HomeMy WebLinkAboutItem 05a- Spirit of Brandtjen Farm 25th Addition3601 Thurston Avenue Anoka, MN 55303 763.231.5840 TPC@PlanningCo.com 1 PLANNING REPORT TO: Community Development Director Tina Goodroad Planning Manager Kris Jenson FROM: D. Daniel Licht DATE: 13 March 2025 RE: Lakeville – Spirit of Brandtjen Farm; 25th Addition TPC FILE: 135.01 ACKGROUND Tradition Development (d/b/a SBF Development Corporation) has submitted plans to develop seven detached townhomes along the west side of Draft Horse Boulevard and north of 170th Street within the Farmstead Preservation Area of Spirit of Brandtjen Farm. The subject property includes Lot 2, Block 1, Spirit of Brandtjen Farm Office Addition that is developed with the Tradition Development real estate office and Outlot B, Spirit of Brandtjen Farm, which encompasses the original outdoor horse ring. The proposed development requires consideration of applications for a PUD Ordinance amendment, PUD Development Stage Plan, Preliminary Plat, and vacation of drainage and utility easements. A public hearing to consider the application was been noticed for the Planning Commission meeting on 6 March 2025. The public hearing was tabled to the Planning Commission on 20 March 2025 to allow the developer to host a neighborhood meeting on 11 March 2025. Exhibits: A. Site Location Map B. SBF Master Land Use Plan (SBF Booklet p. 3.4) C. SBF Sample Master Site Plan (SBF Booklet p 3.5) D. SBF Farmstead Preservation Area Concept Plan (SBF Booklet p. 8.3) E. Existing Conditions F. Site Plan G. Demolition Plan H. Preliminary Plat I. Erosion and Sediment Control Plan J. Grading and Drainage Plan K. Landscape Plans (2 pages) Dakota County, Maxar, Microsoft 170TH ST ± DRAFT HORSE BLVD 169TH ST Proposed 25th Add. plat area City of Lakeville Spirit of Brandtjen Farm 25th Add. Pre Plat Site Location Map EXHIBIT A DRAPER WAY DYNAMIC DR EXHIBIT B EXHIBIT C EXHIBIT D Know what's below.before you dig.Call R EXHIBIT E EEXHIBIT F REMOVE & RELOCATE UTILITY BOX REMOVE PIPE AND CAP WATER SERVICE AT MAIN REMOVE / SALVAGE 23,777 SF OF EX CL 5 GRAVEL REMOVE EX HYDRANT, GV AND 17 LF PIPE REMOVE 707 LF OF EX DECORATION FENCE EXISTING FIBER OPTIC PER OWNER (VERIFY LOCATION AND ELEVATION PRIOR DEMOLITION) REMOVE / ADJUST EX LANDSCAPE AS NEEDED REMOVE 23 LF PIPE AND PLUG SANITARY PIPE REMOVE 72 LF CURB AND GUTTER REMOVE 195 SF SIDEWALK REMOVE 624 SF PAVEMENT AND 44 LF CURB & GUTTER REMOVE & RELOCATE LIGHT POLE. EX TREE TO BE RELOCATED (SEE LANDSCAPE PLAN REMOVE 372 SF PAVEMENT Know what's below.before you dig.Call R EXHIBIT G Lot 1, Block 21, SPIRIT OF BRANDTJEN FARM, Dakota County, Minnesota. and Lot 2, Block 1, SPIRIT OF BRANDTJEN FARM OFFICE ADDITION, Dakota County, Minnesota. PROPERTY DESCRIPTION 29 9 9 W E S T C . R . 4 2 , S U I T E 1 0 0 , B U R N S V I L L E , M N 5 5 3 0 6 PH O N E : 9 5 2 . 8 9 0 . 6 0 4 4 w w w . j r h i n c . c o m PL A N N E R S / E N G I N E E R S / S U R V E Y O R S SP I R I T O F B R A N D T J E N F A R M 2 5 T H A D D I T I O N LA K E V I L L E , M I N N E S O T A PR E L I M I N A R Y P L A T FO R SB F D E V E L O P M E N T C O R P O R A T I O N 16 9 7 2 B R A N D T J E N F A R M D R I V E , L A K E V I L L E , M N 5 5 0 4 4 DRAWN BY DATE REVISIONS PLM 11/22/2024 CAD FILE 20662-66pp.dwg PROJECT NO. 20662-66 C2.0 Ja m e s R . H i l l , I n c . EXHIBIT H  SB-1  EXHIBIT I SB-1 EXHIBIT J EXHIBIT K 2 ANALYSIS Tradition Development received City Council approval of a PUD, Planned Unit Development District on 30 June 2005 for development of 548 acres as the Spirit of Brandtjen Farm. The approval of the PUD District established zoning entitlements for a mix of commercial businesses; residential dwellings including single family, detached townhomes, two-family, townhouse, and multiple family dwellings; and public and private open spaces that Tradition Development has proceeded with constructing over the last 20 years. The PUD District approval was the outcome of a more than two year planning process led by Tradition Development to work with the Planning Commission to create development standards unique to Spirit of Brandtjen Farm. These standards outlined in the SBF PUD Booklet dated 30 June 2005 adopted concurrent with the rezoning amendment, including the allowed mix of uses within the development, lot requirements and setbacks, design standards for streets and private drives, pedestrian accessibility, and preservation of open space that is to be either public or publicly accessible and privately maintained. The planning process also involved extensive study of the proposed development related to potential for environmental impacts, as well as transportation studies and utility planning to ensure that adequate infrastructure would be in-place at full-build out. Each addition to Spirit of Brandtjen Farm is implemented through consistency with the PUD District set forth by the ordinance adopted by the City Council and the SBF PUD Booklet. The PUD District ordinance and SBF PUD Booklet provide direction to the developer, public, and City officials as to consideration of development within Spirit of Brandtjen Farm. Several key principles are integral to the PUD District and SBF PUD Booklet: ▪Spirit of Brandtjen Farm is to include a mix of commercial, residential dwellings, private recreation amenities, and public or publicly accessible open space. ▪The development is allowed to include up to 2,109 dwelling units. ▪The developer is given the flexibility to transfer density within the planned residential areas of Spirit of Brandtjen Farm up to the limit of 2,1019 dwelling units. ▪Because of the timeframe involved in developing the area included in the PUD District, the developer Is to be given flexibility through amendments to the PUD District or through PUD Development Stage Plan approvals to address changes in market preferences and trends. The SBF Master Land Use Plan (Page 3.4 of the SBF PUD Booklet) designates the subject property a Farmstead Preservation Area. The Farmstead Preservation Area was a focus in the planning for Spirit of Brandtjen Farm to reflect the history of the property and provide character for the overall development that was to occur under the provisions of the PUD District. Section 8 of the SBF PUD Booklet documents the history of the Brandtjen Farm and provides guidance for planned restoration of the remaining buildings within designated Farmstead Preservation Area and additional development to be allowed to occur within the area. The central element of the Farmstead Preservation Area is the dairy barn that has been converted to a private neighborhood recreation building and outdoor pool. The Brandtjen residence demolished as the structure was not suitable for reuse, but was reconstructed for commercial uses with exterior design 3 almost exactly matching with that of the original structure. The horse barn is the third remaining element of the original Brandtjen farmstead that was repurposed for office uses and expanded to the east in 2018 that is currently occupied as a real estate office. Zoning. The subject property is zoned PUD, Planned Unit Development District. The PUD District ordinance specifies that the allowed uses within the Farmstead Preservation Area as those use allowed within the O-R, Office Residential District, and: 4 Building Plans. The developer intends that the detached townhouses will be of the same or similar design as the buildings constructed within Spirit of Brandtjen Farm 21st to 23rd Additions located east of Eagleview Drive and 162nd Street for Planning Commission consideration with the submitted plans. The representative structures are characteristic of the high quality single family architecture within Spirit of Brandtjen and in harmony with the single family dwellings to the east and other structures within the Farmstead Preservation Area. Lot Area. Development of detached townhomes within Spirit of Brandtjen Farm is to provide a minimum of 5,000 square feet of lot area per dwelling unit in accordance with the requirements of the RST-2, Single and Two Family District. The area of the seven unit lots and one base lot for the detached townhomes is 0.912 acres (39,726.72 square feet) or 5,675.24 square feet for each dwelling unit. The area to be developed for the proposed detached townhouses complies with the minimum lot area requirements of the SBF PUD Booklet. Setbacks. The table below indicates the required setbacks for the proposed detached townhouse buildings as established by the table on page 7.1 of the SBF PUD Booklet: th Street nd Street was approved for Spirit of Brandtjen Farms 21st through 23rd Additions. The reduced setback provides a more building forward streetscape and reflects the side yard being indented the primary open space for each dwelling within the site plan. The proposed 15 foot setback to Draft Horse Boulevard is acceptable within the intent of the site plan and architecture of the proposed detached townhouses. th Addition appropriate. Access. The subject property abuts 170th Street and Draft Horse Boulevard. The preliminary plat does not include dedication of right-of-way or construction of new streets. Access to the proposed detached townhouse dwellings is to be provided for with construction of private drives and off-street parking areas 5 within Outlot A and B of the preliminary plat. These private drives and off-street parking areas will also serve the horse barn and real estate office buildings. Public Street. The only modification to public streets is construction of a parking lane for two vehicles on the west side of Draft Horse Boulevard. Plans for construction of the parking lane is to be subject to review and approval of the City Engineer. City staff recommends that a 20 minute parking zone be established for the two spaces to limit use to deliveries and drop offs. Section 6-1-1-1 of the City Code provides for establishment of parking zones by City Council resolution. A resolution establishing the proposed parking zone will be considered concurrently with an application for final plat. Private Drive/Off-Street Parking. The private drive accessing the proposed detached townhouse dwellings is encompassed within Outlot A and connected to the existing private drive to the north of the subject property at an existing stub. The proposed private drive is to be 24 feet in width to allow for two way traffic with an additional eight feet to the west side to allow for parking spaces with concrete curb and gutter. The seven off-street parking spaces along the private drive satisfy the guest parking requirements for the proposed detached townhouses. Sidewalks/Trails. There is an existing five-foot wide sidewalk abutting the subject site Brandtjen Farm Drive and Draft Horse Boulevard and a 10-foot wide trail along 170th Street. There is also a five-foot wide sidewalk along the north line of the subject property adjacent to the off-street parking area and private drive to the north. The site plan includes construction of a five-foot wide concrete sidewalk between Lots 4 and 5, Block 1 connecting Draft Horse Boulevard and the private drive within Outlot A and a sidewalk between the private drive within Outlot A to the sidewalk east of the riding arena building connected to the off-street parking area within Outlot B. These sidewalks must be overlaid by easement to allow public access as part of the overall pedestrian system within Spirit of Brandtjen Farm. Landscaping. A landscape plan has been submitted for the proposed development. There are existing trees in the median of Draft Horse Boulevard and the east boulevard of the street adjacent to the single family homes to the east. The landscape plan provides for planting of additional street trees in the west boulevard of Draft Horse Boulevard and a landscape buffer yards abutting 170th Street consistent with 6 previous phases of SBF. There is also a row of shade trees along the west side of the private drive separating the real estate office and proposed detached townhomes. The landscape plan is to be subject to review and approval of the City Forester. Easements. Existing drainage and utility easements dedicated over the subject property with the Spirit of Brandtjen Farm or Spirit of Brandtjen Farm Office Addition final plats are to be vacated with the current subdivision application as they will no longer serve a public purpose upon approval of a final plat for the proposed development. The City Council will hold a public hearing to consider vacation of the existing drainage and utility easements concurrent with review of the proposed development. Park Dedication. Land within Spirit of Brandtjen Farm to be acquired by the City as public parks or open space or retained by the Spirit of Brandtjen Farm as either private or publicly accessible, privately maintained open space is designated on the SBF Master Land Use Plan. The SBF PUD Booklet does not identify acquisition of public open space or development of additional private or publicly accessible, privately maintained open space within the Farmstead Preservation Area. As such, the preliminary plat does not include dedication of land to the City for public parks. Park dedication requirements are to be satisfied at the time of final plat approval by payment of the specific cash fee in lieu of land established by the provisions of the SBF Master PUD Agreement. Storm Water Management. The submitted plans include grading, drainage, and erosion control plans. All grading plans are subject to review and approval by the City Engineer. Utilities. The subject site is included within the current MUSA. Plans have been submitted for connection of sanitary sewer and water utilities to serve the proposed detached townhouses. All utility plans are subject to review and approval of the City Engineer. Outlots. The preliminary plat includes two outlots encompassing the proposed private drive and off-street parking area with the proposed ownership of each outlot identified below. Ingress and egress easements will be required to be established over the outlots to allow for access and circulation. th Add. sub-HOA Homeowners Association. Documents including Spirit of Brandtjen Farm 25th Addition as part of the Spirit of Brandtjen Farm Master Homeowners Association are required. A separate homeowners association must also be established for ownership and maintenance of Lots 1-8, Block 1 and Outlot A within the 7 preliminary plat. All homeowners association documents are subject to review and approval by the City Attorney and must be recorded prior to the issuance of building permits. Development Contract. The Subdivision Ordinance requires the developer to provide construction and warranty securities for the public improvements within the final plat that are to be outlined within a development contract. The development contract will also memorialize the PUD Development Stage Plan approvals. The development contract will be drafted by the City Attorney and is to be executed by the applicant prior to City Council consideration of the final plat. Neighborhood Meeting. The developer hosted a neighborhood meeting on 11 March 2025 at the Spirit of Brandtjen Farm barn to provide information and answer questions about the proposed development. There were approximately 40 residents of Spirit of Brandtjen Farm present along with Tradition Development and City representatives. Residents’ questions included how the proposed dwellings would be incorporated into the SBF Master Association; traffic and access; site design, architecture and setbacks; and the start, duration, and construction hours. Tradition Development addressed questions as to why they are proposing townhomes versus additional recreation amenities or open space, noting that what is proposed is much less intensive than what can be allowed under the PUD District and SBF PUD Booklet. City staff addressed the history of planning for Spirit of Brandtjen Farm, including responding to questions about traffic impacts from the proposed development to Draft Horse Boulevard. RECOMMENDATION th Addition is consistent with the PUD District, SBF Master Land Use Plan, and Farmstead Preservation Area guidelines. The proposed preliminary plat also complies with the Subdivision Ordinance. Our office and City staff recommend approval of the requested applications, subject to the following stipulations: th Street 8 4. A parking zone limiting of the parking spaces on Draft Horse Boulevard to 20 minutes shall be established by City Council resolution at the time of final plat approval. th Addition sub-homeowners association for ownership and maintenance. th Addition including the plat within the SBF Master Association and establishing a sub-association for ownership and maintenance of Lot 8, Block 1 and Outlot A shall be subject to review and approval by the City Attorney and must be recorded prior to the issuance of building permits. City of Lakeville Memorandum To:Kris Jenson, Planning Manager From:Jon Nelson, Assistant City Engineer McKenzie L. Cafferty, Environmental Resources Manager Joe Masiarchin, Parks and Recreation Director Copy:Zach Johnson, City Engineer Julie Stahl, Finance Director Dave Mathews, Building Official Tina Goodroad, Community Development Director Date:March 13, 2025 Subject:Spirit of Brandtjen Farm 25th Addition •Preliminary Plat Review •Preliminary Grading and Erosion Control Plan Review •Preliminary Tree Preservation Review •Preliminary Utility Plan Review BACKGROUNDBACKGROUND Tradition Development has submitted a preliminary plat application for a development to be known as Spirit of Brandtjen Farm 25th Addition. The proposed subdivision is located north of and adjacent to 170th Street, west of and adjacent to Draft Horse Boulevard, south of, east of and adjacent to Brandtjen Drive. The parent parcel consists of two platted lots (PID No. 227130021010 and 227136001020) zoned PUD, Planned Unit Development District. The preliminary plat consists of seven (7) townhome lots, one (1) common area lot, one (1) office space lot, and two (2) outlots on 2.44 acres. The outlots created with the preliminary plat shall have the following use: Outlot A: Private Driveway; to be retained by the developer (0.27 acres) Outlot B: Parking Lot; to be retained by the developer (0.94 acres) The proposed development will be completed by: Developer: Tradition Development Engineer/Surveyor: James R. Hill, Inc. SSPIRITPIRIT OFOF BBRANDTJENRANDTJEN FFARMARM 2525THTH AADDITIONDDITION PPRELIMINARYRELIMINARY PPLATLAT MMARCHARCH 13,13, 20252025 PPAGEAGE 22 OFOF 55 SITESITE CONDITIONSCONDITIONS The Spirit of Brandtjen Farm 25th Addition site consists of an existing office building, gravel parking lot, and community garden constructed as part of the Planned Urban Development of Spirit of Brandtjen Farm Addition and Spirit of Brandtjen Farm Office Addition. The south end of the site generally drains north to south and the north end of the site generally drains south to north. There is a property access on the west end and north end of the site. EASEMENTSEASEMENTS The existing drainage and utility easements on the parent parcels will be vacated in conjunction with the preliminary plat and reestablished with the final plat. Prior to recording of the final plat: •Outlot A and Outlot B shall be removed and shown as lots and blocks. STREETSTREET ANDAND SUBDIVISIONSUBDIVISION LAYOUTLAYOUT Private Drives Development of Spirit of Brandtjen Farm 25th Addition includes the construction of a privately owned and maintained roadway providing access to townhome lots. The Developer is dedicating a drainage and utility easement over the private roadway. The City shall not be responsible for any repairs (including cost) to the private roadway due to maintenance within the easement area. CONSTRUCTIONCONSTRUCTION ACCESSACCESS Construction traffic access and egress for grading, utility and street construction will be from Brandtjen Farm Drive. PARKS,PARKS, TRAILS,TRAILS, ANDAND SIDEWALKSSIDEWALKS The Park Dedication requirement has been collected on the parent parcels with the final plat of Spirit of Brandtjen Farm 1st Addition. UTILITIESUTILITIES SSANITARYANITARY SSEWEREWER Spirit of Brandtjen Farm 25th Addition is located within subdistricts NC-20070 of the North Creek sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed through sanitary sewer to the northern trunk monitored by meter M643A and continue to the Empire plant. SSPIRITPIRIT OFOF BBRANDTJENRANDTJEN FFARMARM 2525THTH AADDITIONDDITION PPRELIMINARYRELIMINARY PPLATLAT MMARCHARCH 13,13, 20252025 PPAGEAGE 33 OFOF 55 Spirit of Brandtjen Farm 25th Addition includes the extension of privately owned and maintained sanitary sewer. 8-inch sanitary sewer will be constructed within the development and connect to the existing sanitary sewer stub at Draft Horse Boulevard. st Addition. WWATERMAINATERMAIN th Addition includes the construction of privately owned and maintained watermain. 8-inch watermain will be constructed within the development and connect to the existing watermain stub at Brandtjen Farm Drive. DRAINAGEDRAINAGE ANDAND GRADINGGRADING th Addition is located within subdistrict NCL 80a-11P of the North Creek stormwater district, as identified in the City’s Water Resources Management Plan. th Addition utilizes an existing stormwater management basin network constructed with previous additions of Spirit of Brandtjen Farm to collect and treat the stormwater runoff generated from the site. The stormwater management design is consistent with City ordinance requirements. th Addition contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. STORMSTORM SEWERSEWER th Addition includes the construction of privately owned and maintained storm sewer systems. Private storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the private lots to the stormwater management basin system located within previous Spirit of Brandtjen Farm Additions. SSPIRITPIRIT OFOF BBRANDTJENRANDTJEN FFARMARM 2525THTH AADDITIONDDITION PPRELIMINARYRELIMINARY PPLATLAT MMARCHARCH 13,13, 20252025 PPAGEAGE 44 OFOF 55 Draintile construction is required in areas of non-granular soils within Spirit of Brandtjen Farm 25th Addition for the street sub-cuts and lots. Any additional draintile construction, including perimeter draintile required for building footings, which is deemed necessary during construction shall be the developer’s responsibility to install and finance. st Addition. FEMA FLOODPLAIN ANALYSIS WETLANDSWETLANDS th Addition preliminary plat. TREETREE PRESERVATIONPRESERVATION th Addition. The trees shall be identified in accordance with City Ordinance tree preservation requirement prior to recording of the final plat. EROSIONEROSION CONTROLCONTROL SSPIRITPIRIT OFOF BBRANDTJENRANDTJEN FFARMARM 2525THTH AADDITIONDDITION PPRELIMINARYRELIMINARY PPLATLAT MMARCHARCH 13,13, 20252025 PPAGEAGE 55 OFOF 55 RECOMMENDATIONRECOMMENDATION Engineering recommends approval of the preliminary plat, grading and erosion control plan, tree preservation, and utility plan for Spirit of Brandtjen Farm 25th Addition, subject to the requirements and stipulations within this report.