HomeMy WebLinkAbout25-055 Resolution Approving the Preliminary Plat of Spirit of Bradtjen Farm 25th Addition CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 25-oS�
RESOLUTION APPROVING THE PRELIMINARY PLAT
OF SPIRIT OF BRANDTJEN FARM 25TH ADDITION
WHEREAS, Tradition Development has requested approval of the preliminary plat of
seven townhome lots to be known as SPIRIT OF BRANDTJEN FARM 25TH ADDITION;legally
described as:
Lot 2,Block 1,Spirit of Brandtjen Farm Office Addition;and
Lot 1,Block 21, Spirit of Brandtjen Farm
WHEREAS, the Planning Commission held a public hearing on the application at its
March 20,2025 meeting,preceded by published and mailed notice as required by the Subdivision
Ordinance;and
WHEREAS, the Planning Commission recommended approval of the preliminary plat;
and
WHEREAS, the preliminary plat meets Subdivision Ordinance requirements and is
acceptable to the City;
NOW THEREFORE BE IT RESOLVED by the Lakeville City Council:
The SPIRIT OF BRANDTjEN FARM 25TH ADDITION preliminary plat is hereby approved
subject to the following conditions:
1. The site plan and preliminary plat shall comply with the following setback requirements:
Detached Townhomes
170`''Street 50ft.
Draft Horse Building 15ft.
Boulevard
Garage Door NA
Side-Corner Building 15ft.
Rear Building NA
Garage Door 25ft.
Between Buildings 15ft.
Lot l,Block 2 None
Off-Street Parking
Public Right-of-Way 15ft.
1
2. Construction plans for a parking lane on Draft Horse Boulevard shall be subject to review
of the City Engineer.
3. All private drive and off-street parking section designs and construction plans shall be
subject to review and approval of the City Engineer.
4. A parking zone limiting of the parking spaces on Draft Horse Boulevard to 20 minutes shall
be established by City Council resolution at the time of final plat approval.
5. Public access easements shall be dedicated over the sidewalks within Lot 8,Block 1,Outlot
A,and Outlot B.
6. The landscape plan shall be to be subject to review and approval of the City Forester.
8. The preliminary plat shall be revised to provide for dedication of drainage and utility
easements at the perimeter of Lot 1,Block 2;all drainage and utility easements are subject to review
and approval of the City Engineer.
9. All grading,drainage,and erosion control plans shall be subject to review and approval by
the City Engineer.
10. All utility plans are subject to review and approval by the City Engineer.
11. Outlot A shall be deeded to the Spirit of Brandtjen Farm 25�'' Addition sub-homeowner's
association for ownership and maintenance.
12. Park dedication requirements shall be satisfied as a cash fee in lieu of land as provided for
by the SBF Master Development Agreement at the time of final plat approval, if required.
13. Homeowners Association documents for Spirit of Brandtjen Farm 25`''Addition including
the plat within the SBF Master Association and establishing a sub-association for ownership and
maintenance of Lot 8, Block 1 and Outlot A shall be subject to review and approval by the City
Attorney and must be recorded prior to the issuance of building permits.
14. The developer shall execute a development contract with the City as drafted by City
Attorney and subject to approval of the City Council concurrent with final plat approval.
ADOPTED by the Lakeville City Council this 7�''day of April,2025.
CITY OF LAKEVILLE
.��� �
By.
Luke M. Hellier,Mayor
ATTEST:
Ann Orlofsky,City Clerk
2