Loading...
HomeMy WebLinkAboutItem 07a - Heritage Commons 9th Addition City of Lakeville Community Development Dept Memorandum To: Planning Commission From: Kris Jenson, Planning Manager Date: April 25, 2025 Subject: Packet Material for the May 8, 2025 Planning Commission Meeting Agenda Item: Heritage Commons 9th Addition 1. Preliminary and Final plat of two commercial lots to be known as Heritage Commons 9th Addition 2. Vacation of drainage and utility easement Vacation Application Action Deadline: June 19, 2025 BACKGROUND Representatives of The Architects Partnership have submitted applications for a preliminary and final plat to be known as Heritage Commons 9th Addition for two commercials lots and the vacation of public drainage and utility easements for the development of a Chase Bank. The plat is 2.65 acres in area. Chase Bank will be located on Lot 1 (1.36 acres) and Lot 2 (1.29 acres) is a future development parcel. The subject property is currently platted as Outlot A, Heritage Commons 8th Addition and is zoned PUD, Planned Unit Development. The Heritage Commons PUD was approved in 1999 and the property is located north of 202 nd Street (CSAH 50), south of Heritage Drive and east of Idealic Avenue. The Heritage Commons 9th Addition final plat and the Chase Bank development plans have been reviewed by Engineering and Environment Resources Division staff as well as the City Forester. The Dakota County Plat Commission has also reviewed the final plat. 2 EXHIBITS A. Location Map B. Zoning Map C. Preliminary Plat D. Final Plat E. Site Plan F. Grading and Drainage Plan G. Utility Plan H. Landscape Plan I. Ghost plan for Lot 2 J. Lighting Photometric Plan K. Building Elevation Plan L. Floor Plan M. Dakota County Plat Commission letter dated March 13, 2025 STAFF A NALYSIS Project Phasing. The Heritage Commons commercial development has progressed over several phases since the initial development phase was approved in 1999. The proposed final plat is the ninth phase of the Planned Unit Development and the 10th phase is under review. Phase One: Approved September 7, 1999, included the two multi-tenant buildings where the Lakeville liquor store and Minnesota School of Beauty are located. Phase Two: Approved February 3, 2003, included the multi-tenant building located south of Phase One. Phase Three: Approved February 20, 2007, included the Cub Foods grocery store and the multi-tenant building located south of Cub Foods and north of Heritage Drive. Phase Four: Approved November 17, 2008, included the development of Green Planet Car Wash. Phase Five: Approved December 19, 2016, preliminary and final plat of 8.08 acres of commercial outlots that included the construction of the private drive connection between Kenwood Trail and Heritage Drive. Phase Six: Approved December 18, 2017 and included the development of a single retail building for O’Reilly Auto Parts. Phase Seven: Approved August 20, 2018 for the BeeHive memory care building. Phase Eight: Approved November 2, 2020 for the Tires Plus minor auto repair building. 3 PRELIMINARY AND FINAL PLAT Comprehensive Plan. The Heritage Commons 9th Addition property is located in Planning District No. 4, Central Lakeville, and is guided for commercial uses in the 2040 Comprehensive Land Use Plan. The proposed commercial use is consistent with the commercial designation of the Comprehensive Land Use Plan. Zoning. The Heritage Commons 9th Addition property is zoned PUD, Planned Unit Development District with an underlying C-3, General Commercial District zoning. Surrounding Land Uses and Zoning North – Heritage Drive and multi-tenant commercial building (PUD District) South – 202nd Street (CSAH 50) and commercial businesses (C-3 District) East – Tires Plus (PUD District) West – Idealic Avenue (private drive) and O’Reilly Auto Parts (PUD District) Consistency with the Capital Improvement Plan (CIP). No public street construction or other public funded infrastructure construction is proposed with the Heritage Commons 9 th Addition final plat. All streets, sanitary sewer, water and storm sewer improvements required for the area of the Heritage Commons 9th Addition were installed by the developer with the Heritage Commons development in 2001. Lots/Blocks. The Heritage Commons 9th Addition final plat proposes two lots on one block. The following C-3 District lot requirements pertain to this final plat: Lot Area Lot Width Minimum Required 20,000 SF 100 feet Proposed Lot 1 59,366 SF (1.36 ac) 204.83 feet Proposed Lot 2 56,407 SF (1.29 ac) 190.75 feet Both lots within the Heritage Commons 9th Addition exceed the minimum lot requirements in the underlying C-3 District. Outlot. There are no outlots in the Heritage Commons 9th Addition plat. Easements. The final plat must be revised to include five-foot-wide drainage and utility easements along the side property lines of both lots, prior to City Council consideration. Streets. No new street construction is proposed with the Heritage Commons 9th Addition final plat. The property is adjacent to 202nd Street (CSAH 9), Heritage Drive and Idealic Avenue. 202nd Street is classified as a minor arterial road and Heritage Drive is classified as minor collector road in the Comprehensive Transportation Plan. Idealic Avenue is a private street. All required right- 4 of-way for the streets abutting the plat was dedicated with previous phases of Heritage Commons. Trails and Sidewalks. Eight-foot-wide concrete sidewalks are in place along 202 nd Street and Heritage Drive with a five-foot-wide concrete sidewalk along both sides of Idealic Avenue. No new public sidewalk or trail construction is required with the Heritage Commons 9th Addition plat. Grading, Drainage, Erosion Control, and Utilities. Grading, drainage and erosion control plans have been submitted with the Heritage Commons 9th Addition preliminary plat. Alanna Sobottka, Civil Engineer and Maria Friedges, Environmental Resources Specialist have reviewed the site, grading, drainage and erosion control, and utility plans. A copy of the engineering report dated April 25, 2025 is attached for your review. The Engineering Division recommends approval of the preliminary plat subject to the recommendations outlined in the report. Tree Preservation. There are no significant trees located on the subject property. Wetlands. There are no wetlands located on the subject property. Park Dedication. Park dedication for the Heritage Commons development was satisfied with a land dedication with the Planned Unit Development and first phase final plat of Heritage Commons in 2000. Dakota County Plat Commission. The Dakota County Plat Commission reviewed the preliminary and final plat at their March 12, 2025 meeting and will recommend approval of the final plat to the Dakota County Board. SITE P LAN Setbacks. The Chase Bank building and parking lot on Lot 1, Block 1, Heritage Commons 9th Addition is subject to the following minimum building setback (C-3, General Commercial District) requirements: Abutting a Public Street: 30 feet Interior Lot Lines: 10 feet Parking: 15 feet (abutting street), 5 feet (interior lot lines) The proposed Chase Bank building and parking lot meet the setback requirements of the Zoning Ordinance. Parking. The proposed 3,395 square foot bank requires 15 parking spaces, taking into account the allowable 10% gross floor area credit and the requirement for one parking space per 200 square feet of floor area. The site plan proposes 26 parking spaces, including two handicap accessible spaces at the 5 front entrance. This is in compliance with the parking requirements in effect at the time of the preliminary plat application. The site also proposes a bike rack placed on a concrete pad The proposed parking spaces and drive aisle dimensions and configurations comply with the requirements of the Zoning Ordinance. Parking aisles will be 24 feet in width and parking stall dimensions will be 9 feet in width and 20 feet in length. Snow storage may not occur within required parking spaces. Circulation/Loading Area. Access to the site will be from Heritage Drive and from Idealic Avenue. Parking spaces are primarily located along the north side of the building. A drive-up ATM is located on the south side of the building as well as bypass lane to provide access around the building. No direct driveway access to 202nd Street is permitted. An agreement for shared driveway access between the parcels in Heritage Commons 9th Addition and Heritage Commons 8th Addition (Tires Plus) is required to be executed as part of the recording of the final plat. Landscaping. The landscape plan proposes a mix of overstory trees around the perimeter of the site, foundation plantings on three sides of the building, and a row of plantings along the south side of the drive through to minimize headlights shining on to 202 nd Street. Remaining areas will be seeded and in-ground irrigation is required. Development of the site shall include responsibility for boulevard maintenance along 202nd Street, Heritage Drive and Idealic Avenue. The Developer must provide an estimate of the landscape costs to be submitted as a security to guarantee installation of the landscaping. The City Forester has reviewed and approved the landscape plan dated May 1, 2025. Landscaping on site must be installed per the approved plan. Prior to a landscape inspection, an as-built landscape plan must be submitted to the city. Building Exterior. The proposed one-story bank building is proposed to be clad with exterior materials that are nearly all Grade A materials (97.7%), including three colors of brick, cast stone, and glass. Grade C metal trim is proposed at the roofline, several canopies, and metal panels framing some of the windows (2.3%). The materials proposed comply with Zoning Ordinance requirements. The building includes a variety of roofline heights as well as relief so as to not have flat exterior walls. A contrasting stripe of pale brick is about two-thirds of the way up the building, matching the color of the cast stone at the foundation of the building. The contrasting strip is a design element seen in all of the buildings in the Heritage Commons development. Trash Enclosure. The trash and recycling enclosure will be located on the north side of the building. The enclosure is proposed to be six feet, six inches in height and uses two of the materials in contrasting colors proposed for the building exterior. The trash enclosure gate must be durable and made of maintenance-free gate. Signs. A development sign for Heritage Commons is located at the northeast corner of 202 nd Street and Idealic Avenue. According to the adopted sign plan for Heritage Commons, Chase Bank is able to have a monument sign, up to six feet in height and with a sign area of up to 18 square feet, at the southeast corner of the parcel, if desired. Since the building fronts more than 6 one street, up to two wall signs permitted, not to exceed 100 square feet in sign area. All signs require approval of a sign permit prior to installation. Exterior Lighting. Parking lot lighting is scattered around the site and is proposed to be mounted at a height of 25 feet. The photometric plan indicates that the proposed light levels complies with Zoning Ordinance requirements. All lighting fixtures shall contain a cutoff which directs the light at an angle of 90 degrees or less. All building mounted lighting must face downward onto the structure. Mechanical Equipment . Any roof-mounted mechanical equipment must be screened if greater than three feet in height. Ground-mounted mechanical equipment must be screened with landscaping and/or fencing. Ghost Plan. No development plans have been received for Lot 2, Block 1, but a future development access stub will be provided from Lot 1 to Lot 2 on the north side of the bank building. Access from the Tires Plus parcel east of Lot 2 is provided on the north side of the parcel, with a shared access to Heritage Drive and along the south side of the lot. Snow Storage. Snow storage may not take place in required parking spaces. Stormwater Maintenance Agreement. A Stormwater Maintenance Agreement will be required with the final for maintenance of the stormwater basin on site. EASEMENT VACATION The platted drainage and utility easements within Outlot A, Heritage Commons 8th Addition are proposed to be vacated and the same easements platted on the Heritage Commons 9 th Addition final plat. RECOMMENDATION Community Development Department staff recommends approval of the Heritage Commons 9 th Addition preliminary plat and easement vacation, subject to the following stipulations: 1. Implementation of the recommendations listed in the April 25, 2025 engineering report. 2. The site shall be developed according to the plans approved by the City Council. 3. Execution of a Stormwater Maintenance Agreement shall be required between Chase Bank and the City of Lakeville for the maintenance of the stormwater basin located on Lot 1, Block 1, Heritage Commons 9th Addition. 4. An agreement for shared driveway access shall be established between Lots 1 and 2, Block 1, Heritage Commons 9th Addition and Lot 1, Block 1, Heritage Commons 8th Addition (Tires Plus) in conjunction with the recording of the final plat. 7 5. The trash enclosure must have a durable maintenance-free gate. 6. Any rooftop and/or ground-mounted mechanical equipment must be screened per Zoning Ordinance requirements. 7. The City Forester has reviewed and approved the landscape plan dated May 1, 2025. Landscaping on site must be installed per the approved plan. Prior to a landscape inspection, an as-built landscape plan must be submitted to the city. 8. A cost estimate for the installation of the approved landscaping shall be submitted prior to City Council consideration of the final plat. 9. Exterior lighting shall be down-cast only and shall not glare onto road right-of-way. 10. Snow storage shall not occur within required parking spaces. 11. Prior to City Council consideration of the final plat, drainage and utility easements must be added along the side property lines of each parcel. Dakota County, Maxar, Microsoft City of Lakeville Heritage Commons 9th Addition Site Location Map EXHIBIT A DO D D B L V D C S A H 9 202ND ST (CSAH 50) IB E R I A A V E Site Location HERITAGEDR ID E A L I C A V E 203RD ST± City of Lakeville Heritage Commons 9th Addition Site Location Map EXHIBIT B DO D D B L V D C S A H 9 202ND ST (CSAH 50) IB E R I A A V E Site Location HERITAGEDR ID E A L I C A V E 203RD ST± PUD PUD PUD PUD PUD C-3 C-3 C-3 C-3 P/OS P/OS RM-1 RM-1 RH-1 EXHIBIT C HERITAGE DRIVE ID E A LIC A V E N U E 202ND STREET T NO P A R KI N G FFE: 982.30± 3,395 SF 15' PARKING SETBACK 15' PARKING SETBACK 5' PARKING SETBACK 15' PARKING SETBACK DRAINAGE & UTILITY EASEMENT EXISTING 10' DRAINAGE & UTILITY EASEMENT STORMWATER MANAGEMENT AREA PROPOSED PROPERTY LINE 10' BUILDING SETBACK 30' BUILDING SETBACK 30' BUILDING SETBACK 30' BUILDING SETBACK 24 0 9. 0 12 0 14.0' 20 0 9.0' 33.0' 24 0 20 0 QQ Q Q Q P P P P 25.0' Q6.5' 6. 0 U R25.0' R8.0' R3.0' R20.0' R20.0' R20.0' R3.0' R8.0' R15.0' R15.0'R15.0' R3.0' R25.0' R15.0' C C C C FUTURE DEVELOPMENT ACCESS DRIVE STUB C C 10.0' 13.3 S Y Q C C AAL N M M M M N A A A A A F F G AA J E E T H D M M N H M M D M N M R15.0' R3.0' R X B J J O O O O O O O B Y Y W W EXISTING DEVELOPMENT MONUMENT SIGN AA AA L L L L L L L AA BB BB BB AA L AA A BB PROPOSED 10' DRAINAGE & UTILITY EASEMENT PROPOSED 10' DRAINAGE & UTILITY EASEMENT PROPOSED 10' DRAINAGE & UTILITY EASEMENT 9 5 6.0' 8.0' D 20.0' 9. 0 9. 0 9. 0 C 5. 0 N H U 9.0'R3.0'R8.0' O A B 24.0' D 11 O 5. 0 6. 0 M AA M 1 CI T Y C O M M E N T S 03 2 8 2 0 2 5 B S K Th i s d o c u m e n t t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n a s a n i n s t r u m e n t o f s e r v i c e i s i n t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d R e u s e o f a n d i m p r o p e r r e l i a n c e o n t h i s d o c u m e n t w i t h o u t w r i t t e n a u t h o r i z a t i o n a n d a d a p t a t i o n b y K i m l e y H o r n a n d A s s o c i a t e s I n c s h a l l b e w i t h o u t l i a b i l i t y t o K i m l e y H o r n a n d A s s o c i a t e s I n c SHEET NUMBER 2 0 2 5 K I M L E Y H O R N A N D A S S O C I A T E S I N C 11 9 9 5 S I N G L E T R E E L A N E S U I T E 2 2 5 E D E N P R A I R I E M N 5 5 3 4 4 PH O N E 6 5 1 6 4 5 4 1 9 7 WW W K I M L E Y H O R N C O M K: T C W L D E V t h e a r c h i t e c t s p a r t n e r s h i p l a k e v i l l e c h a s e b a n k 3 D e s i g n C A D p l a n s h e e t s C 4 S I T E P L A N d w g A p r i l 3 0 2 0 2 5 1 0 2 4 a m BY RE V I S I O N S No DA T E PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N 2 CI T Y C O M M E N T S 05 0 1 2 0 2 5 B S K Know what'sbelow. before you dig.Call R NORTH LEGENDPROPERTYSUMMARY TOTAL PROPERTY AREA 1.36 AC / 59,366 SF DISTURBED AREA 1.06 AC / 46,124 SF EXISTING IMPERVIOUS AREA 0.01 AC / 500 SF / 1.1% EXISTING PERVIOUS AREA 1.05 AC / 45,624 SF / 98.9% PROPOSED IMPERVIOUS AREA 0.64 AC / 27,800 SF / 60.3% PROPOSED PERVIOUS AREA 0.42 AC / 18,324 SF / 39.7% NET INCREASE IN IMPERVIOUS AREA 0.63 AC / 27,300 SF SITE DATA EXISTING ZONING PUD- PLANNED UNIT DEVELOPMENT PROPOSED LAND USE FINANCIAL INSTITUTION PARKING SETBACKS SIDE/REAR = 5' STREET = 15' BUILDING SETBACKS FRONT = 30' SIDE = 10' (30' STREET) REAR = 10' (30' STREET) SITE PLAN NOTES 1. REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF STOOPS, TRUCK DOCKS, TRASH ENCLOSURES & PRECISE BUILDING DIMENSIONS. REFER TO THE SITE ELECTRICAL PLAN FOR LOCATIONS OF PROPOSED LIGHT POLES, CONDUITS, AND ELECTRICAL EQUIPMENT. 2. REFER TO CERTIFIED SITE SURVEY OR PLAT FOR EXACT LOCATION OF EXISTING EASEMENTS, PROPERTY BOUNDARY DIMENSIONS, AND ADJACENT RIGHT-OF-WAY & PARCEL INFORMATION. 3. DIMENSIONS AND RADII ARE DRAWN TO THE FACE OF CURB, UNLESS OTHERWISE NOTED. DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT, AND AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT. 4. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING EXISTING SITE IMPROVEMENTS THAT CONFLICT WITH THE PROPOSED WORK, INCLUDING BUT NOT LIMITED TO TRAFFIC SIGNS, LIGHT POLES, ABOVEGROUND UTILITIES, ETC. PERFORM WORK IN ACCORDANCE WITH GOVERNING AUTHORITIES REQUIREMENTS AND PROJECT SITE WORK SPECIFICATIONS. COST SHALL BE INCLUDED IN BASE BID. 5. TYPICAL PARKING STALL DIMENSIONS SHALL BE 9.0-FEET IN WIDTH AND 20-FEET IN LENGTH UNLESS OTHERWISE INDICATED. 6. MONUMENT SIGN(S) ARE DETAILED ON THE ARCHITECTURAL PLANS AND ARE SHOWN FOR GRAPHICAL & INFORMATIONAL PURPOSES ONLY. CONTRACTOR TO VERIFY SIGN DIMENSIONS, LOCATION AND REQUIRED PERMITS WITH THE OWNER. 7. THE CURB & GUTTER AND CONCRETE WHEEL STOPS LOCATED IN FRONT OF THE PROPOSED ADA STALLS & AISLE ARE TO BE PAINTED SAFETY YELLOW. PR E P A R E D F O R SI T E P L A N C400 CH A S E B A N K 2 0 2 N D W A N D I D E A L A V E TH E A R C H I T E C T S PA R T N E R S H I P LA K E V I L L E MN DA T E I H E R E B Y C E R T I F Y T H A T T H I S P L A N SP E C I F I C A T I O N O R R E P O R T W A S P R E P A R E D B Y ME O R U N D E R M Y D I R E C T S U P E R V I S I O N A N D TH A T I A M A D U L Y L I C E N S E D P R O F E S S I O N A L EN G I N E E R U N D E R T H E L A W S O F T H E S T A T E O F MI N N E S O T A MNLI C N O BR I A N M W U R D E M A N 11 2 5 2 0 2 4 53 1 1 3 DA T E CH E C K E D B Y SC A L E DE S I G N E D B Y DR A W N B Y KH A P R O J E C T 16 0 0 9 4 0 5 6 03 2 8 2 0 2 5 AS S H O W N BS K BS K MT L BUILDING DATA TOTAL BUILDING AREA 3,395 SF PERCENT OF TOTAL PROPERTY AREA 5.72% PARKING SUMMARY REQUIRED PARKING 17 SPACES @ 1 / 200 SF TOTAL PROPOSED PARKING 26 SPACES REQUIRED ACCESSIBLE PARKING 2 STANDARD SPACES 1 VAN ACCESSIBLE PROPOSED ACCESSIBLE PARKING 2 VAN ACCESSIBLE PROPOSED CURB AND GUTTER PROPERTY LINE PROPOSED FENCE SETBACK LINE PROPOSED FLUSH CURB DRAINAGE AND UTILITY EASEMENT STANDARD DUTY ASPHALT PAVMENT SEE DETAILS FOR SECTION HEAVY DUTY ASPHALT PAVEMENT SEE DETAILS FOR SECTION HEAVY DUTY CONCRETE PAVEMENT SEE DETAILS FOR SECTION CONCRETE SIDEWALK SEE DETAILS FOR SECTION STORM WATER AREA SEE GRADING PLAN FOR DETAILS KEYNOTE LEGEND CONCRETE SIDEWALK - SEE DETAIL 6" CONCRETE FILLED PIPE BOLLARD - SEE DETAIL MATCH EXISTING EDGE OF PAVEMENT/ CURB & GUTTER ACCESSIBLE CURB RAMP - SEE DETAIL ACCESSIBLE PARKING SIGN, SIGN AND POST FURNISHED BY CHASE SIGN VENDOR. BOLLARD AND CONCRETE FOUNDATION PROVIDED BY GC ACCESSIBLE PARKING SYMBOL - SEE DETAIL AREA STRIPED WITH 4" SYSL @ 45° 2' O.C. TRUNCATED DOMES, SEE DETAIL NO PARKING" SIGN - SEE DETAIL CONCRETE WHEEL STOP, SEE DETAIL SITE DIRECTIONAL SIGN (SEE ARCH PLANS FOR DETAILS) B612 CURB AND GUTTER (TYP.) - SEE DETAIL TRANSITION CURB - SEE DETAIL FLUSH CURB - SEE DETAIL LIGHT POLE (SEE ARCH SITE PLAN FOR DETAILS) 4" WIDE PAINTED SOLID LINE, TYP. TRAFFIC FLOW PAVEMENT MARKINGS, TYP. (SEE DETAILS) PROPOSED TRANSFORMER, CONCRETE PAD, & BOLLARDS (SEE MEP PLANS FOR DETAILS). TRASH ENCLOSURE (SEE ARCH PLANS FOR DETAILS) BIKE RACK WITH ASSOCIATED CONCRETE PAD FLATWORK (SEE ARCH PLANS) ACCESSIBLE CROSSWALK - SEE DETAIL MONUMENT SIGN (SEE ARCH PLANS FOR DETAILS) DO NOT ENTER' SIGN - SEE DETAIL CLEARANCE BAR (SEE ARCH PLANS FOR DETAILS) HEAVY DUTY CONCRETE - SEE DETAIL UTILITY SCREENING FENCE (SEE ARCH PLANS FOR DETAILS) OUTFALL B612 CURB AND GUTTER (TYP.) - SEE DETAIL STOP' SIGN & PAVEMENT MARKING- SEE DETAIL A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA BB PROPOSED OUTFALL CURB AND GUTTER 2 EXHIBIT E T FFE: 982.30± 3,395 SF HERITAGE DRIVE ID E A LIC A V E N U E 202ND STREET 981981 980 98 0 98 0 98 0 98 0 97 9 98 1 98 1 98 2 981 981 978 9793.39 2. 5 4 1. 99 0. 6 2 7.98% 975 976 977 978 979 975 976 977 978 979 3. 69 4. 1 8 2. 25 2.79% 3.033. 53 3. 54 1.65% 3. 2 3 2. 24 1.73% 3. 203.67 3. 64 3.95 2.08% CO SURFACE INFILTRATION BASIN (B-1) TOTAL VOLUME: 24,202 CF BOTTOM OF BASIN INVERT: 974.50 REQUIRED WQV: 3,475 CF PROVIDED WQV: 5,579 CF 10-YR HWL: 976.31 100-YR HWL: 977.09 NWL: 974.50 (DRY) 3: 1 3: 1 7:1 3:1 CBMH 4 RE:980.17 IE:977.17 SW IE:977.17 N CB 1 RE:980.00 IE:977.00 N CBMH 2 W/ SNOUT UNIT RE:979.68 IE:974.72 S IE:974.72 E IE:974.72 N 4' SUMP) CBMH 5 RE:979.35 IE:976.06 S IE:976.06 W OCS CBMH 48" DIA RE:978.10 IE:976.10 SW IE:974.74 N CONNECT TO EXISTING MH IE:973.80 S RD 17 IE:978.11 E RD 13 IE:976.60 W CO 18 RE:980.96 IE:977.65 W IE:977.65 NE 55 LF - 12" HDPE @ 1.67% 101 LF - 12" HDPE @ 1.09% 123 LF - 12" HDPE @ 1.09% 22 LF - 15" HDPE @ 1.00% 47 LF - 12" RCP @ 2.00% 26 LF - 6" PVC @ 2.00% 10 LF - 12" RCP @ -15.81% 23 LF - 6" PVC @ 2.00% 24 LF - 6" PVC @ 2.00% 9:1 980 980 980981 98 2983 982 981 981 980 980 980981 982 982 981 980 980 979 979 978 978 978 978 979 979 979 980 980 98 1 1.37% 98 2 98 1 CONNECT TO EXISTING MANHOLE. CONTRACTOR TO FIELD VERIFY LOCATION AND INVERT ELEVATIONS AND NOTIFY ENGINEER IMMEDIATELY IF ANY DISCREPANCIES. FES 8 IE:974.50 S FES 15 IE:974.50 NE APPROXIMATE LOCATION OF EXISTING UNDERGROUND STORMWATER SYSTEM. CONTRACTOR TO FIELD VERIFY & NOTIFY ENGINEER IF ANY DISCREPANCIES. 2. 00 2. 5 2 42 LF - 18" RCP @ 3.10% EX ST-1 RE:977.71 IE:973.70 N,W 5' WIDE x MIN 3" THICK POLYSTYRENE INSULATION (SEE NOTE 17) 12 3 8 5. 3 4 2.69% WYE CONNECT IE:976.08 S IE:976.08 E IE:976.08 N 6: 1 982 981 982 98 1 98 2 98 1 981 98 1 2.30% 82 LF - 12" HDPE @ 1.67% 3. 9 8 980 981 G:981.17 G:981.68 G:981.01 G:980.68 G:980.44 G:980.90 G:981.93 HP:982.00 ME:981.70 ME:980.49 HP:981.42 G:980.88 G:980.77 G:980.36 G:980.17 G:980.51 HP:980.54 G:980.48 LP:979.68 G:981.37 G:981.34 G:981.12 G:981.22 G:980.02 LP:980.00 HP:981.78 G:981.34 G:981.68 T/G:980.84 T/G:980.87 G:981.25 HP:980.90 ME:979.52 G:979.51 ME:977.49 ME:977.57 HP:981.30 ME:979.93 G:981.68 T:982.18 G:980.47 LP:980.17 G:981.32G:981.80 G:981.80 982.30 981.82 FFE = 982.3 982.07 G:980.35 G:980.97 FFE = 982.3 G:980.13 G:980.06 G:980.13 G:980.25 G:980.45 G:980.19 G:980.10 G:979.57 G:979.38 LP:979.35 HP:979.76 HP:980.30 982.30982.30 EOF:980.67 EOF:978.39 EOF:980.18 EOF:981.30 EOF:979.85 981.83 976.78 977.28 T/G:980.82 HP:980.47 G:980.87 T/G:981.68 T/G:981.68 G:981.68 T:982.15 1 CI T Y C O M M E N T S 03 2 8 2 0 2 5 B S K Th i s d o c u m e n t t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n a s a n i n s t r u m e n t o f s e r v i c e i s i n t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d R e u s e o f a n d i m p r o p e r r e l i a n c e o n t h i s d o c u m e n t w i t h o u t w r i t t e n a u t h o r i z a t i o n a n d a d a p t a t i o n b y K i m l e y H o r n a n d A s s o c i a t e s I n c s h a l l b e w i t h o u t l i a b i l i t y t o K i m l e y H o r n a n d A s s o c i a t e s I n c SHEET NUMBER 2 0 2 5 K I M L E Y H O R N A N D A S S O C I A T E S I N C 11 9 9 5 S I N G L E T R E E L A N E S U I T E 2 2 5 E D E N P R A I R I E M N 5 5 3 4 4 PH O N E 6 5 1 6 4 5 4 1 9 7 WW W K I M L E Y H O R N C O M K: T C W L D E V t h e a r c h i t e c t s p a r t n e r s h i p l a k e v i l l e c h a s e b a n k 3 D e s i g n C A D p l a n s h e e t s C 5 G R A D I N G P L A N d w g A p r i l 3 0 2 0 2 5 1 0 2 4 a m BY RE V I S I O N S No DA T E PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N 2 CI T Y C O M M E N T S 05 0 1 2 0 2 5 B S K NORTH GRADING PLAN NOTES PROPOSED STORM SEWER PROPERTY LINE EXISTING CONTOUR PROPOSEDCONTOUR925 PROPOSED SPOTELEVATION100.00 LEGEND PROPOSED HIGH POINT ELEVATIONHP:0.0 PROPOSED LOW POINT ELEVATION PROPOSED GUTTER ELEVATION PROPOSED TOP OF CURB ELEVATION PROPOSED FLUSH PAVEMENT ELEVATION LP:0.0 G:0.00 T:0.00 PROPOSED EMERGENCY OVERFLOW ELEVATION T/G:0.0 EOF:0.0 0.0%PROPOSED DRAINAGE DIRECTION ME:0.0 MATCH EXISTING ELEVATION PROPOSED STORM MANHOLE (SOLID CASTING) PROPOSED STORM MANHOLE (ROUND INLET CASTING) PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING) PROPOSED STORM SEWER CLENOUT PROPOSED RIPRAP PROPOSED FLARED END SECTION CO D PROPOSED RIDGE LINE PROPOSED SWALE PROPOSED TOP/BOTTOM OF WALL ELEVATIONTW:0.0 BW:0.0 Know what'sbelow. before you dig.Call R PR E P A R E D F O R GR A D I N G A N D DR A I N A G E P L A N C500 CH A S E B A N K 2 0 2 N D W A N D I D E A L A V E TH E A R C H I T E C T S PA R T N E R S H I P LA K E V I L L E MN DA T E I H E R E B Y C E R T I F Y T H A T T H I S P L A N SP E C I F I C A T I O N O R R E P O R T W A S P R E P A R E D B Y ME O R U N D E R M Y D I R E C T S U P E R V I S I O N A N D TH A T I A M A D U L Y L I C E N S E D P R O F E S S I O N A L EN G I N E E R U N D E R T H E L A W S O F T H E S T A T E O F MI N N E S O T A MNLI C N O BR I A N M W U R D E M A N 11 2 5 2 0 2 4 53 1 1 3 DA T E CH E C K E D B Y SC A L E DE S I G N E D B Y DR A W N B Y KH A P R O J E C T 16 0 0 9 4 0 5 6 03 2 8 2 0 2 5 AS S H O W N BS K BS K MT L 1. PERFORM GRADING WORK IN ACCORDANCE WITH APPLICABLE CITY SPECIFICATIONS AND BUILDING PERMIT REQUIREMENTS. 2. CONTACT STATE 811 CALL-BEFORE-YOU-DIG LOCATING SERVICE AT LEAST TWO WORKING DAYS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY LOCATIONS. 3. STORM SEWER PIPE SHALL BE AS FOLLOWS: RCP PER ASTM C-76 HDPE: 0" - 10" PER AASHTO M-252 HDPE: 12" OR GREATER PER ASTM F-2306 PVC SCH. 40 PER ASTM D-1785 STORM SEWER FITTINGS SHALL BE AS FOLLOWS: RCP PER ASTM C-76, JOINTS PER ASTM C-361, C-990, AND C-443 HDPE PER ASTM 3212 PVC PER ASTM D-3034, JOINTS PER ASTM D-3212 4. CONTRACTOR TO FIELD VERIFY THE LOCATIONS AND ELEVATIONS OR EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO THE START OF SITE GRADING. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES OR VARIATIONS. 5. SUBGRADE EXCAVATION SHALL BE BACKFILLED IMMEDIATELY AFTER EXCAVATION TO HELP OFFSET ANY STABILITY PROBLEMS DUE TO WATER SEEPAGE OR STEEP SLOPES. WHEN PLACING NEW SURFACE MATERIAL ADJACENT TO EXISTING PAVEMENT, THE EXCAVATION SHALL BE BACKFILLED PROMPTLY TO AVOID UNDERMINING OF EXISTING PAVEMENT. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL CONTROL. 7. CONTRACTOR SHALL EXCAVATE DRAINAGE TRENCHES TO FOLLOW PROPOSED STORM SEWER ALIGNMENTS. 8. GRADES SHOWN ARE FINISHED GRADES. CONTRACTOR SHALL ROUGH GRADE TO SUBGRADE ELEVATION AND LEAVE STREET READY FOR SUBBASE. 9. ALL EXCESS MATERIAL, BITUMINOUS SURFACING, CONCRETE ITEMS, ANY ABANDONED UTILITY ITEMS, AND OTHER UNSTABLE MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF THE CONSTRUCTION SITE. 10. REFER TO THE UTILITY PLAN FOR SANITARY SEWER MAIN, WATER MAIN SERVICE LAYOUT AND ELEVATIONS AND CASTING / STRUCTURE NOTATION. 11. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION OF PAVEMENTS AND CURB AND GUTTER WITH SMOOTH UNIFORM SLOPES TO PROVIDE POSITIVE DRAINAGE. 12. INSTALL A MINIMUM OF 4" CLASS 5 AGGREGATE BASE UNDER CURB AND GUTTER AND CONCRETE SIDEWALKS. 13. UPON COMPLETION OF EXCAVATION AND FILLING, CONTRACTOR SHALL RESTORE ALL STREETS AND DISTURBED AREAS ON SITE. ALL DISTURBED AREAS SHALL BE RE-VEGETATED WITH A MINIMUM OF 4" OF TOPSOIL. 14. ALL SPOT ELEVATIONS/CONTOURS ARE TO GUTTER / FLOW LINE UNLESS OTHERWISE NOTED. 15. GRADING FOR ALL SIDEWALKS AND ACCESSIBLE ROUTES INCLUDING CROSSING DRIVEWAYS SHALL CONFORM TO CURRENT ADA STATE/NATIONAL STANDARDS. IN NO CASE SHALL ACCESSIBLE RAMP SLOPES EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPES EXCEED 2% . IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPES EXCEED 5%. IN NO CASE SHALL ACCESSIBLE PARKING STALLS OR AISLES EXCEED 2% (1.5% TARGET) IN ALL DIRECTIONS. SIDEWALK ACCESS TO EXTERNAL BUILDING DOORS AND GATES SHALL BE ADA COMPLIANT. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ADA CRITERIA CANNOT BE MET IN ANY LOCATION PRIOR TO PAVING. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR A.D.A COMPLIANCE ISSUES. 16. MAINTAIN A MINIMUM OF 0.5% GUTTER SLOPE TOWARDS LOW POINTS. 17. CONTRACTOR TO PROVIDE 3" INSULATION BY 5' WIDE CENTERED ON STORM PIPE IF LESS THAN 4' OF COVER IN PAVEMENT AREAS AND LESS THAN 3' OF COVER IN LANDSCAPE AREAS. 18. ROOF DRAIN INVERT CONNECTIONS AT THE BUILDING SHALL BE AT ELEVATION <XXX.XX> OR LOWER UNLESS NOTED OTHERWISE. REFERENCE MEP PLANS FOR ROOF DRAIN CONNECTION. 19. ALL STORM SEWER CONNECTIONS SHALL BE GASKETED AND WATER TIGHT INCLUDING MANHOLE CONNECTIONS. 20. ALL STORM SEWER PIPE SHALL BE AIR TESTED IN ACCORDANCE WITH THE CURRENT PLUMBING CODE. 21. MAINTAIN A MINIMUM OF 1.25% SLOPE IN BITUMINOUS PAVEMENT AREAS, 0.5% SLOPE IN CONCRETE PAVEMENT AREAS. 22. CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT "INFALL CURB" WHERE PAVEMENT DRAINS TOWARD GUTTER, AND "OUTFALL" CURB WHERE PAVEMENT DRAINS AWAY FROM GUTTER. NO LATER THAN DURING INFILTRATION/FILTRATION BASIN OVER-EXCAVATION/SUB-SOIL WORK, THE APPLICANT SHALL ENSURE THAT A CERTIFIED SOIL SCIENTIST WILL BE PRESENT TO VERIFY AND DOCUMENT THAT PRACTICE AREA SUB-SOILS ARE SUITABLE FOR A SATURATED CONDITION INFILTRATION RATE OF 0.30-INCH PER HOUR OR GREATER. IF THE SUB-SOIL SATURATED CONDITION INFILTRATION RATES ARE LESS THAN 0.30-INCH PER HOUR, THE CONTRACTOR SHALL CORRECT DOWN TO A POORLY GRADED SAND LAYER. THE CITY SHALL BE PROVIDED WITH 24-HOURS' NOTICE OF COMMENCEMENT OF INFILTRATION TESTING AND SHALL BE PROVIDED WITH INFILTRATION RESULTS (E.G. TESTING DATA LOGS) WITHIN 24-HOURS OF TESTING COMPLETION. THE APPLICANT SHALL PROVIDE THE CITY WATER RESOURCES STAFF WITH 24-HOUR ADVANCE NOTICE PRIOR TO ANY EXCAVATION AND/OR SOIL BACKFILLING WITHIN ANY INFILTRATION/FILTRATION PRACTICES (CITY WATER RESOURCES STAFF CONTACT/INSTRUCTIONS SHALL BE CLEARLY/PROMINENTLY LISTED ON APPROPRIATE PLAN SHEETS). EXHIBIT F T FFE: 982.30± 3,395 SF HERITAGE DRIVE ID E A LIC A V E N U E CO SS-1 IE:975.47 E CONNECT TO EXISTING MANHOLE RE:978.79 IE:971.40 S UTILITY CROSSING. T/SAN: 973.96 B/STRM: 975.92 PROPOSED TRANSFORMER. REFER TO MEP PLANS. 5. 0 CO 10.5' UTILITY CROSSING. MAINTAIN 18" OF VERTICAL CLEARANCE. 12.5' PROPOSED INFILTRATION BASIN REFER TO SHEET C500) SS-6 RE:979.81 IE:973.70 S IE:973.70 N 46 LF - 6" PVC @ 2.00% 70 LF - 6" PVC @ 2.00% 2" WATER SERVICE CONNECT FRANCHISE UTILITIES IN ROW. CONTRACTOR TO WORK W/ PRIVATE UTILITY COMPANIES ON EXACT LOCATIONS & CONNECTIONS EXISTING HYDRANT EXISTING 12" DIP WATER MAIN CONNECT TO EXISTING WATER STUB. 8" DIP IE: 968.60 SS-7 RE:977.45 IE:971.30 E 223 LF - 8" PVC @ 0.67% ADJUST RIM TO FINISHED GRADE. PROPOSED GATE VALVE 2)2" DATA CONDUITS. REFER TO MEP PLANS. 10 4 APPROXIMATE LOCATION OF EXISTING UNDERGROUND STORMWATER SYSTEM 18 LF - 6" PVC @ 2.00% SS-2 RE:980.49 IE:975.11 W IE:975.11 N 10.8' PROPOSED HYDRANT 6" WATER LINE CONNECT TO EXISTING WATER LINE EXISTING 8" DIP WATER SERVICE 10.4' UTILITY CROSSING. MAINTAIN 18" VERTICAL CLEARANCE. CO SS-14 RE:979.91 IE:972.78 S IE:972.78 N 69 LF - 6" PVC @ 2.00% 12.5' 5.0' 10.4' 1 CI T Y C O M M E N T S 03 2 8 2 0 2 5 B S K Th i s d o c u m e n t t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n a s a n i n s t r u m e n t o f s e r v i c e i s i n t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d R e u s e o f a n d i m p r o p e r r e l i a n c e o n t h i s d o c u m e n t w i t h o u t w r i t t e n a u t h o r i z a t i o n a n d a d a p t a t i o n b y K i m l e y H o r n a n d A s s o c i a t e s I n c s h a l l b e w i t h o u t l i a b i l i t y t o K i m l e y H o r n a n d A s s o c i a t e s I n c SHEET NUMBER 2 0 2 5 K I M L E Y H O R N A N D A S S O C I A T E S I N C 11 9 9 5 S I N G L E T R E E L A N E S U I T E 2 2 5 E D E N P R A I R I E M N 5 5 3 4 4 PH O N E 6 5 1 6 4 5 4 1 9 7 WW W K I M L E Y H O R N C O M K: T C W L D E V t h e a r c h i t e c t s p a r t n e r s h i p l a k e v i l l e c h a s e b a n k 3 D e s i g n C A D p l a n s h e e t s C 6 U T I L I T Y P L A N d w g A p r i l 3 0 2 0 2 5 1 0 2 5 a m BY RE V I S I O N S No DA T E PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N 2 CI T Y C O M M E N T S 05 0 1 2 0 2 5 B S K NORTH SANITARY SEWER MANHOLE SANITARY SEWER WATERMAIN GATE VALVE HYDRANT TEE REDUCER UNDERGROUND ELECTRIC TELEPHONE GAS MAIN STORM SEWER LEGEND CO SANITARYCLEANOUTCO EXISTING PROPOSED Know what'sbelow. before you dig.Call R PR E P A R E D F O R UT I L I T Y P L A N C600 CH A S E B A N K 2 0 2 N D W A N D I D E A L A V E TH E A R C H I T E C T S PA R T N E R S H I P LA K E V I L L E MN DA T E I H E R E B Y C E R T I F Y T H A T T H I S P L A N SP E C I F I C A T I O N O R R E P O R T W A S P R E P A R E D B Y ME O R U N D E R M Y D I R E C T S U P E R V I S I O N A N D TH A T I A M A D U L Y L I C E N S E D P R O F E S S I O N A L EN G I N E E R U N D E R T H E L A W S O F T H E S T A T E O F MI N N E S O T A MNLI C N O BR I A N M W U R D E M A N 11 2 5 2 0 2 4 53 1 1 3 DA T E CH E C K E D B Y SC A L E DE S I G N E D B Y DR A W N B Y KH A P R O J E C T 16 0 0 9 4 0 5 6 03 2 8 2 0 2 5 AS S H O W N BS K BS K MT L UTILITY PLAN NOTES 1. INSTALL UTILITIES IN ACCORDANCE WITH APPLICABLE CITY SPECIFICATIONS, STATE PLUMBING CODE, AND BUILDING PERMIT REQUIREMENTS. 2. CONTACT STATE 811 CALL-BEFORE-YOU-DIG LOCATING SERVICE AT LEAST TWO WORKING DAYS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY LOCATIONS. 3. CONTRACTOR IS RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL CONTROL. 4. SANITARY SEWER PIPE SHALL BE: PVC: ASTM D-2729, D-3034 PVC SCH 40: ASTM D-1785, F-714, F-894 SANITARY SEWER FITTINGS SHALL BE: PVC: ASTM D-2729, D-3034 PVC SCH40: ASTM D-2665, F-2794, F-1866 5. WATER MAIN PIPE SHALL BE: PVC: ASTM D-1785, D-2241, AWWA C-900 DUCTILE IRON: AWWA C115 WATER MAIN FITTINGS SHALL BE: PVC: ASTM D-2464, D-2466, D-2467, F-1970, AWWA C-907 DUCTILE IRON: AWWA C-153, C-110, ASME 316.4 6. WHEN CONNECTING TO AN EXISTING UTILITY LINE, FIELD VERIFY THE LOCATION, DEPTH, AND SIZE OF THE EXISTING PIPE(S) PRIOR TO INSTALLATION OF THE NEW LINES. NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES OR VARIATIONS IMPACTING THE PROPOSED DESIGN OF THE PROJECT. 7. PLACE AND COMPACT ALL FILL MATERIAL PRIOR TO INSTALLATION OF PROPOSED UNDERGROUND UTILITIES. MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 8. MAINTAIN A MINIMUM OF 7'-6" COVER ON ALL WATER LINES. 9. FOR WATER LINES AND STUB-OUTS UTILIZE MECHANICAL JOINTS WITH RESTRAINTS SUCH AS THRUST BLOCKING, WITH STAINLESS STEEL OR COBALT BLUE BOLTS, OR AS INDICATED IN THE CITY SPECIFICATIONS AND PROJECT DOCUMENTS. 10. MAINTAIN 18-INCH MINIMUM VERTICAL SEPARATION WHERE SEWER PIPE CROSSES WATER LINES (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE OR STRUCTURE). PROVIDE 10-FOOT HORIZONTAL SEPARATION BETWEEN SEWER PIPE AND WATER LINES. 11. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINES (OR ANY OBSTRUCTION EXISTING AND PROPOSED), THE SANITARY PIPE MATERIAL SHALL BE PVC SCHEDULE 40 OR PVC C900 AND HAVE MECHANICAL JOINTS AT LEAST 10 FEET ON EITHER SIDE OF THE CENTER LINE OF THE CROSSING. THE WATER LINE SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE FASTENERS AS REQUIRED TO PROVIDE A MINIMUM OF 18-INCH VERTICAL SEPARATION MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C-151) (CLASS 50). 12. ALL PVC & HDPE SEWER AND WATER PIPE SHALL HAVE A TRACER WIRE INSTALLED IN THE TRENCH AND TERMINATED PER THE DETAILS. 13. UNDERGROUND UTILITY LINES SHALL BE INSTALLED, INSPECTED AND APPROVED PRIOR TO PLACING BACKFILL. 14. IN PAVEMENT AREAS, RAISE MANHOLE CASTINGS TO BE FLUSH WITH PROPOSED FINISHED SURFACE GRADE. IN GREEN AREAS, RAISE MANHOLE CASTINGS TO BE ONE FOOT ABOVE FINISHED GROUND ELEVATION & INSTALL A WATERTIGHT LID. 15. REFER TO PLUMBING PLANS FOR LOCATION, SIZE AND ELEVATION OF UTILITY SERVICE CONNECTIONS AND ROOF DRAINS TO THE INTERIOR BUILDING SYSTEMS. BACKFLOW DEVICES (DDCV AND PRZ ASSEMBLIES) & METERS ARE LOCATED INSIDE THE BUILDING. 16. CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 17. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES. COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. 18. REFER TO THE SITE ELECTRICAL PLANS FOR SPECIFICATIONS OF THE PROPOSED SITE LIGHTING AND ELECTRICAL EQUIPMENT. 19. EXCAVATE DRAINAGE TRENCHES TO FOLLOW PROPOSED STORM SEWER ALIGNMENTS. REFER TO THE UTILITY PLANS FOR LAYOUT AND ELEVATIONS FOR PROPOSED SANITARY SEWER, WATER MAIN, AND OTHER BUILDING UTILITY SERVICE CONNECTIONS. REFER TO THE GRADING PLAN FOR DETAILED SURFACE ELEVATIONS. 20. EXCESS MATERIAL, ABANDONED UTILITY ITEMS, AND OTHER UNUSABLE MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF THE CONSTRUCTION SITE. 21. COORDINATE WITH THE PLUMBING PLANS FOR THE LOCATION, SIZE AND ELEVATION OF THE PROPOSED UNDERGROUND ROOF DRAIN CONNECTIONS. 22. WHERE STORM SEWER ROOF DRAINS HAVE LESS THAN 4-FEET OF COVER IN PAVED AREAS OR 3-FEET OF COVER IN LANDSCAPE AREAS, PROVIDE 3-INCH THICK INSULATION A MINIMUM OF 5-FEET IN WIDTH, CENTERED ON THE PIPE. 23. ALL STORM SEWER PIPE JOINTS SHALL BE WATER-TIGHT CONNECTIONS. 24. ALL STORM SEWER PIPE CONNECTIONS TO MANHOLES SHALL BE GASKETED AND WATER TIGHT. BOOTED COUPLERS AT THE STRUCTURE OR A WATER STOP WITH NON-SHRINK GROUT MAY BE USED IN ACCORDANCE WITH LOCAL CODES. 25. CONTRACTOR SHALL AIR TEST ALL STORM SEWER PIPE IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS. EXHIBIT G LANDSCAPE LEGEND EDGER (TYP.) APPROXIMATE LIMITS OF SEEDING/ SEED ALL DISTURBED AREAS (TYP.) SEED EDGE (TYP.) BOULDERS (TYP.) SEED WITH SHORT PRAIRIE GRASS SEED MIX AND WILDFLOWER MIX AVAILABLE FROM PRAIRIE RESTORATIONS, INC. SEED WITH MNDOT WET DITCH SEED MIX (TYP.) A LANDSCAPE KEYNOTES EDGER (TYP.) ROCK MULCH (TYP.) SEED WITH MNDOT SOUTHERN BOULEVARD SEED MIX (TYP.) BOULDER (TYP.) SEED WITH SHORT PRAIRIE GRASS SEED MIX AND WILDFLOWER MIX AVAILABLE FROM PRAIRIE RESTORATIONS, INC. SEED WITH MNDOT WET DITCH SEED MIX TYP.) BOTTOM BASIN PLUGS: DISTRIBUTE EVENLY USING TRIANGULAR SPACING, SEE INFILTRATION POND PLANT SCHEDULE A B C D E F G T NO P A R KI N G FFE: 982.30± 3,395 SF HERITAGE DRIVE ID E A LIC A V E N U E A B C D D D D D D D D A B A B B A B B B B B E C C E E F F E E C C G SYMBOL CODE QTY COMMON NAME BOTANICAL NAME N/A CAL. CONIFEROUS TREE NWS 3 NORWAY SPRUCE PICEA ABIES B & B 6` HT. OVERSTORY TREE BOL 5 BOULEVARD LINDEN TILIA AMERICANA `BOULEVARD`B & B 2.5" CAL. IHL 5 IMPERIAL HONEYLOCUST GLEDITSIA TRIACANTHOS VAR. INERMIS `IMPERIAL`B & B 2.5" CAL. PRE 3 AMERICAN ELM ULMUS AMERICANA `PRINCETON`B & B 2.5" CAL. SWO 3 SWAMP WHITE OAK QUERCUS BICOLOR B & B 2.5" CAL. SYMBOL CODE QTY COMMON NAME BOTANICAL NAME CONTAINER SPACING CONIFEROUS SHRUBS HZA 7 HETZ MINI ARBORVITAE THUJA OCCIDENTALIS `HETZ MINI`#5 CONT. 3` O.C. SGJ 19 SEA OF GOLD JUNIPER JUNIPERUS X PFITZERIANA 'MONSAN'#5 CONT. 4` O.C. TAU 9 TAUTON YEW TAXUS X MEDIA `TAUNTONII`#5 CONT. 5` O.C. DECIDUOUS SHRUBS AFD 8 ARTIC FIRE DOGWOOD CORNUS SERICEA `ARTIC FIRE`#5 CONT. 3` O.C. ANH 4 ANNABELLE HYDRANGEA HYDRANGEA ARBORESCENS `ANNABELLE`#5 CONT. 4` O.C. BLC 26 IROQUOIS BEAUTY BLACK CHOKEBERRY ARONIA MELANOCARPA `IROQUOIS BEAUTY` TM #5 CONT. 4` O.C. GLS 5 GRO-LOW FRAGRANT SUMAC RHUS AROMATICA `GRO-LOW`#5 CONT. 4` O.C. LDN 10 LITTLE DEVIL NINEBARK PHYSOCARPUS OPULIFOLIUS `DONNA MAY` TM #5 CONT. 4` O.C. ORNAMENTAL GRASSES GVH 6 GOLDEN VARIEGATED HAKONECHLOA HAKONECHLOA MACRA `AUREOLA`#1 CONT 24" OC HMS 14 HEAVY METAL SWITCHGRASS PANICUM VIRGATUM 'HEAVY METAL'#1 CONT. 3` O.C. NSG 20 NORTHWIND SWITCH GRASS PANICUM VIRGATUM 'NORTHWIND'#1 CONT. 24" O.C. PDS 23 PRAIRIE DROPSEED SPOROBOLUS HETEROLEPIS #1 CONT. 18" O.C. PFG 5 PURPLE FLAME GRASS MISCANTHUS X `PURPURASCENS`#1 CONT 18" O.C. PERENNIALS BES 21 BLACK-EYED SUSAN RUDBECKIA FULGIDA `GOLDSTURM`#1 CONT. 18" O.C. RBC 21 RUBY STAR CONEFLOWER ECHINACEA PURPUREA `RUBY STAR`#1 CONT. 20" O.C. VPA 14 VISION IN PINK CHINESE ASTILBE ASTILBE CHINENSIS 'VISION IN PINK'#1 CONT. 24" O.C. PLANT SCHEDULE BOTTOM OF BASIN PLUGS 2,205 SF CAREX PENSYLVANICA / PENNSYLVANIA SEDGE 51 FLAT, 2" PLUGS 20% @ 36" oc CAREX VULPINOIDEA / FOX SEDGE 64 FLAT, 2" PLUGS, 36" OC 25% @ 36" oc EUPATORIUM MACULATUM / JOE PYE WEED 14 FLAT, 2" PLUGS, 48" O.C. 10% @ 48" oc EUPATORIUM PERFOLIATUM / BONESET 36 FLAT, 2" PLUGS, 48" O.C. 25% @ 48" oc IRIS VERSICOLOR / BLUE FLAG 25 FLAT, 2" PLUGS, 36" OC 10% @ 36" oc PANICUM VIRGATUM / SWITCHGRASS 25 FLAT, 2" PLUGS, 36" OC 10% @ 36" oc INFILTRATION POND PLANTSCHEDULE202NDSTREET 1 CI T Y C O M M E N T S 03 2 8 2 0 2 5 B S K Th i s d o c u m e n t t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n a s a n i n s t r u m e n t o f s e r v i c e i s i n t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d R e u s e o f a n d i m p r o p e r r e l i a n c e o n t h i s d o c u m e n t w i t h o u t w r i t t e n a u t h o r i z a t i o n a n d a d a p t a t i o n b y K i m l e y H o r n a n d A s s o c i a t e s I n c s h a l l b e w i t h o u t l i a b i l i t y t o K i m l e y H o r n a n d A s s o c i a t e s I n c SHEET NUMBER 2 0 2 5 K I M L E Y H O R N A N D A S S O C I A T E S I N C 11 9 9 5 S I N G L E T R E E L A N E S U I T E 2 2 5 E D E N P R A I R I E M N 5 5 3 4 4 PH O N E 6 5 1 6 4 5 4 1 9 7 WW W K I M L E Y H O R N C O M K: T C W L D E V t h e a r c h i t e c t s p a r t n e r s h i p l a k e v i l l e c h a s e b a n k 3 D e s i g n C A D p l a n s h e e t s L 1 L A N D S C A P E P L A N D W G A p r i l 3 0 2 0 2 5 1 0 2 5 a m BY RE V I S I O N S No DA T E PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N 2 CI T Y C O M M E N T S 05 0 1 2 0 2 5 B S K Know what'sbelow. before you dig.Call R PR E P A R E D F O R LA N D S C A P E P L A N L100 CH A S E B A N K 2 0 2 N D W AN D I D E A L A V E TH E A R C H I T E C T S PA R T N E R S H I P LA K E V I L L E MN DA T E I H E R E B Y C E R T I F Y T H A T T H I S P L A N SP E C I F I C A T I O N O R R E P O R T W A S P R E P A R E D B Y ME O R U N D E R M Y D I R E C T S U P E R V I S I O N A N D TH A T I A M A D U L Y L I C E N S E D P R O F E S S I O N A L LA N D S C A P E A R C H I T E C T U N D E R T H E L A W S O F TH E S T A T E O F M I N N E S O T A MNLI C N O RY A N A H Y L L E S T E D 03 2 8 2 0 2 5 53 8 2 8 DA T E CH E C K E D B Y SC A L E DE S I G N E D B Y DR A W N B Y KH A P R O J E C T 16 0 0 9 4 0 5 6 03 2 8 2 0 2 5 AS S H O W N CF K RA H CF K NOTE: QUANTITIES ON PLAN SUPERSEDE LIST QUANTITIES IN THE EVENT OF A DISCREPANCY. ABBREVIATIONS: B&B = BALLED AND BURLAPPED CAL. = CALIPER HT. = HEIGHT MIN. = MINIMUM O.C. = ON CENTER SP. = SPECIES QTY. = QUANTITY PERIMETER TREES REQUIRED:PLANTINGS AT PROPERTY PERIMETER, DESIGNED SITE AMENITIES (COMPOSITION OF PLANT MATERIAL AND / OR CREATIVE GRADING, DECORATIVE LIGHTING, EXTERIOR SCULPTURE, ETC) PERIMETER TREES PROVIDED:SEE PLAN CONIFEROUS TREES MAY REPLACE SOME DECIDUOUS TREES TO PROVIDE YEAR AROUND SCREENING PARKING LOT SCREENING REQUIRED:36" HT MAX. CONTINUOUS SCREEN OF PARKING LOT FROM ROADWAY DECIDUOUS TREES 40' O.C. MAX, CONIFEROUS TREES 15' O.C. MAX, DECIDUOUS SHRUBS 4' O.C. MAX, CONIFEROUS SHRUBS 3' O.C. MAX PARKING LOT SCREENING PROVIDED:SEE PLAN INTERIOR LANDSCAPE AREA REQUIRED:441 SF = (8,820 SF OFF STREET PARKING AREA / 100) * 5 INTERIOR LANDSCAPE AREA PROVIDED:772 SF MINIMUM DIMENSION OF LANDSCAPE AREA IS NINE (9) FEET IN ANY DIRECTION, MEASURED FROM BACK OF CURB. MINIMUM LANDSCAPE AREA IS ONE HUNDRED SIXTY (160) SQUARE FEET. LANDSCAPING SHALL BE SETBACK 2' FROM PARKING STALLS. LANDSCAPE SUMMARY NORTH EXHIBIT H HERITAGE DRIVE ID EA LIC A V EN U E 202ND STREET T NO P A R KI N G FFE: 982.30± 3,395 SF EXISTING TIRES PLUS 1 CI T Y C O M M E N T S 03 2 8 2 0 2 5 B S K Th i s d o c u m e n t t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n a s a n i n s t r u m e n t o f s e r v i c e i s i n t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d R e u s e o f a n d i m p r o p e r r e l i a n c e o n t h i s d o c u m e n t w i t h o u t w r i t t e n a u t h o r i z a t i o n a n d a d a p t a t i o n b y K i m l e y H o r n a n d A s s o c i a t e s I n c s h a l l b e w i t h o u t l i a b i l i t y t o K i m l e y H o r n a n d A s s o c i a t e s I n c SHEET NUMBER 2 0 2 5 K I M L E Y H O R N A N D A S S O C I A T E S I N C 11 9 9 5 S I N G L E T R E E L A N E S U I T E 2 2 5 E D E N P R A I R I E M N 5 5 3 4 4 PH O N E 6 5 1 6 4 5 4 1 9 7 WW W K I M L E Y H O R N C O M K: T C W L D E V t h e a r c h i t e c t s p a r t n e r s h i p l a k e v i l l e c h a s e b a n k 3 D e s i g n C A D E x h i b i t s V a c a n t P a r c e l 2 0 2 5 0 3 1 7 C o n c e p t L a k e v i l l e V a c a n t P a r c e l C o n c e p t d w g M a r c h 2 7 2 0 2 5 1 5 4 p m BY RE V I S I O N S No DA T E PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N Know what'sbelow. before you dig.Call R NORTH PR E P A R E D F O R VA C A N T P A R C E L SI T E C O N C E P T CH A S E B A N K 2 0 2 N D W A N D I D E A L A V E TH E A R C H I T E C T S PA R T N E R S H I P LA K E V I L L E MN DA T E CH E C K E D B Y SC A L E DE S I G N E D B Y DR A W N B Y KH A P R O J E C T 16 0 0 9 4 0 5 6 11 2 5 2 0 2 4 AS S H O W N BS K BS K MT L CONCEPT PLAN IS SHOWN FOR REFERENCE ONLY. CONCEPT PLAN IS NOT TO BE USED IN ANY OTHER CAPACITY UNDER ANY CIRCUMSTANCES. EXHIBIT I EXHIBIT D D a t e C o m m e n t s Ch e c k e d B y Revisions Page M of 1 Da t e 3 2 6 2 0 2 5 PH O T O M E T R I C C A L C U L A T I O N S Dr a w n B y J J M JP M C L A K E V I L L E M N LI G H T I N G L A Y O U T DUE TO CHANGING LIGHTING ORDINANCES IT IS THE CONTRACTORS RESPONSIBILITY TO SUBMIT THE SITE PHOTOMETRICS AND LUMINAIRE SPECS TO THE LOCAL INSPECTOR BEFORE ORDERING TO ENSURE THIS PLAN COMPLIES WITH LOCAL LIGHTING ORDINANCES THIS LIGHTING DESIGN IS BASED ON INFORMATION SUPPLIED BY OTHERS. CHANGES IN ELECTRICAL SUPPLY, AREA GEOMETRY AND OBJECTS WITHIN THE LIGHTED AREA MAY PRODUCE ILLUMINATION VALUES DIFFERENT FROM THE PREDICTED RESULTS SHOWN ON THIS LAYOUT. THIS LAYOUT IS BASED ON IES FILES THAT WERE LAB TESTED OR COMPUTER GENERAGED. ACTUAL RESULTS MAY VARY MH IS OVERALL MOUNTING HEIGHT Luminaire Schedule Symbol Label Qty Part Number Description Calculation Summary Label Units Avg Max Min Avg/Min Max/Min Description 24HR-ENTRY 5'Fc 56.89 86.9 16.2 3.51 5.36 FC TAKEN 5' FROM ENTRY @ 3'-0" AFG SL3 1 24HR-ENTRY 50'Fc 4.21 52.7 2.0 2.11 26.35 FC TAKEN 50' FROM ENTRY @ 3'-0" AFG EACL010E4AF740-DIMMING-D1-FINISH FULL CUTOFF AREA LIGHT ATM 5'Fc 76.71 107.8 24.9 3.08 4.33 SL2 1 EACL010D4AF740-DIMMING0D1-FINISH W/SHIELDFULL CUTOFF AREA LIGHT W/SHIELD FC TAKEN 5' FROM ATM @ 3'-0" AFG ATM 50'Fc 4.00 99.3 0.1 40.00 993.00 SL1-S FC TAKEN 50' FROM ATM @ 3'-0" AFG PROPERTY LINE Fc 0.30 1.0 0.0 N.A. 7 EACL010E4AF740-DIMMING- D1-FINISH W/SHIELDFULL CUTOFF AREA LIGHT W/SHIELD N.A.FC TAKEN @ GRADE SITE Fc 1.51 90.6 0.0 L7R 7 5811SAT20L RECESSED DOWNLIGHT L4-DO 5 9004-W1-RW-LED3090-W-BK-L1-UNV WALL MOUNT DN LIGHT L21-B 1 XTOR6B-W WALL MOUNT FULL CUTOFF HO WALLPACK N.A.N.A.FC TAKEN @ GRADE JPMC PAVEMENT Fc 3.83 90.6 0.6 6.38 151.00 FC TAKEN @ GRADE ATM HERITAGE DRIVE DRIVE- UP ATM DONOTENTER THRU ONLY T ONE WAY NO PARKING STOPSTOP STOP STOP FFE: 982.30 3,395 SF 24HR VEST. ENTRY SL1-S MH: 25 SL1-S MH: 25 MH: 25 SL1-SSL1-S MH: 25 SL3 MH: 25 SL1-S MH: 25 SL1-S MH: 25 MH: 25 SL2 L7R MH: 10 L7R MH: 10MH: 10 L7R MH: 10 L7R MH: 9 L4-DO L4-DO MH: 9 MH: 9 L4-DO L4-DO MH: 9 L4-DO MH: 9 L21-B MH: 9 L7R MH: 10 L7R MH: 10 MH: 10 L7R SL1-S MH: 25 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.4 0.4 0.4 0.5 0.4 0.3 0.2 0.3 0.1 0.1 0.1 0.1 0.2 0.3 0.6 0.5 0.3 0.2 0.1 0.2 0.4 0.6 0.7 0.5 0.4 0.2 0.5 0.6 0.8 1.0 0.9 0.7 0.8 0.7 0.5 0.30.40.20.20.10.20.20.40.60.60.40.30.20.20.20.20.40.40.2 0.3 0.5 0.7 0.8 0.40.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.5 0.7 0.7 0.7 0.8 0.6 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.3 0.3 0.3 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.5 0.7 0.6 0.8 0.6 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.7 1.2 1.2 1.6 1.2 0.6 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.9 1.6 1.4 2.2 1.4 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.5 1.1 2.3 2.4 4.1 2.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.5 1.2 2.4 2.3 4.3 2.1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.5 1.2 2.5 2.6 4.4 2.7 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.5 1.1 2.0 1.7 2.7 1.6 0.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.5 1.1 1.7 1.6 2.1 1.5 0.8 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.6 1.1 1.6 1.6 1.9 1.5 1.0 0.4 0.0 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 1.0 1.7 1.6 2.1 1.6 0.9 0.3 0.1 0.1 0.2 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.3 0.3 0.3 0.4 0.2 1.1 2.1 1.9 2.9 2.0 0.7 0.1 0.1 0.2 0.5 0.5 0.4 0.3 0.3 0.4 0.6 0.9 0.9 0.8 0.6 0.5 0.5 0.4 0.4 2.9 2.9 4.5 3.0 0.5 0.1 0.2 0.3 0.8 1.2 1.5 2.5 2.2 2.6 1.6 1.7 1.5 1.6 1.8 2.7 2.2 2.9 2.3 3.4 2.9 4.5 2.5 0.4 0.1 0.2 0.5 1.1 1.8 3.1 4.8 4.7 4.7 3.2 2.8 2.4 2.6 3.4 4.9 4.6 4.6 3.5 4.0 3.2 4.4 3.0 0.8 0.1 0.2 0.5 1.0 1.6 2.3 3.6 3.5 4.1 3.5 3.5 3.1 2.7 3.0 3.5 3.1 3.4 2.7 3.2 2.4 2.7 1.9 0.9 0.2 0.3 0.5 1.0 1.6 2.4 3.6 3.8 4.0 4.0 3.7 3.4 2.8 3.5 3.5 3.2 3.5 3.2 3.3 2.8 2.7 2.1 1.2 0.5 0.2 0.4 0.8 1.2 1.8 3.0 3.7 4.5 5.2 4.8 4.7 3.2 3.3 2.6 2.3 2.6 2.9 2.9 3.0 2.3 1.8 1.0 0.4 0.2 0.3 0.5 0.8 1.3 2.5 3.2 3.9 4.4 3.6 4.5 2.7 2.7 1.7 1.4 1.8 2.7 2.6 3.4 2.2 1.6 0.8 0.3 0.1 0.2 0.4 0.7 1.5 2.9 3.8 4.4 5.1 4.2 4.4 2.7 2.5 1.5 1.2 1.7 3.0 3.3 5.0 3.2 2.0 0.7 0.2 0.1 0.2 0.3 0.5 1.2 2.8 3.7 3.5 4.4 3.6 3.2 2.0 2.0 1.2 1.0 1.5 2.9 3.1 5.1 2.7 1.7 0.6 0.1 0.1 0.2 0.2 0.4 1.1 3.3 5.0 3.7 4.2 3.1 2.5 1.6 1.6 1.1 0.9 1.4 2.8 4.6 14.9 3.2 2.2 0.9 0.3 0.1 0.2 0.2 0.3 0.7 3.0 5.3 3.6 3.9 2.7 2.1 7.6 3.5 0.9 0.4 0.1 0.1 0.2 0.3 0.6 2.9 5.0 3.2 3.3 2.2 16.3 49.1 5.0 1.1 0.5 0.1 0.1 0.2 0.3 1.0 2.8 4.1 3.0 3.2 2.4 20.1 1.9 2.5 1.0 0.5 0.1 0.1 0.2 0.4 1.0 2.1 3.1 3.0 3.7 3.2 3.0 6.1 1.7 1.1 0.6 0.1 0.1 0.2 0.4 1.0 1.8 2.5 2.6 3.4 3.0 2.8 1.9 1.8 1.4 1.7 1.9 72.2 90.6 19.4 2.3 1.4 1.0 0.5 0.0 0.1 0.2 0.3 0.7 1.4 2.2 3.0 4.7 4.5 4.3 2.4 2.0 1.5 1.8 2.3 4.5 5.1 4.8 3.4 1.9 1.3 0.5 0.0 0.1 0.1 0.2 0.5 1.0 1.5 2.0 3.3 2.6 3.1 1.8 1.6 1.2 1.5 1.6 2.7 2.6 2.7 2.3 1.4 1.0 0.4 0.0 0.1 0.1 0.2 0.3 0.6 0.8 0.7 0.7 0.5 0.8 0.8 1.0 0.8 0.9 0.8 0.8 0.4 0.4 0.7 0.7 0.6 0.3 0.0 0.0 0.1 0.1 0.2 0.3 0.3 0.1 0.1 0.1 0.1 0.2 0.4 0.4 0.4 0.2 0.1 0.1 0.1 0.1 0.2 0.3 0.2 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 JPMC PAVEMENT FC TAKEN @ GRADE Illuminance (Fc) Average = 3.83 Maximum = 90.6 Minimum = 0.6 Avg/Min Ratio = 6.38 Max/Min Ratio = 151.00 EXHIBIT L EXHIBIT K EXHIBIT L Dakota County Surveyor’s Office Western Service Center 14955 Galaxie Avenue Apple Valley, MN 55124 952.891 -7087 Fax 952.891 -7127 www.co.dakota.mn.us March 13, 2025 City of Lakeville 20195 Holyoke Ave. Lakeville, MN 55044 Re: HERITAGE COMMONS 9TH ADDITION The Dakota County Plat Commission met on March 12, 2025, to consider the preliminary plat of the above referenced plat. The plat is adjacent to CSAH 50 (202nd St. W.) and is therefore subject to the Dakota County Contiguous Plat Ordinance. The proposed site is a replat of Outlot A, HERITAGE COMMONS 8TH ADDITION. The plat includes one lot and one outlot. The right-of-way needs for a 4-lane divided roadway are 75 feet of half right of way, which has been met. Restricted access is shown along all of CSAH 50 as dedicated in the plat of HERITAGE COMMONS. The Plat Commission has approved the preliminary and final plat and will recommend approval to the County Board of Commissioners meeting on April 8, 2025. Traffic volumes on CSAH 50 are 7,703 ADT and are anticipated to be 14,900 ADT by the year 2040. No work shall commence in the County right of way until a permit is obtained from the County Transportation Department and no permit will be issued until the plat has been filed with the County Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat Commission highly recommends early contact with the Transportation Department to discuss the permitting process which reviews the design and may require construction of highway improvements, including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact TJ Bentley regarding permitting questions at (952) 891-7115 or Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891-7070. Sincerely, Todd B. Tollefson Secretary, Plat Commission c: EXHIBIT M City of Lakeville Memorandum To:Kris Jenson, Planning Manager From:Alanna Sobottka, Civil Engineer McKenzie L. Cafferty, Environmental Resources Manager Copy:Tina Goodroad, Community Development Director Julie Stahl, Finance Director Zach Johnson, City Engineer David Mathews, Building Official Date:April 25, 2025 Subject:Heritage Commons 9th Addition Preliminary Plat Preliminary Grading and Erosion Control Plan Preliminary Landscape Plan Preliminary Utility Plan BACKGROUNDBACKGROUND The Architects Partnership, LTD has submitted a preliminary plat named Heritage Commons 9th Addition. The parent parcel (PID No. 22-32032-00-010) consists of Outlot A Heritage Commons 8th Addition and is zoned PUD, Planned Unit Development. The proposed development is located east of and adjacent to Idealic Avenue, north of and adjacent to 202nd Street West (CSAH 50), and south of Heritage Drive. The final plat consists of two (2) commercial lots within one (1) block on 2.66 acres. The proposed development will be completed by: Developer: The Architects Partnership, LLC Engineer: Kimley-Horn SITESITE CONDITIONSCONDITIONS HHERITAGEERITAGE CCOMMONSOMMONS 99THTH AADDITIONDDITION –– PPRELIMINARYRELIMINARY PPLATLAT AAPRILPRIL 25,25, 20252025 PPAGEAGE 22 OFOF 66 The site consists of undeveloped land. Three existing shared access driveways are located on the north and east sides of the parcel. There are no existing wetlands or trees located in or near the parcel. The site is located within the South Creek Stormwater District with the site generally draining south to north. STREETSTREET ANDAND SUBDIVISIONSUBDIVISION LAYOUTLAYOUT nd Street West (CSAH 50) th Addition is located north of and adjacent to 202nd Street West, a minor arterial County roadway as identified in the City’s Transportation Plan. The Dakota County Plat Commission reviewed the final plat at its March 12, 2025 meeting and recommended approval. The necessary right-of-way for 202nd Street West was dedicated with the Heritage Commons final plat; no additional right-of-way is required with the final plat. th Addition is located south of and adjacent to Heritage Drive, a minor collector roadway as identified in the City’s Transportation Plan. The right-of-way for Heritage Drive was dedicated with the Heritage Commons final plat; no additional right-of- way is required with the final plat. th Addition is located east of and adjacent to Idealic Avenue, a private roadway as identified in the City’s Transportation Plan. CONSTRUCTIONCONSTRUCTION ACCESSACCESS PARKS,PARKS, TRAILSTRAILS ANDAND SIDEWALKSSIDEWALKS nd Street West, and Heritage Drive adjacent to the plat. UTILITIESUTILITIES SSANITARYANITARY SSEWEREWER th Addition is located within subdistrict ML-70050 of the Lake Marion sanitary sewer district as identified in the City’s Comprehensive Sanitary Sewer Plan. Wastewater will be conveyed to the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility. HHERITAGEERITAGE CCOMMONSOMMONS 99THTH AADDITIONDDITION –– PPRELIMINARYRELIMINARY PPLATLAT AAPRILPRIL 25,25, 20252025 PPAGEAGE 33 OFOF 66 An existing sanitary sewer manhole extends into the east portion of the parcel. Development of Heritage Commons 9th Addition includes the extension of 6-inch sanitary sewer service to provide service to Lot 1, Block 1. The Sanitary Sewer Area Charge has been collected and will not be required with the building permit application. Final sewer service connection locations and sizes will be reviewed by City staff with the final construction plans. WWATERMAINATERMAIN An existing 8-inch watermain stub extends into the parcel from Heritage Drive on the north side. Development of Heritage Commons 9th Addition includes the extension of an 8-inch watermain to provide service to the development. Final water service connection locations and sizes will be reviewed by City staff with the final construction plans. DRAINAGEDRAINAGE ANDAND GRADINGGRADING Heritage Commons 9th Addition is located within subdistrict SC-52 of the South Creek Drainage District, as identified in the City’s Water Resources Management Plan. Development of Heritage Commons 9th Addition will include the construction of one privately owned and maintained stormwater infiltration basin located within Lot 1, Block 1, Heritage Commons 9th Addition. The Developer shall sign a stormwater maintenance agreement for the stormwater basin and dedicate a drainage and utility easement over the stormwater management area prior to the recording of the final plat. The infiltration basin will provide water quality treatment, volume reduction and rate control of the stormwater runoff generated from the proposed site improvements. The final grading plan must indicate any proposed borrow areas in which the building footings will be placed on fill material. The grading specifications must indicate that all embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be issued until an as-built certified grading plan has been submitted and approved by the City Engineer. Heritage Commons 9th Addition contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being HHERITAGEERITAGE CCOMMONSOMMONS 99THTH AADDITIONDDITION –– PPRELIMINARYRELIMINARY PPLATLAT AAPRILPRIL 25,25, 20252025 PPAGEAGE 44 OFOF 66 disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. HHERITAGEERITAGE CCOMMONSOMMONS 99THTH AADDITIONDDITION –– PPRELIMINARYRELIMINARY PPLATLAT AAPRILPRIL 25,25, 20252025 PPAGEAGE 55 OFOF 66 STORMSTORM SEWERSEWER Privately owned and maintained storm sewer will be constructed with Heritage Commons 9th Addition. Private storm sewer constructed within Lot 1, Block 1, Heritage Commons 9th Addition will convey runoff to the privately owned and maintained stormwater infiltration basin. The stormwater basin will outlet to the existing City storm sewer system along Heritage Drive. A security of $2,500.00 will be collected for the proposed storm sewer connection with the final plat. The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and will be collected with the final plat. Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. Heritage Commons 9th Addition is shown on the Flood Insurance Rate Map (Map Nos. 27037C0211E; Eff. Date 12/2/2011) as Zone X by the Federal Emergency Management Agency FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. There are no wetlands on the site. There are no trees within the parent parcel. The plans include a detailed erosion and sediment control plan. The Developer is responsible for meeting all the requirements of the MPCA Construction Permit. The permit requires that all erosion and sediment best management practices (BMPs) be clearly outlined in a site’s SWPPP. Additional erosion control measures may be required during construction as deemed necessary by City staff. Any additional measures required shall be installed and maintained by the Developer. Changes made throughout construction must be documented in the SWPPP. An on-site preconstruction meeting shall be held with the City prior to work commencing on the site. No grading can take place until the City has reviewed and approved the SWPPP for the site. HHERITAGEERITAGE CCOMMONSOMMONS 99THTH AADDITIONDDITION –– PPRELIMINARYRELIMINARY PPLATLAT AAPRILPRIL 25,25, 20252025 PPAGEAGE 66 OFOF 66 The MS4 Administration Fee has not been collected on the parent parcel and shall be paid with the final plat. RECOMMENDATIONRECOMMENDATION th Addition preliminary plat, preliminary grading and erosion control plan, preliminary utility plan, and landscape plan subject to the requirements and stipulations within this report.