and an intersection operations analysis.
2.1 Study Area Intersections
In consultation with City of Lakeville staff, the following study intersections were identified:
• CSAH 46 (162nd Street W) & Kendale Drive
• CSAH 46 & Buck Hill Road
2.2 Data Collection
2.2.1 Traffic Volumes
To document existing conditions, weekday turning movement counts were collected at the study
intersections by Alliant Engineering in August 2023 over the following time periods:
• AM Peak Period: 6:00-9:00 a.m.
• PM Peak Period: 4:00-7:00 p.m.
The existing peak hour traffic volumes at the study intersections are shown in Figure 2. Collected
turning movement counts are included in Appendix A. Previously collected 2017 and 2021 turning
movement counts, including applied adjustments to 2021 counts to account for any lingering
impacts from the COVID-19 pandemic, were no longer considered as traffic volumes are
considered to have normalized throughout the greater Twin Cities area.
Project Location
Figure 1
ALLIANT
Sundance Lakeville TIS
COUNTY
COUNTY
Burnsville
Lakeville
46
5
35
Hill
Buck
Development
Proposed
COUNTY
Existing Conditions
Figure 2Sundance Lakeville TIS
ALLIANT
46
Development
Proposed Buck Hill Rd
Kend
ale Dr
X,XXX
8,300
Dup
o
n
t Ave
Kend
ale Dr
158th St
LEGEND
AM (PM) Peak Hour VolumeXX (XX)
CSAH 46
Buck Hill
Rd
Lane Geometry
Through/Stop Control
Daily Volume*
Signalized Control
CSAH 46
Kend
ale Dr
**
approach to allow side-by-side vehicles.
**Sufficient width exists on the southbound
(14
) 22
R(1) 1 R
(359) 252 T
(6) 3 L
(13
8
) 97
R
(18
) 17
T
(26
) 19
L(27) 18 R
(358) 290 T
(12) 10 L
Turning Movement Counts (TMC) from August 2023.
*2019 AADT volume - MnDOT Traffic Mapping Application.
(98
)
L 59
(37
)
T 13
(32
)
R 12
(127)L 100
(364)T 273
(103)R 67
(24
)
L 44
(0)
T 1
(2)
R 2
(21)L 8
(355)T 280
(46)R 16
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 4
May 23, 2024
2.2.2 Roadway/Intersection Characteristics
Field observations were completed to identify roadway and intersection characteristics within the
study area (i.e., geometry, posted speed limits, and traffic controls), which are summarized in
Table 1 and Table 2.
Table 1 – Roadway Characteristics
Roadway Cross-Section Speed Limit Functional Classification
CSAH 46 4-Lane Divided 45 mph Minor Arterial
Kendale Drive 2-Lane Undivided 30 mph Local
Buck Hill Road 3-Lane Undivided 40 mph Collector
Table 2 – Intersection Characteristics
Intersection Traffic Control Lane Designations by Approach (1)
NB SB EB WB
CSAH 46 & Kendale Drive Through/Stop R LTR (2) L/T/T/R L/T/T/R
CSAH 46 & Buck Hill Road Traffic Signal L/T/R L/T/R L/T/T/R L/T/T/R
(1) L=Left-Turn, T=Through, R=Right-Turn
(2) Dakota County plans to restrict Kendale Drive to a three-quarter access, eliminating SB left-turn and through movements
2.2.3 Pedestrian/Bicycle Accommodations
Existing pedestrian/bicycle accommodations within the study area were also documented:
• Mixed-use trails run along both the north and south sides of CSAH 46
• A sidewalk runs along the west side of Buck Hill Road
2.3 Traffic Operations Analysis
An existing conditions traffic operations analysis was completed using Synchro/SimTraffic
software to establish a baseline condition to which future traffic operations could be compared.
Operations analysis results identify a Level of Service (LOS) which indicates the quality of traffic
flow through an intersection. The LOS results are based on average delay per vehicle, which
correspond to the delay threshold values presented in Table 3. Intersections are given a ranking
from LOS A through LOS F. LOS A indicates the best traffic operation, with vehicles experiencing
minimal delays. LOS F indicates an intersection where demand exceeds capacity, or a breakdown
of traffic flow. The LOS D/E threshold for overall intersection operations is often used as the
indicator of congestion in an urban area. For side-street stop-controlled intersections, a key
measure of operational effectiveness is the side-street LOS. Long delays and poor LOS can occur
on side-street approaches even if the overall intersection is functioning well, making side-street
LOS a valuable design criterion.
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 5
May 23, 2024
Table 3 – Level of Service Criteria
After LOS, the second component of the traffic operations analysis is a study of vehicular queuing,
or the lineup of vehicles waiting to pass through an intersection. An intersection can operate with
an acceptable LOS, but if queues from the intersection block entrances to turn lanes or adjacent
driveways, unsafe operating conditions could result. The 95th percentile queue, or the length of
queue with only a five percent probability of being exceeded during an analysis period, is
considered the standard for design purposes.
The existing traffic operations analysis was performed at the study intersections for the volume
adjusted a.m. and p.m. peak hours. Results of the existing traffic operations analysis, presented in
Table 4, indicate that each study intersection currently operates at overall LOS A during the a.m.
and p.m. peak hours. In addition, no significant side-street delay or queuing issues were observed
in the field or traffic simulations. Detailed operations and queuing analysis results are presented in
Appendix B.
Table 4 – Existing Traffic Operations Analysis
Description Signalized
Intersection
Unsignalized
Intersection
A Free Flow: Low volumes and no delays.0 - 10 0 - 10
B Stable Flow: Speeds restricted by travel conditions, minor delays.> 10 - 20 > 10 - 15
C Stable Flow: Speeds and maneuverability closely controlled due to higher volumes.> 20 - 35 > 15 - 25
D Stable Flow: Speeds considerably affected by change in operating conditions.
High density traffic restricts maneuverability, volume near capacity.> 35 - 55 > 25 - 35
E Unstable Flow: Low speeds, considerable delay, volume at or slightly over capacity.> 55 - 80 > 35 - 50
F Forced Flow: Very low speeds, volume exceed capacity, long delays with stop and go
traffic.> 80 > 50
Source: Highway Capacity Manual, 6th Edition, Transportation Research Board, Exhibits 19-8, 20-2, 21-8, 22-8.
Delay per Vehicle (seconds)
Level of Service
CSAH 46 & Kendale Drive A /A 1.2 /6.8 A /A 1.2 /9.4
CSAH 46 & Buck Hill Road A /C 7.2 /25.5 A /C 8.3 /21.0
LOS Results: Overall Intersection / Worst Approach Delay Results: Overall Intersection / Worst
Intersection AM Peak Hour PM Peak Hour
LOS Delay (s)LOS Delay (s)
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 6
May 23, 2024
3.0 Proposed Development
The proposed Sundance Lakeville development, shown in Figure 3, is expected to provide
nine (9) single-family detached homes and 167 multi-family townhomes in the northwest quadrant
of the CSAH 46/Buck Hill Road intersection in Lakeville. In addition, the development will
include two single-story retail centers, covering about 26,500 sq. ft. combined, on the south side
of the developed area. While the proposed development construction timeframe is currently
unknown, a year 2025 completion was assumed for the purpose of this study. Access to the
development is proposed at the following locations:
• Along Buck Hill Road approximately 250 feet north of CSAH 46 (East Access)
o The outbound (eastbound) approach is expected to be stop controlled and consist of a
single shared left-turn/right-turn lane
• Along Kendale Drive approximately 200 feet north of CSAH 46 (West Access)
o The outbound (westbound) approach is expected to be stop controlled and consist of a
single shared left-turn/right-turn lane
• Along Kendale Drive approximately 500 feet north of CSAH 46 (Single-Family Access)
o The outbound (westbound) approach is expected to be stop controlled and consist of a
single shared left-turn/right-turn lane
3.1 Trip Generation
Trip generation estimates for the proposed Sundance Lakeville development were completed
for the weekday a.m. and p.m. peak hours as well as on a daily basis by utilizing the
Institute of Transportation Engineers Trip Generation Manual, 10th Edition (ITE TGM). Results
of the trip generation estimates, shown in Table 5, indicate the proposed development is expected
to generate approximately 136 a.m. peak hour trips, 268 p.m. peak hour trips, and 2,656 daily trips.
The distribution of development generated trips, shown in Figure 4, was estimated based on a
review of existing traffic volumes/patterns and by engineering judgement. This trip distribution
was then applied to the estimated proposed development generated trips in the future conditions
analysis years.
Table 5 – Trip Generation Estimates – Sundance Lakeville
Trips
In
Trips
Out
Total
Trips
Trips
In
Trips
Out
Total
Trips
Single-Family Detached Housing (210)Dwellings 9 2 4 6 5 3 8 86
Multifamily Housing (220)Dwellings 167 16 51 67 54 31 85 1,126
Strip Retail Plaza [<40k sq ft] (822)1000 sq ft.26.5 38 25 63 87 88 175 1,444
56 80 136 146 122 268 2,656
Setting Assumption: General urban/suburban setting
(1) Peak hour of the adjacent roadway network
Source: Institute of Transportation Engineers Trip Generation Manual, 11th Edition
Daily
TripsLand Use (ITE Code)Size
AM Peak Hour Trips(1)PM Peak Hour Trips(1)
Units
Total Development Trips
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 9
May 23, 2024
4.0 Future Conditions
To determine potential traffic impacts associated with the proposed development, future conditions
were evaluated using Synchro/SimTraffic software. The future conditions evaluated in this study
were the year 2025 (i.e., one year after assumed development completion) and the year 2045
(20-year horizon).
4.1 Planned Developments and Infrastructure Improvements
Planned developments and infrastructure improvements that may influence future traffic volumes
within the study area were reviewed.
4.1.1 Planned Developments
The Moments memory care senior living facility opened in December of 2018 in the southeast
quadrant of the CSAH 46/Buck Hill Road intersection. A second phase of the Moments was
expected to open later in year 2021 with 60 new memory care senior living units. Given the updated
turning movement counts collected in August 2023 it is assumed that trips related to The Moments
Phase II development are included in the analysis. It should be noted that a general background
traffic growth rate was applied in the future conditions analysis and is expected to account for any
variations in the limited trips added by The Moments Phase II development. No other planned
developments within the study area are known at this time.
4.1.2 Planned Infrastructure Improvements
The existing configuration of the CSAH 46/Kendale Drive intersection restricts the northbound
approach to a three-quarter access preventing northbound left-turn and through movements. This
design was intentional, as Dakota County plans to also restrict the northbound approach to a three-
quarter access as well, eliminating southbound left-turn and through movements. Once these
movements are restricted, motorists destined for CSAH 46 eastbound and/or I-35 will likely utilize
the proposed roadway internal to the development site to access CSAH 46 via Buck Hill Road. To
account for this change in traffic patterns, volumes associated with the restricted movements were
redistributed to the CSAH 46/Buck Hill Road intersection to evaluate 2025 and 2045 conditions.
According to information presented in the Lakeville 2040 Comprehensive Plan, no other
significant roadway improvements are planned within the study area through the year 2040.
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 10
May 23, 2024
4.2 Background Traffic Growth
Historical annual average daily traffic (AADT) volumes along CSAH 46 were provided by the
Minnesota Department of Transportation (MnDOT) via its online Traffic Mapping Application.
The historical AADT data was reviewed to determine growth trends within the study area. The
CSAH 46 AADT volume data, shown in Figure 5, indicates a slight growth trend over a 20+ year
period. Based on this data, and traffic forecasts in the Lakeville 2040 Comprehensive Plan, a
conservative annual growth rate of one percent was applied to existing traffic volumes to provide
an estimate of future background traffic growth. The resultant year 2025 conditions and year 2045
conditions, a combination of background traffic volumes, redistributed trips, and trips generated
by the proposed development, are shown in Figure 6 and Figure 7, respectively.
Figure 5 – CSAH 46 Historical AADT Volume
Per Dakota County comments received on May 10th, 2024, historical AADT volumes were once
again reviewed and compared to projections from the Dakota County 2040 Transportation Plan
which suggests the study segment of CSAH 46 between CSAH 5 to I-35 West Ramp would reach
11,800 AADT in 2040. The most recent draft AADT available – 7,384 in 2023 – supports 2019
AADT volumes which show traffic volumes along CSAH 46 decreasing rather than increasing.
When 2040 AADT estimates were developed using the Dakota County Travel Demand Model the
2019 AADT of 8,300 along this segment of CSAH 46 was not utilized – instead the 2016 AADT
of 9,000 was included, resulting in a higher projection for 2040. Applying an annual growth rate
of one percent, as noted above, is still expected to be a conversative estimate of future traffic
volumes which, based on 2019 and 2023 AADTs, is not expected to reach 11,800 per the
Dakota County 2040 Transportation Plan.
0
2000
4000
6000
8000
10000
12000
1990 1995 2000 2005 2010 2015 2020 2025
AA
D
T
V
o
l
u
m
e
CSAH 46 AADT Volume Linear (CSAH 46 AADT Volume)Growth Trendline
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 13
May 23, 2024
4.3 Traffic Operations Analysis
Future conditions traffic operations analyses were completed using Synchro/SimTraffic software
to determine potential traffic impacts associated with the proposed development.
4.3.1 Year 2025 Conditions
Results of the year 2025 traffic operations analysis, presented in Table 6, indicate that all study
intersections and proposed access locations are expected to operate at overall LOS B during the
a.m. and p.m. peak hours. In addition, no significant side-street delay or queuing issues were
observed in the traffic simulations. Detailed operations and queuing analysis results are presented
in Appendix B.
Table 6 – Year 2025 Traffic Operations Analysis
4.3.2 Year 2045 Conditions
Results of the year 2045 traffic operations analysis, presented in Table 7, indicate that all study
intersections and proposed access locations are expected to operate at overall LOS B or better
during the a.m. and p.m. peak hours. In addition, no significant side-street delay or queuing issues
were observed in the traffic simulations. Detailed operations and queuing analysis results are
presented in Appendix B.
Table 7 – Year 2045 Traffic Operations Analysis
Generally, the proposed development is expected to have minimal impact on study area traffic
operations even with the redistributed Kendale Drive southbound volumes. Therefore, no
geometric or traffic control improvements are required from an operations perspective.
CSAH 46 & Kendale Drive A /A 0.8 /2.7 A /A 1.1 /3.0
CSAH 46 & Buck Hill Road A /C 9.6 /29.0 B /C 10.3 /23.7
Buck Hill Road & East Access A /A 1.9 /3.4 A /A 1.9 /3.8
Kendale Drive & West Access A /A 1.8 /4.2 A /A 1.4 /4.3
Kendale Drive & Single-Family Access A /A 0.3 /4.4 A /A 0.2 /4.1
LOS Results: Overall Intersection / Worst Approach Delay Results: Overall Intersection / Worst Approach
Intersection AM Peak Hour PM Peak Hour
LOS Delay (s)LOS Delay (s)
CSAH 46 & Kendale Drive A /A 0.8 /2.7 A /D 2.0 /28.8
CSAH 46 & Buck Hill Road B /C 10.8 /31.1 B /C 11.4 /24.7
Buck Hill Road & East Access A /A 1.9 /3.6 A /A 2.0 /4.2
Kendale Drive & West Access A /A 1.9 /4.2 A /C 4.0 /19.2
Kendale Drive & Single-Family Access A /A 0.3 /4.7 A /A 0.2 /4.3
LOS Results: Overall Intersection / Worst Approach
Intersection AM Peak Hour PM Peak Hour
LOS Delay (s)LOS Delay (s)
Delay Results: Overall Intersection / Worst Approach
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 14
May 23, 2024
4.4 Additional Considerations
Additional considerations related to the proposed development include the following:
4.4.1 Development Site Through Traffic
The East Access and West Access of the proposed development will be linked by an east/west
roadway running parallel to CSAH 46. In addition to proposed development trips, this new
roadway will facilitate southbound Kendale Drive movements restricted by the planned conversion
of the CSAH 46/Kendal Drive intersection to a three-quarter access by Dakota County. As a public
road rather than a private road, traffic along Buck Hill Road destined for Kendale Drive may also
utilize this new roadway but the impact is expected to be negligible.
4.4.2 Residential Neighborhood Through Traffic
For access to and from CSAH 5 west of the Sundance Lakeville site, a limited number of motorists
associated with the proposed development, particularly those originating from and destined to the
Single-Family Access, may choose to route through the adjacent residential neighborhood via
Kendale Drive, Dupont Avenue, and 158th Street. However, the narrow, winding, and low-speed
nature of these roadways is expected to make this route less attractive than CSAH 46 to the
majority of residents associated with the proposed development. Consequently, less than 150 daily
trips associated with the proposed Sundance Lakeville development would be expected to utilize
the Kendale Drive, Dupont Avenue, and 158th Street residential neighborhood route.
5.0 Site Plan/Access Review
A review of the proposed site plan was completed to identify any issues and recommended
potential improvements regarding vehicle ingress/egress, internal traffic circulation, and
pedestrian/bicycle connectivity. The following key points are offered for consideration:
• The proposed East Access along Buck Hill Road is expected to provide approximately
250 feet of effective southbound vehicle storage between the driveway and CSAH 46. This
distance is expected to accommodate the southbound forecast 95th percentile peak period
queues at the CSAH 46/Buck Hill Road intersection through the year 2045.
o Note: 95th percentile queues are defined as the queue length that only has a five-
percent probability of being exceeded. Average queues are expected to be much
shorter, and typically there is not a need to design turn lanes beyond this metric.
• The proposed internal roadways appear to adequately accommodate typical passenger
vehicles. However, turning movements should be reviewed to ensure design vehicles such
as garbage/recycling trucks have adequate accommodations to negotiate internal roadways.
• Establish appropriate traffic control (e.g., through/stop control) at internal roadway
intersections to minimize driver confusion and the potential for conflicts.
• Sidewalks and/or trails within the proposed development should be extended to meet the
existing sidewalk along Buck Hill Road and the existing trail along CSAH 46.
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 15
May 23, 2024
5.1 Sight Line Analysis
Alliant conducted a sight line analysis for the proposed accesses along both Kendale Drive and
Buck Hill Road based on the current site plan and aerial imagery. Approximate sight distances
measured for both accesses, looking to the northwest and northeast, are show below in Table 8.
Table 8 – Sight Line Analysis
Access Distance from
Intersection Speed Limit Design
Sight Distance
Measured
Sight Distance
Kendale Drive &
West Access 200 feet 30 mph 335 feet 310 feet
Buck Hill Road &
East Access 250 feet 40 mph 445 feet 450 feet
All sight distances were conservatively compared to Table 9-7, Design Intersection Sight Distance
for Case B1, Left Turn from Stop from the AASHTO Policy on Geometric Design of Highways
and Streets, 7th Edition which assumes a passenger car as the design vehicle.
• Kendale Drive & West Access: The required intersection sight distance for a 30-mph
roadway is 335 feet. Comparing the required distance to the approximate sight distances
measured (310 feet), the sight distance to the northwest is not meeting by 25 feet. However,
if the curvature of the roadway reduces approaching vehicle speeds to 25 mph the required
distance would only be 280 feet and the approximate sight distance would be adequate.
Furthermore, the proximity of the West Access to the stop-controlled intersection of
CSAH 46/Kendale Drive would also reduce approaching vehicle speeds.
• Buck Hill Road & East Access: The required intersection sight distance for a 40 -mph
roadway is 445 feet. Comparing the required distance to the approximate sight distances
measured, the sight distance to the northeast (450 feet) would be adequate.
o The removal of scrub trees along the east side of Buck Hill Road may provide
additional visibility for both eastbound motorists and northbound left-turning
motorists if sight lines remain a concern.
Existing foliage, time of day (sunrise, sunset), seasonal variations, and stop bar placement may
impact the actual site distances for stopped vehicles exiting either development access. Despite the
Kendale Drive & West Access approximate sight distance being slightly below the required
distance neither access is expected to pose a safety risk due to sight lines.
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 16
May 23, 2024
6.0 Conclusions and Recommendations
The following study conclusions and recommendations are offered for consideration:
• Results of the existing traffic operations analysis indicate that all study intersections currently
operate at overall LOS A during the a.m. and p.m. peak hours. In addition, no significant
side-street delay or queuing issues were observed in the field or traffic simulations.
• The proposed Sundance Lakeville development is expected to provide nine (9) single-family
detached homes and 167 multi-family townhomes in the northwest quadrant of the CSAH 46/
Buck Hill Road intersection in Lakeville. In addition, the development will include two single-
story retail centers, covering about 26,500 sq. ft. combined, on the south side of the developed
area. While the proposed development construction timeframe is currently unknown, a
year 2025 completion was assumed for the purpose of this study.
o The proposed development is expected to generate approximately 136 a.m. peak hour trips,
268 p.m. peak hour trips, and 2,656 daily trips.
• Results of the year 2025 traffic operations analysis indicate that all study intersections and
proposed access locations are expected to operate at overall LOS B during the a.m. and
p.m. peak hours with all study intersections and proposed access locations expected to operate
at overall LOS B or better during the year 2045 a.m. and p.m. peak hours. In addition, no
significant side-street delay or queuing issues were observed in the traffic simulations.
o Generally, the proposed development is expected to have minimal impact on study area
traffic operations even with the redistributed Kendale Drive southbound volumes.
Therefore, no geometric improvements are required from an operations perspective.
• Additional considerations related to the proposed development include the following:
o The new east/west roadway will facilitate southbound Kendale Drive movements restricted
by the planned conversion of the CSAH 46/Kendal Drive intersection to a three-quarter
access by Dakota County. As a public road rather than a private road, traffic along
Buck Hill Road destined for Kendale Drive may also utilize this new roadway but the
impact is expected to be negligible.
o For access to and from CSAH 5 west of the Sundance Lakeville site, a limited number of
motorists associated with the proposed development, particularly those originating from
and destined to the Single-Family Access, may choose to route through the adjacent
residential neighborhood via Kendale Drive, Dupont Avenue, and 158th Street. However,
the narrow, winding, and low-speed nature of these roadways is expected to make this route
less attractive than CSAH 46 to the majority of residents associated with the proposed
development. Consequently, less than 150 daily trips associated with the proposed
development would be expected to utilize the Kendale Drive, Dupont Avenue, and
158th Street residential neighborhood route.
• A review of the proposed site plan was completed to identify any issues and recommended
potential improvements regarding vehicle ingress/egress, internal traffic circulation, and
pedestrian/bicycle connectivity and is documented in Section 5.0: Site Plan/Access Review.
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 A1
Appendix A – Collected Turning Movement Counts
Intersection:Site Code:
Date:Ref Pt:
Duration:
Start Time U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
6:00 -- 12 -- --12 1 --1 26 1 28 -- -- -- -- 1 1 1 -- -- 24 --24 -- 65 2
6:15 -- 7 -- --7 -- -- -- 43 1 44 -- -- -- -- 3 3 -- -- -- 27 2 29 -- 83 --
6:30 -- 10 -- --10 -- -- -- 60 1 61 -- -- -- -- 6 6 -- -- -- 46 --46 -- 123 --
6:45 -- 16 -- --16 -- -- -- 64 3 67 -- -- -- -- 3 3 -- 1 -- 52 --53 -- 139 --
Hour Total -- 45 -- --45 1 -- 1 193 6 200 -- -- -- -- 13 13 1 1 -- 149 2 152 -- 410 2
7:00 -- 10 -- --10 -- -- 1 62 1 64 -- -- -- -- 3 3 -- -- -- 37 --37 -- 114 --
7:15 -- 7 1 1 9 -- -- 2 66 6 74 -- -- 1 -- 3 4 -- -- 1 53 --54 -- 141 --
7:30 -- 10 -- 1 11 -- -- 1 66 1 68 -- -- -- -- 6 6 1 -- -- 56 --56 -- 141 1
7:45 -- 13 -- --13 -- -- 1 93 6 100 -- -- -- -- 9 9 -- -- 1 70 1 72 -- 194 --
Hour Total -- 40 1 2 43 -- -- 5 287 14 306 -- -- 1 -- 21 22 1 -- 2 216 1 219 -- 590 1
8:00 -- 14 -- --14 -- -- 4 55 3 62 -- -- -- -- 4 4 -- -- 1 67 --68 -- 148 --
8:15 -- 11 -- --11 1 1 1 57 2 61 -- -- -- -- 2 2 -- -- -- 54 --54 -- 128 1
8:30 -- 8 -- --8 -- -- 1 63 6 70 -- -- -- -- 3 3 1 -- -- 46 --46 -- 127 1
8:45 -- 16 -- --16 -- -- 4 60 5 69 -- -- -- -- 1 1 -- -- -- 41 --41 -- 127 --
Hour Total -- 49 -- --49 1 1 10 235 16 262 -- -- -- -- 10 10 1 -- 1 208 --209 -- 530 2
16:00 -- 5 -- --5 -- -- 2 79 12 93 -- -- -- -- 2 2 -- -- -- 86 --86 -- 186 --
16:15 -- 9 -- 1 10 -- 1 5 95 18 119 -- -- -- -- 3 3 2 1 2 95 1 99 -- 231 2
16:30 -- 7 -- 1 8 -- -- 5 95 7 107 -- -- -- -- 4 4 -- -- 1 84 --85 -- 204 --
16:45 -- 3 -- --3 1 -- 6 70 8 84 -- -- -- -- 2 2 -- -- 1 96 --97 -- 186 1
Hour Total -- 24 -- 2 26 1 1 18 339 45 403 -- -- -- -- 11 11 2 1 4 361 1 367 -- 807 3
17:00 -- 5 -- --5 -- -- 5 94 13 112 -- -- -- -- 5 5 1 1 2 79 --82 -- 204 1
17:15 -- 10 1 --11 -- -- 8 82 12 102 -- -- -- -- 1 1 -- -- -- 92 1 93 -- 207 --
17:30 1 8 -- 1 10 1 1 4 88 14 107 -- -- -- -- 2 2 -- -- -- 78 2 80 -- 199 1
17:45 -- 7 -- --7 1 -- 3 79 5 87 -- -- -- -- 1 1 1 -- 2 68 --70 -- 165 2
Hour Total 1 30 1 1 33 2 1 20 343 44 408 -- -- -- -- 9 9 2 1 4 317 3 325 -- 775 4
18:00 -- 7 -- --7 -- -- 1 53 12 66 -- -- -- -- 5 5 -- -- -- 64 --64 -- 142 --
18:15 -- 11 1 1 13 -- 1 6 67 9 83 -- -- -- -- 6 6 -- -- -- 60 --60 -- 162 --
18:30 -- 5 -- --5 -- 1 9 87 7 104 -- -- -- -- 1 1 1 -- -- 58 --58 -- 168 1
18:45 -- 7 -- --7 -- -- 2 50 13 65 -- -- -- -- --0 -- -- 1 48 1 50 -- 122 --
Hour Total 32 318 12 232
228 1897 77 1504
% of App. 0.4% 95.6% 1.3% 2.6%0.3% 3.8% 87.2% 8.8%0.0% 1.3% 0.0% 98.7%0.2% 0.8% 98.5% 0.5%
% of Total 0.0% 5.9% 0.1% 0.2% 6.2% 38.5% 0.1% 1.9% 44.6% 4.5% 51.2% 0.0% 0.0% 0.0% 0.0% 2.1% 2.1% 61.5% 0.1% 0.3% 40.0% 0.2% 40.6% 0.0%
Cars Total 1 217 3 6 227 5 5 71 1638 165 1879 -- -- -- -- 75 75 6 3 11 1459 8 1481 -- 3662 11
Movement 100% 99.5% 100% 100% 99.6% 45.5% 100% 98.6% 99.0% 99.4% 99.1% 0.0% 0.0% 0.0% 0.0% 98.7% 97.4% 54.5% 100% 91.7% 98.5% 100% 98.5% 0.0% 98.8%
Trucks Total -- 1 -- --1 -- -- 1 16 1 18 -- -- 1 -- 1 2 2 -- 1 22 --23 -- 44 2
Trucks % of
Movement 0.0% 0.5% 0.0% 0.0% 0.4% 0.0% 0.0% 1.4% 1.0% 0.6% 0.9% 0.0% 0.0% 100% 0.0% 1.3% 2.6% ##### 0.0% 8.3% 1.5% 0.0% 1.5% 0.0% 1.2%
All Vehicles (Cars & Trucks) Printed
ALLIANT ENGINEERING, INC.
733 S Marquette Ave #700, Minneapolis, MN 55402
360
N/A
Page No: 1 of 36:00-9:00, 16:00-19:00
CSAH 46 (162nd St SW) & Kendale Dr
6/3/2021
Int. Ped/
Bike
Total
Kendale Dr CSAH 46 (162nd St SW)Kendale Dr CSAH 46 (162nd St SW)
Int. Veh.
Total
Intersection:Site Code
Date:Ref Pt:
Duration:
Start Time U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
7:15 -- 7 1 1 9 ---- 2 66 6 74 -- -- 1 -- 3 4 -- -- 1 53 --54 -- 141 --
7:30 -- 10 -- 1 11 -- -- 1 66 1 68 -- -- -- -- 6 6 1 -- -- 56 --56 -- 141 1
7:45 -- 13 -- --13 -- -- 1 93 6 100 -- -- -- -- 9 9 -- -- 1 70 1 72 -- 194 --
14 62 4 68
Hour Total -- 44 1 2 47 -- -- 8 280 16 304 -- -- 1 -- 22 23 1 -- 3 246 1 250 -- 624 1
% of App. 0.0% 93.6% 2.1% 4.3%0.0% 2.6% 92.1% 5.3%0.0% 4.3% 0.0% 95.7%0.0% 1.2% 98.4% 0.4%
% of Total 0.0% 7.1% 0.2% 0.3% 7.5% 0.0% 0.0% 1.3% 44.9% 2.6% 48.7% 0.0% 0.0% 0.2% 0.0% 3.5% 3.7% ##### 0.0% 0.5% 39.4% 0.2% 40.1% 0.0%
Cars Total -- 44 1 2 47 -- -- 8 275 15 298 -- -- -- -- 22 22 1 -- 2 240 1 243 -- 610 1
Movement 0.0% 100% 100% 100% 100% 0.0% 0.0% 100% 98.2% 93.8% 98.0% 0.0% 0.0% 0.0% 0.0% 100% 95.7% ##### 0.0% 66.7% 97.6% 100% 97.2% 0.0% 97.8%
Trucks Total -- -- -- --0 -- -- -- 5 1 6 -- -- 1 -- --1 -- -- 1 6 --7 -- 14 --
Trucks % of
Movement 0.0% 0.0% 0.0% 0.0% 0.0% -- 0.0% 0.0% 1.8% 6.3% 2.0% -- 0.0% 100% 0.0% 0.0% 4.3% -- 0.0% 33.3% 2.4% 0.0% 2.8% -- 2.2%
Total Vehicles:624
0
44
LeftThruRight
2 1
AM Peak Hour Data
3
Pe
d
s
/
Bi
k
e
s
0
0
Bikes
Le
f
t
T
h
r
u
8
2
8
0
All Vehicles (Cars & Trucks) Printed
ALLIANT ENGINEERING, INC.
733 S Marquette Ave #700, Minneapolis, MN 55402
N/A
360
Page No: 2 of 36:00-9:00, 16:00-19:00
6/3/2021
CSAH 46 (162nd St SW) & Kendale Dr
Int. Ped/
Bike
Total
Kendale Dr CSAH 46 (162nd St SW)Kendale Dr CSAH 46 (162nd St SW)
Int. Veh.
Total
Peds/
Bikes
1
16
Ri
g
h
t
Pe
d
s
/
Bi
k
e
s
Thru Right
1 0
Le
f
t
22
Left
Th
r
u
R
i
g
h
t
1
2
4
6
Intersection:Site Code
Date:Ref Pt:
Duration:
Start Time U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
16:15 -- 9 -- 1 10 -- 1 5 95 18 119 -- -- -- -- 3 3 2 1 2 95 1 99 -- 231 2
16:30 -- 7 -- 1 8 -- -- 5 95 7 107 -- -- -- -- 4 4 -- -- 1 84 --85 -- 204 --
16:45 -- 3 -- --3 1 -- 6 70 8 84 -- -- -- -- 2 2 -- -- 1 96 --97 -- 186 1
5 112 5 82
Hour Total -- 24 -- 2 26 1 1 21 354 46 422 -- -- -- -- 14 14 3 2 6 354 1 363 -- 825 4
% of App. 0.0% 92.3% 0.0% 7.7%0.2% 5.0% 83.9% 10.9%0.0% 0.0% 0.0% 100%0.6% 1.7% 97.5% 0.3%
% of Total 0.0% 2.9% 0.0% 0.2% 3.2% 25.0% 0.1% 2.5% 42.9% 5.6% 51.2% 0.0% 0.0% 0.0% 0.0% 1.7% 1.7% 75.0% 0.2% 0.7% 42.9% 0.1% #### 0.0%
Cars Total -- 24 -- 2 26 1 1 21 351 46 419 -- -- -- -- 13 13 3 2 6 354 1 363 -- 821 4
Movement 0.0% 100% 0.0% 100% 100% 25.0% 100% 100% 99.2% 100% 99.3% 0.0% 0.0% 0.0% 0.0% 92.9% 92.9% 75.0% 100% 100% 100% 100% 100% 0.0% 99.5%
Trucks Total -- -- -- --0 -- -- -- 3 --3 -- -- -- -- 1 1 -- -- -- -- --0 -- 4 --
Trucks % of
Movement 0.0% 0.0% 0.0% 0.0% 0.0% -- 0.0% 0.0% 0.8% 0.0% 0.7% -- 0.0% 0.0% 0.0% 7.1% 7.1% -- 0.0% 0.0% 0.0% 0.0% 0.0% -- 0.5%
Total Vehicles:825
All Vehicles (Cars & Trucks) Printed
ALLIANT ENGINEERING, INC.
733 S Marquette Ave #700, Minneapolis, MN 55402
N/A
360
Page No: 3 of 36:00-9:00, 16:00-19:00
6/3/2021
CSAH 46 (162nd St SW) & Kendale Dr
CSAH 46 (162nd St SW)
Int. Veh.
Total Int. Ped/
Bike
Total
2 0 24
Kendale Dr CSAH 46 (162nd St SW)Kendale Dr
Peds/
Bikes
1
Right Thru Left
46
Ri
g
h
t
Pe
d
s
/
Bi
k
e
s
0 PM Peak Hour Data
35
4
Th
r
u
Le
f
t
8 22
Le
f
t
Th
r
u
35
4
Pe
d
s
/
Bi
k
e
s
0
Ri
g
h
t
1
0 0 14
Left Thru Right
Bikes
3
Intersection:Site Code:
Date:Ref Pt:
Duration:
Start Time U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
6:00 -- 3 -- 1 4 -- --4 29 3 36 -- -- 1 -- 8 9 -- -- -- 34 2 36 -- 85 --
6:15 -- 5 -- --5 -- -- 17 42 7 66 -- -- 2 -- 8 10 -- -- 1 35 3 39 1 120 1
6:30 -- 9 4 --13 -- -- 14 63 9 86 -- -- 4 1 17 22 -- -- 1 57 5 63 -- 184 --
6:45 -- 15 2 1 18 -- -- 18 58 15 91 -- -- 6 2 19 27 -- -- 2 67 4 73 -- 209 --
Hour Total -- 32 6 2 40 -- -- 53 192 34 279 -- -- 13 3 52 68 -- -- 4 193 14 211 1 598 1
7:00 -- 14 4 1 19 -- -- 21 63 11 95 -- -- 1 2 10 13 -- -- 1 48 1 50 -- 177 --
7:15 -- 9 3 3 15 -- -- 21 69 15 105 -- -- 2 2 21 25 -- -- 2 62 4 68 -- 213 --
7:30 -- 20 1 2 23 -- 1 19 61 9 90 -- -- 8 4 38 50 1 -- 2 66 4 72 1 235 2
7:45 -- 15 4 2 21 -- -- 22 95 31 148 -- -- 6 6 20 32 -- -- 2 87 4 93 -- 294 --
Hour Total -- 58 12 8 78 -- 1 83 288 66 438 -- -- 17 14 89 120 1 -- 7 263 13 283 1 919 2
8:00 -- 11 7 3 21 -- -- 24 56 9 89 -- -- 4 5 21 30 -- -- 3 78 5 86 -- 226 --
8:15 -- 13 1 5 19 -- -- 35 57 18 110 -- -- 1 2 18 21 -- -- 3 59 5 67 -- 217 --
8:30 -- 14 1 5 20 1 1 36 64 14 115 -- -- 3 4 31 38 -- -- -- 50 4 54 1 227 2
8:45 -- 11 1 1 13 -- -- 25 65 19 109 -- -- 7 3 22 32 -- -- 3 54 5 62 -- 216 --
Hour Total -- 49 10 14 73 1 1 120 242 60 423 -- -- 15 14 92 121 -- -- 9 241 19 269 1 886 2
16:00 -- 20 8 9 37 -- -- 26 72 25 123 -- -- 8 3 27 38 -- -- 4 86 7 97 2 295 2
16:15 -- 26 11 10 47 -- 3 30 99 22 154 -- -- 8 2 27 37 -- -- 2 92 7 101 -- 339 --
16:30 -- 16 10 9 35 -- 1 30 92 23 146 -- -- 8 4 44 56 -- -- 6 85 5 96 -- 333 --
16:45 -- 30 6 3 39 -- -- 37 76 28 141 -- -- 5 6 28 39 -- -- 3 93 10 106 1 325 1
Hour Total -- 92 35 31 158 -- 4 123 339 98 564 -- -- 29 15 126 170 -- -- 15 356 29 400 3 1292 3
17:00 -- 26 10 10 46 -- 1 30 97 30 158 -- -- 5 6 39 50 -- -- 1 88 5 94 -- 348 --
17:15 -- 25 9 8 42 -- -- 24 93 40 157 -- -- 8 3 21 32 -- -- 6 91 3 100 -- 331 --
17:30 -- 28 6 3 37 -- -- 29 96 28 153 -- -- 9 6 33 48 -- -- 5 77 6 88 -- 326 --
17:45 -- 27 4 11 42 -- 1 24 65 34 124 -- -- 7 7 21 35 -- -- 4 64 6 74 3 275 3
Hour Total -- 106 29 32 167 -- 2 107 351 132 592 -- -- 29 22 114 165 -- -- 16 320 20 356 3 1280 3
18:00 -- 21 4 8 33 -- 1 24 58 40 123 -- -- 2 9 26 37 -- -- 6 67 5 78 -- 271 --
18:15 -- 24 4 3 31 -- 1 44 75 36 156 -- -- 6 5 16 27 -- -- 11 60 6 77 2 291 2
18:30 -- 24 9 15 48 -- -- 30 82 40 152 -- -- 6 6 22 34 -- -- 10 48 7 65 -- 299 --
18:45 -- 26 7 10 43 -- 1 31 49 27 108 -- -- 4 3 17 24 -- -- 3 54 1 58 -- 233 --
Hour Total 155 539 122 278
671 2835 766 1797
% of App. 0.0% 64.4% 17.3% 18.3%0.4% 21.7% 59.1% 18.8%0.0% 15.8% 11.9% 72.3%0.0% 4.5% 89.1% 6.3%
% of Total 0.0% 7.1% 1.9% 2.0% 11.1% 7.7% 0.2% 10.1% 27.6% 8.8% 46.7% 0.0% 0.0% 2.0% 1.5% 9.1% 12.6% 7.7% 0.0% 1.3% 26.4% 1.9% 29.6% 84.6%
Cars Total -- 431 116 123 670 -- 11 613 1657 531 2812 -- -- 121 91 552 764 -- -- 81 1578 114 1773 4 6019 4
Movement 0.0% 99.8% 100% 100% 99.9% 0.0% 100% 99.7% 98.9% 99.6% 99.2% 0.0% 0.0% 100% 100% 99.6% 99.7% 0.0% 0.0% 100% 98.5% 100% 98.7% ##### 99.2%
Trucks Total -- 1 -- --1 1 -- 2 19 2 23 -- -- -- -- 2 2 1 -- -- 24 --24 7 50 9
Trucks % of
Movement 0.0% 0.2% 0.0% 0.0% 0.1% 11.1% 0.0% 0.3% 1.1% 0.4% 0.8% 0.0% 0.0% 0.0% 0.0% 0.4% 0.3% 11.1% 0.0% 0.0% 1.5% 0.0% 1.3% 77.8% 0.8%
Int. Ped/
Bike
Total
Buck Hill Rd CSAH 46 (162nd St SW)Kenyon Ave CSAH 46 (162nd St SW)
Int. Veh.
Total
All Vehicles (Cars & Trucks) Printed
ALLIANT ENGINEERING, INC.
733 S Marquette Ave #700, Minneapolis, MN 55402
361
N/A
Page No: 1 of 36:00-9:00, 16:00-19:00
CSAH 46 (162nd St SW) & Buck Hill Rd
8/23/2023
Intersection:Site Code
Date:Ref Pt:
Duration:
Start Time U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
7:30 -- 20 1 2 23 -- 1 19 61 9 90 -- -- 8 4 38 50 1 -- 2 66 4 72 1 235 2
7:45 -- 15 4 2 21 -- -- 22 95 31 148 -- -- 6 6 20 32 -- -- 2 87 4 93 -- 294 --
8:00 -- 11 7 3 21 -- -- 24 56 9 89 -- -- 4 5 21 30 -- -- 3 78 5 86 -- 226 --
19 110 21 67
Hour Total -- 59 13 12 84 -- 1 100 269 67 437 -- -- 19 17 97 133 1 -- 10 290 18 318 1 972 2
% of App. 0.0% 70.2% 15.5% 14.3%0.2% 22.9% 61.6% 15.3%0.0% 14.3% 12.8% 72.9%0.0% 3.1% 91.2% 5.7%
% of Total 0.0% 6.1% 1.3% 1.2% 8.6% 0.0% 0.1% 10.3% 27.7% 6.9% 45.0% 0.0% 0.0% 2.0% 1.7% 10.0% 13.7% 50.0% 0.0% 1.0% 29.8% 1.9% 32.7% 50.0%
Cars Total -- 58 13 12 83 -- 1 100 264 67 432 -- -- 19 17 97 133 -- -- 10 281 18 309 -- 957 --
Movement 0.0% 98.3% 100% 100% 98.8% -- 100% 100% 98.1% 100% 98.9% -- 0.0% 100% 100% 100% 100% -- 0.0% 100% 96.9% 100% 97.2% -- 98.5%
Trucks Total -- 1 -- --1 -- -- -- 5 --5 -- -- -- -- --0 1 -- -- 9 --9 1 15 2
Trucks % of
Movement 0.0% 1.7% 0.0% 0.0% 1.2% 0.0% 0.0% 0.0% 1.9% 0.0% 1.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 0.0% 0.0% 3.1% 0.0% 2.8% 50.0% 1.5%
Total Vehicles:972
Bikes
1
67
Ri
g
h
t
Pe
d
s
/
Bi
k
e
s
Thru Right
19 17
Le
f
t
97
Left
Th
r
u
R
i
g
h
t
18
2
9
0
Int. Ped/
Bike
Total
Buck Hill Rd CSAH 46 (162nd St SW)Kenyon Ave CSAH 46 (162nd St SW)
Int. Veh.
Total
All Vehicles (Cars & Trucks) Printed
ALLIANT ENGINEERING, INC.
733 S Marquette Ave #700, Minneapolis, MN 55402
N/A
361
Page No: 2 of 36:00-9:00, 16:00-19:00
8/23/2023
CSAH 46 (162nd St SW) & Buck Hill Rd
10
Pe
d
s
/
Bi
k
e
s
0
0
Bikes
Le
f
t
T
h
r
u
10
1
2
6
9
1
59
LeftThruRight
12 13
AM Peak Hour Data
Intersection:Site Code
Date:Ref Pt:
Duration:
Start Time U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
U-
Turn Left Thru Right App.
Total
Peds/
Bikes
16:15 -- 26 11 10 47 -- 3 30 99 22 154 -- -- 8 2 27 37 -- -- 2 92 7 101 -- 339 --
16:30 -- 16 10 9 35 -- 1 30 92 23 146 -- -- 8 4 44 56 -- -- 6 85 5 96 -- 333 --
16:45 -- 30 6 3 39 -- -- 37 76 28 141 -- -- 5 6 28 39 -- -- 3 93 10 106 1 325 1
46 158 50 94
Hour Total -- 98 37 32 167 -- 5 127 364 103 599 -- -- 26 18 138 182 -- -- 12 358 27 397 1 1345 1
% of App. 0.0% 58.7% 22.2% 19.2%0.8% 21.2% 60.8% 17.2%0.0% 14.3% 9.9% 75.8%0.0% 3.0% 90.2% 6.8%
% of Total 0.0% 7.3% 2.8% 2.4% 12.4% 0.0% 0.4% 9.4% 27.1% 7.7% 44.5% 0.0% 0.0% 1.9% 1.3% 10.3% 13.5% 0.0% 0.0% 0.9% 26.6% 2.0% #### #####
Cars Total -- 98 37 32 167 -- 5 126 360 103 594 -- -- 26 18 138 182 -- -- 12 357 27 396 1 1339 1
Movement 0.0% 100% 100% 100% 100% 0.0% 100% 99.2% 98.9% 100% 99.2% 0.0% 0.0% 100% 100% 100% 100% 0.0% 0.0% 100% 99.7% 100% #### ##### 99.6%
Trucks Total -- -- -- --0 -- -- 1 4 --5 -- -- -- -- --0 -- -- -- 1 --1 -- 6 --
Trucks % of
Movement 0.0% 0.0% 0.0% 0.0% 0.0% -- 0.0% 0.8% 1.1% 0.0% 0.8% -- 0.0% 0.0% 0.0% 0.0% 0.0% -- 0.0% 0.0% 0.3% 0.0% 0.3% -- 0.4%
Total Vehicles:1345
Left Thru Right
Bikes
0
Pe
d
s
/
Bi
k
e
s
0
Ri
g
h
t
27
26 18 138
Le
f
t
12
13
2
Le
f
t
Th
r
u
35
8
10
3
Ri
g
h
t
Pe
d
s
/
Bi
k
e
s
1 PM Peak Hour Data
36
4
Th
r
u
32 37 98
Buck Hill Rd CSAH 46 (162nd St SW)Kenyon Ave
Peds/
Bikes
0
Right Thru Left
CSAH 46 (162nd St SW)
Int. Veh.
Total Int. Ped/
Bike
Total
All Vehicles (Cars & Trucks) Printed
ALLIANT ENGINEERING, INC.
733 S Marquette Ave #700, Minneapolis, MN 55402
N/A
361
Page No: 3 of 36:00-9:00, 16:00-19:00
8/23/2023
CSAH 46 (162nd St SW) & Buck Hill Rd
Traffic Impact Study
Sundance Lakeville
Alliant No. 221-0039.0 B1
Appendix B – Detailed Operations and Queuing Analysis
Existing Conditions - AM Peak Hour
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 0.9 0.4 0.5 2.0 0.9 0.7 0.0 0.0 2.6 7.0 6.6 3.5 1.2
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 3 0 0 9 0 0 0 0 29 45 45 8
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 5.2 4.3 0.7 8.2 4.1 2.3 29.1 22.4 3.9 30.8 25.7 2.9 7.2
Movement LOS A A A A A A C C A C C A A
Movement 95th Queue (ft) 16 55 9 47 32 13 39 36 48 79 30 25
Approach Delay (sec/veh)
Approach LOS
Existing Conditions - PM Peak Hour
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 2.5 0.4 0.2 2.9 1.2 1.2 0.0 0.0 2.5 10.0 0.0 3.2 1.2
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 9 0 0 25 0 2 0 0 24 35 35 10
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 11.9 7.7 1.3 9.4 4.5 2.2 23.8 22.1 4.3 27.0 20.5 3.7 8.3
Movement LOS B A A A A A C C A C C A A
Movement 95th Queue (ft) 24 76 18 68 45 24 50 31 50 101 48 33
Approach Delay (sec/veh)
Approach LOS
Traffic Signal CSAH 46 &
Buck Hill Road 7.4 5.1 9.0 21.0
A A A C
Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Intersection
Total
Traffic Signal CSAH 46 &
Buck Hill Road 4.1 4.6 10.4 25.5
A A B C
Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Intersection
Total
2.5 9.4
A A A A
Through/Stop CSAH 46 &
Kendale Drive 0.4 1.3
Westbound Approach Northbound Approach Southbound Approach Intersection
TotalTraffic Control Intersection MOE Eastbound Approach
Northbound Approach Southbound Approach Intersection
Total
Through/Stop CSAH 46 &
Kendale Drive 0.4 0.9 2.6
Traffic Control Intersection MOE Eastbound Approach Westbound Approach
6.8
A A A A
Year 2025 Conditions - AM Peak Hour
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 1.4 0.3 0.6 2.0 0.9 0.6 0.0 0.0 2.4 0.0 0.2 2.8 0.8
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 13 0 0 11 0 0 0 0 31 0 0 29
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 7.0 4.7 0.9 7.2 4.3 2.5 26.1 26.2 3.7 31.8 24.1 2.3 9.6
Movement LOS A A A A A A C C A C C A A
Movement 95th Queue (ft) 18 51 13 40 36 20 37 36 43 149 32 17
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 5.6 0.0 3.3 0.0 0.0 0.0 2.4 1.1 0.0 0.0 0.3 0.1 1.9
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 63 0 63 0 0 0 17 17 0 0 0 0
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 0.0 0.0 0.0 4.5 0.0 2.6 0.0 0.2 0.1 1.8 0.7 0.0 1.8
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 0 0 0 38 0 38 0 0 0 11 11 0
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 0.0 0.0 0.0 4.4 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.3
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 0 0 0 20 0 20 0 0 0 0 0 0
Approach Delay (sec/veh)
Approach LOS
Year 2025 Conditions - PM Peak Hour
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 1.9 0.4 0.3 2.8 1.3 1.8 0.0 0.0 2.2 0.0 0.5 3.3 1.1
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 22 0 0 26 0 0 0 0 26 7 7 31
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 12.9 9.7 1.6 10.8 5.3 3.0 23.6 22.6 4.3 28.6 16.8 3.1 10.3
Movement LOS B A A B A A C C A C B A B
Movement 95th Queue (ft) 22 86 18 74 49 42 47 42 51 168 50 29
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 6.8 0.0 3.6 0.0 0.0 0.0 3.0 1.6 0.0 0.0 0.5 0.0 1.9
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 57 0 57 0 0 0 48 48 0 0 0 0
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 0.0 0.0 0.0 4.8 0.0 2.8 0.0 0.2 0.1 2.1 0.3 0.0 1.4
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 0 0 0 45 0 45 0 0 0 20 20 0
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 0.0 0.0 0.0 4.1 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.2
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 0 0 0 18 0 18 0 0 0 0 0 0
Approach Delay (sec/veh)
Approach LOS
Northbound Approach Southbound Approach Intersection
Total
Through/Stop CSAH 46 &
Kendale Drive 0.4 0.9 2.4
Traffic Control Intersection MOE Eastbound Approach Westbound Approach
Intersection
Total
Traffic Signal CSAH 46 &
Buck Hill Road 4.6 4.4
2.7
A A A A
Traffic Control Intersection MOE Eastbound Approach
9.9 29.0
A A A C
Westbound Approach
Intersection
Total
Through/Stop Buck Hill Road &
East Access 3.4 0.0 1.4
Traffic Control Intersection MOE Eastbound Approach Westbound Approach
A A A A
Westbound Approach
Northbound Approach Southbound Approach
Northbound Approach Southbound Approach
4.2
0.3
A A A A
Traffic Control Intersection MOE Eastbound Approach
0.2 1.7
Northbound Approach Southbound Approach
Northbound Approach Southbound Approach Intersection
Total
Through/Stop Kendale Drive &
Single-Family Access 0.0 4.4 0.1
Traffic Control Intersection MOE Eastbound Approach Westbound Approach
Intersection
Total
Through/Stop Kendale Drive &
West Access 0.0
Intersection
Total
Through/Stop CSAH 46 &
Kendale Drive 0.5 1.4
0.0
A A A A
Traffic Control Intersection MOE Eastbound Approach
2.2
Intersection
Total
Traffic Signal CSAH 46 &
Buck Hill Road 9.3 5.7 9.2
Traffic Control Intersection MOE Eastbound Approach Westbound Approach
0.5
Northbound Approach Southbound Approach
A A A A
Westbound Approach
Northbound Approach Southbound Approach
Northbound Approach Southbound Approach
0.0
23.7
A A A C
3.0
A A A A
Westbound Approach
MOE Eastbound Approach Westbound Approach
Traffic Control Intersection MOE Eastbound Approach
2.2
Intersection
Total
Through/Stop Buck Hill Road &
East Access 3.8
1.9
A A A A
Northbound Approach Southbound Approach Intersection
Total
Through/Stop Kendale Drive &
West Access 0.0 4.3 0.2
Traffic Control Intersection
Through/Stop Kendale Drive &
Single-Family Access 0.0 4.1 0.1 0.0
A A A A
Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Intersection
Total
Year 2045 Conditions - AM Peak Hour
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 1.5 0.3 0.8 1.9 1.0 0.8 0.0 0.0 2.4 0.0 0.4 3.0 0.8
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 15 0 0 11 0 0 0 0 33 0 0 29
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 10.1 5.8 0.9 10.4 4.7 2.9 24.3 23.2 4.2 35.5 17.5 2.6 10.8
Movement LOS B A A B A A C C A D B A B
Movement 95th Queue (ft) 22 71 19 70 39 22 40 40 52 166 38 20
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 5.6 0.0 3.4 0.0 0.0 0.0 2.7 1.2 0.0 0.0 0.5 0.0 1.9
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 58 0 58 0 0 0 19 19 0 0 0 0
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 0.0 0.0 0.0 4.8 0.0 2.5 0.0 0.3 0.1 2.0 0.2 0.0 1.9
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 0 0 0 41 0 41 0 0 0 17 17 0
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 0.0 0.0 0.0 4.7 0.0 0.0 0.0 0.2 0.1 0.0 0.0 0.0 0.3
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 0 0 0 23 0 23 0 0 0 0 0 0
Approach Delay (sec/veh)
Approach LOS
Year 2045 Conditions - PM Peak Hour
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 3.5 0.4 0.0 3.6 1.4 1.6 0.0 0.0 2.5 0.0 0.5 31.7 2.0
Movement LOS A A A A A A A A A A A D A
Movement 95th Queue (ft) 29 0 0 32 0 3 0 0 25 37 37 39
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 12.8 12.0 1.7 14.3 6.3 3.7 21.7 17.5 5.0 30.1 18.7 4.2 11.4
Movement LOS B B A B A A C B A C B A B
Movement 95th Queue (ft) 27 111 17 97 56 47 53 44 65 183 63 36
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 8.5 0.0 3.8 0.0 0.0 0.0 3.2 1.7 0.0 0.0 0.5 0.2 2.0
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 59 0 59 0 0 0 48 48 0 0 4 4
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 0.0 0.0 0.0 23.4 0.0 2.5 0.0 0.3 0.2 2.2 0.6 0.0 4.0
Movement LOS A A A C A A A A A A A A A
Movement 95th Queue (ft) 0 0 0 57 0 57 0 0 0 23 23 0
Approach Delay (sec/veh)
Approach LOS
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Movement Delay (sec/veh) 0.0 0.0 0.0 4.3 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.2
Movement LOS A A A A A A A A A A A A A
Movement 95th Queue (ft) 0 0 0 20 0 20 0 0 0 0 0 0
Approach Delay (sec/veh)
Approach LOS
Northbound Approach Southbound Approach Intersection
Total
Through/Stop CSAH 46 &
Kendale Drive 0.4 1.0 2.4
Traffic Control Intersection MOE Eastbound Approach Westbound Approach
Intersection
Total
Traffic Signal CSAH 46 &
Buck Hill Road 5.7 5.4
2.7
A A A A
Traffic Control Intersection MOE Eastbound Approach
9.7 31.1
A A A C
Westbound Approach
Intersection
Total
Through/Stop Buck Hill Road &
East Access 3.6 0.0 1.5
Traffic Control Intersection MOE Eastbound Approach Westbound Approach
A A A A
Westbound Approach
Northbound Approach Southbound Approach
Northbound Approach Southbound Approach
4.2
0.5
A A A A
Traffic Control Intersection MOE Eastbound Approach
0.2 1.9
Northbound Approach Southbound Approach
Northbound Approach Southbound Approach Intersection
Total
Through/Stop Kendale Drive &
Single-Family Access 0.0 4.7 0.2
Traffic Control Intersection MOE Eastbound Approach Westbound Approach
Intersection
Total
Through/Stop Kendale Drive &
West Access 0.0
Intersection
Total
Through/Stop CSAH 46 &
Kendale Drive 0.6 1.5
0.0
A A A A
Traffic Control Intersection MOE Eastbound Approach
2.5
Intersection
Total
Traffic Signal CSAH 46 &
Buck Hill Road 11.3 7.2 8.9
Traffic Control Intersection MOE Eastbound Approach Westbound Approach
0.5
Northbound Approach Southbound Approach
A A A A
Westbound Approach
Northbound Approach Southbound Approach
Northbound Approach Southbound Approach
0.0
24.7
B A A C
28.8
A A A D
Westbound Approach
MOE Eastbound Approach Westbound Approach
Traffic Control Intersection MOE Eastbound Approach
2.2
Intersection
Total
Through/Stop Buck Hill Road &
East Access 4.2
2.0
A C A A
Northbound Approach Southbound Approach Intersection
Total
Through/Stop Kendale Drive &
West Access 0.0 19.2 0.3
Traffic Control Intersection
Through/Stop Kendale Drive &
Single-Family Access 0.0 4.3 0.1 0.0
A A A A
Traffic Control Intersection MOE Eastbound Approach Westbound Approach Northbound Approach Southbound Approach Intersection
Total
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
TIMBERLAND PARTNERS, INC.
CONDITIONAL USE PERMIT
FINDINGS OF FACT AND RECOMMENDATION
On July 18, 2024 the Lakeville Planning Commission met at its regularly scheduled meeting to
consider the application of Timberland Partners, Inc. for a conditional use permit to allow
multiple family townhome and recreational buildings on a single parcel in the M-1, Mixed Use I-
35 Corridor District. The Planning Commission conducted a public hearing on the proposed
conditional use permit preceded by published and mailed notice. The applicant was present and
the Planning Commission heard testimony from all interested persons wishing to speak.
1. The property is located in Planning District No. 1 of the 2040 Comprehensive Land Use Plan,
which guides the property for corridor mixed use, which includes multi-family residential.
2. The property is zoned M-1, Mixed Use I-35 Corridor District.
3. The legal description of the property is:
4. Section 11-4-3E of the City of Lakeville Zoning Ordinance provides that a conditional use
permit may not be issued unless certain criteria are satisfied. The criteria and our findings
regarding them are:
The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City Comprehensive
Plan.
Finding: The multi-family townhomes and recreation building use of the property is
consistent with the 2040 Comprehensive Land Use Plan and District 1 recommendations of
the Comprehensive Plan.
The proposed use is or will be compatible with present and future land uses of the area.
Finding: The multi-family townhomes and recreation building on a single parcel is compatible
with existing land uses in the area given compliance with the stipulations listed in the July 12,
2024 planning report.
The proposed use conforms with all performance standards contained in the Zoning
Ordinance.
Finding: Provided compliance with stipulations of the conditional use permit, the multi-family
townhomes and recreation building on a single parcel will conform to all performance
standards contained in the Zoning Ordinance.
The proposed use can be accommodated with existing public services and will not
overburden the City’s service capacity.
Finding: The subject property is within the existing MUSA. The property is served with
city sanitary sewer and water. The multi-family townhomes and recreation building will
not have a negative impact on the City’s service capacity.
Traffic generation by the proposed use is within capabilities of streets serving the
property.
Finding: The multi-family townhomes and recreation building use on a single parcel will not
overburden the streets serving the property.
5. The planning report dated July 12, 2024 prepared by Frank Dempsey, AICP, Associate Planner is
incorporated herein.
The Planning Commission recommends that the City Council approve the conditional use
permit conditioned upon compliance with the planning report prepared by Frank Dempsey,
AICP, Associate Planner dated July 12, 2024.
BY: __________________________
Jenna Majorowicz, Chair
EXHIBIT A
Legal Description
That part of the West 722.00 feet of the Northeast Quarter of the Northwest Quarter of Section 1,
Township 114, Range 21, Dakota County, Minnesota, lying Northerly of Dakota County Right of
Way Map no. 145, according to the recorded map thereof, Dakota County, Minnesota except that
part lying Westerly, Southwesterly and Westerly of the following described line:
Commencing at the Northeast corner of said Northeast Quarter of the Northwest Quarter;
thence North 89 degrees 45 minutes 28 seconds West, an assumed bearing along the North line
of the Northeast Quarter of the Northwest Quarter of said Section 1, a distance of 1064.56 feet to
the point of beginning of the line to be described; thence South 00 degrees 45 minutes 50 seconds
West, a distance of 385.50 feet; thence Southeasterly along a non-tangential curve concave to the
Southwest, having a radius of 140.00 feet, a included angle of 75 degrees 03 minutes 19 seconds,
an arc length of 183.39 feet and a chord bearing of South 36 degrees 12 minutes 31 seconds East;
thence South 01 degrees 19 minutes 08 seconds West, tangent to last described curve, a distance
of 307.15 feet to the Northerly line of said Dakota County Right of Way Map No. 145 and there
terminating.
AND
That part of the Northeast Quarter of the Northwest Quarter of Section 1, Township 114, Range
21, Dakota County, Minnesota lying Northerly and Northwesterly of Dakota County Right of
Way Map No. 145, according to the recorded map thereof, Dakota County, Minnesota, and
Easterly of the West 722.00 feet of said Northeast Quarter of the Northwest Quarter, according to
the United States Government Survey thereof and situate in Dakota County, Minnesota.
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Frank Dempsey, Associate Planner
Jon Nelson, Assistant City Engineer
McKenzie L. Cafferty, Environmental Resources Manager
Joe Masiarchin, Parks and Recreation Director
Zach Johnson, City Engineer
Julie Stahl, Finance Director
Dave Mathews, Building Official
Tina Goodroad, Community Development Director
July 8, 2024
Sundance Lakeville Second Addition
• Preliminary Plat Review
• Preliminary Grading and Erosion Control Plan Review
• Preliminary Tree Preservation Review
• Preliminary Utility Plan Review
Timberland Partners, LLC has submitted preliminary plat applications for a development to be
known as Sundance Lakeville Second Addition. The proposed subdivision is located north of
and adjacent to 162nd Street West (CSAH 46), west of and adjacent to Buck Hill Road, and
including and adjacent to Kendale Drive. The parent parcels consist of one metes and bounds
parcel (PID No. 220011037020) zoned RM-1, Medium Density Residential District, RST-2-,
Single- and Two-Family Residential District, and C-3, General Commercial District.
The preliminary plat consists of nine (9) single family lots, thirteen (13) attached townhome
lots, and one (1) clubhouse lot within one (1) block, and one (1) outlot on 14.74 acres. The
Developer is dedicating 0.50 acres as Kenyon Court right-of-way.
The outlots created with the preliminary plat shall have the following use:
Outlot A: Stormwater Management Basin; to be deeded to the City (0.22 acres)
The proposed development will be completed by:
Developer: Timberland Partners, LLC
Engineer/Surveyor: Alliant Engineering
SSUUNNDDAANNCCEE LLAAKKEEVVIILLLLEE 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY PPLLAATT
JJUULLYY 88,, 22002244
PPAAGGEE 22 OOFF 66
SSIITTEE CCOONNDDIITTIIOONNSS
The Sundance Lakeville Second Addition site consists of undeveloped agricultural land and
wooded areas generally draining north to south. There are two barns and a property access
on the south end of the site. There is an overhead utility line on the north end of the site.
There are no existing easements on the parent parcel that will be vacated with the
preliminary plat.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
162nd Street West (CSAH 46)
Sundance Lakeville Second Addition is located north of and adjacent to 162nd Street West, a
minor arterial roadway, as identified in the City’s Transportation Plan. 162nd Street West is
constructed as a four-lane divided urban roadway adjacent to the preliminary plat. The
existing right-of-way is a total of 150-ft as shown on the preliminary plat. No additional right-
of-way is required. Site access shall be modified at the intersection of Kendale Drive and
162nd Street West in accordance with the requirements set forth by the Dakota County Plat
Commission.
Buck Hill Road
Sundance Lakeville Second Addition is located west of and adjacent to Buck Hill Road, a local
roadway. Access for the development is proposed at Buck Hill Road. Buck Hill Road is
designated as a 60-foot-wide urban road with a sidewalk along one side, within a varying
width right-of-way. The Developer shall construct improvements along Buck Hill Road as
determined with the first phase final plat.
Kendale Drive
Sundance Lakeville Second Addition is located adjacent to and including Kendale Drive, a
local roadway. Kendale Drive is designated as a 32-foot-wide rural roadway. The Developer
shall improve Kendale Drive as an urban roadway section on the east side. Kendale Drive was
dedicated 60-feet of right-of-way to the City with the Sundance Lakeville final plat. The
Sundance Lakeville Second Addition final plat shall show Outlot A, Sundance Lakeville as
right-of-way dedicated to the City. Site access shall be modified at the intersection of Kendale
Drive and 162nd Street West in accordance with the requirements set forth by the Dakota
County Plat Commission.
Kenyon Avenue
Development of Sundance Lakeville Second Addition includes the construction of Kenyon
Court, a local roadway. Kenyon Court is designed as a 32-foot-wide urban roadway
terminating in a cul-de-sac. The Developer is dedicating the necessary right-of-way.
SSUUNNDDAANNCCEE LLAAKKEEVVIILLLLEE 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY PPLLAATT
JJUULLYY 88,, 22002244
PPAAGGEE 33 OOFF 66
Private Drives
Development of Sundance Lakeville Second Addition includes the construction of a privately
owned and maintained roadway network providing driveway access to the attached
townhome units. The private roadway network is designed as 24-foot-wide urban roadway,
with the exception of a 32-foot-wide urban roadway connecting Buck Hill Road and Kendale
Drive. The Developer shall dedicate a drainage and utility easement over the private roadway.
The City shall not be responsible for any repairs (including cost) to the private roadway due to
maintenance within the easement area.
Construction traffic access and egress for grading, utility and street construction will be
determined with each phase of construction.
Development of Sundance Lakeville Second Addition includes the construction of public
sidewalks. Five-foot-wide concrete sidewalks, with pedestrian curb ramps, will be installed
along one side of Kendale Drive from 162nd Street West to Dupont Avenue. The Developer
will be credited for sidewalk installed between the western plat boundary and Dupont
Avenue.
The City’s Parks, Trails and Open Space Plan does not designate a future neighborhood park
within Sundance Residential. The Park Dedication requirement has not been collected on the
parent parcels and shall be satisfied through a cash contribution with the final plat. Only area
outside of wetlands, wetland buffers and stormwater basins is to be credited or compensated
for park dedication purposes.
Sundance Lakeville Second Addition is located within subdistricts CL-41200 of the Crystal
Lake sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan. Wastewater
will be conveyed through sanitary sewer to the northern trunk monitored by meter M630 and
continue to the Seneca Wastewater Treatment Facility.
Sundance Lakeville Second Addition includes the extension of public sanitary sewer. 8-inch
sanitary sewer will be extended from Kendale Drive through Kenyon Court. City sanitary
sewer lift station No. 26 is under construction in conjunction with Sundance Residential. The
Developer shall pay a cash fee for construction of sanitary sewer lift station No. 26. The fee
shall be calculated based on the development impact to the overall sanitary flow to the lift
station.
SSUUNNDDAANNCCEE LLAAKKEEVVIILLLLEE 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY PPLLAATT
JJUULLYY 88,, 22002244
PPAAGGEE 44 OOFF 66
The Sanitary Sewer Availability Charge has not been collected on the parent parcels and will
be required with the final plat. The fee will be based on the current rate in effect at the time of
final plat approval.
Development of Sundance Lakeville Second Addition includes the extension of public
watermain. 8-inch watermain will be extended within the subdivision from 8-inch watermain
extended onto a private drive constructed with the Sundance Lakeville development. The 8-
inch watermain extends to the subdivision from Buck Hill Road. 8-inch watermain shall be
extended along Kendale Drive from 162nd Street West to Dupont Avenue. The 8-inch
watermain installed along Kendale Drive shall extend through Kenyon Court to the northern
terminus of the cul-de-sac. The Developer will be credited for watermain installed between
the western plat boundary and Dupont Avenue. The City’s Comprehensive Water Plan does
not identify any trunk watermain improvements within the proposed plat.
An overhead electric transmission line and poles are located along the north side of the
parent parcel. The transmission line is a high voltage line and is therefore not required to be
buried, consistent with the City’s Public Ways and Property Ordinance.
Sundance Lakeville Second Addition is located within subdistricts CL-007, CL-009, and CL-010
of the Crystal Lake stormwater district, as identified in the City’s Water Resources
Management Plan.
Development of Sundance Lakeville Second Addition includes the construction of one
publicly owned and maintained stormwater management basin and three privately-owned
and maintained stormwater management basins to collect and treat the stormwater runoff
generated from the site. Three of the basins will ultimately outlet to the storm sewer along
Kendale Drive to the west. One basin will outlet to the storm sewer along 162nd Street West
to the south. The Developer shall enter into a maintenance agreement and grant an
easement to the City over the private stormwater improvements. The public stormwater
management basin will be located within Outlot A which will be deeded to the City with the
final plat. The stormwater management design is consistent with City ordinance
requirements.
The temporary basin constructed with Sundance Lakeville shall be removed and restored in
accordance with the National Pollution Discharge Elimination System General Stormwater
Permit requirements.
The final grading plan shall identify all fill lots in which the building footings will be placed on
fill material. The grading specifications shall also indicate that all embankments meet
FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings
SSUUNNDDAANNCCEE LLAAKKEEVVIILLLLEE 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY PPLLAATT
JJUULLYY 88,, 22002244
PPAAGGEE 55 OOFF 66
placed on fill material are appropriately constructed. Building permits will not be issued until
a soils report and an as-built certified grading plan have been submitted and approved by
City staff.
Sundance Lakeville Second Addition contains more than one acre of site disturbance. A
National Pollution Discharge Elimination System General Stormwater Permit for construction
activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre
being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be
submitted to the City upon receipt from the MPCA.
Development of Sundance Lakeville Second Addition includes the construction of public and
private sewer systems. Public storm sewer will be installed within the subdivision to collect
and convey stormwater runoff generated from within the public right-of-way and lots to the
public stormwater management basin located within Outlot A.
Draintile construction is required in areas of non-granular soils within Sundance Lakeville
Second Addition for the street sub-cuts and lots. Any additional draintile construction,
including perimeter draintile required for building footings, which is deemed necessary
during construction shall be the developer’s responsibility to install and finance.
The Storm Sewer Charge has not been collected on the parent parcels and must be collected
with the Sundance Residential final plat.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
Sundance Lakeville Second Addition is shown on the Flood Insurance Rate Map (FIRM) as
Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation,
there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as
determined by FEMA.
A wetland delineation was completed and reviewed by City Staff. No wetlands were
identified on the site.
A tree preservation plan was submitted by the developer for the entirety of the Sundance
subdivision. There are 783 significant trees located within the preliminary plat boundaries.
The tree preservation plan proposes to save 643 of the significant trees on site. A tree
preservation plan for Sundance Lakeville Second Addition shall be submitted prior to
SSUUNNDDAANNCCEE LLAAKKEEVVIILLLLEE 22NNDD AADDDDIITTIIOONN PPRREELLIIMMIINNAARRYY PPLLAATT
JJUULLYY 88,, 22002244
PPAAGGEE 66 OOFF 66
issuance of a city grading permit. Significant trees, as identified in the Lakeville Subdivision
Ordinance, shall be protected and preserved through termination of all grading and
construction activities.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing a SWPPP for the site prior to construction. The permit requires that all erosion and
sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction
must be documented in the SWPPP.
Additional erosion control measures may be required during construction as deemed
necessary by City staff. Any additional measures required shall be installed and maintained by
the developer.
Engineering recommends approval of the preliminary plat, grading and erosion control plan,
tree preservation, and utility plan for Sundance Lakeville Second Addition, subject to the
requirements and stipulations within this report.