Loading...
HomeMy WebLinkAboutItem 6a - Cedar Hills North Prelim PlatCity of Lakeville Community Development Dept Planning Commission Kris Jenson, Planning Manager October 29, 2024 Packet Material for the November 7, 2024 Planning Commission Meeting Cedar Hills North preliminary plat November 19, 2024 US Home, LLL (Lennar) has applied for a preliminary plat to allow the development of 88 single family residential lots and 144 attached townhome lots on 148.6 acres to be known as Cedar Hills North. The Cedar Hills North preliminary plat is located north of 200th Street (CR 64) and east of Cedar Avenue (CSAH 23). The Cedar Hills North preliminary plat plans have been distributed to Engineering Division and Parks and Recreation Department staff, and the Parks, Recreation and Natural Resources Committee. A. Aerial Map B. Zoning Map with approved revisions C. Certificate of Survey D. Preliminary Plat E. Site Plans F. Phasing Plan G. Ghost Plat H. Street Plans I. Sewer and Water Plans J. Storm Sewer Plans K. Grading Plans L. Tree Survey M. Landscape Plan 2 N. Wetland Impacts O. July 18, 2024 Plat Commission meeting letter On October 7, 2024, the City Council approved comprehensive plan and zoning map amendments for the Cedar Hills North preliminary plat area, minus Outlot F. The Metropolitan Council is reviewing the comprehensive plan amendment and must approved prior to the recording of the final plat. The preliminary plat area consists of seven parcels, though generally only the south half of the plat area is proposed for development. The use on the property has been primarily undeveloped agricultural land as well as a few homes, accessory structures, wells, and septic systems, which must be removed with the development of the site. A 100-foot-wide natural gas pipeline bisects the property from the southwest corner of the site to the northeast, and a water corridor begins in the southwest corner as well and runs east through the property. (Exhibit A). The Cedar Hills North property is located in Planning District 5 of the 2040 Comprehensive Plan, which guided the subject property for low/medium and medium/high density residential. Provided the comprehensive plan amendment is approved by Metropolitan Council, the property will be in compliance with the comprehensive plan. . The adjacent land uses and zoning are as follows: North – Undeveloped agricultural farmland (RST-2, RM-3) East – Undeveloped agricultural farmland (City of Farmington) South – 200th Street, detached townhomes (RM-1) West – Cedar Avenue, Undeveloped Agricultural land (RM-3) City streets, sanitary sewer and water improvements for the area of Cedar Hills North will be financed and constructed by the developer. The development costs associated with the Cedar Hills North development are not programmed in the 2024– 2028 CIP. A preliminary plat may be deemed premature if any of the criteria listed in Chapter 10-2-4-1 of the Subdivision Ordinance exist. Eligible criteria pertain to a lack of adequate: drainage, water, streets, sanitary sewer, and public service capacity (police and fire protection). The other pertinent criteria pertain to inconsistencies with the City Comprehensive Land Use and Capital Improvement Plans 3 (discussed above). Staff review of the Cedar Hills North preliminary plat against these criteria finds that it is not a premature subdivision. . The Cedar Hills North preliminary plat consists of 88 single family lots and 144 attached townhome lots on 148.6 acres. This results in a gross density of 1.56 units per acre. Excluding arterial street right-of-way, wetlands, stormwater management ponds, and future development outlots, the overall net density is 3.88 units per acre. The single-family area of the development (guided Low Density Residential) has a density of 2.65 units per acre, while the attached townhome area (guided Medium/High Density Residential) has a density of 6.77 units per acre. Both densities are consistent with density ranges required by those land use designations. The following minimum single-family lot size requirements of the RST-2, Single- and Two-Family Residential District pertain to the Cedar Hills North preliminary plat: Single family lot sizes within the Cedar Hills North preliminary plat range from 8,779 square feet to 25,915 square feet in area. All of the single-family lots meet the lot area, width and depth requirements of the RST-2 District. The following minimum requirements for single family building setbacks in the RST-2 District pertain to the Cedar Hills North preliminary plat: 25 ft (garage) The proposed house pads shown on the Cedar Hills North grading, drainage and erosion control plan indicate that all 88 single-family lots have adequate building pad areas that meet setback requirements for principal structures. 4 ATTACHED TOWNHOME DEVELOPMENT STANDARDS Lot Requirements. The following minimum requirements for attached townhome building setbacks in the RM-3 District pertain to the Cedar Hills North preliminary plat: 25 feet (garage) The proposed unit lots shown on the Cedar Hills North preliminary plat have sufficient area to accommodate attached townhome units. The RM-3 District requires at least 3,800 square feet per unit. The Cedar Hills North Preliminary plat has an average of just over 6,400 square feet per unit for the attached townhomes area, which exceeds the minimum lot area per unit requirements of the RM-3 District. Each unit must meet the requirements of Section 11-60-21.B.3, which requires that a minimum of 25% of the area of each elevation of the unit must have an exterior finish of brick, stucco, and/or natural or artificial stone. Except for brick, stucco, and/or natural or artificial stone, no single elevation may have more than 75% of one type of finish or have more than 60% of all elevations of one type of finish. The City has deemed the use of cement fiberboard material as satisfying the minimum masonry material requirement and is therefore also allowed to exceed the maximum area limit for non-masonry materials. The developer must submit dimensioned floor plans for the detached townhome units to verify compliance with the minimum requirements for above grade floor area established by Section 11-17-13.D of the Zoning Ordinance. The proposed detached townhome units are proposed to be slab on grade. The minimum area of each garage must be at least 540 square feet and have a minimum interior width of 20 feet. A homeowner’s association is required to be established for ownership and maintenance of Lot 89 and Lots 145-152, as well as for the exteriors of the attached townhome buildings. Prior to building permits being issued for the townhomes, the Developer must submit the HOA documents for review by the City Attorney, as well as provide proof that the HOA documents have been recorded and that all common areas have been deeded to the HOA for ownership. Each townhome building must provide landscaping at the immediate perimeter of the unit, as shown on the landscape plan (Exhibit M). All landscaped areas, including common open space and public right of way, must have an inground irrigation system with an automatic controller. With the final plat, the Developer must provide 5 information that the landscaping of the detached townhome units meets the requirements of Section 11-60-21H. Sixteen (16) single family lots require buffer yard landscaping as 200th Street is classified as a major collector street Comprehensive Transportation Plan. The buffer yard screening must provide an effective minimal visual screen to a height of 10 feet. The RM-3 District does not require buffer yard plantings that meet the standards set forth in Section 11-21-9.E, but an appropriate variety of coniferous trees, tall growing shrubs, and deciduous shade trees shall be provided for screening purposes in yards bordering major collector and arterial streets. The buffer yard landscape plan includes a variety of overstory and evergreen trees, as well as shrubs to provide a visual buffer (Exhibit M). The single-family lots abutting 200th Street must install sod to the side/rear property line. A $1,000/lot security will be required with the building permit. There are six outlots totaling 87.35 acres in the Cedar Hills North preliminary plat. The use of the proposed outlots will be as follows: Outlot A is a 0.64 acre outlot for future development that will be retained by the current property owner. Outlot B is a 4.7 acre outlot consisting of a stream re-alignment and stormwater management basin that will be deeded to the City with the final plat. Outlot C is a 3.55 acre outlot consisting of a stream re-alignment and stormwater management basins and that will be deeded to the City with the final plat. Outlot D is a 5.98 acre outlot consisting of a stream re-alignment and stormwater management basin that will be deeded to the City with the final plat. Outlot E is a 0.03 acre outlot to provide a trail connection from Road 4 to the trail along the north side of 200th Street. Outlot F is a 72.45 acre outlot and will be retained by the current property owner. No subdivision identification monument signs are proposed with the Cedar Hills North preliminary plat. If signs are proposed, they must be located on property that will be owned and maintained by an HOA. The following is a summary of streets adjacent to or proposed with the Cedar Hills North preliminary plat. Additional detailed information is outlined in the Engineering Division memorandum dated October 29, 2024. Cedar Avenue (CSAH 23) – Cedar Avenue is west of an adjacent to the property and is classified as a minor arterial county highway in the City’s Comprehensive Transportation Plan and is a four-lane divided highway along the development parcels. The required right of way, per the Dakota County Plat Needs Map, will be dedicated with the final plat. 6 200th Street (CR 64) – 200th Street is south of and adjacent to the property is classified as a major collector street in the City’s Comprehensive Transportation Plan and is a two-lane undivided rural roadway. The Developer is dedicating the necessary right-of-way as shown on the preliminary plat. Gallifrey Way – Gallifrey Way is a minor collector street extending north from the Cedar Hills subdivision and is a 38-foot-wide street within an 80-foot-wide right of way and is shown with five-foot-wide concrete sidewalks on both sides of the street. Gallifrey Way will provide future access to Outlot F and must include barricades and a “Future Street Extension” at the north terminus. Lots 24, 25, 38, 39, 50, 57, 58, 87 may not have driveway access to Gallifrey Way and must access the adjacent side street. Gadfly Way – Gadfly Way will be a 32-foot-wide residential street constructed within a 60-foot-wide right-of-way that will end in a permanent cul-de-sac. A five-foot-wide sidewalk is proposed for the west side of Gadfly Way to provide a pedestrian connection between the trail along the north side of 200th Street and the trail along the south side of the creek. Roads 3, 6, 8, and 11 – These will be 32-foot-wide local residential streets constructed within a 60-foot right-of-way and a five-foot-wide concrete sidewalk along one side of the street. Road 6 requires a temporary cul-de-sac at the north terminus along with barricades and a “Future Street Extension” sign. Roads 4, 5, and 7 – These will be 32-foot-wide local residential streets constructed within a 60-foot-wide right-of-way that end in a permanent cul-de-sac. Roads 12, 13, 14, 15, and 16 – These will be 24 foot and 28-foot-wide private streets owned and maintained by the homeowner’s association with connections to public streets 8 and 11. The private streets must be posted as no parking zones on both sides of the driveway. All streets meet the minimum width and design requirements of the Subdivision Ordinance. The Dakota County Plat Commission reviewed and approved the preliminary plat at their July 18, 2024 meeting. The Plat Commission letter is included as Exhibit O. Cedar Hills North is proposed to be developed in three phases (Exhibit F). The first phase of development is the single-family lots south of the water channel, the second phase is the townhomes between Gallifrey Way and the gas pipeline easement, and the third phase is the townhomes west of the pipeline and the single family lots east of Gallifrey Way and north of the water channel. Proposed grading, drainage, erosion control, and utilities for the Cedar Hills North preliminary plat is shown on the grading, 7 drainage and erosion control and utility plans. All existing and new local utilities shall be placed underground. Grading, drainage, erosion control, and utilities details are outlined in the October 29, 2024 engineering report prepared by Jon Nelson, Assistant City Engineer and Mac Cafferty, Environmental Resources Manager. The Engineering Division recommends approval of the preliminary plat. A tree preservation plan (Exhibit L), submitted by the developer, identifies 196 significant trees within the Cedar Hills North preliminary plat boundary, all of which are proposed to be removed. The vast majority of the trees on the site are Silver Maple and Boxelder trees. Mac Cafferty, Environmental Resources Manager has reviewed the tree preservation plan and his comments are included in the October 29, 2024 engineering report. A wetland delineation has been completed and the information and data has been incorporated into the preliminary plat plans. Two small wetlands have been identified adjacent to the Vermillion River Watershed Water Quality Corridor, which will be realigned and restored with this development. This project will impact 0.29 acres of wetland that will require replacement. Mac Cafferty has reviewed the wetland delineation report. His comments are included in the October 29, 2024 engineering report. When the City’s 2015 Parks, Trails, and Open Space Plan was drafted and adopted, the parcels north of 200th Street along Cedar Avenue were not within the MUSA or assigned a timeframe for development. The 2040 Comprehensive Land Use Plan was adopted in 2019, which brought the parent parcels of Cedar Hills North into the MUSA and available for development. This is why the Cedar Hills North area is not included in a park search area within the Parks, Trails, and Open Space plan. Park dedication has not been collected on this parcel and will be required to be satisfied through a cash contribution at the time of final plat. The Parks, Recreation and Natural Resources Committee will review the preliminary plat at their November 6, 2024 meeting. Their comments, if any, will be forwarded to the Planning Commission at the public hearing. The developer will construct five-foot-wide concrete sidewalks along one side of all streets in the development, except for Road 4, 5, and 7 cul-de-sacs and the privately owned and maintained streets. A 10-foot-wide bituminous trail will be constructed by the Developer on the east side of Cedar Avenue along the plat boundary and along the north side of 200th Street, also along the plat boundary. The Cedar Hills North preliminary plat area is located within the current MUSA. A ghost plat (Exhibit G) for the future development area to the north has been submitted and shows a potential attached townhome and single-family development layout that connects Gallifrey Way to a future 195th Street. Much like the Cedar Hills 8 North site, the area to the north includes a water channel and the continuation of the natural gas pipeline. Overhead electric lines are located along the east side of Cedar Avenue. The developer will be required to place these utilities underground as a part of the improvements on the site. A security will be required to guarantee that the work is completed. Community Development Department staff recommends approval of the Cedar Hills North preliminary plat, subject to the following stipulations: 1. Approval of the preliminary plat is contingent upon approval of the comprehensive plan amendment by Metropolitan Council. 2. Implementation of the recommendations listed in the October 29, 2024 engineering report. 3. Park dedication shall be satisfied with a cash contribution paid with the final plat for each development phase. 4. The developer shall construct five-foot-wide concrete sidewalks as shown on the preliminary plat plans. The developer shall construct a bituminous trail along the north side of 200th Street and the east side of Cedar Avenue, as shown on the plans. 5. Outlots B, C, D, and E shall be deeded to the City with the final plat. 6. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The lots abutting 200th Street must install sod to the side or rear property line and a $1,000 per lot security will be required with the building permit. 7. The following lots shall have restricted driveway access: • Lots 24 and 39 shall have driveway access from Road 3. • Lots 25 and 38 shall have driveway access from Road 4. • Lot 50 and 57 shall have driveway access from Road 5. • Lot 58 and 87 shall have driveway access from Road 6. 8. All new local utilities and any existing overhead service utilities located on the property shall be placed underground. 9. The existing houses, accessory structures, fences, wells, and septic systems must be removed with the development of this property. 10. A homeowner’s association must be established for ownership and maintenance of Lots 89 and 145-152. 9 11. The Developer must submit HOA documents for review and provide proof of recording of the HOA documents and deeds conveying the common area lots to the HOA, prior to building permits issued for the attached townhomes. 12. Attached townhomes must meet the exterior materials requirements of Section 11-58-21.C.4 of the Zoning Ordinance. 13. The developer must submit dimensioned floor plans for the detached townhome units to verify compliance with the minimum requirements for above grade floor area established by Section 11-17-13D of the Zoning Ordinance. 14. Each detached townhome unit shall include an attached garage meeting the minimum width and area requirements of Section 11-58-21D of the Zoning Ordinance. 15. The developer shall provide details to verify compliance with the landscape requirements of Section 11-58-21K of the Zoning Ordinance. Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community 200TH ST (CR 64) CED A R A V E ( C S A H 2 3 ) 202ND ST Cit y o f F a r m i n g t o n GALLIFREY WAY City of Lakeville Aerial Location Map Cedar Hills North Preliminary Plat Preliminary Plat Area EXHIBIT A RM-3 RST-2 ZONING MAP AMENDMENT EXHIBIT B POND N3P NWL-1007.0 HWL-1011.1 WETLAND G Outlet-1003.95 HWL-1007.7POND N2P NWL-1019.5HWL-1023.5 PARCEL 1 SANANIKONE PARCEL 2 PA R C E L 3 PARCEL 4 PA R C E L 5 PARCEL 6 TRACT A TRACT B TR A C T D TRACT E g i j e o ac aa ab z s p (200TH STREET W) (C E D A R A V E N U E ) GALLIFREY WAY GAINES COURT GADFLY WAY C. S . A . H N O . 2 3 COUNTY ROAD NO. 64 TR A C T C PARCEL 7 s Bearings are based on the Dakota County Coordinate System (NAD 83 - 1986 adj.) VICINITY MAP NO SCALE NOR TH 0 SCALE IN FEET 200 100 100 200 400 SURVEY LEGEND XX WB SR R GN NE ENIG E DESI E NN SATHRE-BERGQUIST, INC. S US S Y R S O ER EVR PLA ALTA/NSPS LAND TITLE SURVEY PREPARED FOR: U.S. HOME, LLC NO. BY DATE REVISION 1 CMT 4/12/2024 ADDED REENTS PARCEL 2 EMW 4/19/2024 UPDATE TREE INVENTORY FIELD CREW XXX DRAWN CW/AK/EW CHECKED CT DATE 1/17/24 USE (INCLUDING COPYING, DISTRIBUTION, AND/OR CONVEYANCE OF INFORMATION) OF THIS PRODUCT IS STRICTLY PROHIBITED WITHOUT SATHRE-BERGQUIST, INC.'s EXPRESS WRITTEN AUTHORIZATION. USE WITHOUT SAID AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND SHALL THEREBY INDEMNIFY SATHRE-BERGQUIST, INC. OF ALL RESPONSIBILITY. SATHRE-BERGQUIST, INC. RESERVES THE RIGHT TO HOLD ANY ILLEGITIMATE USER OR PARTY LEGALLY RESPONSIBLE FOR DAMAGES OR LOSSES RESULTING FROM ILLEGITIMATE USE. Dakota County FILE NO. 8 5401-697 LAKEVILLE, MINNESOTA TWP:114-RGE.20-SEC.22 14000 25TH AVENUE NORTH, SUITE 120 PLYMOUTH MN 55447 (952) 476-6000 WWW.SATHRE.COM To: U.S. Home, LLC, Donnelly Farms Limited Partnership, Burnet Title and First American Title Insurance Company: This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2021 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and includes Items 1 - 5, 6(a), 7(a), 8, 11(b), 16, and 18 of Table A thereof. The field work was completed on 1/26/2024. Date of Plat or Map: March 22, 2024 ________________________________________________________ Colyn M. Tvete, PLS Minnesota License No. 62269 2 EXHIBIT C EXHIBIT D EXHIBIT E EXHIBIT F EXHIBIT G EXHIBIT H EXHIBIT I EXHIBIT J EXHIBIT K EXHIBIT L Name Date:10/16/2024 Reg#---- Lot Cover Mix Common Scientific Rate lbs/acre Redtop Agrostis alba 2.1 lbs/acre Perennial Rye Lolium perenne 14.7 lbs/acre Timothy Phleum praetense 2.1 lbs/acre Canada Bluegrass Poa compressa 9.8 lbs/acre Kentucky Bluegrass Poa pratensis 20.3 lbs/acre White Clover Trifloium 2.1 lbs/acre Chewings Fescue Festuca rubra 12 lbs/acre Tall Fescue Festuca arundinacea 12 lbs/acre TOTAL 75.1 lbs. Seeding Rate: 70 lbs. per acre * all seeded areas to receive 50 Oats at 50 lbs per acre * all seeded areas to be mulched with straw at a rate of 2000 lbs per acre and disc anchored OutLot Cover Mix Nurse/Cover Common Scientific Rate Acre Oats Avena sativa 30 lbs/acre TOTAL 30 lbs Native Grasses Common Scientific Rate Acre Little Bluestem Andropogon scoparius 3 lbs/acre Sideoats Grama Grass Bouteloua curtipendla 3 lbs/acre Prairie Dropseed Sporabolus heterolepis 1 lbs/acre Blue Grama Grass Bouteloua gracilis 1 lbs/acre Quatro Sheep Fescue Festuca ovina 30 lbs/acre TOTAL 38 lbs Native Wildflowers Common Scientific Rate Acre Purple Prairie Clover Petalostemum purpureum 2 oz/acre Black-eyed Susan Rudbeckia hirta 4 oz/acre Prairie Blazing Star Liatris pynostachya 2 oz/acre Common Milkweed Asclepias syriaca 2 oz/acre Wild Bergamot Monarda fistulosa 2 oz/acre TOTAL 12 oz Buffer Yard (per code) Buffer Yard (per code) Trail Bench/ Perennial Plantings Trail Bench/ Perennial Plantings Trail Bench/ Perennial Plantings Trail Bench/ Perennial Plantings Buffer Yard (per code) Settling Basin Pond 6 Pond 5 Pond 4 Pond 3 Pond 2 Pond 1 Buffer Yard (per code) PLANT SCHEDULE Overstory Code Common Name Botanical Name Cont.Qty.M Height M Width PA Prairie Gold Aspen Populus tremuloides `NEArb`2.5" BB 41 20-30'15-20' RB River Birch Betula nigra 2.5" BB 21 40-60'30-40' DB Dakota Pinnacle Birch Betula platyphylla `Fargo`2.5" BB 9 20-30'8-10' KC Kentucky Coffee Tree Gymnocladus dioica 2.5" BB 5 50-60'40-50' HB Common Hackberry Celtis occidentalis 2.5" BB 4 50-75'40-50' AL American Linden Tilia americana 2.5" BB 11 40-60'20-30' RM Red Maple Acer rubrum 2.5" BB 17 40-50'15-20' SO Swamp White Oak Quercus bicolor 2.5" BB 29 50-60'40-50' Coniferous Code Common Name Botanical Name Cont.Qty.M Height M Width BF Balsam Fir Abies balsamea 8' BB 11 40-50'20-25' LA American Larch Larix laricina 8' BB 23 40-80'15-30' NP Norway Pine Pinus resinosa 8' BB 28 60-80'20-30' WP White Pine Pinus strobus 8' BB 39 50-80'30-40' BH Black Hills Spruce Picea glauca densata 8' BB 49 30-40'20-30' NS Norway Spruce Picea abies 8' BB 28 60-80'25-30' Undertsory Code Common Name Botanical Name Cont.Qty.M Height M Width HA Thornless Hawthorn Crataegus crus-galli var. inermis 2" BB 6 15-20'15-20' LT Japanese Lilac Syringa reticulata 2" BB 8 25-30'20-25' MA Showy Mountain Ash Sorbus decora 2" BB 5 20-25'20' SB Servicerberry Tree Amelanchier x grandiflora `Autumn Brilliance`2" BB 12 20-25'15' Shrubs Code Common Name Botanical Name Cont.Qty.M Height M Width CB Black Chokeberry Aronia melanocarpa elata 18"+ HT 54 4-6'4-5' DW Compact Dogwood Cornus sericea `Bailadeline`18"+ HT 81 4-5'4-5' WH Wild Hydrangea Hydrangea arborescens L.18"+ HT 74 3-5'3-5' MK Miss Kim Lilac Syringa meyeri `Miss Kim`18"+ HT 37 5-6'5-6' WB Winterberry llex verticillata 'Jim Dandy'18"+ HT 65 4-5'4-5' Perennials Code Common Name Botanical Name Cont.Qty. BES Black Eyed Susan Rudbeckia `Goldsturm`1 Gal 32 3" M I N 12 " M I N TOP OF ROOT BALL SLIGHTLY EXCPOSED MULCH PER PLAN BACKFILL WITH 50/50 MIX OF TOP SOIL AND NATIVE SOIL UNDISTERBED SUBGRADE SCARIFY BOTTOM OF HOLE SET ROOT BALL ON SUBGRADE 3" M I N 6" M I N TOP OF ROOT BALL SLIGHTLY EXCPOSED MULCH PER PLAN 4" OF TOPSOIL ROTO-TILLED INTO 6" OF NATIVE SOIL UNDISTERBED SUBGRADE SET ROOT BALL ON SUBGRADE PROPOSED GRADE (SLOPE AWAY FROM PLANT) HAND LOOSEN ALL CONTAINERED ROOT BALLS HAND LOOSEN ALL CONTAINERED ROOT BALLS 2x DIAMETER OF ROOT BALL PLANTING PIT 4-6" DEEPER THAN ROOT BALL 30" MULCH RING PROVIDE RODENT/ANIMAL PROTECTION ROOT FLARE AND ROOT BALL SHALL BE EXPOSED 1" ABOVE GRADE (NO SOIL SHALL COVER ROOT FLARE) NO MULCH SHALL TOUCH TRUNK SHREDDED HARDWOOD MULCH 6" DEPTH EXPOSE TOP OF ROOT BALL FROM WIRE AND BURLAP 4" HIGH EARTHEN BERM AT EDGE OF ROOT BALL 50/50 TOPSOIL MIXED WITH NATIVE SOIL SCARIFY HOLE EDGES SET ROOT BALL ON UNDESTERBED OR COMPACTED SUBGRADE UNDISTERBED SUBGRADE 2x DIAMETER OF ROOT BALL CONTRACTOR SHALL ENSURE TREES REMAIN PLUM , DURING WARRENTY PERIOD. IF STAKES ARE TO BE USED, USE THE 2/3 STAKE METHOD WITH TRUNK WEBBING. (NO WIRE IS TO BE USED ON TRUNK) NO SCALE TYPICAL TREE DETAILL1 1 NO SCALE TYPICAL PERENNIAL DETAILL1 3 NO SCALE TYPICAL SHRUB DETAILL1 2 1)THE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OF THE WORK. 2)THE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE LANDSCAPE ARCHITECT DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT. 3)THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES, REGULATIONS, AND PERMITS GOVERNING THE WORK. 4)THE CONTRACTOR SHALL PROTECT EXISTING ROADS,CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING CONSTRUCTION.DAMAGE TO SAME SHALL BE REPAIRED AND/OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. 5)VERIFY ALL UTILITIES, INCLUDING IRRIGATION LINES, WITH THE OWNER FOR PROPRIETARY UTILITIES AND GOPHER STATE ONE CALL 48 HOURS BEFORE DIGGING. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ANY DAMAGES TO SAME. NOTIFY THE LANDSCAPE ARCHITECT OF ANY CONFLICTS TO FACILITATE PLANT RELOCATION. 6)THE LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE. 7)THE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING OF WORK. 8)THE PLAN TAKES PRECEDENCE OVER THE LANDSCAPE LEGEND IF DISCREPANCIES EXIST. QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE. CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN. 9)THE SPECIFICATIONS TAKE PRECEDENCE OVER THE PLANTING NOTES AND GENERAL NOTES. 10)EXISTING TREES AND SHRUBS TO REMAIN SHALL BE PROTECTED TO THE DRIP LINE FROM ALL CONSTRUCTION TRAFFIC, STORAGE OF MATERIALS ETC. WITH 4' HT. ORANGE PLASTIC SAFETY FENCING ADEQUATELY SUPPORTED BY STEEL FENCE POSTS 6' O.C. MAXIMUM SPACING LONG-TERM STORAGE OF MATERIALS OR SUPPLIES ON- SITE WILL NOT BE ALLOWED. 11) CONTRACTOR SHALL REQUEST IN WRITING, A FINAL ACCEPTANCE INSPECTION. 1)ALL DISTURBED AREAS AFFECTED BY INSTALLATION OF THE LANDSCAPE AND ARE NOT PAVED SHALL BE SEEDED OR SODDED, AS SPECIFIED BY THE PLAN. 2)ALL AREAS TO RECEIVE SOD SHALL ALSO RECEIVE 4" OF TOPSOIL PRIOR TOINSTALLING SOD.TOPSOIL SHALL BE FREE OF TREE ROOTS, STUMPS, BUILDING MATERIAL,AND TRASH, AND SHALL BE FREE OF STONES LARGER THAN 1 1/2" INCHES IN ANY DIMENSION. 3)WHERE SOD ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED SHALL BE HELD 1" BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC. 4)SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, SOD SHALL BE STAKED SECURELY. 5)THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FIELD VERIFICATION OF UTILITY LOCATION BY CALLING GOPHER ON STATE PRIOR TO BEGINNING WORK, TO ENSURE ALL TREES ARE PLANTED OUTSIDE OF 10' UTILITY EASEMENT, MEASURED FROM TREE TRUNK TO PIPE. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ALL DAMAGED UTILITIES AS A RESULT OF LANDSCAPING CONSTRUCTION AT NO COST TO THE OWNER 6)A MINIMUM OF 2 ROWS OF SOD SHALL BE PLANTED BEHIND ROAD CURB THAT MNDOT 3878 C SPECIFICATION FOR SALT TOLERANCE, IF IRRIGATION IS NOT 7)AREAS WHERE SIDEWALKS PARALLEL ROADS, SHALL BE SODDED FROM BACK OF CURB TO SIDEWALK. SOD SHALL MEET MNDOT 3878 C SPECIFICATION FOR SALT TOLERANCE. 8)TURF ON ALL OTHER AREAS DISTURBED BY CONSTRUCTION SHALL BE RESTORED BY SEEDING,MULCHING AND FERTILIZING. 9)ALL DISTURBED AREAS TO BE TURF SEEDED, ARE TO RECEIVE 4" TOP SOIL, SEED, MULCH, AND WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET. 10)ALL DISTURBED AREAS TO RECEIVE NATIVE SEED, ARE TO RECEIVE PLANTING SOIL, SEED, MULCH, AND WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET. GROUND COVER NOTESGENERAL LANDSCAPE NOTES 1)TREES AND SHRUBS SHALL BE FRESHLY DUG AT TIME OF DELIVERY UNLESS CONTAINER GROWN, IF CONTAINER GROWN, PLANTS SHALL BE WATERED EVERYDAY AND KEPT IN A PARTIALLY SHADED AREA UNTIL PLANTED. 2)TREES TO BE PLANTED EXCEPT MULTI-STEM TREES SHALL HAVE A SINGLE STRAIGHT LEADER AND TAPERED TRUNK. ALL TREES SHALL BE FREE OF GIRDING ROOTS THAT HAVE ENCIRCLED THE TREE, TREES MUST BE IN GOOD HEALTH AND FREE OF DISEASE. 3)ALL TREES SHALL HAVE A 2-4" HARDWOOD BARK MULCH 6' DIAMETER RING AROUND THE BASE OF THE TREE. KEEP MULCH OFF TREE TRUNK. 4)THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED TO BE UNSATISFACTORY BEFORE, DURING OR AFTER INSTALLATION 5)PLANTING HOLES SHALL BE FREE OF WEEDS, ROCKS, SOD, CLAY CLUMPS, CLASS V AND OTHER CONSTRUCTION MATERIALS. 6)TOPSOIL FOR BACKFILLING PLANTING HOLES SHALL BE A MIXTURE OF NATIVE AND TOPSOIL AT A RATIO OF 1:1. 7)CONTRACTOR SHALL EXCAVATE 8" OF SOIL IN ALL LANDSCAPE BEDS, REPLACE WITH 8" OF UNSCREENED TOPSOIL, ENOUGH ESTABLISH A POSITIVE GRADE FROM STRUCTURES, FOUNDATIONS, PATIOS, ETC.. 8)PLANTING BEDS PROPOSED WITH ROCK MULCH SHALL BE LAID OVER MIN. 6 MIL. BLACK POLY. 9)PLANTING BEDS PROPOSED WITH BARK MULCH, A PRE EMERGENT HERBICIDE SHALL BE SPREAD AT PRODUCT RECOMMENDED RATIOS BEFORE BARK MULCH IS SPREAD. POLY AND FABRIC UNDERLAYMENTS ARE NOT TO BE USED UNDER BARK MULCH. 10) ALL VINYL EDGING TO BE STAKED 7' ON CENTER, HORIZONTALLY. 11)NO PLANTS SHALL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA. PLANTING NOTES Legend Turf (Sodded/ salt tolerant) MNDot 33-262 (Seeded) Dry Swale MNDot 34-271 (Seeded) Wet Meadow MNDot 34-262 (Seeded) Wet Prairie / Mix of trees, shrubs, and focal plantings Lot/ Outlot Mix (Seeded) 4-6" River Rock Retaining Wall THIS PLAN SET AND THE CONCEPTS REPRESENTED HEREIN ARE THE PROPERTY OF KLEIN-NORBY LANDSCAPE & SITE DESIGN. CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BY KLEIN-NORBY LANDSCAPE & SITE DESIGN I herby certify that this plan, plan set, specification or report was prepaired by me or under my direct supervision and that I am duly registered Landscape Architect under the laws of the State of Minnesota PRELIM I N A R Y N O T FOR C O N S T R U C T I O N KLEIN-NORBY LANDSCAPE & SITE DESIGN www.norbylandscape.com mklein@norbylandscape.com 763.257.6210 CDRAWN BY MK CHECKED BY DATE 10/16/2024 REVISIONS NO.BY DATE COMMENTS PROJECT #FILE # L1 6 CEDAR CREEK LENNAR LAKEVILLE, MN PRELIMINARY LANDSCAPE PLAN KN 01MK 240808 Revise per city/client comments 02MK 240904 Revise per city/client comments 03MK 240912 Revise per city/client comments 04MK 241016 Revise per city/client comments0 100'200' NOT TO SCALE EXHIBIT M Name Date:10/16/2024 Reg#---- WH DW CB WB WH WB CB DW DW WB WH CB DW WH CB WB MK CB WH DW WB THIS PLAN SET AND THE CONCEPTS REPRESENTED HEREIN ARE THE PROPERTY OF KLEIN-NORBY LANDSCAPE & SITE DESIGN. CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BY KLEIN-NORBY LANDSCAPE & SITE DESIGN I herby certify that this plan, plan set, specification or report was prepaired by me or under my direct supervision and that I am duly registered Landscape Architect under the laws of the State of Minnesota PRELIM I N A R Y N O T FOR C O N S T R U C T I O N KLEIN-NORBY LANDSCAPE & SITE DESIGN www.norbylandscape.com mklein@norbylandscape.com 763.257.6210 CDRAWN BY MK CHECKED BY DATE 10/16/2024 REVISIONS NO.BY DATE COMMENTS PROJECT #FILE # L2 6 CEDAR CREEK LENNAR LAKEVILLE, MN PRELIMINARY LANDSCAPE PLAN KN 01MK 240808 Revise per city/client comments 02MK 240904 Revise per city/client comments 03MK 240912 Revise per city/client comments 04MK 241016 Revise per city/client comments0 40'80' Scale: 1"=40' Name Date:10/16/2024 Reg#---- DW WH MK MK WH MK DW WH DW WH WB CB MK WB WB MK WH CB DW MK WH DW WB DW DW WB DW WH CB CB DW WH WH WB BES BES BES BES WH THIS PLAN SET AND THE CONCEPTS REPRESENTED HEREIN ARE THE PROPERTY OF KLEIN-NORBY LANDSCAPE & SITE DESIGN. CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BY KLEIN-NORBY LANDSCAPE & SITE DESIGN I herby certify that this plan, plan set, specification or report was prepaired by me or under my direct supervision and that I am duly registered Landscape Architect under the laws of the State of Minnesota PRELIM I N A R Y N O T FOR C O N S T R U C T I O N KLEIN-NORBY LANDSCAPE & SITE DESIGN www.norbylandscape.com mklein@norbylandscape.com 763.257.6210 CDRAWN BY MK CHECKED BY DATE 10/16/2024 REVISIONS NO.BY DATE COMMENTS PROJECT #FILE # L3 6 CEDAR CREEK LENNAR LAKEVILLE, MN PRELIMINARY LANDSCAPE PLAN KN 01MK 240808 Revise per city/client comments 02MK 240904 Revise per city/client comments 03MK 240912 Revise per city/client comments 04MK 241016 Revise per city/client comments0 40'80' Scale: 1"=40' Name Date:10/16/2024 Reg#---- THIS PLAN SET AND THE CONCEPTS REPRESENTED HEREIN ARE THE PROPERTY OF KLEIN-NORBY LANDSCAPE & SITE DESIGN. CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BY KLEIN-NORBY LANDSCAPE & SITE DESIGN I herby certify that this plan, plan set, specification or report was prepaired by me or under my direct supervision and that I am duly registered Landscape Architect under the laws of the State of Minnesota PRELIM I N A R Y N O T FOR C O N S T R U C T I O N KLEIN-NORBY LANDSCAPE & SITE DESIGN www.norbylandscape.com mklein@norbylandscape.com 763.257.6210 CDRAWN BY MK CHECKED BY DATE 10/16/2024 REVISIONS NO.BY DATE COMMENTS PROJECT #FILE # L4 6 CEDAR CREEK LENNAR LAKEVILLE, MN PRELIMINARY LANDSCAPE PLAN KN 01MK 240808 Revise per city/client comments 02MK 240904 Revise per city/client comments 03MK 240912 Revise per city/client comments 04MK 241016 Revise per city/client comments0 50'100' Scale: 1"=50' Name Date:10/16/2024 Reg#---- DW CB BES BES BES BES CB MK WB DW WH MK WB CB MK DW WB MK WH WH DW WB DW MK THIS PLAN SET AND THE CONCEPTS REPRESENTED HEREIN ARE THE PROPERTY OF KLEIN-NORBY LANDSCAPE & SITE DESIGN. CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BY KLEIN-NORBY LANDSCAPE & SITE DESIGN I herby certify that this plan, plan set, specification or report was prepaired by me or under my direct supervision and that I am duly registered Landscape Architect under the laws of the State of Minnesota PRELIM I N A R Y N O T FOR C O N S T R U C T I O N KLEIN-NORBY LANDSCAPE & SITE DESIGN www.norbylandscape.com mklein@norbylandscape.com 763.257.6210 CDRAWN BY MK CHECKED BY DATE 10/16/2024 REVISIONS NO.BY DATE COMMENTS PROJECT #FILE # L5 6 CEDAR CREEK LENNAR LAKEVILLE, MN PRELIMINARY LANDSCAPE PLAN KN 01MK 240808 Revise per city/client comments 02MK 240904 Revise per city/client comments 03MK 240912 Revise per city/client comments 04MK 241016 Revise per city/client comments0 50'100' Scale: 1"=50' Name Date:10/16/2024 Reg#---- Autumn Fire Sedum Annabelle Hydrangea Moonshine Yarrow Incrediball Hydrangea Karl Foerster Grass Rheinland Astilbe Stella de Oro Daylilly Rheinland Astilbe Globe Hemlock Karl Foerster Grass Karl Foerster Grass Red Winterberry The Rocket Ligularia Spreading Yew Autumn Fire Sedum Autumn Fire Sedum Brunnera Karl Foerster Grass Regal Splendor Hosta Karl Foerster Grass The Rocket Ligularia Spreading Yew Red Winterberry The Rocket Ligularia Karl Foerster Grass Autumn Fire Sedum Brunnera Autumn Fire Sedum Big Bluestem Dwarf Pink Lilac Dwarf Russian Sage Floristan Liatris Black Eyed Susan Floristan Liatris Blue Globe Spruce Moonshine Yarrow Blue Globe Spruce Big Bluestem Ornamental Allium Big Bluestem Dwarf Pink Lilac Dwarf Russian Sage Floristan Liatris Black Eyed Susan Floristan Liatris Big Bluestem Big Bluestem Salvia Ornamental Allium Salvia Globe Fir Big Bluestem Legend 4-6" River Rock Mulch over fabric 3" Double Shredded Bark Mulch Vinyl Edging South/East/ West Facing PlantingsL6 3 North Facing PlantingsL6 2 North Facing PlantingsL6 4 South/East/ West Facing PlantingsL6 6 North Facing PlantingsL6 5 South/East/ West Facing PlantingsL6 7 Building GroundcoverL6 1 (Sun Exposure) (Sun Exposure) (Sun Exposure)(Shade Exposure) (Shade Exposure) (Shade Exposure) THIS PLAN SET AND THE CONCEPTS REPRESENTED HEREIN ARE THE PROPERTY OF KLEIN-NORBY LANDSCAPE & SITE DESIGN. CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BY KLEIN-NORBY LANDSCAPE & SITE DESIGN I herby certify that this plan, plan set, specification or report was prepaired by me or under my direct supervision and that I am duly registered Landscape Architect under the laws of the State of Minnesota PRELIM I N A R Y N O T FOR C O N S T R U C T I O N KLEIN-NORBY LANDSCAPE & SITE DESIGN www.norbylandscape.com mklein@norbylandscape.com 763.257.6210 CDRAWN BY MK CHECKED BY DATE 10/16/2024 REVISIONS NO.BY DATE COMMENTS PROJECT #FILE # L6 6 CEDAR CREEK LENNAR LAKEVILLE, MN PRELIMINARY LANDSCAPE PLAN KN 01MK 240808 Revise per city/client comments 02MK 240904 Revise per city/client comments 03MK 240912 Revise per city/client comments 04MK 241016 Revise per city/client comments0 10'20' Scale: 1"=10' EXHIBIT N Dakota County Surveyor’s Office Western Service Center  14955 Galaxie Avenue  Apple Valley, MN 5512 4 952.891 -7087  Fax 952.891 -7127  www.co.dakota.mn.us July 18, 2024 City of Lakeville 20195 Holyoke Ave. Lakeville, MN 55044 Re: CEDAR HILLS NORTH The Dakota County Plat Commission met on July 17, 2024, to consider the preliminary plat of the above referenced plat. The plat is adjacent to CSAH 23 (Cedar Ave.) and CR 64 (200th St. W.) and is therefore subject to the Dakota County Contiguous Plat Ordinance. The preliminary plat includes a residential development north of County Road 64 (200th St W) and east of CSAH 23 (Cedar Ave). The right-of-way needs are 50 feet of half right of way along CR 64 and 100 feet of half right of way along CSAH 23. Access to the site along CR 64 include two accesses that align with the south intersections at Gallifrey Way and Gadfly Way. However, Gadfly Way is shown as a cul-de-sac and not a through street. The Plat Commission recommended Gadley Way to be a through street. Restricted access should be shown along all of CSAH 23 and all of CR 64 except for two access openings at Gallifrey Way and Gadfly Way. A quit claim deed to Dakota County for restricted access is required with the recording of the plat mylars. According to the Cedar Avenue Corridor Study, the intersections at 197th Street/Cedar Avenue and 200th Street/Cedar Avenue are planned to be restricted in the future. Also, as noted, the traffic study required by the Plat Commission on March 27, 2024, was recently received and the County Traffic Engineer has not reviewed the study at this time. The Plat Commission has approved the preliminary plat provided that the described conditions are met. The Ordinance requires submittal of a final plat for review by the Plat Commission before a recommendation is made to the County Board of Commissioners. Traffic volumes on CSAH 23 and CR 64 are 21,800 and 2,421 ADT, respectively, and are anticipated to be 39,000 and 5,500 ADT by the year 2040. These traffic volumes indicate that current Minnesota noise standards for residential units could be exceeded for the proposed plat. Residential developments along County highways commonly result in noise complaints. In order for noise levels from the highway to meet acceptable levels for adjacent residential units, substantial building setbacks, buffer areas, and other noise mitigation elements should be incorporated into this development. No work shall commence in the County right of way until a permit is obtained from the County Transportation Department and no permit will be issued until the plat has been filed with the County Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat Commission highly recommends early contact with the Transportation Department to discuss the EXHIBIT O medians, etc. Please contact TJ Bentley regarding permitting questions at (952) 891-7115 or Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891-7070. Sincerely, Todd B. Tollefson Secretary, Plat Commission c: Charlie Wiemerslage, Sathre Eng. City of Lakeville Public Works – Engineering Division Memorandum To: Kris Jenson, Planning Manager Jon Nelson, Assistant City Engineer McKenzie L. Cafferty, Environmental Resources Manager Joe Masiarchin, Parks and Recreation Director Zach Johnson, City Engineer Tina Goodroad, Community Development Director Julie Stahl, Finance Director Dave Mathews, Building Official October 29, 2024 Cedar Hills North • Preliminary Plat Review • Preliminary Grading and Erosion Control Plan Review • Preliminary Utility Plan Review • Preliminary Tree Preservation Review Lennar has submitted a preliminary plat named Cedar Hills North. The proposed subdivision is located east of and adjacent to Cedar Avenue (CSAH 23) and north of and adjacent to 200th Street (CR 64). The parent parcels consist of seven metes and bounds parcels (PID Nos. 220220054010, 220220054020, 220220050010, 220220055020, 220220051011, 220220051012, and 220220052020), zoned RST-2 (Single and Two-Family Residential) and RM-3 (Medium Density Residential). The preliminary plat consists of eighty-eight (88) single-family lots and one hundred forty- four (144) attached townhome lots within thirty-eight (38) blocks, and six (6) outlots on 148.6 acres. The Developer is dedicating 1.50 acres as Cedar Avenue and 200th Street right-of-way. The outlots created with the preliminary plat shall have the following use: Outlot A: Future development; to be retained by the current property owner (0.64 acres) Outlot B: Stormwater management basin and channel; to be deeded to the City (4.70 acres) CCEEDDAARR HHIILLLLSS NNOORRTTHH–– PPRREELLIIMMIINNAARRYY PPLLAATT OOCCTTOOBBEERR 2299,, 22002244 PPAAGGEE 22 OOFF 77 Outlot C: Stormwater management basin and channel; to be deeded to the City (3.55 acres) Outlot D: Stormwater management basin and channel; to be deeded to the City (5.98 acres) Outlot E: Public access trail; to be deeded to the City (0.03 acres) Outlot F: Future development; to be retained by the current property owner (72.45 acres) The proposed development will be completed by: Developer: Lennar Engineer/Surveyor: Sathre-Bergquist, Inc. The Cedar Hills North site is agricultural land, three single family homes and contains two delineated wetlands and a drainageway through the site traveling west to east. The parent parcels are bisected by a ridge through the northwest of the site, draining southeast towards the drainageway and northwest towards Cedar Avenue. The south end of the site drains north towards the drainageway. There is an overhead line and facility on the southwest end of the site. The following easement exists on the parent parcels and will be vacated with the final plat: • Easement in favor of the City of Lakeville for roadway, drainage, and utility purposes per Document No. 3542271 Cedar Avenue (CSAH 23) Cedar Hills North is located east of and adjacent to Cedar Avenue, a minor arterial County highway, as identified in the City’s Transportation Plan. Cedar Avenue is currently constructed as a four-lane divided rural roadway with an urban center median. The current Dakota County Plat Review Needs Map indicates a half right-of-way requirement of 100-feet and designates this roadway as a future six-lane urban roadway over its entire length adjacent to the plat. The Developer is dedicating the necessary right-of-way as shown on the preliminary plat. The preliminary plat was reviewed and recommended for approval by the Dakota County Plat Commission at their July 18, 2024 meeting. 200th Street (CR 64) Cedar Hills North is located north of and adjacent to 200th Street, a major collector County roadway, as identified in the City’s Transportation Plan. 200th Street is currently constructed as a two-lane undivided rural roadway adjacent to the plat. The current Dakota County Plat Review Needs Map indicates a half right-of-way requirement of 50-feet and designates this roadway as a future two-lane undivided urban roadway over its entire length adjacent to the plat. The Developer is dedicating the necessary right-of-way as shown on the preliminary plat. CCEEDDAARR HHIILLLLSS NNOORRTTHH–– PPRREELLIIMMIINNAARRYY PPLLAATT OOCCTTOOBBEERR 2299,, 22002244 PPAAGGEE 33 OOFF 77 The preliminary plat was reviewed and recommended for approval by the Dakota County Plat Commission at their July 18, 2024 meeting. The Developer is proposing two full access intersections along 200th Street with the development improvements. The Developer shall be responsible for any improvements to 200th Street (right turn/bypass lanes) as required by Dakota County at the proposed access locations. Gallifrey Way Development of Cedar Hills North includes the construction and extension of Gallifrey Way, a minor collector roadway, as identified in the City’s Transportation Plan. Gallifrey Way is designed as a 38-foot-wide urban roadway with five-foot sidewalks along both sides of the street. The Developer is dedicating 80-feet of right-of-way for Gallifrey Way, as shown on the preliminary plat. Gallifrey Way will provide a connection and access to 200th Street and provide access to the future development of Outlot F. Gadfly Way Development of Cedar Hills North includes the construction of Gadfly Way, a local roadway. Gadfly Way is designed as a 32-foot-wide urban roadway with a five-foot sidewalk along one side of the street. The Developer is dedicating 60-feet of right-of-way. Gadfly Way will provide a connection and access to 200th Street and terminate in a permanent cul-de-sac south of Road 6. Roads 3, 6, 8, and 11 Development of Cedar Hills North includes the construction of Roads 3, 6, 8, and 11, all local roadways. The streets are designed as 32-foot-wide urban roadways with a sidewalk along one side of the street. The Developer is dedicating 60-feet of right-of-way. Roads 4, 5, and 7 Development of Cedar Hills North includes the construction of Roads 4, 5, and 7, all local cul- de-sac roadways. The cul-de-sac streets are designed as 32-foot-wide urban roadways within 60-feet of right-of-way. Roads 12, 13, 14, 15, and 16 – Private Drives Development of Cedar Hills North includes the construction of a privately owned and maintained roadway network providing driveway access to the attached townhome buildings. The private roadways are designed as 24-foot-wide and 28-foot-wide urban roadways connecting to Road 11. Construction traffic access and egress for grading, utility and street construction will be determined with each phase of construction. Access to the existing adjacent local roadways shall be limited as much as feasible for the development construction. CCEEDDAARR HHIILLLLSS NNOORRTTHH–– PPRREELLIIMMIINNAARRYY PPLLAATT OOCCTTOOBBEERR 2299,, 22002244 PPAAGGEE 44 OOFF 77 PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDD EEWWAALLKKSS The City’s Parks, Trails and Open Space Plan does not designate a park within Cedar Hills North. The Park Dedication requirement has not been collected on the parent parcels and shall be satisfied through a cash contribution with the final plat. Development of Cedar Hills North includes the construction of public trails and sidewalks. Five-foot wide concrete sidewalks, with pedestrian curb ramps, will be installed along one side of all local streets except for Road 4, 5 and 7 cul-de-sacs and the privately owned and maintained drives. Bituminous trails will be constructed along the north side of 200th Street (10-feet wide) from the eastern plat boundary to the western plat boundary, and the east side of Cedar Avenue (10-feet wide) from the southern plat boundary to the northern plat boundary. The Developer shall complete an ADA-compliant pedestrian crossing 200th Street at the intersection of 200th Street and Cedar Avenue. The Developer will be responsible for 100% of the grading and restoration for the bituminous trails. The Developer shall receive a credit to the final plat cash fees for the City’s 3/8th share (excluding grading and restoration) of the trail construction costs. Cedar Hills North is located within subdistricts FO-60100 and FO-60200 of the Farmington Outlet sanitary sewer district as identified in the City’s Sanitary Sewer Comprehensive Plan. Development of Cedar Hills North includes the extension of public sanitary sewer. 8-inch sanitary sewer will be constructed within the subdivision. The wastewater from the development will be conveyed via existing trunk sanitary sewer to the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility. Cedar Hills North will extend the trunk sanitary sewer line through the development to the northern plat boundary. A Direct Connection Permit is required from the Metropolitan Council for the connection to the interceptor. The development shall coordinate placement of a sanitary sewer meter within the development in accordance with requirements set forth by the Metropolitan Council. The city will credit the Developer for the oversizing of the trunk sanitary sewer constructed with the development improvements. The credit will be based on the cost difference between 8-inch sewer and the sewer that will be installed. The credit will be applied to the Developer’s final plat cash fees and will be based on an estimate provided by the Developer’s engineer. The Sanitary Sewer Availability Charge has not been collected on the parent parcels and shall be paid with the final plat. The fee will be based on the current rate in effect at the time of final plat approval. Development of Cedar Hills North includes the extension of public watermain. 8-inch watermain will be extended within the development to provide water service to the CCEEDDAARR HHIILLLLSS NNOORRTTHH–– PPRREELLIIMMIINNAARRYY PPLLAATT OOCCTTOOBBEERR 2299,, 22002244 PPAAGGEE 55 OOFF 77 subdivision. 8-inch watermain will be extended to the northern plat boundary at Galifrey Way and Road 11 to service future development. Consistent with the City’s Comprehensive Water System Plan, trunk watermain extensions are required to be completed with the preliminary plat. The Developer shall extend 16-inch trunk watermain along the east side of Cedar Avenue from 200th Street to the north plat boundary. The Developer shall extend 12-inch trunk watermain along Gadfly Way and Road 6 to the north plat boundary. The City will credit the Developer for the oversizing of the trunk watermains in the development. The credit will be based on the cost difference between 8-inch watermain and the oversized watermain that will be installed. The credit will be applied to the Developer’s final plat cash fees and will be based on an estimate provided by the Developer’s engineer. Overhead electric service lines and poles are located along the east side of Cedar Avenue within the southwest preliminary plat area. The Developer is required to remove the poles and place the service utilities underground with the final plat, consistent with the City’s Public Ways and Property Ordinance. Cedar Hills North is located within subdistricts FO-018 and FO-039 of the Farmington stormwater district as identified in the City’s Water and Natural Resources Management Plan. Development of Cedar Hills North includes the construction of seven (7) publicly owned and maintained stormwater management basins and stabilization and alteration of one (1) publicly owned and maintained channel to collect and treat the stormwater runoff generated from the site. The basins will outlet to the channel within the preliminary plat area. The channel flows west to east into the City of Farmington. The stormwater management basins and channel will be located within Outlots B, C, and D which will be deeded to the City with the final plat. The stormwater basin design is consistent with City requirements. The final grading plan shall identify all fill lots in which the building footings will be placed on fill material. The grading specifications shall also indicate that all embankments meet FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings placed on fill material are appropriately constructed. Building permits will not be issued until a soils report and an as-built certified grading plan have been submitted and approved by City staff. Cedar Hills North contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed CCEEDDAARR HHIILLLLSS NNOORRTTHH–– PPRREELLIIMMIINNAARRYY PPLLAATT OOCCTTOOBBEERR 2299,, 22002244 PPAAGGEE 66 OOFF 77 by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. Development of Cedar Hills North includes the construction of public storm sewer systems. Storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the public right-of-way and lots to the public stormwater management basins and channel located within Outlots B, C, and D. The channel conveys the stormwater off site to the eastern plat boundary into City of Farmington. Draintile construction is required in areas of non-granular soils within Cedar Hills North for the street sub-cuts and lots. Any additional draintile construction, including perimeter draintile required for building footings, which is deemed necessary during construction shall be the developer’s responsibility to install and finance. The Storm Sewer Charge has not been collected on the parent parcels and must be paid with the Cedar Hills North final plat. The Developer will receive a credit to the Storm Sewer Charge for deeding the portions of Outlots B, C, and D containing wetland and wetland buffer space, calculated at $5,500/acre consistent with City policy. The reimbursement will be calculated with the final plat. Cedar Avenue is a minor arterial and 200th Street is a major collector roadway as identified in the City’s Transportation Plan. A buffer yard containing earth berms and/or plantings of a sufficient density to provide a visual screen and a reasonable buffer a minimum of ten feet in height shall be provided adjacent to Cedar Avenue and 200th Street consistent with the Zoning Ordinance. A certified as-built grading plan of the buffer yard berm must be submitted and approved by City staff prior to the installation of any buffer yard plantings. Cedar Hills North is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. The wetland delineation for the site was approved on February 27, 2024. The wetland delineation was completed by MNR. The delineation identified two small wetlands on the site adjacent to the Vermillion River Watershed Water Quality Corridor. As part to of the development the previously farmed and eroded channel will be realigned and restored. The development will be impacting 0.29 acres of wetland for a road crossing and restoring the channel. Applicant will purchase a total of 0.58 acres of banking credits. The wetland replacement plan was approved on October 28th, 2024. CCEEDDAARR HHIILLLLSS NNOORRTTHH–– PPRREELLIIMMIINNAARRYY PPLLAATT OOCCTTOOBBEERR 2299,, 22002244 PPAAGGEE 77 OOFF 77 Based on the information provided in the report the impacts indicated for the areas outlined in the report have been determined to be acceptable for use in implementing the Wetland Conservation Act. No impacts are allowed until the final withdrawal information has been received from BWSR. It is the applicant’s responsibility to obtain proper wetland approvals from the U.S. Army Corps of Engineers prior to any impacts to the wetland or channel. All wetlands, channel and buffers will be placed in a city owned outlot that will be dedicated at final plat. The developer is responsible for the establishment of the channel with native vegetation and will be required to manage the site for a minimum of 5 years until established. The tree preservation plan identifies 196 trees on site and plans propose to remove all trees. The landscape plan must be revised prior to the final plan to replace Norway Maple, a specially regulated species, with a different tree type; and to meet the planting requirements consistent with the Zoning Ordinance. Significant trees, as identified in the Lakeville Subdivision Ordinance, shall be protected and preserved throughout the grading and construction activities. The Developer is responsible for meeting all the requirements of the MPCA Construction Permit. A detailed SWPPP must be submitted to the City for review prior to any land disturbance. Redundant silt fence is required along all wetlands and waterways that do not have a 50-foot established buffer. The Developer is responsible for the establishment of native vegetation around all stormwater treatment basins and any disturbed or farmed buffer. A management plan including a schedule for maintenance must be included in the final plat plans. Additional erosion control measures may be required during construction as deemed necessary by City staff or the Vermillion River Watershed JPO. Any additional measures required shall be installed and maintained by the developer. Engineering recommends approval of the preliminary plat, grading and erosion control plan, and utility plan for Cedar Hills North, subject to the requirements and stipulations within this report. It is stipulated that the retaining walls shown on the plans are modified to remove retaining walls from publicly owned outlots and have an accessible path for maintenance on both sides of the retaining wall.