Loading...
HomeMy WebLinkAbout18259 Huntley TrlJg � I I I I I I I I I I \ I I I I I I I 1 I I -=6Planned Trail / Planned r 1 PROPOSED Retaining GARAGE — wall 18259N nBeylTrai1 PROP0 0 ;e0 Ell LOOKO T S (la 4 »w_ did C _ $�� & b E519�88.la- LEGEND Existing Building IM Utility Pedestal ❑ Offset Iron --->--- Sanitary Line — — — ggl — — — Existing Contour GRADING QUANTITIES (Ch --- --- Water Line —962— Proposed Contour Calc Common Cut -240 ZIB --- on Storm Line Proposed Spot Elevation Galc Common Fill 0 Set Lath Property Corner Frivol -21 at S6 Existing Spot Elevation Basement Slab -35 d Cleanout Contracted Amount -50 Surface Drainage Direction Additional Amount -0 ® Curb Stop Send -7 O ManholeGatch Basin Swell 20% 55 Total Cut a53 Total Fill1 334 Total (±) _19 CONSTRUCTION NOTES: 1. Install mck construction entrance. 2. Install silt fence as needed for erosion. 3. Sidewalks shall drain away from house a minimum 0 0f1% 4. Contractor must verify driveway design. 5. Contractor must verify service elevation priorto construction. fi. Add or remove foundation ledge as required GENERAL NOTES: 1. Grading plan by ISO last dated May 9, 2022 was used to determine proposed elevations shown hereon N 2. This survey does not purport to show improvements or encroachments, except as shown, as surveyed by ISO or under my direct supervision. 3. Proposed building dimensions shown are for horizontal location ofstructures on the lot only. Contact builder prior to construction for approved construction plans. 4. No specific soil investigation has been performed on this lot bythe surveyor. The suitability ofsoils to 20 0® support the specific house proposed is not the responsibility of the surveyor SCALE IN FEET 5. If bui Id in fo otprint ex coo ds the builtling pad additional earthwork and testing will be required to meet the requirements as outlined within the geotechnical report. fi. This certificate do as not pu ry oft to show easements otherthan those shown on the recorded plat. 1. Bearings shown are based on the Final Plat. 8. Site address is 18259 Huntley Trail, Lakeville, MN S.:mwoisWmN nn i.w+ RaoassounsuRmvm MARK A SCHWARZ eM �`g�,� pp _ - -A+�^'^^�_ 55944 9. House/Basement type. McKinley EN 11 C3- Right - Lookout 10. Building dimensions shown are based on First Floor DAh3/11n5 u4 No 45817 THI DOCUMENT IS THE PROPERTv or I NO GROUP ING AND Mew NOT BE USED. GORIED OR DUPLICATED OR WRITTEN SONSEN T. PPnJEH Plan 11. Proposed Contours are shown hereon. 12. Topographic surveywas completed on March F. LENNAR 2025. CORPORATION CASLANO 2nd BENCHMARK: LOT 7r BLOCK 7 Top nut fire hydrant located in the SHE quadrant of Hideaway Trail and Highview Avenue. LAKEVIUE MINNESOTA REMAGION SCHEDULE Elevation = 1038.03 feet DATE DESCRIPTION U, AREA TABLE: House/Garage Area = 2, 070 sq. ft. Porch Area = 149 sq. ft. Dnveway=alk Area = 809 so. ft. PROJECT NO 21- Total Impervious Area = 3 028 sq. ft CAN FILE CAME 2530 LI RI Lot Area = 10069 sq ft. DESIGNED By Impervious Coverage = 30.195 0 RGICUSL ISSUE DATE CLIENT PROJECT NO TITLE HOUSE ELEVATIONS: Proposed/As-Built Garage Floor= 10744 CERTIFICATE Top of Foundation = 1074 7 Lowe at Floor= 10667 OF SURVEY Lowest Opening= 1069.9 ex]t ad till Da DIR, aailDn ndriveway nand lot grading 241448 L