Loading...
HomeMy WebLinkAboutItem 06a - Marketplace at Cedar3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 MEMORANDUM TO: Community Development Director Tina Goodroad Planning Manager Kris Jenson FROM: D. Daniel Licht DATE: 26 February 2025 RE: Lakeville – Marketplace at Cedar TPC FILE: 135.01 ACKGROUND Oppidan Investment Company has submitted a proposal for subdivision of 31.72 undeveloped acres consisting of nine lots, five outlots, and public right-of-way. The subject property is located at the southeast quadrant of Cedar Avenue (CSAH 23) and 179th Street. The submitted plans require consideration of applications for a preliminary plat, Conditional Use Permit allowing a lot without public street frontage, and an administrative permit allowing for shared access to public streets. A public hearing to consider the applications has been notice for the Planning Commission meeting on 6 March 2025 at 6:00PM. Exhibits: A. Location Map B. 2040 Land Use Plan Map C. Zoning Map D. Existing Site Survey E. Preliminary Plat F. Site Plans G. Utility Plans H. Grading Plans I. Planting Plan J. November 7, 2024 Plat Commission Letter NALYSIS Comprehensive Plan. The subject property is guided by the 2040 Lakeville Comprehensive Plan for Corridor Mixed Uses. As applied to the Cedar Avenue corridor, Corridor Mixed Uses allow for commercial retail, service, and office uses in standalone or mixed-use buildings together with high-density residential 2 dwellings with a base density allowance of 26 to 40 dwelling units per acre (with the opportunity for up to 45 dwelling units per acre for senior housing). The Comprehensive Plan estimates that commercial land uses will comprise 60 percent or more of the areas guided for Corridor Mixed Uses land use. The nine proposed commercial lots are 41.7 percent of the area of the subject property, not including public rights- of-way or stormwater management outlots. Zoning. The subject property is zoned M-2, Mixed Use Cedar Corridor District, which is established to provide for development of commercial and high density residential uses that will utilize and support transit services within the Cedar Avenue corridor. The site plan illustrates potential commercial uses of the 11 proposed lots. Future development of the individual lots within the preliminary plat will be subject to the uses allowed within the M-2 District and the review processes established by the Zoning Ordinance. The table below summarizes that all of the uses as shown on the site plan, all of which are allowed within the M-2 District. Lot Use M-2 District Allowance Surrounding Uses. The table below summarizes land uses surrounding the subject property. The proposed subdivision of nine lots for commercial uses and outlots for future high density residential development will be compatible with existing and planned land use in the area of the subject property. Direction Land Use Plan Zoning Map Existing Use Lot Requirements. Section 11-66-13 of the Zoning Ordinance establishes that there is no minimum lot area and no minimum lot area required within the M-2 District. The intent of not requiring minimum lot requirements is to encourage the most efficient site design that maximizes the developability of the 3 subject property. The preliminary plat sheet is to be revised to include a statement that no minimum lot area and no minimum lot width is required as required by Section 10-3-2.C of the Subdivision Ordinance. Section 11-16-5.G.1 of the Zoning Ordinance allows for Lot 8, Block 1 to not have any frontage to a public street with approval of a Conditional Use Permit, which will be related to the Administrative Permit necessary for shared vehicle access discussed in subsequent paragraphs. Setbacks. Section 11-66-13 of the Zoning Ordinance requires a 10 foot setback at the perimeter of all lots within the M-2 District except that a 30 foot setback is required for yards abutting a major collector or arterial street. The setbacks are illustrated on the preliminary. Although site plan approval is not applied for at this time, the principal buildings shown within Lots 1-9, Block 1all comply with applicable setback requirements. Right-of-Way. The subject site abuts the following streets with functional classification as established by the Transportation Plan: Roadway Functional Classification Proposed Access th Street (CSAH 9) Vehicle Access. Access to the nine commercial lots is proposed via a right-in from 179th Street (CSAH 9), which is subject to review by the City Engineer and approval of the Dakota County Plat Commission. 4 Pedestrian Access. As noted above, the Comprehensive Plan outlines that developments within the M-2 District are to provide for a compact form that is accessible for both vehicles and pedestrians. ▪There is an existing trail on the east side of Cedar Avenue (CSAH 23) abutting the subject property that is shown on the submitted plans. ▪The submitted plans illustrate construction of a trail on the south side of 179th Street (CSAH 9) between Cedar Avenue (CSAH 23) and Glacier Way. ▪There is an existing sidewalk on the west side of Glacier Way abutting the subject property that is shown on the submitted plans. ▪The submitted plans provide for construction of a sidewalk on the north and west sides of Glanshaw Way within the preliminary plat. Future sidewalks on the east and south sides of Glanshaw Avenue may be considered at such time as Outlot E is final platted and developed. ▪There is a sidewalk shown along one side of the interior shared private drive with connections to individual principal buildings within the nine commercial lots. Pedestrian connectivity to and between each of the lots within the preliminary plat is required and will be reviewed with the zoning and subdivision approvals for each of the lots. Signs. The site plan illustrates a freestanding sign at the northwest corner of the subject property within Lot 1, Block 1. Section 11-23-19.D of the Zoning Ordinance does not allow individual freestanding signs for lots within the M-2 District. Section 11-23-15.X of the Zoning Ordinance does allow a subdivision identification sign for Lots 1-9, Block 1 in yards abutting arterial or major collector streets, which would apply to Cedar Avenue (CSAH 23) and 179th Street (CSAH 9). The freestanding signs allowed by Section 11- 23-15.X of the Zoning Ordinance may be up to 100 square feet in area and erected to height up to 20 feet. A sign permit is required by Section 11-23-5 of the Zoning Ordinance prior to placement of a subdivision identification sign upon the subject property. Landscaping. The developer has submitted an inventory of existing trees upon the subject property, which are generally located along the west and south plat lines. The only significant trees as defined by 10-4- 11.A of the Subdivision Ordinance are located along the south plat line straddling the boundary with the Metro Transit Park and Ride Facility. Significant trees shown on the tree survey east of Glanshaw Avenue are all located on the Edison at Avonlea property. The significant trees are located within the boundaries of proposed Outlot A and Outlot B and not impacted by development of the preliminary plat. th Street (CSAH 9) and Gerdine Path. These plantings are not required as a condition of preliminary plat approval, but would be necessary to comply with Section 11-66-7.A.4 of the Zoning Ordinance based upon the uses to be developed on Lots 6 and 7, Block 1. If the developer intends to install the proposed plantings now, that may be beneficial to allow the vegetation to establish and grow to enhance its screening effects. 5 Storm Water. The submitted plans include a proposed grading plan and Storm Water Pollution Prevention Plan for development of Lots 1-9, Block 1; Glanshaw Avenue; and storm water basins within Outlot A, B, and C. The stormwater basins within Outlots A and Outlot B serve only stormwater from private properties with the outlots not being deeded to the City. The developer will be required to execute a stormwater maintenance agreement at the time of final plat approval to provide for ownership and maintenance of Outlot A and Outlot B. All grading, drainage, and erosion control issues are to be subject to review and approval of the City Engineer. Utilities. The subject property is within the current Municipal Urban Service Area (MUSA). The submitted plans include utility plans for extension of sewer and water utilities within public right-of-way and within the area of Lots 1-9, Block 1 to serve the individual commercial lots. All utility issues are subject to review and approval of the City Engineer. Easements. Section 10-4-4 of the Subdivision Ordinance requires 10 foot wide drainage and utility easements at the perimeter of the proposed lots, which are shown on the preliminary plat. Drainage and utility easements may be required to overlay internal sewer and water utility pipes and/or stormwater drainage facilities. All drainage and utility easements are subject to review and approval of the City Engineer. Outlots. The preliminary plat includes the following outlots with their intended purpose and anticipated ownership: Outlot Purpose Ownership Park Dedication. Subdivision of the subject property requires satisfaction of park dedication requirements established by Section 10-4-8 of the Subdivision Ordinance. The 2015 Parks, Trails, and Open Space Plan does not identify acquisition of land from the subject property for public parks. Section 10-8-4.J of the Subdivision Ordinance provides that where land dedication is not required, the City may elect to receive a cash fee in lieu of land at the time of final plat approval. Park dedication requirements are subject to review of the Parks, Recreation and Natural Resources Committee and approval of the City Council. CONCLUSION 6 2. Dedication of right-of-way, street section design, and street name(s) for Glanshaw Avenue shall be subject to review and approval of the City Engineer. 3. Access from 179th Street (CSAH 9) shall be subject to review by the City Engineer and approval of the Dakota County. 4. An ingress-egress easement for shared access to Lots 1-9, Block 1 shall be submitted with application for final plat approval and is subject to review and approval of the City Attorney. 5. Access to Glanshaw Avenue and the design and construction of the interior private drive shall be subject to review and approval of the City Engineer. 6. Pedestrian connectivity to and between each of the lots within the preliminary plat is required and will be reviewed with the zoning and subdivision approvals for each of the lots. 7. The design and construction of all sidewalks and trails within and abutting the preliminary plat is to be subject to review and approval of the City Engineer. 8. All signs shall comply with Chapter 23 of the Zoning Ordinance Section 11-23-15.X of the Zoning Ordinance and shall require issuance of a sign permit placement upon the subject property. 9. Placement of proposed landscaping along the east side of Glacier Way, in the area of Outlot B and Lots 6 and 7, Block 1, shall be subject to review and approval of the City Forester and Environment Resources Manager prior to final plat approval. 10. A stormwater maintenance agreement shall be executed at the time of final plat approval to provide for ownership and maintenance of Outlot A and Outlot B. 11. All wetland delineations and wetland impacts or grading, drainage, and erosion control issues shall be subject to review and approval of the City Engineer. 12. All utility issues shall be subject to review and approval of the City Engineer. 13. All drainage and utility easements shall be subject to review and approval of the City Engineer. 14. Outlot C shall be deeded to the City at the time of final plat approval for storm water management purposes. 15. Park dedication requirements shall be satisfied by payment of a cash fee in lieu of land dedication at final plat approval, subject to review of the Parks, Recreation, and Natural Resources Committee and approval of the City Council. Findings of fact for the conditional use permit are attached for your consideration. c. Justin Miller, City Administrator Zach Johnson, City Engineer Joe Masiarchin, Parks and Recreation Director Andrea McDowell-Poehler, City Attorney City of Lakeville Public Works – Engineering Division Memorandum To: Kris Jenson, Planning Manager Jon Nelson, Assistant City Engineer McKenzie L. Cafferty, Environmental Resources Manager Joe Masiarchin, Parks and Recreation Director Zach Johnson, City Engineer Julie Stahl, Finance Director Dave Mathews, Building Official Tina Goodroad, Community Development Director February 18, 2025 Marketplace at Cedar • Preliminary Plat Review • Preliminary Grading and Erosion Control Plan Review • Preliminary Tree Preservation Review • Preliminary Utility Plan Review Oppidan Investment Company has submitted a preliminary plat and conditional use permit application for a development to be known as Marketplace at Cedar. The proposed subdivision is located north of 181st Street, west of and adjacent to Glacier Way, east of and adjacent to Cedar Avenue (CSAH 23), and south of and adjacent to 179th Street (CSAH 9). The parent parcel consists of one metes and bounds parcel (PID No. 220100051014) zoned M-2, Mixed Use Cedar Corridor District. The preliminary plat consists of nine (9) commercial lots, and five (5) outlots on 31.72 acres. The Developer is dedicating 0.58 acres as Cedar Avenue (CSAH 23) right-of-way, 0.39 acres as 179th Street (CSAH 9) right-of-way and 1.56 acres as Glanshaw Avenue right-of-way. The outlots created with the preliminary plat shall have the following use: Outlot A: Stormwater Management Basin; to be retained by the developer (0.85 acres) Outlot B: Stormwater Management Basin; to be retained by the developer (0.45 acres) Outlot C: Stormwater Management Basin; to be deeded to the city (0.43 acres) Outlot D: Future development; to be retained by the developer (6.70 acres) Outlot E: Future development; to be retained by the developer (9.34 acres) MMAARRKKEETTPPLLAACCEE AATT CCEEDDAARR PPRREELLIIMMIINNAARRYY PPLLAATT FFEEBBRRUUAARRYY 1188,, 22002255 PPAAGGEE 22 OOFF 66 The proposed development will be completed by: Developer: Oppidan Investment Company Engineer/Surveyor: ISG, Inc. The Marketplace at Cedar site consists of undeveloped agricultural land generally draining northwest to southeast. There is a property access on the west end of the site. There are existing trees on site that will remain in place. There is an existing storm sewer outlet on the southeast of the site. There are three existing water stubs to the site at the north, northeast and southeast of the site. There is one existing sanitary sewer stub to the site to the east. There is one wetland delineated on the site. There is an overhead utility line on the west side of the site. There are no existing easements on the parent parcel that will be vacated with the preliminary plat. The Developer shall provide a drainage and utility easement over the entirety of Outlot A and B and remove the outlots at the time of final plat. SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT Cedar Avenue (CSAH 23) Marketplace at Cedar is located east of and adjacent to Cedar Avenue, a principal arterial roadway, as identified in the City’s Transportation Plan. Cedar Avenue is constructed as a four- lane divided urban roadway adjacent to the preliminary plat. Right-of-way is being dedicated to meet the 100-foot half right-of-way requirement set forth by the Dakota County Plat Commission. 179th Street (CSAH 9) Marketplace at Cedar is located south of and adjacent to 179th Street, a minor arterial roadway, as identified in the City’s Transportation Plan. 179th Street is constructed as a four- lane divided urban roadway adjacent to the preliminary plat. Right-of-way is being dedicated to meet the 75-foot half right-of-way requirement set forth by the Dakota County Plat Commission. Glanshaw Avenue Development of Marketplace at Cedar includes the construction of Glanshaw Avenue, a local roadway. The developer is dedicating the necessary 60-foot-wide right-of-way for the construction of a 36-foot-wide urban section with sidewalk on one side. Private Drives Development of Marketplace at Cedar includes the construction of a privately owned and maintained roadway network providing access to various commercial businesses. The Developer shall dedicate drainage and utility and cross access easements over the private MMAARRKKEETTPPLLAACCEE AATT CCEEDDAARR PPRREELLIIMMIINNAARRYY PPLLAATT FFEEBBRRUUAARRYY 1188,, 22002255 PPAAGGEE 33 OOFF 66 roadways. The City shall not be responsible for any repairs (including cost) to the private roadways due to maintenance within the easement area. Special assessment 221407 for Glacier Way construction is required to be paid at the time of final plat. Construction traffic access and egress for grading, utility and street construction will be determined with each phase of construction. Development of Marketplace at Cedar includes the construction of public sidewalks. Five- foot-wide concrete sidewalks, with pedestrian curb ramps, will be installed along one side of Glanshaw Avenue from Glacier Way to the existing northern terminus of Glanshaw Avenue. The Park Dedication requirement has not been collected on the parent parcels and shall be satisfied through a cash contribution with the final plat. Marketplace at Cedar is located within subdistricts NC-20360 and NC-20135 of the North Creek sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed through sanitary sewer to the northern trunk monitored by meter M643A and continue to the Empire plant. Marketplace at Cedar includes the extension of public sanitary sewer. 8-inch sanitary sewer will be constructed along Glanshaw Avenue and Glacier Way. The Sanitary Sewer Availability Charge has not been collected on the parent parcels and will be required with the final plat. The fee will be based on the current rate in effect at the time of final plat approval. Development of Marketplace at Cedar includes the construction of public watermain. 8-inch watermain will be constructed within the subdivision from 8-inch watermain extended at the existing northern terminus of Glanshaw Avenue and an existing stub at Glacier Way and an existing stub at 179th Street. MMAARRKKEETTPPLLAACCEE AATT CCEEDDAARR PPRREELLIIMMIINNAARRYY PPLLAATT FFEEBBRRUUAARRYY 1188,, 22002255 PPAAGGEE 44 OOFF 66 OOVVEERRHHEEAADD LLIINN EESS An overhead electric transmission line and poles are located along the west side of the parent parcel. The transmission line is a high voltage line and is therefore not required to be buried, consistent with the City’s Public Ways and Property Ordinance. Marketplace at Cedar is located within subdistricts FO-004, FO-012, and FO-044 of the Farmington Outlet stormwater district, as identified in the City’s Water Resources Management Plan. Development of Marketplace at Cedar includes the construction of one publicly-owned and maintained stormwater management basin and three privately-owned and maintained stormwater management basins to collect and treat the stormwater runoff generated from the site. The basins will ultimately outlet to the storm sewer in Glacier Way at the southeast of the site. The Developer shall enter into a maintenance agreement and grant a drainage and utility easement to the City over the private stormwater improvements. The public stormwater management basin will be located within Outlot C which will be deeded to the City with the final plat. The stormwater management design is consistent with City ordinance requirements. Basin 4 shall be modified as necessary to meet City ordinance requirements at the time Outlot E is final platted. The final grading plan shall identify all fill lots in which the building footings will be placed on fill material. The grading specifications shall also indicate that all embankments meet FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings placed on fill material are appropriately constructed. Building permits will not be issued until a soils report and an as-built certified grading plan have been submitted and approved by City staff. Marketplace at Cedar contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. Development of Marketplace at Cedar includes the construction of public storm sewer systems. Public storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the public right-of-way and lots to the public stormwater management basin located within Outlot C. MMAARRKKEETTPPLLAACCEE AATT CCEEDDAARR PPRREELLIIMMIINNAARRYY PPLLAATT FFEEBBRRUUAARRYY 1188,, 22002255 PPAAGGEE 55 OOFF 66 Draintile construction is required in areas of non-granular soils within Marketplace at Cedar for the street sub-cuts and lots. Any additional draintile construction, including perimeter draintile required for building footings, which is deemed necessary during construction shall be the developer’s responsibility to install and finance. The Storm Sewer Charge has not been collected on the parent parcels and must be collected with the Marketplace at Cedar final plat. Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. Marketplace at Cedar is shown on the Flood Insurance Rate Map (Map No. 27037C0204E; Eff. Date 12/2/2011) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. A wetland delineation was reviewed and approved for the site on November 11, 2024. The wetland delineation identified two wetlands on the site. Wetland A is a degraded farmed Type 1 wetland (0.52 acres) located on the north side of the site. Wetland B is a small Type 2 wetland (0.02 acres) located along Cedar Ave. The development plan is proposing to impact all of Wetland A. A TEP meeting was held to review the replacement plan application no comments were received. The replacement plan was approved February 12, 2025. The applicant will be replacing the impacted wetlands with wetland bank credits. No impacts to the wetland can take place until the city receives the approved wetland bank credit withdrawal form. No trees are proposed to be removed with the construction of Marketplace at Cedar. All “save” trees that are damaged or removed will require replacement at a ratio of 2:1 as per the Lakeville Subdivision Ordinance. Significant trees, as identified in the Lakeville Subdivision Ordinance, shall be protected and preserved through termination of all grading and construction activities. EERROOSSIIOONN CCOONNTTRROOLL The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as developing a SWPPP for the site prior to construction. Changes made throughout MMAARRKKEETTPPLLAACCEE AATT CCEEDDAARR PPRREELLIIMMIINNAARRYY PPLLAATT FFEEBBRRUUAARRYY 1188,, 22002255 PPAAGGEE 66 OOFF 66 construction must be documented in the SWPPP. No grading can take place on the site until a complete SWPPP is submitted to the City for review and approval. Additional erosion control measures may be required during construction as deemed necessary by City staff. Any additional measures required shall be installed and maintained by the developer. Engineering recommends approval of the preliminary plat, grading and erosion control plan, tree preservation, and utility plan for Marketplace at Cedar, subject to the requirements and stipulations within this report. Dakota County, Maxar, Microsoft City of Lakeville Marketplace at Cedar Pre Plat & CUP Location Map EXHIBIT A±CE D A R A V E N U E ( C S A H 2 3 ) DODD BLV D 179TH ST (CSAH 9) GLACIER WAY 181ST ST GLASGOW AVE Marketplace at Cedar Central Maintenance Facility Crossroads of Lakeville City of Lakeville Marketplace at Cedar Pre Plat & CUP 2040 Land Use Plan Map EXHIBIT B±CE D A R A V E N U E ( C S A H 2 3 ) DODD BLV D 179TH ST (CSAH 9) 181ST ST GLASGOW AVE Marketplace at Cedar Central Maintenance Facility Crossroads of Lakeville GE R D I N E P A T H 183RD S T C P/QP CMU C L/MDR P/QP HDR RD L/MDR L/MDR MDR MDR P/QP P/QP C MDR LDR P/QP CMU M/HDR M/HDR MDR HDR City of Lakeville Marketplace at Cedar Pre Plat & CUP Zoning Map EXHIBIT C±CE D A R A V E N U E ( C S A H 2 3 ) DODD BLV D 179TH ST (CSAH 9) GLACIER WAY 181ST ST GLASGOW AVE Marketplace at Cedar Central Maintenance Facility Crossroads of Lakeville PUD PUD PUD C-3 C-3 P/OS P/OS P/OS P/OS P/OS RM-1 RM-1 RST-2 RS-4 M-2 RM-3 PUD PUD RM-2 RS-2 RS-3 GE R D I N E P A T H 183RD S T R=997.89 EX SAN MH EX GGV G R=1012.66 EX MH R=1013.21 EX MH G GM G G G G R=1008.78 EX SAN MH FO G G G FO FO OH L OH L OH L OH L OH L OH L V OHL OHL OHL STM STM STM UE UE UE UEGG G >> >> Gas Pump S. Line - SW 1/4 Sec. 10-114-20SW Cnr - SW 1/4 Sec. 10-114-20 METROPOLITAN COUNCIL UE UE UE UE UE UE UE V UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G G G G G G G G G G G G G UE UE UE UE UE UE UE G UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE U R=1001.60 EX SAN MH I=981.62 EI=981.63 W R=1006.67 EX SAN MH I=991.28 (PVC) E I=991.30 (PVC) W FOFO FOG R=1003.96 EX SAN MH I=988.25 (PVC) N I=988.22 (PVC) W I=988.21 (PVC) E G R=975.97 EX SAN MH I=954.34 (PVC) N I=954.36 (PVC) S EX GGV R=1014.80 EX MH R=1014.46 EX MH >>>> >>>>>>>>>>>>>>>>> >>>> >> >> >> >> >> >> >> >> > > > > > > > I I >> >> >> >> UE UE UE V V Ele c t r i c E a s e m e n t p e r D o c u m e n t N o . 1 6 6 6 6 4 0 >> I I I I I I I I I I I I I I I I I I I I I I I I I I I >>>>>>>>>>>> >>>> I WET WET WE T WET WET WETLAND A 0.52 AC 6" 4" 5" DEAD6" DEAD6" 4" 4" POOR HEALTH5" 5" 5" 6" 1000 1005 1010 99699799899910011002100310041006100710081009101 1 101 2 1013 T/C=1000.48 EX CB T/C=1000.25 EX CB T/C=999.58 EX CB T/C=999.90 EX CB T/C=1001.77 EX CB T/C=1003.34 EX CB T/C=1003.63 EX CB T/C=1010.48 EX CB T/C=1004.80 EX CB R=1007.46 EX STM MH R=1007.18 EX STM MH R=1007.37 EX CB T/C=1008.93 EX CBT/C=1009.04 EX CB T/C=1009.28 EX CB R=1007.63 EX CB T/C=1004.79 EX CB T/C=1004.69 EX CB I=991.54 I=998.19 R=984.64 EX CB T/C=992.02 EX CB I= 1 0 0 5 . 0 1 T/C=1013.03 EX CB T/C=1010.37 EX CB R=998.85 EX STM MH I=982.77 (36" RCP) N I=982.70 (RCP) E I=990.91 (15" RCP) W R=1000.54 EX STM MH I=991.93 (15" RCP) E I=995.64 (15" RCP) N I=995.29 (15" RCP) S T/C=998.53 EX CB I=994.02 (15" RCP) N T/C=1000.41 EX CB I=995.78 (15" RCP) NT/C=1003.89 EX CB I=996.21 (48" RCP) N I=996.24 (48" RCP) W I=993.80 (SUMP) T/C=1004.98 EX CB I=997.78 (48" RCP) W I=997.70 (48" RCP) E T/C=1007.68 EX CB I=1000.36 (RCP) N I=1000.31 (48" RCP) E T/C=1009.24 EX CB I=1004.47 (15" RCP) W I=1003.71 (15" RCP) N I=1003.62 (15" RCP) E T/C=1009.37 EX CB I=1005.05 (15" RCP) E T/C=986.60 EX CB I=981.97 (12" RCP) E T/C=986.56 EX CB I=979.96 (12" RCP) SE I=979.98 (12" RCP) NE I=981.38 (12" RCP) W T/C=982.56 EX CB I=977.63 (12" RCP) NW I=977.66 (12" RCP) SE T/C=977.09 EX CB T/C=976.27 EX CB T/C=978.29 EX CB I=973.64 (12" RCP) NE T/C=974.56 EX CB I=967.81 (36" RCP) E I=967.83 (36" RCP) SW R=1008.16 EX STM MH I=999.86 (12" RCP) S I=1000.06I=1003.37 I=968.70 T/C=978.30 EX CB I=971.27 (15" RCP) SE I=971.40 (12" RCP) NW I=972.98 (12" RCP) SW T/C=981.41 EX CB T/C=980.97 EX CB T/C=981.13 EX CB 1005 98 5 990 995 1000 10 0 5 98 2 98 3 98 4 986 987 988 989 991 992 993 994 996997998999100 1 100 2 100 3 10 0 4 10 0 6 990 99 5 1000 10 0 5 989991992 99 3 99 4996997 998 999 1001 10 0 2 100 3 10 0 4 10 0 6 995 991992993994996997998 1000 999 1001 1002 1003 1004 985 99 0 995 983 984 986 98 7 98 8 98 9 99 1 992 993 994 996 997 998 999 1010 1006 1007 1008 1009 1011 1012 1013 179th STREET W. GL A C I E R W A Y GL A C I E R W A Y CE D A R A V E WET WE T WE T THE EDISON AT AVONLEA (APARTMENTS) I 990 990 995 995 1000 991 991 992 992 993 993 994 994 996 996 997 997 997 998 999 1001 1002 1003 1004 980985 990 990 977978979981982983984986 98 7 98 8 989 98 9 991 991992992993993994994 995 99 1 99 2 993 994 996 997 998 990 995 985 98 0 97 5 975 T/C=977.75 EX CB I=970.40 (15" RCP) W I=970.35 (18" RCP) SE I=987.18 992 990 988 989 990 992 989 99 5 100 0 99 2 99399 4 99 6997998999100 1 100 2 100 3 29676 EXISTING DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY DW G L O C A T I O N : S : \ P R O J E C T S \ 2 9 0 0 0 P R O J \ 2 9 6 0 0 - 2 9 6 9 9 \ 2 9 6 7 6 L A K E V I L L E R E T A I L D E V E L O P M E N T - L A K E V I L L E M N \ 2 9 6 7 6 P R O D U C T I O N F I L E S \ 2 9 6 7 6 C I V I L 3 D \ P R O D U C T I O N D W G S \ P R E L I M P L A T \ 2 9 6 7 6 E X I S T I N G . D W G S A V E D B Y : D A Y T O N . G O N Y E A SHEET NOT VALID UNLESS THIS TEXT IS COLOR. C1-10 - 01/28/25 23-29676 C1-10 EXISTING SITE PLAN ---- ---- C1-10 LAKEVILLE MINNESOTA EXISTING SITE PLAN 0 SCALE IN FEET 60 120 BDT/DWG/LMM BDT/DWG/LMM/MC MC, JF MARKETPLACEAT CEDAR PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N PL O T D A T E : 1/ 2 8 / 2 0 2 5 1 0 : 2 9 A M WETLAND MITIGATON ALL EXISTING TREES WILL REMAIN IN PLACE (SEE TREE INVENTORY FOR MORE INFORMATION) EXISTING STORMCEPTOR OVERFLOW MANHOLE (SEE UTILITY PLAN FOR MORE INFORMATION) PROTECT EXISTING STORM SEWER EXHIBIT D BENCHMARK HYDRANT G G GM G G G G FO G G G FO FO V Gas Pump S. Line - SW 1/4 Sec. 10-114-20SW Cnr - SW 1/4 Sec. 10-114-20 METROPOLITAN COUNCIL V U FOFO FOG G V V Ele c t r i c E a s e m e n t p e r D o c u m e n t N o . 1 6 6 6 6 4 0 1/2" Iron RLS 44076 1/2" Iron Capped/Tipped 1/2" Iron RLS 57366 1/2" Iron RLS 57366 1/2" Iron RLS 44110 1/2" Iron RLS 44110 WET WET WE T WET WET 179th STREET W. GL A C I E R W A Y GL A C I E R W A Y GL A N S H A W A V E CE D A R A V E WET WE T WE T THE EDISON AT AVONLEA (APARTMENTS) KJPL AVONLEA LLC EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB 9 108,321 SQ FT 2.49 AC 7 56,611 SQ FT 1.30 AC OUTLOT A 37,091 SQ FT 0.85 AC 4 46,524 SQ FT 1.07 AC 3 42,072 SQ FT 0.97 AC 2 48,581 SQ FT 1.12 AC 8 65,718 SQ FT 1.51 AC 1 51,057 SQ FT 1.17 AC 5 31,831 SQ FT 0.73 AC 6 48,937 SQ FT 1.12 AC OUTLOT B 19,654 SQ FT 0.45 AC OUTLOT D OUTLOT E 60' 60 ' 291,757 SQ FT 6.70 AC 407,025 SQ FT 9.34 AC OUTLOT C 18,786 SQ FT 0.43 AC 5' 10 ' 10' 30' 10 ' 10' 30' 10 ' 30 ' 10' 10' CEDAR AVENUE (CSAH 23) ROW 25,145 SQ FT 0.58 AC GLANSHAW AVENUE ROW 67,994 SQ FT 1.56 AC 179TH STREET W. ROW 17,090 SQ FT 0.39 AC 30 ' 29676 PPLAT DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY DW G L O C A T I O N : S : \ P R O J E C T S \ 2 9 0 0 0 P R O J \ 2 9 6 0 0 - 2 9 6 9 9 \ 2 9 6 7 6 L A K E V I L L E R E T A I L D E V E L O P M E N T - L A K E V I L L E M N \ 2 9 6 7 6 P R O D U C T I O N F I L E S \ 2 9 6 7 6 C I V I L 3 D \ S U R V E Y P R O D U C T I O N D W G S \ 2 9 6 7 6 P P L A T . D W G S A V E D B Y : D A Y T O N . G O N Y E A SHEET NOT VALID UNLESS THIS TEXT IS COLOR. C1-20 - 01/28/25 23-29676 C1-20 PRELIMINARY PLAT ---- ---- C1-20 LAKEVILLE MINNESOTA PRELIMINARY PLAT 0 SCALE IN FEET 60 120 BDT/DWG/LMM BDT/DWG/LMM/MC MC, JF MARKETPLACEAT CEDAR PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N PL O T D A T E : 1/ 2 8 / 2 0 2 5 1 0 : 3 0 A M BUILDING SETBACK (TYP)PARKING SETBACK (TYP)PROPOSED PROPERTY LINE (TYP) PROPOSED RIGHT-OF-WAY DEDICATION (TYP) EXISTING PROPERTY LINE GLANSHAW AVE RIGHT-OF-WAY DEDICATION DRAINAGE & UTILITY EASEMENT (TYP) (1)GROSS AREA (ACRES)31.72 (2)NET DEVELOPABLE AREA (ACRES)28.08 (3)COMPREHENSIVE PLAN --LAND USE DESIGNATION CORRIDORMIXED USE (4) EXISTING ZONING M-2 PROPOSED ZONING N/A (5)GROSS UNIT DENSITY N/A (6)NET UNIT DENSITY N/A (7)ROW (ACRES)3.04 (8)WETLAND (ACRES)0.60 (9) OUTLOT AREA (ACRES) A 0.85 B 0.45 C 0.43 D 6.70 E 9.34 NOTE: NO MINIMUM LOT AREA AND NO MINIMUM LOT WIDTH IS REQUIRED PER SECTION 10-3-2.C ABUTTING PROPERTIES COMPREHENSIVE PLAN & ZONING DIRECTION LAND USE PLAN ZONING MAP EAST MDR RM-3 DISTRICT NORTH COMMERCIAL HDR PUD DISTRICT WEST PUBLIC/QUASI PUBLIC POS DISTRICT SOUTH PUBLIC/QUASI PUBLIC POS DISTRICT HDR PUD DISTRICT TEMPORARY DRAINAGE EASEMENT EXHIBIT E 9 35 36 95 9 PYLON SIGN 17 X X X X X X X X X X X X XXX XXX X X XX 7 5 3 12 12 37 GROCER20,660 SFFFE = 1002.00 CHILD CARE11,700 SFFFE = 998.50 GL A N S H A W A V E GLANSHAW AVE BASIN 4 100 YR HWL = 977.13NWL = 973.25 BOT = 966.25 BASIN 3 100 YR HWL = 976.74 NWL = 974.50 BOT = 965.00 OIL1,870 SFFFE = 1000.00 8 7 OUTLOT A OUTLOT E OUTLOT C OUTLOT B OUTLOT D 9 1 65 432 MEDICAL/OFFICE/RETAIL 7,280 SFFFE = 997.0047 T CAR WASH5,400 SFFFE = 998.00 23 31 12 3234 42 28 11 6 10 7 BANK3,890 SFFFE = 1006.50 QSR3,000 SFFFE = 1001.50 9 20 13 X XX X X MULTI-TENANT5,870 SFFFE = 1004.50 15 BASIN 2 TOP = 990.00 HWL = 989.18 BOT = 986.00 BASIN 1 TOP = 994.00HWL = 993.47 BOT = 990.00 QSR2,450 SFFFE = 1001.00 G G GM G G G G FO G G G FO FO V Gas Pump METROPOLITAN COUNCIL V U FOFO FOG G V V Ele c t r i c E a s e m e n t p e r D o c u m e n t N o . 1 6 6 6 6 4 0 179th STREET W. GL A C I E R W A Y GL A C I E R W A Y GL A N S H A W A V E CE D A R A V E WET WE T WE T THE EDISON AT AVONLEA (APARTMENTS) KJPL AVONLEA LLC 60 ' 60' 10 ' 30 ' 10' 30' AREA TABLE LOT # 1 2 3 4 5 6 7 8 9 OUTLOT A OUTLOT B OUTLOT C OUTLOT D OUTLOT E AREA (SQ FT) 51,016.45 48,581.49 42,072.97 46,524.89 31,831.00 48,937.03 56,611.10 65,718.08 108,321.48 37,091.73 19,654.26 18,786.67 291,757.81 407,025.02 AREA (AC) 1.17 1.12 0.97 1.07 0.73 1.12 1.30 1.51 2.49 0.85 0.45 0.43 6.70 9.34 29676 SITE-OVERALL DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY DW G L O C A T I O N : S : \ P R O J E C T S \ 2 9 0 0 0 P R O J \ 2 9 6 0 0 - 2 9 6 9 9 \ 2 9 6 7 6 L A K E V I L L E R E T A I L D E V E L O P M E N T - L A K E V I L L E M N \ 2 9 6 7 6 P R O D U C T I O N F I L E S \ 2 9 6 7 6 C I V I L 3 D \ P R O D U C T I O N D W G S \ P R E L I M P L A T \ 2 9 6 7 6 S I T E - O V E R A L L . D W G S A V E D B Y : D A Y T O N . G O N Y E A SHEET NOT VALID UNLESS THIS TEXT IS COLOR. C3-10 - 01/28/25 23-29676 C3-10 SITE PLAN - OVERALL ---- ---- C3-10 LAKEVILLE MINNESOTA SITE PLAN - OVERALL 0 SCALE IN FEET 60 120 BDT/DWG/LMM BDT/DWG/LMM/MC MC, JF PAVEMENT LEGEND SYMBOL DESCRIPTION BITUMINOUS TRAIL BITUMINOUS PAVEMENT HEAVY DUTY BITUMINOUS PAVEMENT CONCRETE PAVEMENT MARKETPLACEAT CEDAR PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N PL O T D A T E : 1/ 2 8 / 2 0 2 5 1 0 : 3 1 A M PARKING SETBACK (TYP) BUILDING SETBACK (TYP)PROPOSED R/W PROPERTY LINE (TYP) PROPOSED RETAINING WALL (SEE GRADING PLAN)PROPOSED RETAINING WALL (SEE GRADING PLAN) PARKING SETBACK (TYP) BUILDING SETBACK (TYP) EXHIBIT F 9 35 36 95 9 PYLON SIGN 17 X X X X X X X X X X X X X X X XXXX XXX X X X X XX 7 5 3 12 12 37 GROCER20,660 SFFFE = 1002.00 CHILD CARE11,700 SFFFE = 998.50 GL A N S H A W A V E GLANSHAW AVE OIL1,870 SF FFE = 1000.00 8 7 OUTLOT A OUTLOT E OUTLOT B OUTLOT D 9 1 65 432 MEDICAL/OFFICE/RETAIL 7,280 SF FFE = 997.0047 T CAR WASH5,400 SFFFE = 998.00 23 31 12 3234 42 28 11 6 10 7 BANK3,890 SFFFE = 1006.50 QSR3,000 SFFFE = 1001.50 9 20 13 X X XXX X XX PATIO MULTI-TENANT5,870 SFFFE = 1004.50 15 BASIN 2 TOP = 990.00HWL = 989.18 BOT = 986.00 BASIN 1 TOP = 994.00 HWL = 993.47 BOT = 990.00 QSR2,450 SFFFE = 1001.00 G G GM G G G G FO G G G FO FO V U 1/2" Iron RLS 57366 1/2" Iron RLS 44110 179th STREET W. GL A C I E R W A Y CE D A R A V E WET WE T WE T 30 ' 16' 20' 9' 24' 30' 30' 34'24' 24 ' 24' 39.33' 26 ' 12' 24'20' 9' 20' 9' 14'30' 26 ' 18 ' 30 . 1 6 ' 34.66' 20'30'20'20'24'20'20' 24'20' 20 ' 24 ' 24 ' 24' 9' 9' 43 ' 33 ' 20 ' 24 ' 20 ' 20 ' 24 ' 20 ' 20'24' 24 ' 20 ' 9' 9' 29676 SITE DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY DW G L O C A T I O N : S : \ P R O J E C T S \ 2 9 0 0 0 P R O J \ 2 9 6 0 0 - 2 9 6 9 9 \ 2 9 6 7 6 L A K E V I L L E R E T A I L D E V E L O P M E N T - L A K E V I L L E M N \ 2 9 6 7 6 P R O D U C T I O N F I L E S \ 2 9 6 7 6 C I V I L 3 D \ P R O D U C T I O N D W G S \ P R E L I M P L A T \ 2 9 6 7 6 S I T E . D W G S A V E D B Y : D A Y T O N . G O N Y E A SHEET NOT VALID UNLESS THIS TEXT IS COLOR. C3-11 - 01/28/25 23-29676 C3-11 SITE PLAN - MARKETPLACE ---- ---- C3-11 LAKEVILLE MINNESOTA SITE PLAN - MARKETPLACE 0 SCALE IN FEET 50 100 BDT/DWG/LMM BDT/DWG/LMM/MC MC, JF MARKETPLACEAT CEDAR PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N PL O T D A T E : 1/ 2 8 / 2 0 2 5 1 0 : 3 1 A M ALL WORK IN THIS AREA UNDER SEPARATE SUBMITTAL & PERMIT (FOR REFERENCE ONLY) PROPOSED RIGHT-OF-WAY PROPOSED LOT LINE RIGHT-IN ONLY ACCESS BITUMINOUS PAVEMENT (TYP) CONCRETE WALK (TYP) FULL ACCESS PARKING SUMMARY LOT #USE BUILDING (SF)REQUIREMENT REQUIRED STALLS PROVIDED STALLS 1 BANK 3,980 SF 1 / 200 SF 20 34 2 COFFEE /DENTAL 5,870 SF 1 / 200 SF 30 42 3 QSR 3,000 SF 1 / 75 SF 40 31 4 QSR 2,450 SF 1 / 75 SF 33 28 5 OIL CHANGE 1,870 SF 1 / 200 SF 9 12 6 MEDICAL/ OFFICE/RETAIL 7,280 SF 1 / 200 SF 37 47 7 CAR WASH 5,400 SF 10 STALLS 10 23 8 CHILD CARE 11,700 SF 1 / 4 OCCUPANCY TBD 37 9 GROCER 20,660 SF 1 / 200 SF 103 95 CONCRETE STEPS WITH HANDRAIL PROPOSED RETAINING WALL (SEE GRADING PLAN) PROPOSED RETAINING WALL (SEE GRADING PLAN) PAVEMENT LEGEND SYMBOL DESCRIPTION BITUMINOUS TRAIL BITUMINOUS PAVEMENT HEAVY DUTY BITUMINOUS PAVEMENT CONCRETE PAVEMENT PYLON SIGN X X X X X X X X X X X X X X X XXXX XXX X X X X XX GROCER20,660 SFFFE = 1002.00 CHILD CARE11,700 SFFFE = 998.50 GL A N S H A W A V E GLANSHAW AVE OIL1,870 SFFFE = 1000.00 8 7 OUTLOT A OUTLOT E OUTLOT B OUTLOT D 9 1 65 432 MEDICAL/OFFICE/RETAIL 7,280 SFFFE = 997.00 T CAR WASH5,400 SFFFE = 998.00 BANK3,890 SFFFE = 1006.50 QSR3,000 SFFFE = 1001.50 X X XXX X XX PATIO MULTI-TENANT5,870 SFFFE = 1004.50 BASIN 2 TOP = 990.00HWL = 989.18 BOT = 986.00 BASIN 1 TOP = 994.00 HWL = 993.47BOT = 990.00 QSR2,450 SFFFE = 1001.00 >>>> > > >>>> >>> I I I I I IIIIIIIII I I I I I >>>>>>>>>>>>>>>> >> >> >> >> >> >>>> >> >> >> >> >> >> >> >>>> >> >> >> >>>> >> >> >> >>>> >> S-11R=1002.13I=992.01 S-9R=997.06I=986.68 S-8R=997.88I=985.95 S-10R=998.46I=987.40 S-7R=995.05I=985.40 SP-11 (8") SP - 8 ( 8 " ) SP-10 (8") SP - 7 ( 8 " ) SP-9 (8") R=997.89 EX SAN MH EX GGV G R=1012.66 EX MH R=1013.21 EX MH G GM G G G G R=1008.78 EX SAN MH FO G G FO FO OH L OH L OH L OH L OH L OH L OH L V OHL OHL OHL STM STM STM UE UE UEG G Gas Pump UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G G G G G G G G G G G G G G G G G G UE UE UE UE UE UE UE UE G G UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE U R=1001.60 EX SAN MH I=981.62 EI=981.63 W R=1006.67 EX SAN MH I=991.28 (PVC) E I=991.30 (PVC) W R=1003.96 EX SAN MH I=988.25 (PVC) N I=988.22 (PVC) W I=988.21 (PVC) E EX GGV R=1014.80 EX MH R=1014.46 EX MH >>>>>> >>>>>>>>>>>>>>>>>>>>> >>>> >> >> >> >> >> UE UE UE G Ele c t r i c E a s e m e n t p e r D o c u m e n t N o . 1 6 6 6 6 4 0 >>>> > I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I >>>>>>>>>>>>>>>> >>>>> I T/C=1000.48 EX CB T/C=1000.25 EX CB T/C=999.58 EX CB T/C=999.90 EX CB T/C=1001.77 EX CB T/C=1003.34 EX CB T/C=1003.63 EX CB T/C=1010.48 EX CB T/C=1004.80 EX CB R=1007.46 EX STM MH R=1007.18 EX STM MH R=1007.37 EX CB T/C=1008.93 EX CBT/C=1009.04 EX CB T/C=1009.28 EX CB R=1007.63 EX CB T/C=1004.79 EX CB T/C=1004.69 EX CB I=991.54 I=998.19 R=984.64 EX CB T/C=1013.03 T/C=1010.37 EX CB R=998.85 EX STM MH I=982.77 (36" RCP) N I=982.70 (RCP) E I=990.91 (15" RCP) W R=1000.54 EX STM MH I=991.93 (15" RCP) E I=995.64 (15" RCP) N I=995.29 (15" RCP) S T/C=998.53 EX CB I=994.02 (15" RCP) N T/C=1000.41 EX CB I=995.78 (15" RCP) NT/C=1003.89 EX CB I=996.21 (48" RCP) N I=996.24 (48" RCP) W I=993.80 (SUMP) T/C=1004.98 EX CB I=997.78 (48" RCP) W I=997.70 (48" RCP) E T/C=1007.68 EX CB I=1000.36 (RCP) N I=1000.31 (48" RCP) E T/C=1009.24 EX CB I=1004.47 (15" RCP) W I=1003.71 (15" RCP) N I=1003.62 (15" RCP) E T/C=1009.37 EX CB I=1005.05 (15" RCP) E T/C=986.60 EX CB I=981.97 (12" RCP) E T/C=986.56 EX CB I=979.96 (12" RCP) SE I=979.98 (12" RCP) NE I=981.38 (12" RCP) W T/C=982.56 EX CB I=977.63 (12" RCP) NW I=977.66 (12" RCP) SE R=1008.16 EX STM MH I=999.86 (12" RCP) S I=1000.06I=1003.37 179th STREET W. GL A C I E R W A Y CE D A R A V E WET WE T WE T I I I EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB I I I I I I I I I I I I I I I I I I I >>>>>>>>>>>> >> >> >> >> >> >> >> > > > > > > >>>>>>>> > > > >>>>>>>>>>>>>> >> >> >> >> I I I I I I I I I ST-109R=1003.00I=998.29 ST-108R=1003.44I=997.79 ST-103R=998.14I=995.80 ST-107R=1000.88I=995.74 ST-102R=999.42I=991.21 ST-106R=999.42I=995.00 ST-111R=995.72I=992.18 ST-203R=996.74I=989.50 ST-101AR=993.82I=990.60 ST-104R=996.29I=991.58 ST-101R=993.82I=990.29 ST-105R=996.41I=992.04 ST-202R=994.95I=988.16 OCS-1 (SEE DETAIL) R=993.50I=984.00 FES-101I=990.00 ST-110AR=994.02I=990.49 ST-110R=993.89I=990.17 OCS-2 (SEE DETAIL) R=989.50I=982.00 ST-205R=991.45I=986.11 FES-205I=986.00 FES-110I=990.00 FES-207I=986.00 P-103 (18")P-102 (24") P-101 (36")P-101A (15") P-106 (18") P- 1 0 5 ( 1 5 " ) P- 1 0 4 ( 1 8 " ) P-202 (18") P-111 (12") P-110 (15") P-110A (12") P-109 (12") P- 1 0 8 ( 1 5 " ) P-107 (18") P-203 (15") P-207 (15") P-208 (15") P-113 (30") ST-109AR=1006.98I=998.69 P-109A (12") P-205 (24") ST-201R=994.62I=986.93 FES-201I=986.61 ST-204R=997.83I=497.83 P-204A (12") P-204 (12") P-201 (24") ALL WORK IN THISAREA UNDER SEPARATE SUBMITTAL & PERMIT (FOR REFERENCE ONLY) P-2 (18")ST-2R=1004.87I=998.03 P-3 (18")ST-3R=1004.10I=998.62 ST-1R=1007.65I=1000.60 P-1 (18") 29676 UTILITY DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY DW G L O C A T I O N : S : \ P R O J E C T S \ 2 9 0 0 0 P R O J \ 2 9 6 0 0 - 2 9 6 9 9 \ 2 9 6 7 6 L A K E V I L L E R E T A I L D E V E L O P M E N T - L A K E V I L L E M N \ 2 9 6 7 6 P R O D U C T I O N F I L E S \ 2 9 6 7 6 C I V I L 3 D \ P R O D U C T I O N D W G S \ P R E L I M P L A T \ 2 9 6 7 6 U T I L I T Y . D W G S A V E D B Y : D A Y T O N . G O N Y E A SHEET NOT VALID UNLESS THIS TEXT IS COLOR. C3-20 - 01/28/25 23-29676 C3-20 UTILITY PLAN - MARKETPLACE ---- ---- C3-20 LAKEVILLE MINNESOTA UTILITY PLAN - MARKETPLACE 0 SCALE IN FEET 50 100 BDT/DWG/LMM BDT/DWG/LMM/MC MC, JF MARKETPLACEAT CEDAR PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N PL O T D A T E : 1/ 2 8 / 2 0 2 5 1 0 : 3 1 A M UTILITY LEGEND EXISTING PROPOSED STORM DRAIN SANITARY SEWER SANITARY SEWER FORCEMAIN WATER MAIN GAS OVERHEAD ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND TELEPHONE UNDERGROUND TV OVERHEAD UTILITY UNDERGROUND UTILITY FIBER OPTIC NOTE: CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES. >>>> >> <II II> I I G G OE OE UE UE UT UT UTV OHL UTL FBO CONNECT TO 8" SANITARY STUB (SEE GLANSHAW AVE PLANS) CONNECT TO EXISTING WATERMAIN STUB (VERIFY SIZE, DEPTH, LOCATION) ALL WORK IN THIS AREA UNDER SEPARATE SUBMITTAL & PERMIT (FOR REFERENCE ONLY) CONNECT TO 8" WATERMAIN STUB (SEE GLANSHAW AVE PLANS) FUTURE STORM BY OTHERS (TYP) CONNECT TO 30" STORM STUB (SEE GLANSHAW AVE PLANS) CONNECT TO EXISTING STORM (SEE GLANSHAW AVE PLANS) CONNECT TO EXISTING STORM PIPE (VERIFY SIZE, DEPTH, LOCATION) AL L W O R K I N T H I S A R E A U N D E R SE P A R A T E S U B M I T T A L & P E R M I T (F O R R E F E R E N C E O N L Y ) 4" PERFORATED SUBDRAIN (TYP) CLEANOUT (TYP) ST-205, 3' SUMP ST-201, 3' SUMP ST-110, 2' SUMP ST-101, 3' SUMP 8" WATERMAIN (TYP) CONNECT TO EXISTING STORM CATCH BASIN STORM STUB (TYP) HYDRANT (TYP) WATER + SANITARY SERVICE (TYP) EXISTING STORMCEPTOR OVERFLOW MANHOLE ALL WORK WITHIN PUBLIC ROW TO BE COORDINATED WITH PUBLIC AGENCIES AND UTILITY COMPANIES EXHIBIT G X X X X X X X X X X X X X X GL A N S H A W A V E GLANSHAW AVE BASIN 4 100 YR HWL = 977.13 NWL = 973.25 BOT = 966.25 BASIN 3100 YR HWL = 976.74 NWL = 974.50 BOT = 965.00 7 OUTLOT A OUTLOT E OUTLOT C OUTLOT B T 5,400 SFFFE = 998.00 23 BASIN 2 TOP = 990.00HWL = 989.18BOT = 986.00 BASIN 1 TOP = 994.00 HWL = 993.47 BOT = 990.00 > >>> I III I >>>> >> >> BENCHMARK HYDRANT TNFH = 980.02 S. Line - SW 1/4 Sec. 10-114-20 FOFO FOG G G R=976.11 EX SAN MH R=975.97 EX SAN MH I=954.34 (PVC) N I=954.36 (PVC) S R=977.70 EX SAN MH I=954.07 (PVC) E I=954.11 SI=955.28 (PVC) W I=963.17 (PVC) W >> >> >> >> >> >> >> >> >> > > > > > > > > > > > I I >> >> >> >> >> >> V V > >> R=984.64 EX CB T/C=986.60 EX CB I=981.97 (12" RCP) E T/C=986.56 EX CB I=979.96 (12" RCP) SE I=979.98 (12" RCP) NE I=981.38 (12" RCP) W T/C=982.56 EX CB I=977.63 (12" RCP) NW I=977.66 (12" RCP) SE T/C=977.09 EX CB T/C=976.27 EX CB T/C=978.29 EX CB I=973.64 (12" RCP) NE T/C=974.56 EX CB I=967.81 (36" RCP) E I=967.83 (36" RCP) SW I=968.70 T/C=976.17 EX CB T/C=974.54 EX CB I=967.19 (36" RCP) W I=967.09 (42" RCP) N T/C=978.30 EX CB I=971.27 (15" RCP) SE I=971.40 (12" RCP) NW I=972.98 (12" RCP) SW T/C=981.41 EX CB T/C=980.97 EX CB T/C=981.13 EX CB GL A C I E R W A Y GL A N S H A W A V E THE EDISON AT AVONLEA (APARTMENTS) KJPL AVONLEA LLC EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB T/C=976.87 EX CB I=966.12 (42" RCP) NE I=965.57 (42" RCP) S I=966.85 (18" RCP) NW T/C=977.75 EX CB I=970.40 (15" RCP) W I=970.35 (18" RCP) SE I I I I I I I I I I I I I I I I I I I I I I >>>>>>>>>>>> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>> > > > > > > >>>>>>>> > > > > > > > >>>>>>>>>>>>>> >> >> >> >> >> >> >> >> >> >> I I I I I >> >> S-5R=993.33I=976.55 S-6R=990.41I=980.01 S-4R=985.64I=974.65 S-3R=984.56I=974.35 S-2R=983.85I=973.51 S-1R=981.61I=971.23 STUB-3I=980.23 STUB-2I=985.12 S-1AR=979.51I=963.37 STUB-1I=978.83 WYE-1I=978.68 SP - 6 ( 8 " P V C ) SP-5 (8" PVC)SP-4 (8" PV C ) SP-3 ( 8 " P V C ) SP-2 ( 8 " P V C ) SP- 1 ( 8 " P V C ) P- 7 8 ( 8 " P V C ) SP-6A (8" PVC) SP - 5 A ( 8 " P V C ) CONNECT TO EXISTING SANITARY SEWER STUB ST-305R=993.15I=978.35 ST-304R=990.73I=977.52 ST-302R=991.14I=975.76 ST-306R=990.35I=979.15 ST-303R=989.46I=976.56 ST-307R=984.92I=979.94 ST-309R=984.07I=980.57 ST-308R=984.07I=980.27 ST-301R=978.38I=974.61 OCS-3R=977.00I=967.80 FES-301I=974.55 ST-303AR=985.82I=981.60 ST-304AR=987.00I=982.54 ST-306AR=990.36I=983.84 P-309 (15" RCP) P-308 (18" RCP) P-307 (18" RCP)P-306 (24" RCP) P- 3 0 5 ( 2 4 " R C P ) P- 3 0 4 ( 2 4 " R C P ) P- 3 0 3 ( 3 0 " R C P ) P-302 (30" RCP) P-301 (30" RCP) P-303A (12" RCP) P-304A (12" RCP) P- 3 0 6 A ( 1 2 " R C P ) P-113 (30" RCP) CONNECT TO EXISTING WATERMAIN STUB 8" WATERMAIN (TYP) 8" WATERMAIN STUB P-1 0 ( 3 0 " R C P ) ST-9R=980.85I=971.61 P-9 ( 3 0 " R C P ) ST-8R=983.37I=973.32 P-8 (3 0 " R C P ) ST-7R=986.49I=974.62 P-7 ( 3 0 " R C P ) ST-6R=985.12I=976.53 P-6 (30" RCP) ST-5R=990.41I=980.42 P-4 (30" RCP) ST-4R=993.98I=983.77 ST-10R=978.15I=970.05 P-1 1 ( 3 0 " R C P ) FES-10AI=973.25 P-10A (10") CONNECT TO EXISTING STORM SEWER STREET CROSSING UNDERDRAIN (TYP) (SEE DETAIL) WATER SERVICE WATER SERVICE OUTLOT B MEDICAL/OFFICE/RETAIL 7,280 SF FFE = 997.00 BASIN 2 TOP = 990.00 HWL = 989.18 BOT = 986.00 >> G G V UE UE UE UEG GGG UE UE UE UE >> >> >> R=984.64 EX CB I=995.78 (15" RCP) N T/C=986.60 EX CB I=981.97 (12" RCP) E T/C=986.56 EX CB I=979.96 (12" RCP) SE I=979.98 (12" RCP) NE I=981.38 (12" RCP) W GL A C I E R W A Y I I EX-SB EX-SB >> >> >> I I I I I I I I I I CONNECT TO EXISTING WATERMAIN STUB (VERIFY SIZE, DEPTH, LOCATION) 8" WATERMAIN (TYP) 29676 UTILITY - GLANSHAW DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY DW G L O C A T I O N : S : \ P R O J E C T S \ 2 9 0 0 0 P R O J \ 2 9 6 0 0 - 2 9 6 9 9 \ 2 9 6 7 6 L A K E V I L L E R E T A I L D E V E L O P M E N T - L A K E V I L L E M N \ 2 9 6 7 6 P R O D U C T I O N F I L E S \ 2 9 6 7 6 C I V I L 3 D \ P R O D U C T I O N D W G S \ P R E L I M P L A T \ 2 9 6 7 6 U T I L I T Y - G L A N S H A W . D W G S A V E D B Y : D A Y T O N . G O N Y E A SHEET NOT VALID UNLESS THIS TEXT IS COLOR. C3-21 - 01/28/25 23-29676 C3-21 UTILITY PLAN - GLANSHAW ---- ---- C3-21 LAKEVILLE MINNESOTA UTILITY PLAN - GLANSHAW 0 SCALE IN FEET 50 100 BDT/DWG/LMM BDT/DWG/LMM/MC MC, JF MARKETPLACEAT CEDAR PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N PL O T D A T E : 1/ 2 8 / 2 0 2 5 1 0 : 3 2 A M UTILITY LEGEND EXISTING PROPOSED STORM DRAIN SANITARY SEWER SANITARY SEWER FORCEMAIN WATER MAIN GAS OVERHEAD ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND TELEPHONE UNDERGROUND TV OVERHEAD UTILITY UNDERGROUND UTILITY FIBER OPTIC NOTE: CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES. >>>> >> <II II> I I G G OE OE UE UE UT UT UTV OHL UTL FBO ALL WORK IN THIS AREA UNDERSEPARATE SUBMITTAL & PERMIT (FOR REFERENCE ONLY) ALL WORK IN THIS AREA UNDER SEPARATE SUBMITTAL & PERMIT (FOR REFERENCE ONLY) SEE INSET A FORWATERMAIN CONNECTION TO THE NORTH INSET A PYLON SIGN X X X X X X X X X X X X X X X XXXX XXX X X X X XX GROCER20,660 SFFFE = 1002.00 CHILD CARE11,700 SFFFE = 998.50 GL A N S H A W A V E GLANSHAW AVE OIL1,870 SF FFE = 1000.00 8 7 OUTLOT A OUTLOT E OUTLOT B OUTLOT D 9 1 65 432 MEDICAL/OFFICE/RETAIL 7,280 SFFFE = 997.00 T CAR WASH5,400 SFFFE = 998.00 BANK3,890 SFFFE = 1006.50 QSR3,000 SFFFE = 1001.50 X X XXX X XX PATIO MULTI-TENANT5,870 SFFFE = 1004.50 BASIN 2 TOP = 990.00HWL = 989.18 BOT = 986.00 BASIN 1 TOP = 994.00 HWL = 993.47 BOT = 990.00 QSR2,450 SFFFE = 1001.00 EX GGV G R=1012.66 EX MH R=1013.21 EX MH G GM G G G G FO G G FO FO OH L OH L OH L OH L OH L OH L OH L V OHL OHL OHL UE UE UEG Gas Pump UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G G G G G G G G G G G G G G G G G G UE UE UE UE UE UE UE UE G G UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE U EX GGV R=1014.80 EX MH R=1014.46 EX MH >>>>>> >>>>>>>>>>>>>>>>>>>>> >>>> >> >> >> >> UE UE UE G Ele c t r i c E a s e m e n t p e r D o c u m e n t N o . 1 6 6 6 6 4 0 >>>> > I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I >>>>>>>>>>>>>>>> >>>>> I 1000 1005 1010 9969979989991001100210031004 1006100710081009 1011 101 2 1013 1005 98 5 990 995 1000 10 0 5 98 3 98 4 986 987 988 989 991 992 993 994 996997998999100 1 100 2 10 0 3 10 0 4 10 0 6 990 99 5 1000 10 0 5 98999199 2 99 3 99 4996997 998 999 1001 10 0 2 100 3 10 0 4 10 0 6 995 991992993994996997998 1000 999 1001 1002 1003 1004 99 0 995 986 98 7 98 8 98 9 99 1 992 993 994 996 997 998 999 1010 1006 1007 1008 1009 1011 1012 1013 179th STREET W. GL A C I E R W A Y CE D A R A V E WET WE T WE T I I I 990 995 1000 991 992 993 994 996 997 998 999 1001 1002 1003 1004 995 99 1 99 2 993 994 996 997 998 990 995 985 EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB 99 5 100 0 99 2 993 99 499 6997998999100 1 100 2 100 3 >>>> > > >>>> >>> I I I I I IIIIIIIII I I I I I >>>>>>>>>>>>>>>> >> >> >> >> >> >>>> >> >> >> >> >> >> >> >>>> >> >> >> >>>> >> >> >> >>>> >> 1010 1008 100910111012 10 0 0 99 7 99 7 99 8 99 8 99 8 99 9 10 0 1 99 0 98 6 98 8 99 2 99 6 996 997998 1000 9991001100210031004 996 99 7 99 8 99 9 996997998 995 993994 996 997 990 99 5 995 989991992993994 996 996 99 7 997 1002 1003 1004 10 0 0 1000 10 0 1 1000 996997 998 999 1001 100 510061007 1000 99899910011002 98 5 99 0 990 986 987 988989 991 99 1 992 992 100 5 . 7 4 1004 . 4 0 ST-109AR=1006.98 I=998.69 ST-109 R=1003.00 I=998.29 ST-108 R=1003.44 I=997.79 ST-107 R=1000.88 I=995.74 ST-103 R=998.14 I=995.80 ST-102 R=999.42 I=991.21 ST-106 R=999.42 I=995.00 ST-111 R=995.72 I=992.18 ST-203 R=996.74 I=989.50 ST-104R=996.29 I=991.58 ST-101AR=993.82 I=990.60 ST-101 R=993.82 I=990.29 ST-105 R=996.41 I=992.04 ST-202 R=994.95 I=988.16 ST-110AR=994.02 I=990.49 ST-110 R=993.89 I=990.17 OCS-1 (SEE DETAIL)R=993.50I=984.00 ST-205R=991.45I=986.11 OCS-2 (SEE DETAIL)R=989.50 I=982.00 I I I I I I I I I I I I I I I I I I >>>>>>>>>>>> >> >> >> >> >> >> >> > > > > > > >>>>>>>> > > > >>>>>>>>>>>>>> >> >> >> >> I I I I I I I I I 1001.29 1001. 2 9 993.9 8 993.9 3 995.9 1 1004 . 0 5 998.1 2 995 . 5 5 995. 2 3 996.06 998.6 7 998.9 7 998.3 9 1000 . 4 5 1001 . 7 7 997.5 6 998.7 3 997.5 7 997.0 9 996.6 3 996.6 3 1003 . 6 8 1003 . 3 7 1004 . 5 2 1002 . 3 1 995.2 6997.7 1 998.7 6 996.6 5 998.0 2 1000 992994996998 99 0 99 2 99 4 99 0 99 2 99 4 99 6 990 992 994994 997.1 2 998.0 0 998.7 9 997.2 9 996.21 998 . 7 5 999.72 999 1000 1001 100 0 998 999 995 994996997 995 1000 996 997 998 999 1001 1002 1003 1004 99 0 99 0 98 6 98 8 990 986988 992 994 996 990 986988 986988 100 5 1006 10 0 5 10 0 6 100 5 1002 100 3 10 0 4 1004 1004 . 4 4 1004 . 7 4 1001.7 5 1003 . 7 6 1003 . 2 3 1002.701003.67 1003 . 6 5 1000 . 5 4 998. 7 5 999. 2 9 99799 8 99 9 996 993.5 7 994.8 9 994.2 1 994.7 7 1004 . 3 1 990992994996998 1000 999100110021003 1010 1007 1004 1008 FES-110I=990.00 FES-101I=990.00 FES-207I=986.00 FES-201I=986.61 FES-205I=986.00 ST-1R=1007.65I=1000.60 ST-2R=1004.87I=998.03 ST-3R=1004.10I=998.62 FES-112I=986.00 10001002100410061008 10 0 8 10 0 5 1012 1006 10 0 3 10 0 2 10 0 0 10 0 1 999999 1001 1000 99 6 99 6 EOF EO F EOF EOF EOF EO F EO FEOF EO F EO F EO F EO F EOF EO F EO F EOF EOF EO F EOF 999 999 EOF 29676 GRADING DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY DW G L O C A T I O N : S : \ P R O J E C T S \ 2 9 0 0 0 P R O J \ 2 9 6 0 0 - 2 9 6 9 9 \ 2 9 6 7 6 L A K E V I L L E R E T A I L D E V E L O P M E N T - L A K E V I L L E M N \ 2 9 6 7 6 P R O D U C T I O N F I L E S \ 2 9 6 7 6 C I V I L 3 D \ P R O D U C T I O N D W G S \ P R E L I M P L A T \ 2 9 6 7 6 G R A D I N G . D W G S A V E D B Y : B R A D Y . T H O M A S SHEET NOT VALID UNLESS THIS TEXT IS COLOR. C4-10 - 01/28/25 23-29676 C4-10 GRADING PLAN - MARKETPLACE ---- ---- C4-10 LAKEVILLE MINNESOTA 0 SCALE IN FEET 50 100 BDT/DWG/LMM BDT/DWG/LMM/MC MC, JF MARKETPLACEAT CEDAR PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N PL O T D A T E : 1/ 2 8 / 2 0 2 5 1 0 : 3 2 A M GRADING LEGEND EXISTING CONTOUR (MINOR INTERVAL) EXISTING CONTOUR (MAJOR INTERVAL) PROPOSED CONTOUR (MINOR INTERVAL) PROPOSED CONTOUR (MAJOR INTERVAL) GENERAL GRADING NOTES PROPOSED CONTOURS SHOW FINISHED GRADE ELEVATIONS. BUILDING PAD AND PAVEMENT HOLD DOWNS ARE NOT INCLUDED. WHEN CONSTRUCTING BUILDING PADS WITH A HOLD DOWN, GRADE AREAS TO ENSURE POSITIVE BUILDING PAD DRAINAGE. 101 100 101 100 GRADING PLAN - MARKETPLACE ALL WORK IN THIS AREA UNDER SEPARATE SUBMITTAL & PERMIT (FOR REFERENCE ONLY) EOF993.50 EOF989.50 EXHIBIT H X X X X X X X X X X X X X XX GL A N S H A W A V E GLANSHAW AVE 7 OUTLOT A OUTLOT E OUTLOT C OUTLOT B T 23 TOP = 990.00HWL = 989.18 BOT = 986.00 BASIN 1 TOP = 994.00HWL = 993.47 BOT = 990.00 BENCHMARK HYDRANT TNFH = 980.02 FOFO FOG G G >> >> >> >> >> >> >> >> >> > > > > > > > > > > > I I >> >> >> >> >> >> V V > >> 98 5 990 98 2 98 3 98 4 986 987 988 989 991 990 989991992 985 99 0 995 983 984 986 98 7 98 8 98 9 99 1 992 993 994 996 997 998 GL A C I E R W A Y GL A N S H A W A V E THE EDISON AT AVONLEA (APARTMENTS) KJPL AVONLEA LLC 980985 99 0 977978979981982983984986 98 7 98 8 98 9 991992 985 98 0 975 975 992 990 988 987 99 2 I I I I I I I I I I I I I I I I I I I I I I >>>>>>>>>>>> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>> > > > > > > >>>>>>>> > > > > > > > >>>>>>>>>>>>>> >> >> >> >> >> >> >> >> >> >> I I I I >> >> > >>> I III I >>>> >> >> 99 0 99 5 99 1 99 2 99 3 99 4 99 6 99 7 98 6 99 0 98 7 98 8 98 9 99 0 995 99 1 99 2 99 3 99 4 99 4 995 996 99 8 995 991992993994 996 997996 997 998 995 994996997 98 5 99 0 990 990 986987988989991 99 1 992 992 993 993 -1 . 0 4 % 1. 0 2 % -1 . 0 4 % 0. 5 2 % 1. 8 7 % 2.26% -4.50%-1.11%-1.11%-1.11% 992.32 992.57 989.9 6 991.2 1 991.2 1 994.2 1 993.8 3 992.5 6 990.8 5 990.8 6 98 4 . 8 2 984.5 9 989.9 6 992.6 4 99 0 98 6 98 7 98 8 98 9 99 1 990 987 988989991992993 970 966968972974 976 978 EOF984.44 EOF990.56 ST-4 R=993.98 I=983.77 ST-305R=993.15 I=978.35 ST-304 R=990.73I=977.52 ST-302 R=991.14 I=975.76 ST-303R=989.46I=976.56 ST-5R=990.41I=980.42 ST-306R=990.35I=979.15 ST-7 R=986.49I=974.62 ST-307 R=984.92 I=979.94 ST-6 R=985.12 I=976.53 ST-309R=984.07 I=980.57 ST-308R=984.07 I=980.27 ST-8 R=983.37I=973.32 ST-9 R=980.85 I=971.61 ST-301 R=978.38 I=974.61 OCS-3 R=977.00 I=967.80 FES-301I=974.55 ST-303A R=985.82 I=981.60 ST-304AR=987.00I=982.54 ST-306A R=990.36 I=983.84 986. 2 8 986. 2 8 991.23 991.2 3 970966 968972974 976 970968 972 974976 970 980 968 972 974 976 978982984986 98 0 97 4 97 6 97 8 98 2 98 4 97 0 96 8 97 2 97 4 97 6 97 8 97 6 97 7 97 5 97 3 96 5 97 0 977 975 97 5 97 7 97 7 97 3 978 967 967 96 7 977 97397 7 977 ST-10R=978.15 I=970.05 VERTICAL CURVE: PVI ELEV = 989.73 L = 101.6 K = 30.00 VERTICAL CURVE: PVI ELEV = 983.71 L = 101.4 K = 15.00 VERTICAL CURVE: PVI ELEV = 991.25 L = 50 K = 24.19 VERTICAL CURVE: PVI ELEV = 989.78 L =50 K = 32.08 977 977 BASIN 4 100 YR HWL = 977.13NWL = 973.25 BOT = 966.25 29676 GRADING - GLANSHAW DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY DW G L O C A T I O N : S : \ P R O J E C T S \ 2 9 0 0 0 P R O J \ 2 9 6 0 0 - 2 9 6 9 9 \ 2 9 6 7 6 L A K E V I L L E R E T A I L D E V E L O P M E N T - L A K E V I L L E M N \ 2 9 6 7 6 P R O D U C T I O N F I L E S \ 2 9 6 7 6 C I V I L 3 D \ P R O D U C T I O N D W G S \ P R E L I M P L A T \ 2 9 6 7 6 G R A D I N G - G L A N S H A W . D W G S A V E D B Y : D A Y T O N . G O N Y E A SHEET NOT VALID UNLESS THIS TEXT IS COLOR. C4-11 - 01/28/25 23-29676 C4-11 GRADING PLAN - GLANSHAW ---- ---- C4-11 LAKEVILLE MINNESOTA 0 SCALE IN FEET 50 100 BDT/DWG/LMM BDT/DWG/LMM/MC MC, JF MARKETPLACEAT CEDAR PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N PL O T D A T E : 1/ 2 8 / 2 0 2 5 1 0 : 3 2 A M C4-11 GRADING PLAN - GLANSHAW GRADING LEGEND EXISTING CONTOUR (MINOR INTERVAL) EXISTING CONTOUR (MAJOR INTERVAL) PROPOSED CONTOUR (MINOR INTERVAL) PROPOSED CONTOUR (MAJOR INTERVAL) GENERAL GRADING NOTES PROPOSED CONTOURS SHOW FINISHED GRADE ELEVATIONS. BUILDING PAD AND PAVEMENT HOLD DOWNS ARE NOT INCLUDED. WHEN CONSTRUCTING BUILDING PADS WITH A HOLD DOWN, GRADE AREAS TO ENSURE POSITIVE BUILDING PAD DRAINAGE. 101 100 101 100 EOF977.00 EOF977.25 BASIN 3 100 YR HWL = 976.74 NWL = 974.50 BOT = 965.00 EX GGV G R=1012.66 EX MH R=1013.21 EX MH G GM G G G G FO G G G FO FO FO G G G U U U FO FO FO V OH L OH L OH L OH L OH L OH L V OHL OHL OHL UE UE UE UEGG G >> >> Gas Pump UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G G G G G G G G G G G G G UE UE UE UE UE UE UE G UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE U EX GGV R=1014.80 EX MH R=1014.46 EX MH >>>> >>>>>>>>>>>>>>>>> >>>> >> >> >> >> >> >> >> >> UE UE UE Ele c t r i c E a s e m e n t p e r D o c u m e n t N o . 1 6 6 6 6 4 0 >> I I I I I I I I I I I I I I I I I I I I I I I I I I I >>>>>>>>>>>> >>>> I 1/2" Iron RLS 57366 1/2" Iron RLS 57366 1/2" Iron RLS 44110 1/2" Iron RLS 44110 1000 1005 1010 996997998999100110021003100410061007100810091011 101 2 1013 1005 990 995 1000 10 0 5 986 987 988 989 991 992 993 994 996997998999100 1 100 2 10 0 3 10 0 4 10 0 6 990 99 5 1000 10 0 5 98999199 2 99 3 99 4996997 998 999 1001 10 0 2 100 3 10 0 4 10 0 6 995 991992993994996997998 1000 999 1001 1002 1003 1004 985 99 0 995 983 984 986 98 7 98 8 98 9 99 1 992 993 994 996 997 998 999 1010 1006 1007 1008 1009 1011 1012 1013 179th STREET W. GL A C I E R W A Y CE D A R A V E I 995 1000 992 993 994 996 997 998 999 1001 1002 1003 1004 990 995 985 98 0 EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB EX-SB 99 5 100 0 99 2 99399 4 99 6997998999100 1 100 2 100 3 9 35 36 95 9 PYLON SIGN 17 X X X X X X X X X X X X XXX XXX X X XX 7 5 3 12 12 37 GROCER20,660 SFFFE = 1002.00 CHILD CARE11,700 SFFFE = 998.50 GL A N S H A W A V E GLANSHAW AVE OIL1,870 SFFFE = 1000.00 8 7 OUTLOT A OUTLOT B 9 1 65 432 MEDICAL/OFFICE/RETAIL 7,280 SFFFE = 997.0047 T CAR WASH5,400 SFFFE = 998.00 23 31 12 3234 42 28 11 6 10 7 BANK3,890 SFFFE = 1006.50 QSR3,000 SFFFE = 1001.50 9 20 13 X XX X X PATIO MULTI-TENANT5,870 SFFFE = 1004.50 15 BASIN 2 TOP = 990.00 HWL = 989.18 BOT = 986.00 BASIN 1 TOP = 994.00HWL = 993.47 BOT = 990.00 QSR2,450 SFFFE = 1001.00 995 994 996 997 995 1000 996 997 998 999 1000 1001 1002 1003 99 8 99 6 996 10 0 0 99 7 99 8 99 9 10 0 1 DECIDUOUS TREE 3 ORNAMENTAL TREE 7 EVERGREEN TREE 7 DECIDUOUS SHRUB 12 CONCEPT PLANT SCHEDULE MARKETPLACEAT CEDAR PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N PL O T D A T E : 1/ 2 8 / 2 0 2 5 1 0 : 3 3 A M 29676 LAND DATE REVISION SCHEDULE DESCRIPTION BY SHEET TITLE PROJECT WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY DW G L O C A T I O N : S : \ P R O J E C T S \ 2 9 0 0 0 P R O J \ 2 9 6 0 0 - 2 9 6 9 9 \ 2 9 6 7 6 L A K E V I L L E R E T A I L D E V E L O P M E N T - L A K E V I L L E M N \ 2 9 6 7 6 P R O D U C T I O N F I L E S \ 2 9 6 7 6 C I V I L 3 D \ P R O D U C T I O N D W G S \ P R E L I M P L A T \ 2 9 6 7 6 L A N D . D W G S A V E D B Y : D A Y T O N . G O N Y E A SHEET NOT VALID UNLESS THIS TEXT IS COLOR. C5-10 - 01/28/25 23-29676 C5-10 PLANTING PLAN ---- ---- C5-10 LAKEVILLE MINNESOTA PLANTING PLAN 0 SCALE IN FEET 60 120 BDT/DWG/LMM BDT/DWG/LMM/MC MC, JF ZONING LANDSCAPE REQUIREMENTS 11-21-9: REQUIRED SCREENING AND LANDSCAPING: ZONING: M-2 SCREENING: WHERE ANY COMMERCIAL, INDUSTRIAL OR INSTITUTIONAL USE, EXCEPT THOSE WITHIN THE C-CBD OR I-CBD DISTRICTS, ABUTS A RESIDENTIAL DISTRICT, THAT USE SHALL PROVIDE SCREENING ALONG THE PROPERTY LINE ABUTTING ANY PROPERTY IN THE RESIDENTIAL DISTRICT. SCREENING SHALL ALSO BE PROVIDED ON THE SIDE OF A COMMERCIAL, INDUSTRIAL OR INSTITUTIONAL USE ACROSS THE STREET FROM A RESIDENTIAL DISTRICT. ALL THE SCREENING SPECIFICALLY REQUIRED BY THIS TITLE SHALL BE SUBJECT TO SECTION 11-16-15 OF THIS TITLE RELATED TO TRAFFIC VISIBILITY AND SHALL CONSIST OF A GREENBELT STRIP AS PROVIDED FOR BELOW. A GREENBELT PLANTING STRIP SHALL CONSIST OF EVERGREEN TREES AND/OR DECIDUOUS TREES AND SHRUBS AND SHALL BE A MINIMUM OF TWENTY FEET (20') IN WIDTH AND OF A SUFFICIENT DENSITY TO PROVIDE A SUBSTANTIALLY CONTINUOUS VISUAL SCREEN AT MATURITY OF THE INSTALLED PLANTINGS. THIS PLANTING STRIP SHALL BE DESIGNED TO PROVIDE CONTINUOUS VISUAL SCREENING TO A MINIMUM HEIGHT OF EIGHT FEET (8'). THE GRADE FOR DETERMINING HEIGHT SHALL BE THE GRADE ELEVATION OF THE BUILDING, PARKING LOT OR USE FOR WHICH THE SCREENING IS PROVIDING PROTECTION, UNLESS OTHERWISE ESTABLISHED BY THE ZONING ADMINISTRATOR. THE PLANTING PLAN AND TYPE OF PLANTINGS SHALL REQUIRE THE APPROVAL OF THE ZONING ADMINISTRATOR. DECIDUOUS TREE EVERGREEN TREE DECIDUOUS SHRUB ORNAMENTAL TREE ELEVATION ALONG GLACIER WAY VIEWING WEST NTS EXHIBIT I Dakota County Surveyor’s Office Western Service Center  14955 Galaxie Avenue  Apple Valley, MN 55124 952.891 -7087  Fax 952.891 -7127  www.co.dakota.mn.us November 7, 2024 City of Lakeville 20195 Holyoke Ave. Lakeville, MN 55044 Re: MARKETPLACE AT CEDAR The Dakota County Plat Commission met on November 6, 2024, to consider the preliminary plat of the above referenced plat. The plat is adjacent to CSAH 23 (Cedar Ave.) / CSAH 9 (179th St. W.) and is therefore subject to the Dakota County Contiguous Plat Ordinance. The proposed plat includes retail development on the north portion of the Devney property with two future outlots on the south portion of the property. The future outlots are planned for potential apartments on the remaining Devney property. The right-of-way needs along CSAH 23 are 100 feet of half right of way, which is shown on the plat. The right-of-way needs along CSAH 9 (179th Street) are 75 feet of half right of way, which is shown on the plat. There is one access shown on CSAH 9 (179th Street) between Glacier Way and CSAH 23 as a right-in only access. The location of the access opening will be determined after review of a traffic study. A right turn lane will be required through the permitting process for the right-turn only access. As noted, the Plat Commission is requiring a traffic study of t he site area for review by the Transportation Department to understand impacts to the 179th Street/Glacier Way intersection, proper location of the right turn only access, and turn lane queuing. The Plat Commission has approved the preliminary plat provided that the described conditions are met. The Ordinance requires submittal of a final plat for review by the Plat Commission before a recommendation is made to the County Board of Commissioners. Traffic volumes on CSAH 23 are 21,800 ADT and are anticipated to be 39,00 ADT by the year 2040. Traffic volumes on CSAH 9 are yet to be determined. No work shall commence in the County right of way until a permit is obtained from the County Transportation Department and no permit will be issued until the plat has been filed with the County Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat Commission highly recommends early contact with the Transportation Department to discuss the permitting process which reviews the design and may require construction of highway improvements, including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact TJ Bentley regarding permitting questions at (952) 891-7115 or Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891-7070. Sincerely, Todd B. Tollefson Secretary, Plat Commission c: Jay Moore, Oppidan Investment and Mitchell Cookas , ISG Inc. EXHIBIT J 1 CITY OF LAKEVILLE On 6 March 2025, the Lakeville Planning Commission met at its regularly scheduled meeting to consider the application of Oppidan Investment Company for a conditional use permit to allow platting of a lot without frontage to a public street. The Planning Commission conducted a public hearing regarding the application preceded by published and mailed notice. The applicant was present and the Planning Commission heard testimony from all interested persons wishing to speak. 1. The 2040 Lakeville Comprehensive Plan guides the property for Corridor Mixed Use. 2. The property is zoned M-2, Mixed Use Cedar Corridor District. 3. The legal description of the property is: That part of the South Half of the Southwest Quarter of Section 10, Township 114 North, Range 20 West of the 5th Principal Meridian, lying Southerly of 179th Street West; EXCEPT the portion thereof included in the plat of Crossroads 1st Addition recorded as Document No. 2069087 in the office of the County Recorder; ALSO EXCEPT the portion thereof included in the plat of Cordelia recorded as Document No. 3501970 in the office of the County Recorder, all in Dakota County, Minnesota. 4. Section 11-16-5.G of the Zoning Ordinance requires that each lot shall have frontage to an abutting, improved, and city accepted public street in compliance with the minimum lot width requirements of the respective zoning district, except as may be allowed by approval of a conditional use permit; the applicant is requesting approval of a Conditional Use Permit to allow Lot 8, Block 1 of the proposed Marketplace at Cedar to be platted without frontage to a public street. 5. Section 11-4-3.E of the Zoning Ordinance provides that the Planning Commission shall consider possible effects of the proposed amendment. Its judgment shall be based upon, but not limited to, the following factors: 2 a. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Finding: The 2040 Lakeville Comprehensive Plan guides the subject property for Corridor Mixed Use development. Areas guided for Corridor Mixed Use are to have a compact development form, oriented towards the streetscape and providing for non-vehicular access and circulation. The commercial lots within the preliminary plat are clustered in the north portion of the subject property utilizing shared access to adjacent public streets for maximum utilization of the area. Integration of vehicle and pedestrian access for the commercial lots illustrated on the site plan is consistent with the development pattern envisioned by the Comprehensive Plan for Corridor Mixed Uses. . b. The proposed use is or will be compatible with present and future land uses of the area. Finding: The table below summarizes land uses surrounding the subject property. The proposed subdivision of nine lots for commercial uses and outlots for future high density residential development will be compatible with existing and planned land use in the area of the subject property. Direction Land Use Plan Zoning Map Existing Use North Commercial HDR PUD District Crossroads of Lakeville Crossroads Senior Housing East MDR RM-3 District Row townhouses South Public/Quasi Public HDR POS District PUD District Metro Transit Park/Ride Edison at Avonlea West Public/Quasi Public POS District Central Maintenance Facility c. The proposed use conforms to all performance standards contained in the Zoning Ordinance and the City Code. Finding: The proposed development complies with the requirements of the Zoning Ordinance including performance standards specific to the lot without frontage to a public street. d. The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. Finding: The property is within the Municipal Urban Service Area and the proposed use can be accommodated within the City’s existing public service capacity. e. Traffic generated by the proposed use is within capabilities of streets serving the property. 3 Finding: The property is to be accessed using 179th Street (CSAH 9) and Glanshaw Avenue. The existing streets serving the property have adequate capacity to accommodate traffic generated by the proposed development. 5. The report dated 25 February 2025 prepared by The Planning Company LLC (TPC) is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve a Conditional Use Permit allowing for platting of a lot without frontage to a public street based upon the foregoing information, findings, and conditioned upon compliance with the planning report prepared by TPC dated 25 February 2025. DATED: March 6, 2025 LAKEVILLE PLANNING COMMISSION BY: __________________________ Jenna Majorowicz, Chair