Loading...
HomeMy WebLinkAboutItem 05a - 2026-2030 Capital Improvement Plan1 City of Lakeville Memorandum To: Planning Commission From: Justin Miller, City Administrator Julie Stahl, Finance Director Paul Oehme, Public Works Director Zach Johnson, City Engineer Joe Masiarchin, Parks & Recreation Director Date: September 18, 2025 Subject: 2026-2030 Capital Improvement Plan (CIP) Attached is a draft of the proposed 2026-2030 Capital Improvement Plan (CIP). The CIP is comprised of the following components: Transportation, Utility, Environmental Resources, Parks and Recreation, Facilities, Equipment and Technology. Included with this plan are the project descriptions, locations, revenues and expenditures. The 2026-2030 CIP includes public improvement projects due in large part to increased growth, economic conditions, and the resulting increase in revenue from City permits and connection charges to finance infrastructure improvements. The following are the more significant improvement projects included in the 2026-2030 CIP: Transportation  CP XX-01: Annual Pavement Management/Maintenance (2026-2030 construction)  CP XX-02: Annual Street Rehabilitation/Reconstruction (2026-2030 construction)  CP XX-03: Annual Collector Roadway Rehabilitation/Reconstruction (2026-2030 construction)  CP 22-16: Freight Rail Car Storage Facility (2026 construction)  CP 24-04: 185th St/CSAH 60 Extension (Dodd Blvd - Highview Ave) (2023 construction, 2025 and 2026 payments to Dakota County)  CP 24-05: 179th St/Future CSAH 9 Bridge (2030 construction)  CP 25-04: 185th St/CSAH 60 Expansion (Kenwood Tr - Ipava Ave) (2025 construction; 2026-2028 payment to Dakota County)  CP 25-05: Holyoke Ave/Highview Ave Reconstruction (2029 construction)  CP 26-04: Dodd Blvd/CSAH 9 Modernization (210th St – 202nd St/Kenwood Tr) (2027 construction)  CP 26-05: Interstate 35/CSAH 50 Interchange (2028/2029 construction)  CP 26-15: Lake Marion Greenway (2026 construction)  CP 27-11: CSAH 9 and Glacier Way Trail Traffic Signal (2027 construction)  CP 28-04: Dodd Blvd/CSAH 9 Modernization (215th St - 210th St) (2028 construction)  CP 28-05: CSAH 60 and Orchard Trail Traffic Signal (2027 construction)  CP 29-04: CSAH 9 Improvements at 194th St and 190th St (2029 construction) 2 Utilities  CP 26-09: 215th St Public Improvements (2026 construction)  Watermain maintenance/replacement and sanitary sewer rehabilitation - in conjunction with annual street rehabilitation/reconstruction projects (2026-2030 construction)  Dakota Heights Water Tower Repainting (2026 construction)  Wells 24 and 25 (2028 construction) Parks  Grand Prairie Park (2024-2026 construction)  East Community Park (2026 construction)  Spyglass Park - Phase II (2026 construction)  Voyageur Park (2027 construction)  Ritter Meadows Park (2029 construction)  Klamath Trail Retaining Wall (2027 construction)  Grand Prairie Skatepark (2029 construction)  Various trail and trail lighting projects (2026-2030 construction) Facilities  Public Safety Training Facility (FiRST Center) (2025-2026 construction)  Central Maintenance Facility (CMF) Expansion (2027 construction)  Water Treatment Facility (WTF) Satellite Plant (2027 construction)  Fire Station #5 Construction (2026 construction)  Fire Station Renovations (2027-2028 construction)  Police Station Workout Room Expansion (2028 construction) The CIP was presented to the City Council at their August 25 workshop. The final 2026-2030 CIP will be considered for approval at the October 6, 2025 City Council meeting. Minnesota State Statute 462.356 provides that capital improvements are reviewed by the Planning Commission for consistency with the Comprehensive Plan and the Planning Commission report their findings in writing to the City Council. The Planning Commission is not responsible for reviewing the fiscal implications of the CIP. Staff reviewed the CIP and finds it consistent with the Comprehensive Plan. Therefore, staff recommends a motion finding that the capital improvements identified in the 2026-2030 CIP are in compliance with the Comprehensive Plan. DRAFT City of Lakeville 2026-2030 Capital Improvement Plan- Page 2 Table of Contents 2026-2030 Capital Improvement Plan Page Introduction/Summary Debt Analysis & Tax Levy Impact 3 5 Cost Type Summary 12 Funding Source Summary 13 Projects & Funding Sources by Cost Type 15 Project Details 20 Street Reconstruction Plan (2026-2030) 114 City Planning/Studies/Project chart 115 Map of Major Projects 116 City of Lakeville 2026-2030 Capital Improvement Plan- Page 3 Introduction The Capital Improvement Plan provides a long-range framework to meet the infrastructure needs and development objectives of our community. It provides policy makers and the community with a strategic (documented) approach to implementation and administration of improvement projects and equipment acquisitions. The Plan identifies the allocation of the City’s financial resources and maximizes the use of non- tax revenues to finance the improvements. Municipal State Aid Street Funds (MSA), connection charges, special assessments and other revenue sources are vital elements to financing City improvements. The use of these revenue sources reduces the reliance on property taxes to finance these improvements. The City should pursue the financing strategy as presented, but future events may require changes in both costs and revenues. The Capital Improvement Plan represents a significant financial, engineering and development undertaking for the City in the years ahead. The Capital Improvement Plan is consistent with the City’s Comprehensive Plan and takes into consideration projects identified in the Dakota County Capital Improvement Plan. Categories Transportation includes all roads, streets, street lights, bridges and traffic signals within the City with the exception of Interstate I-35 and routine maintenance of County roads. Major funding sources include Municipal State Aid Street funds, special assessments and property taxes. Utility infrastructure includes the construction and major maintenance of all water systems such as wells, towers and the water treatment facility. Utilities also include sanitary sewer and storm sewer systems. The primary source of financing for developing new systems is connection charges when property develops or with the issuance of a building permit. Maintenance projects are financed with user fees. The Water Treatment Plant project in 2027 is planned to include a combination of bond funding (principal and interest payments to be repaid with user fees), and fund balance/net assets in the Water Trunk Fund and Water Operating Fund, respectively. Environmental Resources system includes lakes, wetlands, streams, prairies and woodlands. Maintenance project are financed with user fees. Parks system includes regional, community and neighborhood parks as well as trails and recreation facilities such as the Arts Center and Heritage Center. Major resources include park dedication fees collected when property develops, and grants. Maintenance projects are financed with property taxes and other revenue sources. A parks bond referendum was approved in the fall of 2021 and related projects are being constructed between 2022-2026. City of Lakeville 2026-2030 Capital Improvement Plan- Page 4 Facilities include the city hall, police station, fire stations, central maintenance facility and other municipal buildings including the FiRST Center. Primary revenue sources include, but not limited to, property taxes, General Fund, Water Fund, and planned bond proceeds in several years (for the FiRST Center, Fire station renovations, CMF expansion, and Water Treatment plant expansion). Bonds on the CMF expansion are planned to be repaid by property tax levies, and bonds for fire station construction/renovation are planned to be repaid by franchise fees. Equipment includes all major equipment acquisitions and replacement. Primary revenue sources include, but not limited to, Liquor Fund contributions, General Fund, Utility Funds, sale of assets and property taxes. Technology includes all major technology-related equipment acquisitions and replacement. Primary revenue sources include, but not limited to, Liquor Fund, General Fund, Utility Funds, and property taxes. Program Summary The majority of capital investments are in Facilities and Transportation for the next five years.  The total budgeted capital expenditures by category are shown on the Cost Type Summary report.  The projects are financed from diverse revenues sources, as shown on the Funding Source Summary.  The Sources and Uses of Funds Details report includes the estimated revenues and expenditures for tax-levy funded Capital Project Funds for the next 10 years.  Project Details are shown on subsequent pages. City of Lakeville 2026-2030 Capital Improvement Plan- Page 5 Debt Analysis and Tax Impact In reviewing the 2026-2030 Capital Improvement Plan, the City Council should consider the level of debt, the commitment of funds to repay that debt, as well as the annual tax impact associated with the scheduled projects. As of 12/31/2025, the City of Lakeville will have $163,395,000 in debt. The following chart reflects the type of debt that comprises the $163.4M. The 2026-2030 CIP includes projects that are funded by bond proceeds. Bonds are issued for the project costs that the City is funding through tax levies as well as the costs that are specially assessed to property owners. The City anticipates $154,163,000 in bonding for projects in the CIP plan for 2026-2030, including the following-  $29,463,000 for street reconstruction/collector road rehabilitation projects in 2026- 2030  $5,240,000 for public utility improvements in 2026  $17,960,000 for the CMF facility expansion in 2027  $40,000,000 for the bonded portion of a Water Treatment Facility satellite facility in 2027  $21,500,000 in 2026, $20,000,000 in 2027 and $20,000,000 in 2028 for fire station construction/remodel projects. Amount 66,155,000$ 11,805,000 55,505,000 3,045,000 4,635,000 550,000 15,245,000 6,405,000 - 50,000 Total remaining principal: 163,395,000 Bond Type Purpose Various capital projects (Central Maintenance Facility, Police Station) Street reconstruction projects GO Capital Improvement GO Street Reconstruction Various capital improvement projects; Includes special assessment-supported debt. Various street improvement projects Holyoke Water Tower, Water Treatment Facility Improvements, Wells 21 and 22 Construction of liquor store (2007) Watermain replacement (in conjunction with street reconstruction projects) Lift station #6 replacement Holyoke Ave Street Lights Arenas projects 2021-2022, Keokuk Liquor Store construction GO Improvement GO State-aid Street Revenue GO Water Revenue HRA Lease Revenue-Liquor Water revenue Sewer revenue Street light revenue Tax Abatement City of Lakeville 2026-2030 Capital Improvement Plan- Page 6 The anticipated bonding amount for 2026 is $30,805,576, which assumes no bonding is needed in 2026 for planned equipment expenditures. The current CIP projections assume no bond funding will be needed for the Municipal State Aid (MSA) projects, which will be dependent on project costs and timing, as well as the ability of Dakota County to provide advance funding on certain MSA projects. Major projects scheduled for 2026, which are planned to be funded with bonds are listed below (note that these amounts also include any bonds which will be repaid by special assessments): Major projects which involve a property tax levy component in 2026 are listed below: Project costs in the CIP may be higher or lower than the tax levy amounts above, due to additional funding sources beyond tax levy, such as fund balance, or other sources (as reflected in the CIP). There are sometimes transfers from General Fund balance reserve into Capital Project Funds to reduce the impact on the tax levy, and such transfers are not reflected in the table above. Project Description Total estimated bonds in 2026 26-02: 2026 Street Reconstruction 3,580,000$ 26-03: Collector Roadway Rehabilitiation 485,576 25-11 New Fire Station Construction 19,500,000 26-09: 215th St Public improvements 5,240,000 Land acquisition for fire station expansion 2,000,000 TOTAL 30,805,576$ Project Description Tax Levy Pavement maintenance project 26-01 (Pavement Management Fund) 2,150,000$ Park & Trail improvements (Park & Trail Improvement Fund) 1,550,000 Equipment purchases (Equipment Fund) 400,000 Facilities maintenance/improvements (Building Fund) 1,000,000 Technology needs (Technology Fund) 250,000 TOTAL 5,350,000$ City of Lakeville 2026-2030 Capital Improvement Plan- Page 7 The following chart reflects the cumulative effect of new debt issued as indicated in the CIP and the retirement of existing debt. The top line is the resulting debt balance at the end of each year. City of Lakeville 2026-2030 Capital Improvement Plan- Page 8 The following charts reflect the cumulative effect of new debt issued as indicated in the proposed CIP and the retirement of existing debt on a per capita basis, and on a per household basis, respectively. City of Lakeville 2026-2030 Capital Improvement Plan- Page 9 City of Lakeville 2026-2030 Capital Improvement Plan- Page 10 The impact of the 2026-2030 CIP and other anticipated bond payment adjustments on the debt service property tax levy are reflected in the following table: Each year, certain bond issues mature and the corresponding debt service payments are eliminated. As noted in the CIP, the City initiated a Pavement Management Program starting in 2009, which increased the scope of the annual street reconstruction projects, which in turn has increased the amount of debt related to such street reconstruction projects. The amount of debt service dropping off each year as payments are made is less than the amount that we are adding for new CIP projects. This results in an increase in the debt service property tax levy. The proposed CIP projects will impact the debt service beginning in 2027. The anticipated bond payments on debt issued in conjunction with these new projects will result in an increased debt service levy of approximately $527,000 for 2027, $2,883,000 for 2028, $3,638,000 for 2029, and $4,413,000 for 2030. The $154.2M of bonding for projects in the 2026-2030 CIP will require significant bond payments beginning in 2027 from the following sources: tax levy, special assessments, franchise fee revenues, and Water Operating Fund. The estimated annual payments by source are shown in the table and chart below. Projected Change in Debt Levy 2026 2027 2028 2029 2030 Total 2026- 2030 12,897,737 12,312,400 11,342,037 9,907,379 58,605,343 Change from: Existing Debt - 751,948 (585,337) (970,363) (1,434,658) (2,238,410) One-time Adjustments - - - - - - New CIP: Street projects - 527,000 1,442,000 2,197,000 2,972,000 7,138,000 Equipment - - - - - - Facilities - - 1,441,157 1,441,157 1,441,157 4,323,471 Parks - - - - - - Change from New CIP: - 527,000 2,883,157 3,638,157 4,413,157 11,461,471 Total Change - 1,278,948 2,297,820 2,667,794 2,978,499 9,223,061 Revised Debt Levy 12,145,789 13,424,737 15,195,557 14,980,194 14,320,536 67,828,404 % Change in Debt Levy 11% 13% -1% -4% City of Lakeville 2026-2030 Capital Improvement Plan- Page 11 *Each year reflects a cumulative total of the funding that would be needed from each of the sources for that year (for example, the obligations shown in 2028 include the change from new CIP debt in 2026 as well as 2027). Impact of the Capital Improvement Plan on the Operating Budget The City’s Operating Budget is affected by the Capital Improvement Plan. Capital improvements typically result in ongoing expenses for routine operation, repair and maintenance upon completion or acquisition. Existing City facilities and equipment will eventually require rehabilitation, renovation or upgrades to accommodate new uses or address needed improvements. Older facilities usually involve higher maintenance and repair costs as well. Capital improvements make a positive contribution to the economic vitality, quality of life and fiscal well-being of our community in spite of potential recurring operating costs. Capital projects such as the redevelopment of under-performing or under-used areas of the City, and the infrastructure expansion needed to support new development, help promote the economic development and growth that generates additional operating revenues. These new revenue sources provide the funding needed to maintain, improve and expand the City’s infrastructure. Additional considerations Dakota County staff continue to prepare the Dakota County’s draft 2026-2030 Transportation, Transportation Sales & Use Tax, and Regional Rail Authority Capital Improvement Program. City and County staff continue to coordinate efforts to create CIPs that align with both local and regional transportation needs. Funding of New Debt from CIP (Cumulative Payments by Year) 2027 2028 2029 2030 2031 Tax Levy 527,000 2,883,157 3,638,157 4,413,157 5,037,157 Special Assessments 678,604 721,340 837,895 898,074 898,074 Franchise Fees 1,725,216 3,330,067 4,934,919 4,934,919 4,934,919 Water Fund - 3,209,703 3,209,703 3,209,703 3,209,703 2,930,820 10,144,268 12,620,674 13,455,853 14,079,853 2026 through 2030 Capital Improvement Plan Lakeville, MNCost Type Summary Cost Type 2026 2027 2028 2029 2030 Total Environmental Resources 1,602,500 1,601,500 1,601,500 1,601,500 1,501,500 7,908,500 Equipment 3,955,358 3,702,407 5,033,350 4,515,312 4,789,749 21,996,176 Facilities 40,871,256 80,100,000 23,667,800 4,374,400 660,199 149,673,655 Parks 7,160,050 4,561,500 2,898,500 3,692,000 3,109,000 21,421,050 Technology 364,663 602,525 743,368 244,994 305,319 2,260,869 Transportation 25,145,522 23,540,884 22,722,971 19,295,488 25,828,100 116,532,965 Utility 9,732,000 1,882,000 3,535,000 2,005,000 1,725,000 18,879,000 GRAND TOTAL 88,831,349 115,990,816 60,202,489 35,728,694 37,918,867 338,672,215 Produced Using Plan-It CIP Software Page 12 2026 through 2030 Capital Improvement Plan Lakeville, MNFunding Source Summary Source 2026 2027 2028 2029 2030 TotalProduced Using Plan-It CIP Software Page 13 Source 2026 2027 2028 2029 2030 Total Arenas 3,142 3,303 1,739 1,457 2,075 11,716 Building Fund 2,581,000 540,000 3,432,800 4,194,440 289,000 11,037,240 Communications Fund 48,908 68,513 50,000 52,000 77,502 296,923 Dakota County 5,280,500 9,215,000 5,228,161 354,250 9,308,000 29,385,911 Dakota County- Advance funding of city share -2,162,128 479,781 1,308,497 -925,620 -917,971 -2,217,441 Donations 60,000 60,000 Environmental Resources Fund 1,441,070 1,349,010 1,352,383 1,340,000 1,343,848 6,826,311 Equipment Fund 3,138,092 3,411,922 4,868,298 4,015,469 4,269,507 19,703,288 Escrows 362,029 196,000 657,600 1,215,629 FiRST Center Operating Fund 25,000 100,000 125,000 General Fund 209,960 250,925 151,500 209,834 265,005 1,087,224 G.O. Improvement Bonds- Franchise Fees (Facilities)27,000,000 20,000,000 20,000,000 67,000,000 G.O. Improvement Bonds - Sp. Assess.5,240,000 330,000 900,000 464,689 6,934,689 G.O. Improvement Bonds- Taxes (Facilities)6,457,256 17,960,000 24,417,256 G.O. Improvement Bonds - Taxes (Streets)4,065,576 7,063,209 5,833,578 5,985,799 4,820,600 27,768,762 Lakeville Baseball Association 150,000 150,000 Liquor Fund 176,340 203,561 194,206 0 414,305 988,412 MSA/MSA Bonds - Sp. Assess.350,000 350,000 Municipal State Aid 3,420,248 1,713,365 5,111,735 5,833,020 5,010,471 21,088,839 Other cost share arrangement- Credit River (Judicial Rd)485,576 485,576 Other funding- Federal 750,000 750,000 Other funding- State 9,047,000 9,047,000 Park Bonds Fund 556,220 556,220 Park Dedication Fund 4,405,080 1,397,500 1,553,000 3,675,750 2,257,000 13,288,330 Park & Trail Improvement Fund 2,208,750 3,211,500 1,535,500 1,477,000 1,284,000 9,716,750 Pavement Management Fund 2,593,750 2,672,500 2,650,000 2,720,000 2,790,000 13,426,250 Sanitary Sewer Operating Fund 1,589,577 1,321,712 1,219,293 1,495,705 1,240,670 6,866,957 Sanitary Sewer Trunk Fund 1,730,000 125,000 85,000 75,000 75,000 2,090,000 Stormwater Infrastructure Fund 755,000 455,000 340,000 1,240,000 2,415,000 5,205,000 Streetlight Operating Fund 30,000 10,000 50,000 90,000 Technology Fund 273,204 375,774 536,506 241,637 234,185 1,661,306 Vermillion River Watershed JPO 10,000 10,000 10,000 10,000 10,000 50,000 Water Operating Fund 2,897,228 6,846,212 1,419,293 1,945,664 1,380,670 14,489,067 Water Revenue Bonds 40,000,000 40,000,000 Water Trunk Fund 4,515,000 -3,635,000 2,225,000 265,000 1,350,000 4,720,000 GRAND TOTAL 88,831,349 115,990,816 60,202,489 35,728,694 37,918,867 338,672,215 Produced Using Plan-It CIP Software Page 14 2026 through 2030 Capital Improvement Plan Lakeville, MNProjects & Funding Sources By Cost Type Cost Type Project #2026 2027 2028 2029 2030 Total Environmental Resources East Lake Rough Fish Barrier 23-58 35,000 35,000 35,000 35,000 35,000 175,000 Water Quality and Water Conservation ER-01 85,000 85,000 85,000 85,000 85,000 425,000 Lake Management ER-02 110,000 110,000 110,000 110,000 110,000 550,000 Stormwater Infrastructure Maintenance ER-03 960,000 960,000 960,000 960,000 960,000 4,800,000 Storm Water Conveyance System Expansion ER-04 100,000 100,000 100,000 100,000 400,000 Forestry (Ash tree injection/removal, reforestatio ER-05 142,500 141,500 141,500 141,500 141,500 708,500 Vegetation Management - City Outlots/Public land ER-06 170,000 170,000 170,000 170,000 170,000 850,000 Environmental Resources Total 1,602,500 1,601,500 1,601,500 1,601,500 1,501,500 7,908,500 Dakota County 10,000 10,000 10,000 10,000 10,000 50,000 Environmental Resources Fund 1,340,000 1,340,000 1,340,000 1,340,000 1,340,000 6,700,000 General Fund 142,500 141,500 141,500 141,500 141,500 708,500 Stormwater Infrastructure Fund 100,000 100,000 100,000 100,000 400,000 Vermillion River Watershed JPO 10,000 10,000 10,000 10,000 10,000 50,000 Source Grand Total 1,602,500 1,601,500 1,601,500 1,601,500 1,501,500 7,908,500 Equipment Police-Equipment E-01 709,000 1,299,733 1,349,714 1,840,807 458,098 5,657,352 Fire - Equipment E-02 562,944 212,524 1,079,564 172,500 1,537,900 3,565,432 Streets-Equipment E-03 1,284,473 1,152,130 1,663,200 1,593,122 1,649,899 7,342,824 Park Maintenance-Equipment E-04 572,405 702,514 775,820 409,040 623,610 3,083,389 Facilities - Equipment E-05 9,270 45,021 54,291 Inspections-Equipment E-06 37,000 48,186 85,186 Construction Services-Equipment E-07 67,460 69,425 31,334 75,319 243,538 Liquor-Equipment E-08 34,880 34,880 Communications PEG-Equipment E-10 45,000 60,000 40,000 52,000 72,654 269,654 Environmental Resources - Equipment E-11 100,000 100,000 Utilities-Equipment E-12 604,806 126,180 125,052 379,509 324,083 1,559,630 Equipment Total 3,955,358 3,702,407 5,033,350 4,515,312 4,789,749 21,996,176 Communications Fund 45,000 60,000 40,000 52,000 72,654 269,654 Environmental Resources Fund 100,000 100,000 Equipment Fund 3,138,092 3,411,922 4,868,298 4,015,469 4,269,507 19,703,288 General Fund 67,460 69,425 68,334 123,505 328,724 Liquor Fund 34,880 34,880 Sanitary Sewer Operating Fund 477,078 63,090 62,526 189,755 162,041 954,490 Water Operating Fund 127,728 63,090 62,526 189,754 162,042 605,140 Source Grand Total 3,955,358 3,702,407 5,033,350 4,515,312 4,789,749 21,996,176 Facilities Fire Station #5 Construction 25-11 25,250,000 25,250,000 First Center- Construction 25-12 6,457,256 6,457,256 City Hall Building Maintenance/Improvements B-01 135,000 207,051 70,000 412,051 Produced Using Plan-It CIP Software Page 15 CMF Building Maintenance/Improvements B-02 1,601,000 17,160,000 300,000 3,147,704 22,208,704 Police Station- Building Maintenance/Improvements B-03 325,000 2,600,000 60,885 25,000 3,010,885 Heritage Center- Maintenance/Improvements B-04 470,000 108,000 96,160 40,000 714,160 Arts Center-Maintenance/Improvements B-05 185,000 545,000 150,000 125,000 1,005,000 Fine Arts Building- Maintenance/Improvements B-06 570,000 570,000 Fire Station #1-Building Maintenance/Improvements B-07 60,000 20,424,800 285,140 22,000 20,791,940 Fire Station #2 Building Maintenance/Improvements B-08 0 0 Fire Station #3-Building Maintenance/Improvements B-09 2,000,000 20,000,000 122,800 7,000 22,129,800 Fire Station #4-Building Maintenance/Improvements B-10 30,000 124,700 154,700 Keokuk Liquor Store- Maintenance/Improv B-12 23,000 23,000 Heritage Liquor Store- Maintenance/Improv B-13 0 65,000 8,000 73,000 Kenrick Liquor Store- Maintenance/Improv B-14 40,000 31,629 71,629 Galaxie Liquor Store- Maintenance/Improv B-15 45,000 331,570 376,570 Water Treatment Facilty- Maintenance/Improvements B-16 4,450,000 41,500,000 170,000 179,960 46,299,960 FiRST Center Facility Maintenance/Improvements B-17 25,000 100,000 125,000 Facilities Total 40,871,256 80,100,000 23,667,800 4,374,400 660,199 149,673,655 Building Fund 2,581,000 540,000 3,432,800 4,194,440 289,000 11,037,240 FiRST Center Operating Fund 25,000 100,000 125,000 G.O. Improvement Bonds- Franchise Fees (Facilities)27,000,000 20,000,000 20,000,000 67,000,000 G.O. Improvement Bonds- Taxes (Facilities)6,457,256 17,960,000 24,417,256 Liquor Fund 108,000 65,000 371,199 544,199 Sanitary Sewer Trunk Fund 100,000 100,000 Stormwater Infrastructure Fund 150,000 150,000 Water Operating Fund 450,000 5,500,000 170,000 179,960 6,299,960 Water Revenue Bonds 40,000,000 40,000,000 Water Trunk Fund 4,000,000 -4,000,000 0 Source Grand Total 40,871,256 80,100,000 23,667,800 4,374,400 660,199 149,673,655 Parks Klamath Trail Retaining Wall 23-13 10,000 1,500,000 1,510,000 Grand Prairie Park 24-20 950,000 950,000 East Community Park Phase II 25-20 2,775,000 2,775,000 Parks Major Maintenance - General P-01 18,250 18,500 19,500 19,500 19,750 95,500 Park Development - Adminstrative Projects P-02 35,000 20,000 20,000 20,000 20,000 115,000 Park Development - Developer Credits P-03 435,000 435,000 435,000 435,000 435,000 2,175,000 Future Park Land Acquisition P-04 100,000 100,000 100,000 300,000 Trail Improvements (Various Trails)P-05 890,000 530,000 708,000 710,000 710,000 3,548,000 Park Improvements (Various Parks)P-06 277,000 694,000 164,000 142,000 112,000 1,389,000 Playground Replacement P-08 513,000 315,000 543,000 372,000 381,000 2,124,000 Park parking lot improvements P-09 75,000 210,000 113,000 55,000 45,000 498,000 Keokuk Avenue/172nd St. Park P-11 65,000 770,000 835,000 Grand Prairie Skatepark P-12 50,000 600,000 650,000 Cost Type Project #2026 2027 2028 2029 2030 Total Produced Using Plan-It CIP Software Page 16 Ritter Meadows Park P-13 58,000 770,000 828,000 Voyageur Park P-14 35,000 720,000 755,000 Parks Major Maintenance - Open Space P-15 27,000 27,000 27,000 27,000 28,000 136,000 Parks Major Maintenance - Fields P-16 31,500 37,000 39,000 39,000 12,000 158,500 Parks Major Maintenance - Bldgs/Shelters/Grounds P-17 60,000 0 0 500 24,850 85,350 Other Projects P-19 300,000 25,000 600,000 325,000 325,000 1,575,000 Parks Major Maintenance - Courts P-20 7,000 30,000 22,000 12,000 51,400 122,400 Kenrick Trail Sheet Pile, Wall, & Trail Repairs P-21 275,000 275,000 192nd St Retaining Wall & Trail Reconstruction P-22 55,000 55,000 Parks System Master Plan P-23 91,300 91,300 Parks - New Parking Lots & Expansions P-24 300,000 300,000 S.W. Corner of 210th Street & I-35 P-25 75,000 75,000 Parks Total 7,160,050 4,561,500 2,898,500 3,692,000 3,109,000 21,421,050 Dakota County 570,000 570,000 Donations 60,000 60,000 Lakeville Baseball Association 150,000 150,000 Park Bonds Fund 556,220 556,220 Park Dedication Fund 3,765,080 1,200,000 1,363,000 2,415,000 1,825,000 10,568,080 Park & Trail Improvement Fund 2,208,750 3,211,500 1,535,500 1,277,000 1,284,000 9,516,750 Source Grand Total 7,160,050 4,561,500 2,898,500 3,692,000 3,109,000 21,421,050 Technology Technology - General Government T-01 18,109 42,709 8,592 11,613 36,783 117,806 Technology-Public Safety T-02 167,489 71,335 123,022 199,705 41,561 603,112 Technology-Public Works T-03 24,044 8,451 6,084 20,109 13,579 72,267 Technology-Arenas T-04 3,142 3,303 1,739 1,457 2,075 11,716 Technology-Communications T-05 2,597 2,513 0 0 848 5,958 Technology-Liquor T-06 58,545 121,681 55,206 17,106 252,538 Technology-Environmental Resources T-07 4,010 4,383 848 9,241 Technology-Utilities T-08 8,912 8,244 7,534 1,900 1,257 27,847 Technology- Parks & recreation T-09 12,915 7,169 19,558 10,210 5,120 54,972 Technology-Network infrastructure T-10 63,760 217,067 511,786 0 186,142 978,755 Technology-Miscellaneous T-11 5,150 116,043 5,464 126,657 Technology Total 364,663 602,525 743,368 244,994 305,319 2,260,869 Arenas 3,142 3,303 1,739 1,457 2,075 11,716 Communications Fund 3,908 8,513 10,000 0 4,848 27,269 Environmental Resources Fund 1,070 9,010 12,383 0 3,848 26,311 Liquor Fund 68,340 168,681 129,206 0 43,106 409,333 Sanitary Sewer Operating Fund 7,499 18,622 26,767 950 8,629 62,467 Technology Fund 273,204 375,774 536,506 241,637 234,185 1,661,306 Water Operating Fund 7,500 18,622 26,767 950 8,628 62,467 Source Grand Total 364,663 602,525 743,368 244,994 305,319 2,260,869 Transportation Freight Rail Car Storage Facility 22-16 8,200,000 8,200,000 Future CSAH 9/CSAH 31 Traffic Signal System 23-08 0 0 0 185th St/Future CSAH 60 (Dodd Blvd - Highview Ave)24-04 0 0 Future CSAH 9 and Bridge at North Creek 24-05 13,395,000 13,395,000 Cost Type Project #2026 2027 2028 2029 2030 Total Produced Using Plan-It CIP Software Page 17 CSAH 60/185th Street (Kenwood Tr- Ipava Ave)25-04 0 0 0 0 Holyoke/Highview Avenue Reconstruction 25-05 1,955,000 6,905,000 8,860,000 CSAH 9 Extension (to CSAH Standards)25-19 500,000 500,000 CSAH 9 Modernization (210th St - CSAH 50)26-04 1,800,000 9,012,500 0 0 0 10,812,500 Interstate 35/CSAH 50 Interchange Reconstruction 26-05 655,620 5,029,393 0 5,685,013 CSAH 50 and Hamburg Avenue RAB 26-06 30,000 30,000 CSAH 60 Alignment Study (CSAH 23 - Flagstaff Ave)26-07 78,750 78,750 CSAH 50/CSAH 60 RAB Modifications 26-08 100,000 100,000 Lake Marion Greenway 26-15 4,580,000 67,500 150,000 405,000 2,880,000 8,082,500 CSAH 5 and Kenyon Avenue Traffic Signal 27-05 360,000 360,000 CSAH 23 Alignment Study (Griffon Tr - 135th St)27-07 8,925 8,925 CSAH 70 Intersection Improvements W. of Keokuk Ave 27-08 400,000 400,000 CSAH 23 M&O (CSAH 9 to CSAH 42)27-09 0 0 CSAH 9 and Glacier Way Traffic Signal 27-11 150,000 600,000 750,000 CSAH 9/Dodd Blvd Modernization (215th St-210th St)28-04 650,000 750,000 4,400,000 5,800,000 CSAH 60 and Orchard Trail Traffic Signal 28-05 150,000 800,000 950,000 CSAH 46 and Foliage Avenue Traffic Signal Replace 28-06 43,750 225,000 268,750 CSAH 46 and Galaxie Avenue Traffic Signal Replacem 28-07 50,000 225,000 275,000 CSAH 9 Improvements at 194th St & 190th St 29-04 140,000 67,500 1,575,000 1,782,500 CSAH 46 at Lac Lavon/Interlachen Traffic Signal 30-05 87,500 475,000 562,500 CSAH 60 and Judicial Road Traffic Signal 30-06 50,000 250,000 300,000 CSAH 50 and Iberia Avenue Traffic Safety Mgmt 31-05 140,000 67,500 207,500 Pavement Management - Maintenance XX-01 2,865,000 2,780,000 2,850,000 2,920,000 2,990,000 14,405,000 Street Reconstruction XX-02 4,405,000 4,507,500 5,515,000 5,145,000 4,835,000 24,407,500 Collector Roadway Rehabilitation XX-03 971,152 3,985,709 2,168,578 2,205,488 935,600 10,266,527 County Pavement Preservation/City Utility Repairs XX-10 10,000 35,000 45,000 Transportation Total 25,145,522 23,540,884 22,722,971 19,295,488 25,828,100 116,532,965 Dakota County 4,700,500 9,205,000 5,218,161 344,250 9,298,000 28,765,911 Dakota County- Advance funding of city share -2,162,128 479,781 1,308,497 -925,620 -917,971 -2,217,441 Escrows 362,029 196,000 657,600 1,215,629 General Fund 40,000 10,000 50,000 G.O. Improvement Bonds - Sp. Assess.330,000 900,000 464,689 1,694,689 G.O. Improvement Bonds - Taxes (Streets)4,065,576 7,063,209 5,833,578 5,985,799 4,820,600 27,768,762 MSA/MSA Bonds - Sp. Assess.350,000 350,000 Municipal State Aid 3,420,248 1,713,365 5,111,735 5,833,020 5,010,471 21,088,839 Other cost share arrangement- Credit River (Judicial Rd)485,576 485,576 Other funding- Federal 750,000 750,000 Other funding- State 9,047,000 9,047,000 Park Dedication Fund 640,000 197,500 190,000 1,260,750 432,000 2,720,250 Park & Trail Improvement Fund 200,000 200,000 Pavement Management Fund 2,593,750 2,672,500 2,650,000 2,720,000 2,790,000 13,426,250 Cost Type Project #2026 2027 2028 2029 2030 Total Produced Using Plan-It CIP Software Page 18 Sanitary Sewer Operating Fund 355,000 385,000 375,000 520,000 375,000 2,010,000 Sanitary Sewer Trunk Fund 340,000 50,000 10,000 400,000 Stormwater Infrastructure Fund 305,000 355,000 240,000 1,140,000 2,415,000 4,455,000 Streetlight Operating Fund 30,000 10,000 50,000 90,000 Water Operating Fund 575,000 677,500 670,000 695,000 670,000 3,287,500 Water Trunk Fund 10,000 935,000 945,000 Source Grand Total 25,145,522 23,540,884 22,722,971 19,295,488 25,828,100 116,532,965 Utility 215th Street Public Improvements 26-09 6,755,000 6,755,000 Sanitary Sewer Trunk Improvements U-01 75,000 75,000 75,000 75,000 75,000 375,000 Sanitary Sewer Lift Station Rehabilitation U-02 150,000 255,000 150,000 180,000 80,000 815,000 Sanitary Sewer Inflow/Infiltration Maintenance U-03 575,000 575,000 575,000 575,000 575,000 2,875,000 Well Construction U-04 100,000 1,800,000 1,900,000 Watermain Trunk Extensions U-05 265,000 265,000 265,000 265,000 265,000 1,325,000 Water Distribution Features U-06 150,000 150,000 150,000 450,000 Well and Pump Rehabilitation U-07 200,000 200,000 100,000 300,000 100,000 900,000 Tower and Reservoir Maintenance U-08 1,150,000 150,000 1,300,000 Water meter replacement U-09 350,000 350,000 350,000 400,000 400,000 1,850,000 Fiber Optic Cable Connection U-10 62,000 62,000 70,000 60,000 80,000 334,000 Utility Total 9,732,000 1,882,000 3,535,000 2,005,000 1,725,000 18,879,000 G.O. Improvement Bonds - Sp. Assess.5,240,000 5,240,000 Sanitary Sewer Operating Fund 750,000 855,000 755,000 785,000 695,000 3,840,000 Sanitary Sewer Trunk Fund 1,290,000 75,000 75,000 75,000 75,000 1,590,000 Stormwater Infrastructure Fund 200,000 200,000 Water Operating Fund 1,737,000 587,000 490,000 880,000 540,000 4,234,000 Water Trunk Fund 515,000 365,000 2,215,000 265,000 415,000 3,775,000 Source Grand Total 9,732,000 1,882,000 3,535,000 2,005,000 1,725,000 18,879,000 GRAND TOTAL 88,831,349 115,990,816 60,202,489 35,728,694 37,918,867 338,672,215 Cost Type Project #2026 2027 2028 2029 2030 Total Produced Using Plan-It CIP Software Page 19 Freight Rail Car Storage Facility 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #22-16 Project Name Freight Rail Car Storage Facility Total Project Cost $8,350,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Other Department Engineering Funding Description Improvement Construction Description Programmed for 2026 construction. The City was awarded $750,000 in Federal Funding (Fiscal Year 2023) for engineering design and $7,000,000 in State Funding for construction. Project includes construction of a 90-car storage yard, and a 30-car transload facility within the City’s industrial parks, south of CSAH 70. Prior Expenditures 2026 2027 2028 2029 2030 Total 150,000 Construction 8,200,000 0 0 0 0 8,200,000 Total 8,200,000 0 0 0 0 8,200,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 150,000 Other funding- State 7,000,000 0 0 0 0 7,000,000 Other funding- Federal 750,000 0 0 0 0 750,000 Sanitary Sewer Trunk Fund 250,000 0 0 0 0 250,000 Stormwater Infrastructure Fund 200,000 0 0 0 0 200,000 Total 8,200,000 0 0 0 0 8,200,000 Produced Using Plan-It CIP Software Page 20 Klamath Trail Retaining Wall 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #23-13 Project Name Klamath Trail Retaining Wall Total Project Cost $1,510,000 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park & Trail Improvement Fund Description There are two existing modular block retaining walls (totaling over 1,200 feet in length) along the south side of Klamath Trail, west of County State Aid Highway 5, which were constructed in 1999. A Condition Assessment Report was completed by a third party after it was noticed that the modular block walls are showing signs of deterioration. Based on the anticipated life span of these walls and the condition assessment that indicates visible staining, cracking along the face of individual blocks along with other types of deterioration, the replacement of these walls is scheduled to be completed in 2027 with prefabricated modular block walls (PMBW). This is currently planned to be funded by the Trail Improvement fund. Expenditures 2026 2027 2028 2029 2030 Total Retaining Wall Reconstruction 0 1,500,000 0 0 0 1,500,000 Engineering/Design/Other costs 10,000 0 0 0 0 10,000 Total 10,000 1,500,000 0 0 0 1,510,000 Funding Sources 2026 2027 2028 2029 2030 Total Park & Trail Improvement Fund 10,000 1,500,000 0 0 0 1,510,000 Total 10,000 1,500,000 0 0 0 1,510,000 Location Produced Using Plan-It CIP Software Page 21 East Lake Rough Fish Barrier 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #23-58 Project Name East Lake Rough Fish Barrier Total Project Cost $175,000 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Department Environmental Resources Funding Description Environmental Resources Fund Expenditures 2026 2027 2028 2029 2030 Total Engineering/Design/Other costs 35,000 35,000 35,000 35,000 35,000 175,000 Total 35,000 35,000 35,000 35,000 35,000 175,000 Funding Sources 2026 2027 2028 2029 2030 Total Environmental Resources Fund 35,000 35,000 35,000 35,000 35,000 175,000 Total 35,000 35,000 35,000 35,000 35,000 175,000 Future CSAH 9 and Bridge at North Creek 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #24-05 Project Name Future CSAH 9 and Bridge at North Creek Total Project Cost $13,395,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Bridge Department Engineering Funding Description Municipal State Aid County Project #97-215 SA/SAP #TBD Description Construction of future County Highway 9 to provide future connectivity between CSAH 31 (Pilot Knob Road) and MN 3. Project includes a 2-lane divided highway bridge spanning North Creek with trails along both sides. Future jurisdictional transfer. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 0 0 10,150,000 10,150,000 Construction- Stormwater infrastructure (new)0 0 0 0 2,310,000 2,310,000 Construction- Water infrastructure (new)0 0 0 0 935,000 935,000 Total 0 0 0 0 13,395,000 13,395,000 Funding Sources 2026 2027 2028 2029 2030 Total Dakota County 0 0 0 0 6,850,000 6,850,000 Municipal State Aid 0 0 0 0 3,300,000 3,300,000 Stormwater Infrastructure Fund 0 0 0 0 2,310,000 2,310,000 Water Trunk Fund 0 0 0 0 935,000 935,000 Total 0 0 0 0 13,395,000 13,395,000 Produced Using Plan-It CIP Software Page 22 Grand Prairie Park 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #24-20 Project Name Grand Prairie Park Total Project Cost $22,494,255 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type New construction Department Park Bonds Funding Description Park Bonds Fund Description Construction of this park is underway in 2025, with completion anticipated in 2026. This project was approved as part of the 2021 Park Bond Referendum. Lakeville Lions has committed $500,000 toward the Grand Paririe Park splash pad over five years ($100,000/year). Lakeville Baseball Association has committed $1.375 Million toward the project over 10 years ($137,500/year). 2026 funding has been added to construct a freestanding shower building at an estimated $650,000.00 Prior Expenditures 2026 2027 2028 2029 2030 Total 21,544,255 Construction 950,000 0 0 0 0 950,000 Total 950,000 0 0 0 0 950,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 21,544,255 Park Dedication Fund 950,000 0 0 0 0 950,000 Total 950,000 0 0 0 0 950,000 Location Produced Using Plan-It CIP Software Page 23 Produced Using Plan-It CIP Software Page 24 Holyoke/Highview Avenue Reconstruction 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #25-05 Project Name Holyoke/Highview Avenue Reconstruction Total Project Cost $10,115,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Rehabilitation Department Engineering Funding Description Municipal State Aid Description ​​​​​​Phase I: Heritage Drive to South of 190th Street Phase II: South of 190th Street to Dodd Boulevard/CSAH 9 Phase I programmed for 2029 construction. Project includes road rehabilitation and modernization, intersection improvements and a pedestrian underpass. Phase II programmed for 2032 construction. Project includes road rehabilitation and modernization and intersection improvements and a pedestrian underpass. Expenditures 2026 2027 2028 2029 2030 Total Future Construction 0 0 1,955,000 4,200,000 0 6,155,000 1,255,000 Construction- New trails 0 0 0 1,200,000 0 1,200,000 Construction- Stormwater infrastructure (new)0 0 0 1,035,000 0 1,035,000 Trail costs (rehabilitation/reconstruction)0 0 0 200,000 0 200,000 Construction- Sanitary Sewer infrastructure (repair/replace)0 0 0 145,000 0 145,000 Construction- Water infrastructure (repair/replace)0 0 0 75,000 0 75,000 Streetlight costs 0 0 0 50,000 0 50,000 Total 0 0 1,955,000 6,905,000 0 8,860,000 Funding Sources 2026 2027 2028 2029 2030 Total Future Municipal State Aid 0 0 1,955,000 3,192,400 0 5,147,400 1,255,000 Park Dedication Fund 0 0 0 1,200,000 0 1,200,000 Stormwater Infrastructure Fund 0 0 0 1,035,000 0 1,035,000 Escrows 0 0 0 657,600 0 657,600 MSA/MSA Bonds - Sp. Assess.0 0 0 350,000 0 350,000 Park & Trail Improvement Fund 0 0 0 200,000 0 200,000 Sanitary Sewer Operating Fund 0 0 0 145,000 0 145,000 Water Operating Fund 0 0 0 75,000 0 75,000 Streetlight Operating Fund 0 0 0 50,000 0 50,000 Total 0 0 1,955,000 6,905,000 0 8,860,000 Produced Using Plan-It CIP Software Page 25 Fire Station #5 Construction 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #25-11 Project Name Fire Station #5 Construction Total Project Cost $25,250,000 Contact Allyn Kuennen, Assistant City Administrator Cost Type Facilities Type New construction Department Fire Station #5 Funding Description Building Fund Description The City has purchased 12 acres adjacent to the water tower along 179th Street West for a fire station and a possible future satellite water treatment facility. This is directly across from the Central Maintenance Facility, 7570 179th Street West. Site planning has started and construction on the fire station could begin as early as 2026. Expenditures 2026 2027 2028 2029 2030 Total Construction 25,250,000 0 0 0 0 25,250,000 Total 25,250,000 0 0 0 0 25,250,000 Funding Sources 2026 2027 2028 2029 2030 Total G.O. Improvement Bonds- Franchise Fees (Facilities)25,000,000 0 0 0 0 25,000,000 Stormwater Infrastructure Fund 150,000 0 0 0 0 150,000 Sanitary Sewer Trunk Fund 100,000 0 0 0 0 100,000 Total 25,250,000 0 0 0 0 25,250,000 Produced Using Plan-It CIP Software Page 26 First Center- Construction 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #25-12 Project Name First Center- Construction Total Project Cost $25,829,024 Contact Allyn Kuennen, Assistant City Administrator Cost Type Facilities Type Maintenance/Improvement Department FiRST Center Funding Description Building Fund Description A regional public safety training facility does not currently exist for use by public safety personnel in the south metro area and adjacent cities and counties. A regional training facility will help ensure our safety personnel have the highest degree of training possible to serve the public. The Minnesota Legislature has clearly stated that public safety personnel need to be better trained and equipped to respond to the growing demands placed on them. Public safety personnel often use local businesses, schools and vacant facilities as temporary training sites since there is not a permanent site that fits all the training and classroom needs. A permanent, dedicated site within Dakota County, available to all jurisdictions within the south metro and Greater Minnesota area, will improve the ability to consistently and routinely train public safety employees, as well as maintain certifications. Construction of the FiRST (First Responders Skills Training) Center began in early 2025 and will be located at the former public works site within the Airlake Industrial Park at 7777 214th Street West. This 40,000-square-foot facility will include the following features: Physical training area for fire, police and EMS Virtual training area Firing range training area with vehicle access Equipment cleaning and armory area Tactical training room with movable partitions for fire, police and EMS Classroom/meeting space for fire, police and EMS Office space Restrooms/lockers Exterior training spaces The overall cost of the project is 25.8 million. $7.1 million of funding was awarded to this project through the 2023 Minnesota Legislature capital investment (cash funding) bill and an additional $800,000 was awarded in 2024 through Federal Congressionally-Directed Funding. The remaining cost of construction will be funded through general obligation bonds. Construction of the facility is expected to be completed by mid-2026. Operational costs to maintain and operate the facility will be provided through membership fees paid by the various agencies that will be using the facility. Prior Expenditures 2026 2027 2028 2029 2030 Total 19,371,768 Construction 6,457,256 0 0 0 0 6,457,256 Total 6,457,256 0 0 0 0 6,457,256 Prior Funding Sources 2026 2027 2028 2029 2030 Total 19,371,768 G.O. Improvement Bonds- Taxes (Facilities)6,457,256 0 0 0 0 6,457,256 Total 6,457,256 0 0 0 0 6,457,256 Produced Using Plan-It CIP Software Page 27 CSAH 9 Extension (to CSAH Standards) 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #25-19 Project Name CSAH 9 Extension (to CSAH Standards) Total Project Cost $1,000,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Extension Department Engineering Funding Description Improvement Construction County Project #97-231 SA/SAP #N/A JPA #TBD Description Future CSAH 9 from a) Embers Avenue to Ellsworth Drive, and b) Eagleview Drive to Draft Horse Boulevard. The roadway improvements will be constructed with developer-installed public improvements with the Pheasant Run of Lakeville Eighth Addition and Brookeshire 4th Additions, respectively, to County State Aid Highway standards. The alignment is consistent with Alignment B (between Highview Avenue and MN-3), as identified in the East/West Corridor Preservation Study Phase 2 - Refinement of Preferred System Plan (2006) Prior Expenditures 2026 2027 2028 2029 2030 Total 500,000 Construction 500,000 0 0 0 0 500,000 Total 500,000 0 0 0 0 500,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 500,000 Dakota County 500,000 0 0 0 0 500,000 Total 500,000 0 0 0 0 500,000 Produced Using Plan-It CIP Software Page 28 East Community Park Phase II 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #25-20 Project Name East Community Park Phase II Total Project Cost $3,125,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Bonds Funding Description Park Bonds Fund Description The 2018 Master Plan for the park identified specific amenities. The park is proposed to be constructed in 2026, which was approved as part of the 2021 Park Bond Referendum. This project also includes the trails/trailhead in East Community Park, which is part of a multi-phased County greenway project designed to provide connectivity City and County trail system. Prior Expenditures 2026 2027 2028 2029 2030 Total 350,000 East Community Park 2,575,000 0 0 0 0 2,575,000 Construction-North Creek Greenway Trails 170,000 0 0 0 0 170,000 Construction-North Creek Greenway Trails (P26-15B- North Creek Trl East Park to 160th)30,000 0 0 0 0 30,000 Total 2,775,000 0 0 0 0 2,775,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 350,000 Park Dedication Fund 1,618,780 0 0 0 0 1,618,780 Dakota County 570,000 0 0 0 0 570,000 Park Bonds Fund 556,220 0 0 0 0 556,220 Park & Trail Improvement Fund 30,000 0 0 0 0 30,000 Total 2,775,000 0 0 0 0 2,775,000 Location Produced Using Plan-It CIP Software Page 29 CSAH 9 Modernization (210th St - CSAH 50) 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #26-04 Project Name CSAH 9 Modernization (210th St - CSAH 50) Total Project Cost $11,712,500 Contact Zach Johnson, City Engineer Cost Type Transportation Type Modernization Department Engineering Funding Description Municipal State Aid County Project #09-065 SA/SAP #TBD Description Modernization of CSAH 9 (Dodd Bouelvard) between 210th Street and CSAH 50 (202nd Street). Project includes a 2-lane divided highway and trails along both sides, with drainage and safety improvements. Prior Expenditures 2026 2027 2028 2029 2030 Total 900,000 Construction 0 9,012,500 0 0 0 9,012,500 Right of Way- Acquisition/Professional fees 1,800,000 0 0 0 0 1,800,000 MSA- Repay County Advance 0 0 135,000 270,000 917,971 1,322,971 Dakota County- Advance funding of city share 0 0 -135,000 -270,000 -917,971 -1,322,971 Total 1,800,000 9,012,500 0 0 0 10,812,500 Prior Funding Sources 2026 2027 2028 2029 2030 Total 900,000 Dakota County 1,530,000 7,397,500 0 0 0 8,927,500 Municipal State Aid 0 0 135,000 270,000 917,971 1,322,971 Escrows 0 292,029 0 0 0 292,029 Stormwater Infrastructure Fund 0 250,000 0 0 0 250,000 Park Dedication Fund 0 97,500 0 0 0 97,500 General Fund 0 40,000 0 0 0 40,000 Streetlight Operating Fund 0 10,000 0 0 0 10,000 Sanitary Sewer Operating Fund 0 5,000 0 0 0 5,000 Water Operating Fund 0 2,500 0 0 0 2,500 Dakota County- Advance funding of city share 270,000 917,971 -135,000 -270,000 -917,971 -135,000 Total 1,800,000 9,012,500 0 0 0 10,812,500 Produced Using Plan-It CIP Software Page 30 Location Produced Using Plan-It CIP Software Page 31 Interstate 35/CSAH 50 Interchange Reconstruction 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #26-05 Project Name Interstate 35/CSAH 50 Interchange Reconstruction Total Project Cost $5,685,013 Contact Zach Johnson, City Engineer Cost Type Transportation Type Interchange Reconstruction Department Engineering Funding Description Municipal State Aid County Project #50-033 SA/SAP #019-650-021 Description Reconstruction of the interchange at I-35 and CSAH 5/50 (Kenwood Trail). The existing interchange is deficient in capacity, sight distance and turn lanes, resulting in delays and safety issues. This project includes replacement of the I-35 bridges over CSAH 5/50 and construction of a northbound auxiliary lane along I-35 between CSAH 5/50 and CSAH 46. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 3,115,380 0 0 3,115,380 Dakota County (County share of repayment of 2017 and 2021/2022 RALF Loans)0 0 1,478,161 0 0 1,478,161 Engineering/Design/Other costs 655,620 0 0 0 0 655,620 MSA- Repay County Advance 0 0 0 655,620 0 655,620 Municipal State Aid (City share of repayment of 2017 and 2021/2022 RALF loans)0 0 260,852 0 0 260,852 Stormwater Infrastructure 0 0 135,000 0 0 135,000 Fiber Conduit (Lift Station)0 0 10,000 0 0 10,000 Fiber Conduit (Park Dedication Fund)0 0 10,000 0 0 10,000 Fiber conduit (Weather Siren)0 0 10,000 0 0 10,000 Fiber conduit (Well/tower)0 0 10,000 0 0 10,000 Dakota County- Advance funding of city share 0 0 0 -655,620 0 -655,620 Total 655,620 0 5,029,393 0 0 5,685,013 Funding Sources 2026 2027 2028 2029 2030 Total Dakota County- Advance funding of city share 655,620 0 3,115,380 -655,620 0 3,115,380 Dakota County 0 0 1,478,161 0 0 1,478,161 Municipal State Aid 0 0 260,852 655,620 0 916,472 Stormwater Infrastructure Fund 0 0 135,000 0 0 135,000 General Fund 0 0 10,000 0 0 10,000 Park Dedication Fund 0 0 10,000 0 0 10,000 Sanitary Sewer Trunk Fund 0 0 10,000 0 0 10,000 Water Trunk Fund 0 0 10,000 0 0 10,000 Total 655,620 0 5,029,393 0 0 5,685,013 Produced Using Plan-It CIP Software Page 32 CSAH 50 and Hamburg Avenue RAB 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #26-06 Project Name CSAH 50 and Hamburg Avenue RAB Total Project Cost $30,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Roundabout Department Engineering Funding Description Municipal State Aid County Project #50-037 SA/SAP #019-650-024 JPA #DCA22893 Description Programmed for 2026 construction as a single-lane roundabout. Dakota County responsible for 100% of project cost per future Joint Powers Agreement. City is only anticipating contributing costs toward streetlights at this time. Expenditures 2026 2027 2028 2029 2030 Total Streetlight costs 30,000 0 0 0 0 30,000 Total 30,000 0 0 0 0 30,000 Funding Sources 2026 2027 2028 2029 2030 Total Streetlight Operating Fund 30,000 0 0 0 0 30,000 Total 30,000 0 0 0 0 30,000 Produced Using Plan-It CIP Software Page 33 CSAH 60 Alignment Study (CSAH 23 - Flagstaff Ave) 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #26-07 Project Name CSAH 60 Alignment Study (CSAH 23 - Flagstaff Ave) Total Project Cost $78,750 Contact Zach Johnson, City Engineer Cost Type Transportation Type Other Department Engineering Funding Description Pavement Management County Project #97-229 SA/SAP #N/A Description Preliminary engineering for future County Highway alignment between the intersections of CSAH 23 (Cedar Avenue)/CSAH 60 (185th Street) and CR 64 (195th Street)/Flagstaff Avenue. The corridor study will recommend preferred alignments. Expenditures 2026 2027 2028 2029 2030 Total Engineering/Design/Other costs 78,750 0 0 0 0 78,750 Total 78,750 0 0 0 0 78,750 Funding Sources 2026 2027 2028 2029 2030 Total Pavement Management Fund 78,750 0 0 0 0 78,750 Total 78,750 0 0 0 0 78,750 CSAH 50/CSAH 60 RAB Modifications 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #26-08 Project Name CSAH 50/CSAH 60 RAB Modifications Total Project Cost $100,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Maintenance/Improvement Department Engineering Funding Description Municipal State Aid County Project #50-038 SA/SAP #TBD JPA #TBD Expenditures 2026 2027 2028 2029 2030 Total Construction 100,000 0 0 0 0 100,000 Total 100,000 0 0 0 0 100,000 Funding Sources 2026 2027 2028 2029 2030 Total Municipal State Aid 100,000 0 0 0 0 100,000 Total 100,000 0 0 0 0 100,000 Produced Using Plan-It CIP Software Page 34 215th Street Public Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #26-09 Project Name 215th Street Public Improvements Total Project Cost $6,755,000 Contact Zach Johnson, City Engineer Cost Type Utility Type Extension Department Engineering Funding Description Improvement Construction County Project #N/A SA/SAP #N/A JPA #N/A Description Sewer and water extension along 215th Street from County Road 70 to west of I-35. Expenditures 2026 2027 2028 2029 2030 Total Construction 5,105,000 0 0 0 0 5,105,000 Engineering/Design/Other costs 1,650,000 0 0 0 0 1,650,000 Total 6,755,000 0 0 0 0 6,755,000 Funding Sources 2026 2027 2028 2029 2030 Total G.O. Improvement Bonds - Sp. Assess.5,240,000 0 0 0 0 5,240,000 Sanitary Sewer Trunk Fund 1,215,000 0 0 0 0 1,215,000 Stormwater Infrastructure Fund 200,000 0 0 0 0 200,000 Water Trunk Fund 100,000 0 0 0 0 100,000 Total 6,755,000 0 0 0 0 6,755,000 Lake Marion Greenway 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #26-15 Project Name Lake Marion Greenway Total Project Cost $8,272,500 Contact Zach Johnson, City Engineer Cost Type Transportation Type Greenway Department Park Dedication Funding Description Park Dedication Fund County Project #2000453 SA/SAP #N/A JPA #TBD Description Trail improvements to existing local network in coordination with jurisdictional transfer to Dakota County for Lake Marion Greenway. Produced Using Plan-It CIP Software Page 35 Prior Expenditures 2026 2027 2028 2029 2030 Total 190,000 Segment A-Ritter Farm Park to Downtown 3,600,000 0 0 0 0 3,600,000 Segment C- Downtown to Cedar Ave 0 0 0 325,000 1,800,000 2,125,000 Segment D- Murphy Hanrehan Park to Ritter Farm Park 0 0 0 80,000 1,080,000 1,160,000 Lake Marion Greenway Trailhead Shelter/Restrooms 650,000 0 0 0 0 650,000 Ritter Farm parking lot/roadway improvements 150,000 0 0 0 0 150,000 Segment E- CSAH 23 to CSAH 31 0 0 150,000 0 0 150,000 Fiber Conduit (Lift Station)90,000 0 0 0 0 90,000 Fiber Conduit (Park Dedication Fund)90,000 0 0 0 0 90,000 Segment B- Downtown 0 67,500 0 0 0 67,500 Total 4,580,000 67,500 150,000 405,000 2,880,000 8,082,500 Prior Funding Sources 2026 2027 2028 2029 2030 Total 190,000 Dakota County 1,953,000 0 0 344,250 2,448,000 4,745,250 Other funding- State 2,047,000 0 0 0 0 2,047,000 Park Dedication Fund 490,000 0 150,000 60,750 432,000 1,132,750 Sanitary Sewer Trunk Fund 90,000 0 0 0 0 90,000 Pavement Management Fund 0 67,500 0 0 0 67,500 Total 4,580,000 67,500 150,000 405,000 2,880,000 8,082,500 Produced Using Plan-It CIP Software Page 36 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project # 26-15 Contact Zach Johnson, City Engineer Project Name Lake Marion Greenway Cost Type Transportation Produced Using Plan-It CIP Software Page 37 CSAH 5 and Kenyon Avenue Traffic Signal 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #27-05 Project Name CSAH 5 and Kenyon Avenue Traffic Signal Total Project Cost $427,500 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project #5-XXX SA/SAP #TBD JPA #TBD Description New traffic signal system designed to alleviate congestion and optimize intersection operations Includes geometric improvements and pavement markings Owned/maintained by Dakota County Prior Expenditures 2026 2027 2028 2029 2030 Total 67,500 Construction 0 360,000 0 0 0 360,000 Total 0 360,000 0 0 0 360,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 67,500 Municipal State Aid 0 360,000 0 0 0 360,000 Total 0 360,000 0 0 0 360,000 Produced Using Plan-It CIP Software Page 38 CSAH 23 Alignment Study (Griffon Tr - 135th St) 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #27-07 Project Name CSAH 23 Alignment Study (Griffon Tr - 135th St) Total Project Cost $8,925 Contact Zach Johnson, City Engineer Cost Type Transportation Type Other Department Engineering Funding Description Municipal State Aid County Project #23-089 SA/SAP #N/A Description Preliminary engineering for CSAH 23 (Cedar Avenue) from Griffon Trail/Upper 164th Street to 135th Street. The corridor study will determine best practices to manage future traffic growth, and recommend pedestrian and corridor safety improvements, and potential grade-separated intersections. Expenditures 2026 2027 2028 2029 2030 Total Engineering/Design/Other costs 0 8,925 0 0 0 8,925 Total 0 8,925 0 0 0 8,925 Funding Sources 2026 2027 2028 2029 2030 Total Municipal State Aid 0 8,925 0 0 0 8,925 Total 0 8,925 0 0 0 8,925 CSAH 70 Intersection Improvements W. of Keokuk Ave 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #27-08 Project Name CSAH 70 Intersection Improvements W. of Keokuk Ave Total Project Cost $400,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Other Department Engineering Funding Description Municipal State Aid County Project #70-025 SA/SAP #N/A Description Construction of a) new full-access intersection along CSAH 70 (210th Street) approximately 2,450-feet west of Keokuk Avenue, and b) directional access median (3/4) at the intersection of CSAH 70 (210th Street) and Keswick Loop, in conjunction with the Artemis developer-installed public improvements. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 400,000 0 0 0 400,000 Total 0 400,000 0 0 0 400,000 Funding Sources 2026 2027 2028 2029 2030 Total Dakota County 0 400,000 0 0 0 400,000 Total 0 400,000 0 0 0 400,000 Produced Using Plan-It CIP Software Page 39 CSAH 9 and Glacier Way Traffic Signal 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #27-11 Project Name CSAH 9 and Glacier Way Traffic Signal Total Project Cost $750,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project #60-XXX SA/SAP #TBD JPA #TBD Description New traffic signal system designed to alleviate congestion and optimize intersection operations. Includes geometric improvements and pavement markings. City-led project Owned/maintained by Dakota County. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 600,000 0 0 0 600,000 Traffic signal- Design/ROW 150,000 0 0 0 0 150,000 Total 150,000 600,000 0 0 0 750,000 Funding Sources 2026 2027 2028 2029 2030 Total Dakota County 82,500 330,000 0 0 0 412,500 Municipal State Aid 67,500 200,000 0 0 0 267,500 Escrows 0 70,000 0 0 0 70,000 Total 150,000 600,000 0 0 0 750,000 Produced Using Plan-It CIP Software Page 40 CSAH 9/Dodd Blvd Modernization (215th St- 210th St) 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #28-04 Project Name CSAH 9/Dodd Blvd Modernization (215th St-210th St) Total Project Cost $5,800,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Modernization Department Engineering Funding Description Municipal State Aid County Project #09-067 SA/SAP #TBD Description Modernization of CSAH 9 (Dodd Bouelvard) between CSAH 70 (215th Street) and 210th Street. Project includes a 2-lane divided highway and trails along both sides, with drainage and safety improvements. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 4,400,000 0 0 4,400,000 Right of Way- Acquisition/Professional fees 0 750,000 0 0 0 750,000 Engineering/Design/Other costs 650,000 0 0 0 0 650,000 Total 650,000 750,000 4,400,000 0 0 5,800,000 Funding Sources 2026 2027 2028 2029 2030 Total Dakota County 552,500 637,500 3,740,000 0 0 4,930,000 Municipal State Aid 97,500 112,500 434,000 0 0 644,000 Escrows 0 0 196,000 0 0 196,000 Park Dedication Fund 0 0 30,000 0 0 30,000 Total 650,000 750,000 4,400,000 0 0 5,800,000 Produced Using Plan-It CIP Software Page 41 CSAH 60 and Orchard Trail Traffic Signal 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #28-05 Project Name CSAH 60 and Orchard Trail Traffic Signal Total Project Cost $950,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project #60-XXX SA/SAP #TBD JPA #TBD Description New traffic signal system designed to alleviate congestion and optimize intersection operations. Includes geometric improvements and pavement markings. City-led project Owned/maintained by Dakota County. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 800,000 0 0 0 800,000 Traffic signal- Design/ROW 150,000 0 0 0 0 150,000 Total 150,000 800,000 0 0 0 950,000 Funding Sources 2026 2027 2028 2029 2030 Total Dakota County 82,500 440,000 0 0 0 522,500 Municipal State Aid 67,500 360,000 0 0 0 427,500 Total 150,000 800,000 0 0 0 950,000 Produced Using Plan-It CIP Software Page 42 CSAH 46 and Foliage Avenue Traffic Signal Replace 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #28-06 Project Name CSAH 46 and Foliage Avenue Traffic Signal Replace Total Project Cost $268,750 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project #46-XXX SA/SAP #TBD JPA #TBD Description Replace traffic signal system that is approaching the end of its useful life and is located at the next highest Dakota County priority intersection. Owned/maintained by Dakota County. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 225,000 0 0 225,000 Traffic signal- Design/ROW 0 43,750 0 0 0 43,750 Total 0 43,750 225,000 0 0 268,750 Funding Sources 2026 2027 2028 2029 2030 Total Municipal State Aid 0 43,750 225,000 0 0 268,750 Total 0 43,750 225,000 0 0 268,750 Produced Using Plan-It CIP Software Page 43 CSAH 46 and Galaxie Avenue Traffic Signal Replacem 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #28-07 Project Name CSAH 46 and Galaxie Avenue Traffic Signal Replacem Total Project Cost $275,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project #46-XXX SA/SAP #TBD JPA #TBD Description Replace traffic signal system that is approaching the end of its useful life and is located at the next highest Dakota County priority intersection. Owned/maintained by Dakota County. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 225,000 0 0 225,000 Traffic signal- Design/ROW 0 50,000 0 0 0 50,000 Total 0 50,000 225,000 0 0 275,000 Funding Sources 2026 2027 2028 2029 2030 Total Municipal State Aid 0 50,000 225,000 0 0 275,000 Total 0 50,000 225,000 0 0 275,000 Produced Using Plan-It CIP Software Page 44 CSAH 9 Improvements at 194th St & 190th St 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #29-04 Project Name CSAH 9 Improvements at 194th St & 190th St Total Project Cost $1,782,500 Contact Zach Johnson, City Engineer Cost Type Transportation Type Maintenance/Improvement Department Engineering Funding Description Municipal State Aid County Project #9-068 SA/SAP #TBD JPA #TBD Description Construction of a) roundabout at the CSAH 9 (Dodd Boulevard) and 194th Street/Indiana Avenue intersection, and b) directional access median (3/4) CSAH 9 (Dodd Boulevard) and 194th Street intersection. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 0 1,575,000 0 1,575,000 Engineering/Design/Other costs 0 140,000 0 0 0 140,000 Right of Way- Acquisition/Professional fees 0 0 67,500 0 0 67,500 Total 0 140,000 67,500 1,575,000 0 1,782,500 Funding Sources 2026 2027 2028 2029 2030 Total Municipal State Aid 0 140,000 67,500 1,575,000 0 1,782,500 Total 0 140,000 67,500 1,575,000 0 1,782,500 Produced Using Plan-It CIP Software Page 45 CSAH 46 at Lac Lavon/Interlachen Traffic Signal 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #30-05 Project Name CSAH 46 at Lac Lavon/Interlachen Traffic Signal Total Project Cost $562,500 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project #46-XXX SA/SAP #TBD JPA #TBD Description Replace traffic signal system that is approaching the end of its useful life and is located at the next highest Dakota County priority intersection. Owned/maintained by Dakota County. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 0 0 475,000 475,000 Traffic signal- Design/ROW 0 0 87,500 0 0 87,500 Total 0 0 87,500 0 475,000 562,500 Funding Sources 2026 2027 2028 2029 2030 Total Municipal State Aid 0 0 87,500 0 475,000 562,500 Total 0 0 87,500 0 475,000 562,500 Produced Using Plan-It CIP Software Page 46 CSAH 60 and Judicial Road Traffic Signal 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #30-06 Project Name CSAH 60 and Judicial Road Traffic Signal Total Project Cost $300,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Traffic Signal Department Engineering Funding Description Municipal State Aid County Project #60-XXX SA/SAP #TBD JPA #TBD Description New traffic signal system designed to alleviate congestion and optimize intersection operations. Includes geometric improvements and pavement markings. City-led project Owned/maintained by Dakota County/Scott County Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 0 0 250,000 250,000 Traffic signal- Design/ROW 0 0 50,000 0 0 50,000 Total 0 0 50,000 0 250,000 300,000 Funding Sources 2026 2027 2028 2029 2030 Total Municipal State Aid 0 0 50,000 0 250,000 300,000 Total 0 0 50,000 0 250,000 300,000 Produced Using Plan-It CIP Software Page 47 CSAH 50 and Iberia Avenue Traffic Safety Mgmt 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #31-05 Project Name CSAH 50 and Iberia Avenue Traffic Safety Mgmt Total Project Cost $1,782,500 Contact Zach Johnson, City Engineer Cost Type Transportation Type Maintenance/Improvement Department Engineering Funding Description Municipal State Aid County Project #50-XXX SA/SAP #TBD JPA #TBD Description Construction of traffic safety management improvements at CSAH 50 (202nd Street) and Iberia Avenue intersection. Expenditures 2026 2027 2028 2029 2030 Total Future Engineering/Design/Other costs 0 0 0 140,000 0 140,000 1,575,000 Right of Way- Acquisition/Professional fees 0 0 0 0 67,500 67,500 Total 0 0 0 140,000 67,500 207,500 Funding Sources 2026 2027 2028 2029 2030 Total Future Municipal State Aid 0 0 0 140,000 67,500 207,500 1,575,000 Total 0 0 0 140,000 67,500 207,500 Produced Using Plan-It CIP Software Page 48 City Hall Building Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-01 Project Name City Hall Building Maintenance/Improvements Total Project Cost $1,572,051 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance Department City Hall Description The CIP includes anticipated maintenance/repair/improvement costs at Lakeville's City Hall building at 20195 Holyoke Ave. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 105,000 Roof replacement 0 0 0 190,000 0 190,000 1,055,000 Carpet 0 135,000 0 0 0 135,000 RTU S3 Replacement 0 0 0 0 70,000 70,000 Window film 0 0 0 17,051 0 17,051 Total 0 135,000 0 207,051 70,000 412,051 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 105,000 Building Fund 0 135,000 0 207,051 70,000 412,051 1,055,000 Total 0 135,000 0 207,051 70,000 412,051 Produced Using Plan-It CIP Software Page 49 CMF Building Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-02 Project Name CMF Building Maintenance/Improvements Total Project Cost $22,917,704 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Central Maintenance Facility Funding Description Building Fund Description The CIP includes anticipated maintenance/repair/improvement costs at Lakeville's Central Maintenance Facility building at 7570 179th St. W. It also includes costs to expand the facility in 2027, which will be funded by bonds, to be repaid by tax levy in future years. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 248,000 CMF Expansion 1,000,000 16,250,000 0 0 0 17,250,000 461,000 Roof replacement 0 0 0 3,000,000 0 3,000,000 Parks shop addition 0 500,000 0 0 0 500,000 Cooling Unit Replacement 420,000 0 0 0 0 420,000 Boiler replacement 0 0 300,000 0 0 300,000 Construction Services Office/Lunchroom remodel 0 210,000 0 0 0 210,000 Building wall system 0 0 0 100,000 0 100,000 MAU Replacements 100,000 0 0 0 0 100,000 Truck Garage paint (interior)0 80,000 0 0 0 80,000 Fuel island upgrades 75,000 0 0 0 0 75,000 Fleet shop and back office floor coating 0 60,000 0 0 0 60,000 Building envelope improvements 0 0 0 47,704 0 47,704 Monument sign 0 40,000 0 0 0 40,000 Fire panel 0 20,000 0 0 0 20,000 Conference room heating coil 6,000 0 0 0 0 6,000 Total 1,601,000 17,160,000 300,000 3,147,704 0 22,208,704 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 248,000 G.O. Improvement Bonds- Taxes (Facilities)0 17,960,000 0 0 0 17,960,000 461,000 Building Fund 1,601,000 -800,000 300,000 3,147,704 0 4,248,704 Total 1,601,000 17,160,000 300,000 3,147,704 0 22,208,704 Produced Using Plan-It CIP Software Page 50 Police Station- Building Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-03 Project Name Police Station- Building Maintenance/Improvements Total Project Cost $4,170,585 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Police Department Funding Description Building Fund Description Anticipated maintenance/repairs/improvements needed on the Police Station building. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 79,700 Workout room expansion 0 0 2,500,000 0 0 2,500,000 1,080,000 Boiler replacement 250,000 0 0 0 0 250,000 High speed garage door replacement 60,000 0 100,000 0 0 160,000 Radiant panels for offices 0 0 0 60,885 0 60,885 Paint-interior 0 0 0 0 25,000 25,000 Mini split unit 15,000 0 0 0 0 15,000 Total 325,000 0 2,600,000 60,885 25,000 3,010,885 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 79,700 Building Fund 325,000 0 2,600,000 60,885 25,000 3,010,885 1,080,000 Total 325,000 0 2,600,000 60,885 25,000 3,010,885 Produced Using Plan-It CIP Software Page 51 Heritage Center- Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-04 Project Name Heritage Center-Maintenance/Improvements Total Project Cost $1,563,460 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Heritage Center Funding Description Building Fund Description The Lakeville Heritage Center is located at 20110 Holyoke Ave and is home to Lakeville Area Active Adults, Lakeville Area Historical Society and Lakeville Yellow Ribbon. The CIP includes estimated costs for maintenance/repairs/improvements at the Heritage Center building. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 734,300 Interior Renovation 450,000 0 0 0 0 450,000 115,000 RTU 7,8,9,11 Replacement 0 0 100,000 0 0 100,000 RTU 2,3,4,6 Replacement 0 0 0 80,000 0 80,000 RTU 1,5 Replacement 0 0 0 0 40,000 40,000 RTU 10 replacement 20,000 0 0 0 0 20,000 Building envelope improvements 0 0 0 16,160 0 16,160 Mini Split Replacement 0 0 8,000 0 0 8,000 Total 470,000 0 108,000 96,160 40,000 714,160 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 734,300 Building Fund 470,000 0 108,000 96,160 40,000 714,160 115,000 Total 470,000 0 108,000 96,160 40,000 714,160 Produced Using Plan-It CIP Software Page 52 Arts Center- Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-05 Project Name Arts Center-Maintenance/Improvements Total Project Cost $1,218,942 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department LAAC - Performing Arts Building Funding Description Building Fund Description The Lakeville Area Arts Center is located at 20965 Holyoke Ave, in historic downtown Lakeville. The Arts Center hosts theater and other events, community classes, and provides rental opportunities. The CIP includes estimated costs for maintenance/repairs/improvements at the Arts Center building. Prior Expenditures 2026 2027 2028 2029 2030 Total 213,942 Condenser Unit #1 replacement 0 520,000 0 0 0 520,000 Theater Seating Refurbishment 0 0 0 150,000 0 150,000 AHU Replacements 0 0 0 0 125,000 125,000 Arts Center Playground- drainage/sidewalks 80,000 0 0 0 0 80,000 Sound system replacement 65,000 0 0 0 0 65,000 Snow melt boiler/pump replacement 25,000 0 0 0 0 25,000 Green room sink and counter 15,000 0 0 0 0 15,000 Stage drape replacement 0 15,000 0 0 0 15,000 Light board replacement 0 10,000 0 0 0 10,000 Total 185,000 545,000 0 150,000 125,000 1,005,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 213,942 Building Fund 185,000 545,000 0 150,000 125,000 1,005,000 Total 185,000 545,000 0 150,000 125,000 1,005,000 Produced Using Plan-It CIP Software Page 53 Fine Arts Building- Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-06 Project Name Fine Arts Building-Maintenance/Improvements Total Project Cost $684,808 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department LAAC - Fine Arts Building Funding Description Building Fund Description The Fine Arts Center is located at 20950 Howland Ave and is a division of the Lakeville Area Arts Center, focused on providing expanded classroom and studio space for fine arts programming. The CIP includes estimated costs for maintenance/repairs/improvements at the Fine Arts Center building. Prior Expenditures 2026 2027 2028 2029 2030 Total 114,808 Roof replacement 0 570,000 0 0 0 570,000 Total 0 570,000 0 0 0 570,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 114,808 Building Fund 0 570,000 0 0 0 570,000 Total 0 570,000 0 0 0 570,000 Produced Using Plan-It CIP Software Page 54 Fire Station #1- Building Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-07 Project Name Fire Station #1-Building Maintenance/Improvements Total Project Cost $21,066,940 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Fire Station #1 Description Station 1 protects the region south of 195th Street to 220th Street, west to Judicial Road (Scott County), and east to the Farmington border. The CIP includes anticipated maintenance/repairs and improvements to the Fire Station #1 building. Prior Expenditures 2026 2027 2028 2029 2030 Total 275,000 Remodel for full time 0 0 20,000,000 0 0 20,000,000 Roof replacement 0 0 0 175,000 0 175,000 Parking lot mill and overlay 0 0 156,000 0 0 156,000 Building envelope improvements 0 0 0 110,140 0 110,140 Rear Concrete Apron 0 0 95,000 0 0 95,000 Fire sprinkler system installation 0 0 70,000 0 0 70,000 MAU Replacements 0 60,000 0 0 0 60,000 Generator Replacement 0 0 50,000 0 0 50,000 Cooling unit 1, 2 & 3 replacement 0 0 35,000 0 0 35,000 Truck bay floor recoating 0 0 0 0 22,000 22,000 Office and Training Room carpet 0 0 11,000 0 0 11,000 Washer replacement 0 0 7,800 0 0 7,800 Total 0 60,000 20,424,800 285,140 22,000 20,791,940 Prior Funding Sources 2026 2027 2028 2029 2030 Total 275,000 G.O. Improvement Bonds- Franchise Fees (Facilities)0 0 20,000,000 0 0 20,000,000 Building Fund 0 60,000 424,800 285,140 22,000 791,940 Total 0 60,000 20,424,800 285,140 22,000 20,791,940 Produced Using Plan-It CIP Software Page 55 Fire Station #3- Building Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-09 Project Name Fire Station #3-Building Maintenance/Improvements Total Project Cost $22,210,800 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Fire Station #3 Funding Description Building Fund Description Anticipated maintenance/repairs/improvements needed on the Fire Station #3 building. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 69,000 Remodel for full time 0 20,000,000 0 0 0 20,000,000 12,000 Land acquisition 2,000,000 0 0 0 0 2,000,000 Roof replacement 0 0 0 115,000 0 115,000 Washer replacement 0 0 0 7,800 0 7,800 Carpet 0 0 0 0 7,000 7,000 Total 2,000,000 20,000,000 0 122,800 7,000 22,129,800 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 69,000 G.O. Improvement Bonds- Franchise Fees (Facilities)2,000,000 20,000,000 0 0 0 22,000,000 12,000 Building Fund 0 0 0 122,800 7,000 129,800 Total 2,000,000 20,000,000 0 122,800 7,000 22,129,800 Produced Using Plan-It CIP Software Page 56 Fire Station #4- Building Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-10 Project Name Fire Station #4-Building Maintenance/Improvements Total Project Cost $322,700 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Fire Station #4 Funding Description Building Fund Description Built in 2002, Station 4 is currently Lakeville's newest and most centrally located station. The CIP includes anticipated maintenance/repairs/improvements needed on the Fire Station #4 building. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 48,000 RTU 1,2,4 replacement 0 0 0 95,000 0 95,000 120,000 Carpet 0 30,000 0 0 0 30,000 Building envelope improvements 0 0 0 29,700 0 29,700 Total 0 30,000 0 124,700 0 154,700 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 48,000 Building Fund 0 30,000 0 124,700 0 154,700 120,000 Total 0 30,000 0 124,700 0 154,700 Keokuk Liquor Store- Maintenance/Improv 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-12 Project Name Keokuk Liquor Store- Maintenance/Improv Total Project Cost $143,000 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Keokuk Liquor Store Funding Description Liquor Fund Description The CIP includes anticipated maintenance/repairs/improvement costs at the Keokuk Liquor Store building, which is located at 20880 Keokuk Ave. This facility also includes the Emporium Room, which is a multi-purpose, 3,000 square feet room that can be rented for meetings, celebrations or classes. Expenditures 2026 2027 2028 2029 2030 Total Future Strip and wax floor 23,000 0 0 0 0 23,000 120,000 Total 23,000 0 0 0 0 23,000 Funding Sources 2026 2027 2028 2029 2030 Total Future Liquor Fund 23,000 0 0 0 0 23,000 120,000 Total 23,000 0 0 0 0 23,000 Produced Using Plan-It CIP Software Page 57 Heritage Liquor Store- Maintenance/Improv 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-13 Project Name Heritage Liquor Store- Maintenance/Improv Total Project Cost $163,000 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Heritage Liquor Store Funding Description Liquor Fund Description The CIP includes anticipated maintenance/repairs/improvement costs at the Heritage Liquor Store building, which is located at 20164 Heritage Dr. Expenditures 2026 2027 2028 2029 2030 Total Future Flooring Replacement 0 0 65,000 0 0 65,000 90,000 Paint sales floor & office walls 0 0 0 0 8,000 8,000 Entrance door replacement 0 0 0 0 0 0 Total 0 0 65,000 0 8,000 73,000 Funding Sources 2026 2027 2028 2029 2030 Total Future Liquor Fund 0 0 65,000 0 8,000 73,000 90,000 Total 0 0 65,000 0 8,000 73,000 Produced Using Plan-It CIP Software Page 58 Kenrick Liquor Store- Maintenance/Improv 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-14 Project Name Kenrick Liquor Store- Maintenance/Improv Total Project Cost $217,629 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Kenrick Store Funding Description Liquor Fund Description The CIP includes anticipated maintenance/repairs/improvement costs at the Kenrick Liquor Store building, which is located at 16179 Kenrick Ave. Expenditures 2026 2027 2028 2029 2030 Total Future Cooler mechanicals 40,000 0 0 0 0 40,000 146,000 Building envelope improvements 0 0 0 0 30,290 30,290 Water savings 0 0 0 0 1,339 1,339 Total 40,000 0 0 0 31,629 71,629 Funding Sources 2026 2027 2028 2029 2030 Total Future Liquor Fund 40,000 0 0 0 31,629 71,629 146,000 Total 40,000 0 0 0 31,629 71,629 Produced Using Plan-It CIP Software Page 59 Galaxie Liquor Store- Maintenance/Improv 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-15 Project Name Galaxie Liquor Store- Maintenance/Improv Total Project Cost $491,570 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department Galaxie Store Funding Description Liquor Fund Description The CIP includes anticipated maintenance/repairs/improvement costs at the Galaxie Liquor Store building, which is located at 16000 Galaxie Ave. Expenditures 2026 2027 2028 2029 2030 Total Future Roof replacement 0 0 0 0 275,000 275,000 115,000 Building envelope improvements 0 0 0 0 56,570 56,570 Flooring Replacement 45,000 0 0 0 0 45,000 Total 45,000 0 0 0 331,570 376,570 Funding Sources 2026 2027 2028 2029 2030 Total Future Liquor Fund 45,000 0 0 0 331,570 376,570 115,000 Total 45,000 0 0 0 331,570 376,570 Produced Using Plan-It CIP Software Page 60 Water Treatment Facilty- Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-16 Project Name Water Treatment Facilty-Maintenance/Improvements Total Project Cost $46,359,960 Contact Paul Oehme, Public Works Director Cost Type Facilities Type Maintenance/Improvement Department Utilities Funding Description Water Operating Fund Description Anticipated maintenance/repairs/improvements needed on the existing Water Treatment Facility building. The City of Lakeville’s Water Treatment Plant was originally constructed in 1997 with a capacity of 10 million gallons per day (MGD). It was expanded in 2001 to 20 MGD, and in 2013, following a successful filter pilot study, the plant was re-rated to a capacity of 26 MGD. The City's water need continues to grow and a study is underway to update the 2022 WTP Expansion Study, in order to determine the best way to reach the capacity for full City build out. It will compare the advantages and disadvantages of two key alternatives: Expanding the existing water treatment facility. Constructing a satellite facility on a parcel located north of the Central Maintenance Facility water tower Costs to build a satellite water treatment facility are estimated in 2027, and will be adjusted if needed upon Council direction after the results of the study are determined. Expenditures 2026 2027 2028 2029 2030 Total Future Water Treatment Plant Expansion 4,000,000 40,000,000 0 0 0 44,000,000 60,000 Roof replacement 0 1,500,000 0 0 0 1,500,000 Boiler plant replacement 350,000 0 0 0 0 350,000 AHU Replacements 0 0 0 115,000 0 115,000 Parking lot mill and overlay 0 0 110,000 0 0 110,000 Auto Shutoff for chlorine tanks 75,000 0 0 0 0 75,000 Building envelope improvements 0 0 0 64,960 0 64,960 Filter rooms exhaust fan replacement 0 0 60,000 0 0 60,000 Well #7 roof replacement 25,000 0 0 0 0 25,000 Total 4,450,000 41,500,000 170,000 179,960 0 46,299,960 Funding Sources 2026 2027 2028 2029 2030 Total Future Water Revenue Bonds 0 40,000,000 0 0 0 40,000,000 60,000 Water Operating Fund 450,000 5,500,000 170,000 179,960 0 6,299,960 Water Trunk Fund 4,000,000 -4,000,000 0 0 0 0 Total 4,450,000 41,500,000 170,000 179,960 0 46,299,960 Produced Using Plan-It CIP Software Page 61 FiRST Center Facility Maintenance/Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #B-17 Project Name FiRST Center Facility Maintenance/Improvements Total Project Cost $125,000 Contact Tom Breeggemann, Facilities Supervisor Cost Type Facilities Type Maintenance/Improvement Department FiRST Center Funding Description FiRST Center Operating Fund Description Construction of the FiRST Center began in early 2025 and will be located at the former Public Works site within the Airlake Industrial Park at 7777 214th Street West. It is expected to be completed in 2026. Operational costs to maintain and operate the facility will be provided through membership fees paid by the various agencies that will be using the facility. The CIP estimates maintenance/repair/improvements costs at this facility. Expenditures 2026 2027 2028 2029 2030 Total Facility improvements/maintenance 25,000 100,000 0 0 0 125,000 Total 25,000 100,000 0 0 0 125,000 Funding Sources 2026 2027 2028 2029 2030 Total FiRST Center Operating Fund 25,000 100,000 0 0 0 125,000 Total 25,000 100,000 0 0 0 125,000 Produced Using Plan-It CIP Software Page 62 Police- Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-01 Project Name Police-Equipment Total Project Cost $12,119,305 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Police Department Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Police division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment purchase - squad vehicles 395,000 1,013,700 991,200 1,759,500 70,800 4,230,200 6,461,953 Equipment purchase - radios 195,000 212,550 313,040 74,407 65,844 860,841 Equipment purchase - command center 0 0 0 0 250,000 250,000 Equipment purchase - firearms 59,000 56,026 6,384 6,900 6,726 135,036 Equipment purchase - supplemental equipment 35,000 0 24,629 0 32,077 91,706 Equipment purchase - safety equipment 0 17,457 14,461 0 32,651 64,569 Equipment purchase - drones 25,000 0 0 0 0 25,000 Total 709,000 1,299,733 1,349,714 1,840,807 458,098 5,657,352 Funding Sources 2026 2027 2028 2029 2030 Total Future Equipment Fund 709,000 1,299,733 1,349,714 1,840,807 458,098 5,657,352 6,461,953 Total 709,000 1,299,733 1,349,714 1,840,807 458,098 5,657,352 Produced Using Plan-It CIP Software Page 63 Fire - Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-02 Project Name Fire - Equipment Total Project Cost $5,486,930 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Fire Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Fire division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment purchase - multi-year fire equipment 0 0 800,000 0 1,532,000 2,332,000 1,921,498 Equipment purchase - radios 177,644 177,644 177,644 0 0 532,932 Equipment Purchase - vehicle 250,000 0 72,800 172,500 0 495,300 Equipment purchase - supplemental equipment 130,000 34,880 29,120 0 0 194,000 Equipment Purchase - Trailer 5,300 0 0 0 5,900 11,200 Total 562,944 212,524 1,079,564 172,500 1,537,900 3,565,432 Funding Sources 2026 2027 2028 2029 2030 Total Future Equipment Fund 562,944 212,524 1,079,564 172,500 1,537,900 3,565,432 1,921,498 Total 562,944 212,524 1,079,564 172,500 1,537,900 3,565,432 Produced Using Plan-It CIP Software Page 64 Streets- Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-03 Project Name Streets-Equipment Total Project Cost $14,874,144 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Streets Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Streets division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment Purchase - plow truck 922,200 675,800 1,187,200 713,000 731,600 4,229,800 7,531,320 Equipment purchase - heavy equipment 0 394,580 459,200 723,797 79,392 1,656,969 Equipment Purchase - vehicle 296,800 81,750 0 69,000 141,600 589,150 Equipment purchase - supplemental equipment 46,287 0 16,800 87,325 362,424 512,836 Equipment purchase - sweepers 0 0 0 0 324,558 324,558 Equipment Purchase - Trailer 19,186 0 0 0 10,325 29,511 Total 1,284,473 1,152,130 1,663,200 1,593,122 1,649,899 7,342,824 Funding Sources 2026 2027 2028 2029 2030 Total Future Equipment Fund 1,284,473 1,152,130 1,663,200 1,593,122 1,649,899 7,342,824 7,531,320 Total 1,284,473 1,152,130 1,663,200 1,593,122 1,649,899 7,342,824 Produced Using Plan-It CIP Software Page 65 Park Maintenance- Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-04 Project Name Park Maintenance-Equipment Total Project Cost $5,990,900 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Park Maintenance Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Park Maintenance division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment purchase - mowers 172,906 177,799 182,692 240,540 163,006 936,943 2,907,511 Equipment Purchase - vehicle 96,106 126,355 129,530 37,950 310,006 699,947 Equipment purchase - heavy equipment 0 95,375 371,280 92,000 0 558,655 Equipment purchase - supplemental equipment 75,416 30,485 50,072 38,550 132,898 327,421 Equipment purchase - load & pack refuse 0 272,500 0 0 0 272,500 Equipment purchase - seasonal staff equipment 227,977 0 27,741 0 0 255,718 Equipment Purchase - Trailer 0 0 14,505 0 17,700 32,205 Total 572,405 702,514 775,820 409,040 623,610 3,083,389 Funding Sources 2026 2027 2028 2029 2030 Total Future Equipment Fund 572,405 702,514 775,820 409,040 623,610 3,083,389 2,907,511 Total 572,405 702,514 775,820 409,040 623,610 3,083,389 Produced Using Plan-It CIP Software Page 66 Facilities - Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-05 Project Name Facilities - Equipment Total Project Cost $109,506 Contact Tom Breeggemann, Facilities Supervisor Cost Type Equipment Type Equipment Department General Government Facilities Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Facilities division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment purchase 9,270 45,021 0 0 0 54,291 55,215 Total 9,270 45,021 0 0 0 54,291 Funding Sources 2026 2027 2028 2029 2030 Total Future Equipment Fund 9,270 45,021 0 0 0 54,291 55,215 Total 9,270 45,021 0 0 0 54,291 Inspections- Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-06 Project Name Inspections-Equipment Total Project Cost $349,186 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Inspections Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Inspections division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment purchase 0 0 0 37,000 48,186 85,186 264,000 Total 0 0 0 37,000 48,186 85,186 Funding Sources 2026 2027 2028 2029 2030 Total Future General Fund 0 0 0 37,000 48,186 85,186 264,000 Total 0 0 0 37,000 48,186 85,186 Produced Using Plan-It CIP Software Page 67 Construction Services- Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-07 Project Name Construction Services-Equipment Total Project Cost $279,908 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Construction Services Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Construction Services division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment purchase 67,460 69,425 0 31,334 75,319 243,538 36,370 Total 67,460 69,425 0 31,334 75,319 243,538 Funding Sources 2026 2027 2028 2029 2030 Total Future General Fund 67,460 69,425 0 31,334 75,319 243,538 36,370 Total 67,460 69,425 0 31,334 75,319 243,538 Liquor- Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-08 Project Name Liquor-Equipment Total Project Cost $60,022 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Keokuk Liquor Store Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Liquor stores. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment purchase 0 34,880 0 0 0 34,880 25,142 Total 0 34,880 0 0 0 34,880 Funding Sources 2026 2027 2028 2029 2030 Total Future Liquor Fund 0 34,880 0 0 0 34,880 25,142 Total 0 34,880 0 0 0 34,880 Produced Using Plan-It CIP Software Page 68 Communications PEG- Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-10 Project Name Communications PEG-Equipment Total Project Cost $454,654 Contact Tierney Helmers, Communications Manager Cost Type Equipment Type Equipment Department Communications Funding Description Equipment Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Communications division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment purchase 45,000 60,000 40,000 52,000 72,654 269,654 185,000 Total 45,000 60,000 40,000 52,000 72,654 269,654 Funding Sources 2026 2027 2028 2029 2030 Total Future Communications Fund 45,000 60,000 40,000 52,000 72,654 269,654 185,000 Total 45,000 60,000 40,000 52,000 72,654 269,654 Environmental Resources - Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-11 Project Name Environmental Resources - Equipment Total Project Cost $136,596 Contact Bob Mach, Fleet Supervisor Cost Type Equipment Type Equipment Department Environmental Resources Funding Description Environmental Resources Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Environmental Resources division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment purchase - mowers 65,000 0 0 0 0 65,000 36,596 Equipment purchase 35,000 0 0 0 0 35,000 Total 100,000 0 0 0 0 100,000 Funding Sources 2026 2027 2028 2029 2030 Total Future Environmental Resources Fund 100,000 0 0 0 0 100,000 36,596 Total 100,000 0 0 0 0 100,000 Produced Using Plan-It CIP Software Page 69 Utilities- Equipment 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #E-12 Project Name Utilities-Equipment Total Project Cost $2,632,122 Contact Shane Quade, Utilities Superintendent Cost Type Equipment Type Equipment Department Utilities Funding Description Water Operating Fund Description The CIP includes anticipated replacement/addition of various equipment costs for the Utilities division. Expenditures 2026 2027 2028 2029 2030 Total Future Equipment Purchase - vehicle 212,836 64,104 125,052 379,509 324,083 1,105,584 1,072,492 Equipment purchase - heavy equipment 370,660 53,000 0 0 0 423,660 Equipment purchase - supplemental equipment 21,310 0 0 0 0 21,310 Equipment Purchase - Trailer 0 6,956 0 0 0 6,956 Equipment Purchase - attachments 0 2,120 0 0 0 2,120 Total 604,806 126,180 125,052 379,509 324,083 1,559,630 Funding Sources 2026 2027 2028 2029 2030 Total Future Sanitary Sewer Operating Fund 477,078 63,090 62,526 189,755 162,041 954,490 1,072,492 Water Operating Fund 127,728 63,090 62,526 189,754 162,042 605,140 Total 604,806 126,180 125,052 379,509 324,083 1,559,630 Produced Using Plan-It CIP Software Page 70 Water Quality and Water Conservation 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #ER-01 Project Name Water Quality and Water Conservation Total Project Cost $425,000 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Type Other Department Environmental Resources Funding Description Environmental Resources Fund County Project #N/A SA/SAP #N/A JPA #N/A Description Water Quality Best Management Practices Partnership projects aligning with Black Dog Watershed Water Management Organization, Dakota County Soil and Water Conservation District and Vermillion River Watershed Joint Powers Organization restoration and protection strategies. Funding intended as City’s cost-share to meet partnership or grant matching requirements. Emphasis on Federal Clean Water Act, Minnesota Pollution Control Agency MS4 permit and Total Maximum Daily Load compliance. Urban Restoration - Public System Initiatives and Improvements Program designed to restore and manage landscaping at public facilities and public open spaces by replacing hardscape and lawns with native plants/low- maintenance vegetation. Best management practices include native grasses/plants, prairies, rain gardens and woodlands to provide stormwater rate control/volume reduction or water quality improvements. Water Conservation Program designed to implement water conservation strategies to reduce water use. Best management practices include water reuse and smart irrigation systems. Expenditures 2026 2027 2028 2029 2030 Total Water Quality BMPs 75,000 75,000 75,000 75,000 75,000 375,000 Urban Restoration- Public System Initiatives 10,000 10,000 10,000 10,000 10,000 50,000 Total 85,000 85,000 85,000 85,000 85,000 425,000 Funding Sources 2026 2027 2028 2029 2030 Total Environmental Resources Fund 85,000 85,000 85,000 85,000 85,000 425,000 Total 85,000 85,000 85,000 85,000 85,000 425,000 Produced Using Plan-It CIP Software Page 71 Lake Management 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #ER-02 Project Name Lake Management Total Project Cost $550,000 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Type Other Department Environmental Resources Funding Description Environmental Resources Fund County Project #N/A SA/SAP #N/A JPA #N/A Description Annual management program designed to promote and protect public water resources. Annual assessments, including aquatic plant surveys, aquatic invasive species monitoring, fish surveys and water monitoring/sampling, guide best management practices and strategies, and prioritize and schedule treatments. Best management practices and strategies include chemical treatments, education and outreach, and fish management. Expenditures 2026 2027 2028 2029 2030 Total Water Quality Assessment 60,000 60,000 60,000 60,000 60,000 300,000 Water Quality Treatment 50,000 50,000 50,000 50,000 50,000 250,000 Total 110,000 110,000 110,000 110,000 110,000 550,000 Funding Sources 2026 2027 2028 2029 2030 Total Environmental Resources Fund 100,000 100,000 100,000 100,000 100,000 500,000 Dakota County 10,000 10,000 10,000 10,000 10,000 50,000 Total 110,000 110,000 110,000 110,000 110,000 550,000 Produced Using Plan-It CIP Software Page 72 Stormwater Infrastructure Maintenance 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #ER-03 Project Name Stormwater Infrastructure Maintenance Total Project Cost $4,800,000 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Type Maintenance Department Engineering Funding Description Environmental Resources Fund Description Stormwater Basin Rehabilitation Annual maintenance program designed to extend service life/minimize life-cycle costs of public stormwater management basins. Stormwater management basins improve water quality of stormwater runoff and reduce peak stormwater discharge rates. Public stormwater management basins are inspected regularly to prioritize and schedule maintenance and rehabilitation projects. Best management practices include maintenance at emergency overflow/easement areas, sediment/vegetation removal and slope restoration. Emphasis on Minnesota Pollution Control Agency Municipal Separate Storm Sewer System (MS4) permit compliance. Stormwater Infrastructure Maintenance/Rehabilitation Annual preventive maintenance program designed to protect the City’s investment in public stormwater infrastructure. Best management practices include flared-end section repairs, sediment removal, storm sewer pipe and manhole repairs, and stormwater conveyance systems improvements. Emphasis on Minnesota Pollution Control Agency Municipal Separate Storm Sewer System (MS4) permit compliance. Flared-End Section (FES) Maintenance Annual maintenance program designed to improve the overall performance and effectiveness of the City’s stormwater management system. Best management practices include removal of accumulated sediment that is restricting stormwater flow through flared-end sections, stormwater infrastructure designed to convey water to/from stormwater management basins. Stormwater Structure Sump Filling Annual program designed to improve the overall efficiency and effectiveness in maintaining the performance of the City's stromwater management. Expenditures 2026 2027 2028 2029 2030 Total Stormwater Basin Rehabilitation 450,000 450,000 450,000 450,000 450,000 2,250,000 Stormwater Infrastructure maintenance/rehabilitation 290,000 290,000 290,000 290,000 290,000 1,450,000 Creeks- proactive/preventative maintenance 100,000 100,000 100,000 100,000 100,000 500,000 FES Maintenance- MS4 Pond/Outfall Insp.85,000 85,000 85,000 85,000 85,000 425,000 Stormwater structure sump filling 35,000 35,000 35,000 35,000 35,000 175,000 Total 960,000 960,000 960,000 960,000 960,000 4,800,000 Funding Sources 2026 2027 2028 2029 2030 Total Environmental Resources Fund 950,000 950,000 950,000 950,000 950,000 4,750,000 Vermillion River Watershed JPO 10,000 10,000 10,000 10,000 10,000 50,000 Total 960,000 960,000 960,000 960,000 960,000 4,800,000 Produced Using Plan-It CIP Software Page 73 Storm Water Conveyance System Expansion 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #ER-04 Project Name Storm Water Conveyance System Expansion Total Project Cost $500,000 Contact Zach Johnson, City Engineer Cost Type Environmental Resources Prior Expenditures 2026 2027 2028 2029 2030 Total 100,000 Construction 100,000 100,000 100,000 100,000 0 400,000 Total 100,000 100,000 100,000 100,000 0 400,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 100,000 Stormwater Infrastructure Fund 100,000 100,000 100,000 100,000 0 400,000 Total 100,000 100,000 100,000 100,000 0 400,000 Forestry (Ash tree injection/removal, reforestatio 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #ER-05 Project Name Forestry (Ash tree injection/removal, reforestatio Total Project Cost $708,500 Contact Zach Jorgensen, City Forester Cost Type Environmental Resources Type Maintenance Department Environmental Resources Description Annual maintenance program designed to manage, preserve, and protect public woodland assets. Best management practices include Emerald Ash Borer program (tree injections, tree removal/stump grinding of infected trees and reforestation of public parks/open spaces). Expenditures 2026 2027 2028 2029 2030 Total Ash tree injection 62,000 60,000 55,000 55,000 55,000 287,000 Ash tree removal 53,000 53,000 56,000 56,000 56,000 274,000 Reforestation 27,500 28,500 30,500 30,500 30,500 147,500 Total 142,500 141,500 141,500 141,500 141,500 708,500 Funding Sources 2026 2027 2028 2029 2030 Total General Fund 142,500 141,500 141,500 141,500 141,500 708,500 Total 142,500 141,500 141,500 141,500 141,500 708,500 Produced Using Plan-It CIP Software Page 74 Vegetation Management - City Outlots/Public land 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #ER-06 Project Name Vegetation Management - City Outlots/Public land Total Project Cost $850,000 Contact Zach Jorgensen, City Forester Cost Type Environmental Resources Type Maintenance Department Environmental Resources Description Annual maintenance program designed to help establish deep-rooted native vegetation that will help prevent erosion and filter out chemicals, and nutrients, like phosphorous, that degrades water quality. Managing invasive and noxious weeds also helps to establish the native vegetation, increase biodiversity, and improve habitat for local wildlife. Expenditures 2026 2027 2028 2029 2030 Total Vegetation maintenance-City outlots/public land 170,000 170,000 170,000 170,000 170,000 850,000 Total 170,000 170,000 170,000 170,000 170,000 850,000 Funding Sources 2026 2027 2028 2029 2030 Total Environmental Resources Fund 170,000 170,000 170,000 170,000 170,000 850,000 Total 170,000 170,000 170,000 170,000 170,000 850,000 Produced Using Plan-It CIP Software Page 75 Parks Major Maintenance - General 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-01 Project Name Parks Major Maintenance - General Total Project Cost $214,956 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description Includes general park amenities like benches, grills, tables and improvements completed through our Eagle Scout Program. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 18,206 Park Amenities – Benches, Grills, Tables, etc.10,000 10,000 11,000 11,000 11,000 53,000 101,250 Eagle Scout Project Materials 8,250 8,500 8,500 8,500 8,750 42,500 Total 18,250 18,500 19,500 19,500 19,750 95,500 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 18,206 Park & Trail Improvement Fund 18,250 18,500 19,500 19,500 19,750 95,500 101,250 Total 18,250 18,500 19,500 19,500 19,750 95,500 Produced Using Plan-It CIP Software Page 76 Park Development - Adminstrative Projects 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-02 Project Name Park Development - Adminstrative Projects Total Project Cost $270,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description The Park Dedication Fund budget provides appropriations for many activities including planning, design and feasibility reports for park projects. On an annual basis those project include engineering and design work for a wide variety of park projects, including rinks, playgrounds and future parks. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 55,000 Engineering/Design/Other costs 20,000 20,000 20,000 20,000 20,000 100,000 100,000 Buildings/Shelters/Grounds 15,000 0 0 0 0 15,000 Total 35,000 20,000 20,000 20,000 20,000 115,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 55,000 Park Dedication Fund 35,000 20,000 20,000 20,000 20,000 115,000 100,000 Total 35,000 20,000 20,000 20,000 20,000 115,000 Produced Using Plan-It CIP Software Page 77 Park Development - Developer Credits 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-03 Project Name Park Development - Developer Credits Total Project Cost $4,785,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type Other Department Park Dedication Funding Description Park Dedication Fund Description Represents credits associated with new development when the park dedication requirement is fulfilled through a land dedication. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 435,000 Developer-Credits 435,000 435,000 435,000 435,000 435,000 2,175,000 2,175,000 Total 435,000 435,000 435,000 435,000 435,000 2,175,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 435,000 Park Dedication Fund 435,000 435,000 435,000 435,000 435,000 2,175,000 2,175,000 Total 435,000 435,000 435,000 435,000 435,000 2,175,000 Future Park Land Acquisition 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-04 Project Name Future Park Land Acquisition Total Project Cost $2,200,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type Other Department Park Dedication Funding Description Park Dedication Fund Description Represents potential costs of land acquisition where needed to fulfill future plans for parks in the City based on the 2026-2036 Parks System Master Plan. Expenditures 2026 2027 2028 2029 2030 Total Future Land acquisition for parks/trails use 0 0 100,000 100,000 100,000 300,000 1,900,000 Total 0 0 100,000 100,000 100,000 300,000 Funding Sources 2026 2027 2028 2029 2030 Total Future Park Dedication Fund 0 0 100,000 100,000 100,000 300,000 1,900,000 Total 0 0 100,000 100,000 100,000 300,000 Produced Using Plan-It CIP Software Page 78 Trail Improvements (Various Trails) 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-05 Project Name Trail Improvements (Various Trails) Total Project Cost $7,900,500 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Reconstruction/Maintenance Department Park Maintenance Funding Description Trail Improvement Fund Description The City retained a third party in 2022 to evaluate the condition of all trail segments in our community and plans are to do this again in 2025. Based on the evaluation results staff will refine the current plan for either overlaying or reclaiming City trail segments, along with crack filling and fog sealing of trails. Maintenance of sidewalks and trails along Dakota County roadways is provided in accordance with the current County and City Maintenance Agreement for County Bikeway Trails. In 2021, the Dakota County Board of Commissioners approved the following regarding trails and sidewalks along Dakota County roadways: Multi-Use Trails and Sidewalk Maintenance Dakota County will participate in pavement preservation, overlay, or reconstruction of trails and sidewalks along the County highway system up to 100 percent. The City is responsible for snow and ice removal. To be eligible for County participation in trails and sidewalks, a system-wide maintenance agreement between the County and local agency will be required to identify system-wide trail and sidewalk roles and cost responsibilities. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 602,500 Construction- Trail Rehabilitation/Reconstruction 810,000 450,000 500,000 525,000 525,000 2,810,000 3,750,000 Crack Seal 80,000 80,000 85,000 85,000 85,000 415,000 Construction- New trails 0 0 100,000 100,000 100,000 300,000 Trail inspection and rating 0 0 23,000 0 0 23,000 Total 890,000 530,000 708,000 710,000 710,000 3,548,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 602,500 Park & Trail Improvement Fund 890,000 530,000 608,000 610,000 610,000 3,248,000 3,750,000 Park Dedication Fund 0 0 100,000 100,000 100,000 300,000 Total 890,000 530,000 708,000 710,000 710,000 3,548,000 Produced Using Plan-It CIP Software Page 79 Park Improvements (Various Parks) 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-06 Project Name Park Improvements (Various Parks) Total Project Cost $2,379,000 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description The Park Improvement Fund provides funding for replacement and upgrades to shelters and buildings, improvements to hockey rinks, basketball, pickleball, tennis courts and other park amenities. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 130,000 Miracle Field surface replacement/repairs 0 300,000 0 0 0 300,000 860,000 Dodd Trail Pickleball reconstruction 0 225,000 0 0 0 225,000 Highview rink reconstruction 155,000 0 0 0 0 155,000 Meadows Rink reconstruction 0 0 0 135,000 0 135,000 McGuire-Rink reconstruction 0 110,000 0 0 0 110,000 Parkview Rink reconstruction 0 0 0 0 105,000 105,000 Rolling Oaks rink reconstruction 0 0 105,000 0 0 105,000 Dodd Trail BB Reconstruction-concrete 0 52,000 0 0 0 52,000 Prairie Lake BB reconstruction-concrete 0 0 52,000 0 0 52,000 Cherryview BB Reconstruction- concrete 50,000 0 0 0 0 50,000 Meadows BB court reconstruction-concrete 50,000 0 0 0 0 50,000 Ballfield dugout roof support 7,000 7,000 7,000 7,000 7,000 35,000 Pioneer Plaza water fountain repairs/upgrade 15,000 0 0 0 0 15,000 Total 277,000 694,000 164,000 142,000 112,000 1,389,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 130,000 Park & Trail Improvement Fund 277,000 544,000 164,000 142,000 112,000 1,239,000 860,000 Lakeville Baseball Association 0 150,000 0 0 0 150,000 Total 277,000 694,000 164,000 142,000 112,000 1,389,000 Produced Using Plan-It CIP Software Page 80 Playground Replacement 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-08 Project Name Playground Replacement Total Project Cost $3,523,000 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Reconstruction/Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description The Park Improvement Fund provides funding for replacement and upgrades to playgrounds. The Arts Center playground funding includes a $60,000 donation from QA-1. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 226,000 Aronson Park 0 0 300,000 0 0 300,000 1,173,000 Arts Center playground 145,000 0 0 0 0 145,000 Valley Lake Park 130,000 0 0 0 0 130,000 Bassett Park 0 0 0 0 127,000 127,000 Kenreel Park 0 0 0 0 127,000 127,000 Spyglass Park 0 0 0 0 127,000 127,000 Jaycee Park 0 0 0 124,000 0 124,000 Lakeridge Park 0 0 0 124,000 0 124,000 Rolling Oaks Park 0 0 0 124,000 0 124,000 Fairfield Park 0 0 121,500 0 0 121,500 Lynwood Heights Park 0 0 121,500 0 0 121,500 Dakota Heights 120,000 0 0 0 0 120,000 Prairie Lake Park 0 120,000 0 0 0 120,000 Village Creek Park 0 120,000 0 0 0 120,000 Brackett's Crossing Park 118,000 0 0 0 0 118,000 Orchard Lake Beach 0 75,000 0 0 0 75,000 Total 513,000 315,000 543,000 372,000 381,000 2,124,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 226,000 Park & Trail Improvement Fund 453,000 315,000 543,000 372,000 381,000 2,064,000 1,173,000 Donations 60,000 0 0 0 0 60,000 Total 513,000 315,000 543,000 372,000 381,000 2,124,000 Produced Using Plan-It CIP Software Page 81 Park parking lot improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-09 Project Name Park parking lot improvements Total Project Cost $898,000 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Reconstruction/Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description The Park Improvement Fund provides funding for replacement and rehabilitation of parking lots used to access City parks. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 90,000 Orchard Lake Park 0 210,000 0 0 0 210,000 310,000 Bunker Hill 75,000 0 0 0 0 75,000 Greenridge Park 0 0 68,000 0 0 68,000 Prairie Lake Park 0 0 0 55,000 0 55,000 Cedar Highlands 0 0 0 0 45,000 45,000 Highview Heights 0 0 45,000 0 0 45,000 Total 75,000 210,000 113,000 55,000 45,000 498,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 90,000 Park & Trail Improvement Fund 75,000 210,000 113,000 55,000 45,000 498,000 310,000 Total 75,000 210,000 113,000 55,000 45,000 498,000 Produced Using Plan-It CIP Software Page 82 Keokuk Avenue/172nd St. Park 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-11 Project Name Keokuk Avenue/172nd St. Park Total Project Cost $835,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description The Parks, Trails and Open Space Plan calls for a neighborhood park in the area which is proposed to be constructed in 2030. Planning/design costs are included in 2029. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 0 0 750,000 750,000 Planning/Design 0 0 0 65,000 20,000 85,000 Total 0 0 0 65,000 770,000 835,000 Funding Sources 2026 2027 2028 2029 2030 Total Park Dedication Fund 0 0 0 65,000 770,000 835,000 Total 0 0 0 65,000 770,000 835,000 Location Produced Using Plan-It CIP Software Page 83 Grand Prairie Skatepark 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-12 Project Name Grand Prairie Skatepark Total Project Cost $650,000 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type New construction Department Park Dedication Description Planning/design costs are included in 2028 with construction planned for 2029. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 0 600,000 0 600,000 Planning/Design 0 0 50,000 0 0 50,000 Total 0 0 50,000 600,000 0 650,000 Funding Sources 2026 2027 2028 2029 2030 Total Park Dedication Fund 0 0 50,000 600,000 0 650,000 Total 0 0 50,000 600,000 0 650,000 Location Produced Using Plan-It CIP Software Page 84 Ritter Meadows Park 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-13 Project Name Ritter Meadows Park Total Project Cost $828,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description The Parks, Trails and Open Space Plan calls for a neighborhood park in the area which is proposed to be constructed in 2029. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 0 750,000 0 750,000 Planning/Design 0 0 58,000 20,000 0 78,000 Total 0 0 58,000 770,000 0 828,000 Funding Sources 2026 2027 2028 2029 2030 Total Park Dedication Fund 0 0 58,000 770,000 0 828,000 Total 0 0 58,000 770,000 0 828,000 Location Produced Using Plan-It CIP Software Page 85 Voyageur Park 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-14 Project Name Voyageur Park Total Project Cost $755,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description The Parks, Trails, and Open Space Plan calls for a neighborhood park East of Cedar Avenue and south of 181st Street serving the future development in this area. The park will be approximately 2 acres in size and is proposed to be constructed in 2027. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 700,000 0 0 0 700,000 Planning/Design 35,000 20,000 0 0 0 55,000 Total 35,000 720,000 0 0 0 755,000 Funding Sources 2026 2027 2028 2029 2030 Total Park Dedication Fund 35,000 720,000 0 0 0 755,000 Total 35,000 720,000 0 0 0 755,000 Location Produced Using Plan-It CIP Software Page 86 Parks Major Maintenance - Open Space 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-15 Project Name Parks Major Maintenance - Open Space Total Project Cost $316,000 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description Includes parking lot and trail maintenance work such as crack sealing and paint striping. Funds also include ongoing maintenance and improvements at the West Lake Marion Bike Course. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 40,000 Pavement Maintenance Parking Lots & Trails 18,000 18,000 18,000 18,000 19,000 91,000 140,000 West Lake Marion Mountain Bike Contract Maintenance 9,000 9,000 9,000 9,000 9,000 45,000 Total 27,000 27,000 27,000 27,000 28,000 136,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 40,000 Park & Trail Improvement Fund 27,000 27,000 27,000 27,000 28,000 136,000 140,000 Total 27,000 27,000 27,000 27,000 28,000 136,000 Produced Using Plan-It CIP Software Page 87 Parks Major Maintenance - Fields 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-16 Project Name Parks Major Maintenance - Fields Total Project Cost $314,546 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description Includes field maintenance and improvements throughout the parks system. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 86,046 Field improvements/Maintenance 6,500 12,000 12,000 12,000 12,000 54,500 70,000 Aronson – replace backstop field 3 0 0 0 27,000 0 27,000 Aronson – replace backstop field 4 0 0 27,000 0 0 27,000 Aronson – replace backstop field 1 25,000 0 0 0 0 25,000 Aronson – replace backstop field 2 0 25,000 0 0 0 25,000 Total 31,500 37,000 39,000 39,000 12,000 158,500 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 86,046 Park & Trail Improvement Fund 31,500 37,000 39,000 39,000 12,000 158,500 70,000 Total 31,500 37,000 39,000 39,000 12,000 158,500 Produced Using Plan-It CIP Software Page 88 Parks Major Maintenance - Bldgs/Shelters/Grounds 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-17 Project Name Parks Major Maintenance - Bldgs/Shelters/Grounds Total Project Cost $435,003 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance/Improvement Department Park Maintenance Funding Description Park Improvement Fund Description Includes general maintenance projects, maintenance of buildings, park shelters and grounds (examples- re-shingle park shelters, replace signs, repair fencing, replace rubber floors, etc.). Prior Expenditures 2026 2027 2028 2029 2030 Total Future 14,353 Projects TBD - Major Maintenance Bldgs/Shelters/Grounds 0 0 0 500 24,850 25,350 335,300 Fence Repairs 20,000 0 0 0 0 20,000 LED Light Installation 18,000 0 0 0 0 18,000 Wayside Park Fence Replacement 15,000 0 0 0 0 15,000 Georgetown Court Fence Replacement 7,000 0 0 0 0 7,000 Total 60,000 0 0 500 24,850 85,350 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 14,353 Park & Trail Improvement Fund 60,000 0 0 500 24,850 85,350 335,300 Total 60,000 0 0 500 24,850 85,350 Produced Using Plan-It CIP Software Page 89 Other Projects 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-19 Project Name Other Projects Total Project Cost $3,245,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Department Park Dedication Funding Description Park Dedication Fund Description This category is intended to include smaller park projects such as adding artwork in the parks, tree planting, security cameras at park facilities, Pickleball courts in the south side of the City based on the 2026-2036 Parks System Master Plan, and the completion of an ADA Transition Plan. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 70,000 Other amenities to be determined 0 0 300,000 300,000 300,000 900,000 1,600,000 ADA Transition Plan 0 0 275,000 0 0 275,000 Aronson Park – Field 9 improvements 125,000 0 0 0 0 125,000 King Park spectator protection and safety fencing 120,000 0 0 0 0 120,000 Tree Planting 15,000 15,000 15,000 15,000 15,000 75,000 Art in the Park 10,000 10,000 10,000 10,000 10,000 50,000 Security cameras- various park facilities 30,000 0 0 0 0 30,000 Total 300,000 25,000 600,000 325,000 325,000 1,575,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 70,000 Park Dedication Fund 300,000 25,000 600,000 325,000 325,000 1,575,000 1,600,000 Total 300,000 25,000 600,000 325,000 325,000 1,575,000 Produced Using Plan-It CIP Software Page 90 Parks Major Maintenance - Courts 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-20 Project Name Parks Major Maintenance - Courts Total Project Cost $368,345 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park Improvement Fund Description Includes funding to resurface and restripe basketball, pickleball, and tennis courts. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 13,845 Bunker Hill 0 30,000 0 0 0 30,000 232,100 Pinnacle Reserve Park 0 0 0 0 22,200 22,200 Cedar Crossing Park 0 0 12,000 0 0 12,000 Jaycee Park 0 0 10,000 0 0 10,000 Chadwick Park 0 0 0 0 9,000 9,000 Fieldstone Park 0 0 0 0 9,000 9,000 Kensington Park 0 0 0 0 9,000 9,000 Village Creek Park 7,000 0 0 0 0 7,000 North Creek Park 0 0 0 0 2,200 2,200 Bassett Park 0 0 0 2,000 0 2,000 Foxborough Park 0 0 0 2,000 0 2,000 Greenridge Park 0 0 0 2,000 0 2,000 Highview Heights 0 0 0 2,000 0 2,000 Hypointe Crossing Park 0 0 0 2,000 0 2,000 Rolling Oaks Park 0 0 0 2,000 0 2,000 Total 7,000 30,000 22,000 12,000 51,400 122,400 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 13,845 Park & Trail Improvement Fund 7,000 30,000 22,000 12,000 51,400 122,400 232,100 Total 7,000 30,000 22,000 12,000 51,400 122,400 Produced Using Plan-It CIP Software Page 91 Kenrick Trail Sheet Pile, Wall, & Trail Repairs 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-21 Project Name Kenrick Trail Sheet Pile, Wall, & Trail Repairs Total Project Cost $275,000 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Maintenance Department Park Maintenance Funding Description Park & Trail Improvement Fund Description The I-35 fishing bridge access sidewalk is failing from water levels behind the current retaining wall. Staff have worked with WSB consulting to complete testing of the area and have determined a new sheet pile retaining wall will be required to support the concrete sidewalk. The project will result in a safe, ADA compliant access to the fishing pier. Expenditures 2026 2027 2028 2029 2030 Total Trail repairs 275,000 0 0 0 0 275,000 Total 275,000 0 0 0 0 275,000 Funding Sources 2026 2027 2028 2029 2030 Total Park & Trail Improvement Fund 275,000 0 0 0 0 275,000 Total 275,000 0 0 0 0 275,000 Location Produced Using Plan-It CIP Software Page 92 192nd St Retaining Wall & Trail Reconstruction 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-22 Project Name 192nd St Retaining Wall & Trail Reconstruction Total Project Cost $55,000 Contact Mark Kruse, Parks Superintendent Cost Type Parks Type Reconstruction/Maintenance Department Park Maintenance Funding Description Park & Trail Improvement Fund Description The small block retaining wall located on 192nd Street is failing. The retaining wall maintains the elevation difference between the trail and roadway and a private residence backyard. The project includes replacement of the retaining wall to ensure the private property is not impacted and related trail replacement along the retaining wall. Expenditures 2026 2027 2028 2029 2030 Total Trail costs (rehabilitation/reconstruction)55,000 0 0 0 0 55,000 Total 55,000 0 0 0 0 55,000 Funding Sources 2026 2027 2028 2029 2030 Total Park & Trail Improvement Fund 55,000 0 0 0 0 55,000 Total 55,000 0 0 0 0 55,000 Location Produced Using Plan-It CIP Software Page 93 Parks System Master Plan 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-23 Project Name Parks System Master Plan Total Project Cost $156,800 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type Other Department Park Dedication Funding Description Park Dedication Fund Description The 2026-2036 Parks System Master Plan will serve as a long-term strategic document that guides the growth, development and enhancement of the parks and recreation system within the City of Lakeville. The goal of the plan is to ensure that the parks system is efficient, sustainable, inclusive and responsive to the needs of the community, with a focus on improving the quality of life, recreational opportunities and environmental stewardship. Prior Expenditures 2026 2027 2028 2029 2030 Total 65,500 Planning/Design 91,300 0 0 0 0 91,300 Total 91,300 0 0 0 0 91,300 Prior Funding Sources 2026 2027 2028 2029 2030 Total 65,500 Park Dedication Fund 91,300 0 0 0 0 91,300 Total 91,300 0 0 0 0 91,300 Produced Using Plan-It CIP Software Page 94 Parks - New Parking Lots & Expansions 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-24 Project Name Parks - New Parking Lots & Expansions Total Project Cost $300,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Funding Description Park Dedication Fund Description Parking lot projects at Capserson park includes paving the existing gravel lot used for soccer decks, the mountain bike course and overflow parking for the performance stage. By paving this lot, we anticipate increasing capacity by at least 20%. Expenditures 2026 2027 2028 2029 2030 Total Casperson Park 300,000 0 0 0 0 300,000 Total 300,000 0 0 0 0 300,000 Funding Sources 2026 2027 2028 2029 2030 Total Park Dedication Fund 300,000 0 0 0 0 300,000 Total 300,000 0 0 0 0 300,000 Location Produced Using Plan-It CIP Software Page 95 S.W. Corner of 210th Street & I- 35 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #P-25 Project Name S.W. Corner of 210th Street & I-35 Total Project Cost $1,000,000 Contact Joseph Masiarchin, Parks Director Cost Type Parks Type New construction Department Park Dedication Description The existing Parks, Trails and Open Spaces plan calls for a future neighborhood park in the area of 210th street and I-35. Expenditures 2026 2027 2028 2029 2030 Total Future Planning/Design 0 0 0 0 75,000 75,000 925,000 Total 0 0 0 0 75,000 75,000 Funding Sources 2026 2027 2028 2029 2030 Total Future Park Dedication Fund 0 0 0 0 75,000 75,000 925,000 Total 0 0 0 0 75,000 75,000 Location Produced Using Plan-It CIP Software Page 96 Technology - General Government 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-01 Project Name Technology - General Government Total Project Cost $238,586 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2026 2027 2028 2029 2030 Total Future Technology - computers/hardware acquisitions 18,109 42,709 8,592 11,613 36,783 117,806 120,780 Total 18,109 42,709 8,592 11,613 36,783 117,806 Funding Sources 2026 2027 2028 2029 2030 Total Future Technology Fund 18,109 42,709 8,592 11,613 36,783 117,806 120,780 Total 18,109 42,709 8,592 11,613 36,783 117,806 Technology- Public Safety 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-02 Project Name Technology-Public Safety Total Project Cost $1,188,724 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2026 2027 2028 2029 2030 Total Future Technology - computers/hardware acquisitions 167,489 71,335 123,022 199,705 41,561 603,112 585,612 Total 167,489 71,335 123,022 199,705 41,561 603,112 Funding Sources 2026 2027 2028 2029 2030 Total Future Technology Fund 167,489 71,335 123,022 199,705 41,561 603,112 585,612 Total 167,489 71,335 123,022 199,705 41,561 603,112 Produced Using Plan-It CIP Software Page 97 Technology- Public Works 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-03 Project Name Technology-Public Works Total Project Cost $143,709 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2026 2027 2028 2029 2030 Total Future Technology - computers/hardware acquisitions 24,044 8,451 6,084 20,109 13,579 72,267 71,442 Total 24,044 8,451 6,084 20,109 13,579 72,267 Funding Sources 2026 2027 2028 2029 2030 Total Future Technology Fund 24,044 8,451 6,084 20,109 13,579 72,267 71,442 Total 24,044 8,451 6,084 20,109 13,579 72,267 Technology- Arenas 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-04 Project Name Technology-Arenas Total Project Cost $22,829 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for Lakeville Arenas. Expenditures 2026 2027 2028 2029 2030 Total Future Technology - computers/hardware acquisitions 3,142 3,303 1,739 1,457 2,075 11,716 11,113 Total 3,142 3,303 1,739 1,457 2,075 11,716 Funding Sources 2026 2027 2028 2029 2030 Total Future Arenas 3,142 3,303 1,739 1,457 2,075 11,716 11,113 Total 3,142 3,303 1,739 1,457 2,075 11,716 Produced Using Plan-It CIP Software Page 98 Technology- Communications 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-05 Project Name Technology-Communications Total Project Cost $19,420 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2026 2027 2028 2029 2030 Total Future Technology - computers/hardware acquisitions 2,597 2,513 0 0 848 5,958 13,462 Total 2,597 2,513 0 0 848 5,958 Funding Sources 2026 2027 2028 2029 2030 Total Future Communications Fund 2,597 2,513 0 0 848 5,958 13,462 Total 2,597 2,513 0 0 848 5,958 Technology- Liquor 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-06 Project Name Technology-Liquor Total Project Cost $376,211 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2026 2027 2028 2029 2030 Total Future Technology - IT infrastructure 51,500 53,045 54,636 0 0 159,181 123,673 Technology - computers/hardware acquisitions 7,045 68,636 570 0 17,106 93,357 Total 58,545 121,681 55,206 0 17,106 252,538 Funding Sources 2026 2027 2028 2029 2030 Total Future Liquor Fund 58,545 121,681 55,206 0 17,106 252,538 123,673 Total 58,545 121,681 55,206 0 17,106 252,538 Produced Using Plan-It CIP Software Page 99 Technology- Environmental Resources 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-07 Project Name Technology-Environmental Resources Total Project Cost $19,973 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2026 2027 2028 2029 2030 Total Future Technology - computers/hardware acquisitions 0 4,010 4,383 0 848 9,241 10,732 Total 0 4,010 4,383 0 848 9,241 Funding Sources 2026 2027 2028 2029 2030 Total Future Environmental Resources Fund 0 4,010 4,383 0 848 9,241 10,732 Total 0 4,010 4,383 0 848 9,241 Technology- Utilities 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-08 Project Name Technology-Utilities Total Project Cost $66,116 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Description The Technology Fund accounts for the accumulation and disbursement of funds for the purchase of technology equipment for the City. Expenditures 2026 2027 2028 2029 2030 Total Future Technology - computers/hardware acquisitions 1,449 8,244 7,534 1,900 1,257 20,384 38,269 Technology - IT infrastructure 7,463 0 0 0 0 7,463 Total 8,912 8,244 7,534 1,900 1,257 27,847 Funding Sources 2026 2027 2028 2029 2030 Total Future Sanitary Sewer Operating Fund 4,456 4,122 3,767 950 629 13,924 38,269 Water Operating Fund 4,456 4,122 3,767 950 628 13,923 Total 8,912 8,244 7,534 1,900 1,257 27,847 Produced Using Plan-It CIP Software Page 100 Technology- Parks & recreation 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-09 Project Name Technology- Parks & recreation Total Project Cost $113,064 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Expenditures 2026 2027 2028 2029 2030 Total Future Technology - computers/hardware acquisitions 12,915 7,169 19,558 10,210 5,120 54,972 58,092 Total 12,915 7,169 19,558 10,210 5,120 54,972 Funding Sources 2026 2027 2028 2029 2030 Total Future Technology Fund 12,915 7,169 19,558 10,210 5,120 54,972 58,092 Total 12,915 7,169 19,558 10,210 5,120 54,972 Technology- Network infrastructure 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-10 Project Name Technology-Network infrastructure Total Project Cost $2,648,110 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Expenditures 2026 2027 2028 2029 2030 Total Future Technology - IT infrastructure 63,760 217,067 511,786 0 186,142 978,755 1,669,355 Total 63,760 217,067 511,786 0 186,142 978,755 Funding Sources 2026 2027 2028 2029 2030 Total Future Technology Fund 45,497 130,067 373,786 0 137,142 686,492 1,669,355 Liquor Fund 9,795 47,000 74,000 0 26,000 156,795 Water Operating Fund 3,044 14,500 23,000 0 8,000 48,544 Sanitary Sewer Operating Fund 3,043 14,500 23,000 0 8,000 48,543 Communications Fund 1,311 6,000 10,000 0 4,000 21,311 Environmental Resources Fund 1,070 5,000 8,000 0 3,000 17,070 Total 63,760 217,067 511,786 0 186,142 978,755 Produced Using Plan-It CIP Software Page 101 Technology- Miscellaneous 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #T-11 Project Name Technology-Miscellaneous Total Project Cost $126,657 Contact Trevor Stewart, IT Manager Cost Type Technology Type Technology Expenditures 2026 2027 2028 2029 2030 Total Technology - IT other 5,150 116,043 5,464 0 0 126,657 Total 5,150 116,043 5,464 0 0 126,657 Funding Sources 2026 2027 2028 2029 2030 Total Technology Fund 5,150 116,043 5,464 0 0 126,657 Total 5,150 116,043 5,464 0 0 126,657 Sanitary Sewer Trunk Improvements 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-01 Project Name Sanitary Sewer Trunk Improvements Total Project Cost $825,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Equipment Fund Description The Sanitary Sewer Plan anticipates the extension of sanitary sewer trunk facilities to serve areas of anticipated/planned growth. Lift Station 26 is under construction in 2025. Timing of sanitary sewer trunk system improvements subject to growth rate and location of planned land development. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 75,000 Construction 75,000 75,000 75,000 75,000 75,000 375,000 375,000 Total 75,000 75,000 75,000 75,000 75,000 375,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 75,000 Sanitary Sewer Trunk Fund 75,000 75,000 75,000 75,000 75,000 375,000 375,000 Total 75,000 75,000 75,000 75,000 75,000 375,000 Produced Using Plan-It CIP Software Page 102 Sanitary Sewer Lift Station Rehabilitation 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-02 Project Name Sanitary Sewer Lift Station Rehabilitation Total Project Cost $1,030,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Type Maintenance Department Utilities Funding Description Equipment Fund Description Lift station service life is 12-15 years. Pumps, motors and equipment are inspected, repaired and replaced to ensure uninterrupted service. Lift stations are inspected/cleaned annually and scheduled for rehabilitation every 12-15 years. Prior Expenditures 2026 2027 2028 2029 2030 Total 215,000 Lift Station 7 0 175,000 0 0 0 175,000 Lift Station 5 0 0 0 100,000 0 100,000 Lift Station 20 80,000 0 0 0 0 80,000 Lift Station 3 0 80,000 0 0 0 80,000 Lift Station 22 0 0 75,000 0 0 75,000 Lift Station 6 0 0 75,000 0 0 75,000 Lift Station 11 0 0 0 40,000 0 40,000 Lift Station 12 0 0 0 0 40,000 40,000 Lift Station 13 0 0 0 0 40,000 40,000 Lift Station 18 40,000 0 0 0 0 40,000 Lift Station 19 0 0 0 40,000 0 40,000 Lift Station 8 30,000 0 0 0 0 30,000 Total 150,000 255,000 150,000 180,000 80,000 815,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 215,000 Sanitary Sewer Operating Fund 150,000 255,000 150,000 180,000 80,000 815,000 Total 150,000 255,000 150,000 180,000 80,000 815,000 Produced Using Plan-It CIP Software Page 103 Sanitary Sewer Inflow/Infiltration Maintenance 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-03 Project Name Sanitary Sewer Inflow/Infiltration Maintenance Total Project Cost $3,450,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Equipment Fund Description Annual program designed to manage peak discharge rates and maintain/extend the overall service life of the sanitary sewer collection system through rehabilitating infrastructure susceptible to inflow and infiltration (groundwater). Public sanitary sewer infrastructure is inspected (televising 250,000 pipe-feet/year) and cleaned (jetting 75 pipe-miles/year) to maintain the integrity and function of the sanitary sewer collection system. Prior Expenditures 2026 2027 2028 2029 2030 Total 575,000 Construction 575,000 575,000 575,000 575,000 575,000 2,875,000 Total 575,000 575,000 575,000 575,000 575,000 2,875,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 575,000 Sanitary Sewer Operating Fund 575,000 575,000 575,000 575,000 575,000 2,875,000 Total 575,000 575,000 575,000 575,000 575,000 2,875,000 Produced Using Plan-It CIP Software Page 104 Well Construction 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-04 Project Name Well Construction Total Project Cost $2,950,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Equipment Fund Description The Water Plan provides guidance in identifying future water system facilities required to serve areas of planned land development. Well #23 is currently under construction and will be brought online in 2025, and Wells 24 and 25 are programmed for 2028 construction. Construction timing and well location subject to population demand/water needs. The Wellhead and Source Water Protection Plan must be amended prior to receiving a Minnesota Department of Health permit. Expenditures 2026 2027 2028 2029 2030 Total Future Construction 0 0 1,800,000 0 0 1,800,000 1,050,000 Engineering/Design/Other costs 0 100,000 0 0 0 100,000 Total 0 100,000 1,800,000 0 0 1,900,000 Funding Sources 2026 2027 2028 2029 2030 Total Future Water Trunk Fund 0 100,000 1,800,000 0 0 1,900,000 1,050,000 Total 0 100,000 1,800,000 0 0 1,900,000 Watermain Trunk Extensions 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-05 Project Name Watermain Trunk Extensions Total Project Cost $2,915,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Water Trunk Fund Description The Water Plan anticipates the extension of watermain trunk facilities to serve areas of planned land development. Timing of watermain trunk system improvements subject to growth rate and location of planned land development. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 265,000 Construction 265,000 265,000 265,000 265,000 265,000 1,325,000 1,325,000 Total 265,000 265,000 265,000 265,000 265,000 1,325,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 265,000 Water Trunk Fund 265,000 265,000 265,000 265,000 265,000 1,325,000 1,325,000 Total 265,000 265,000 265,000 265,000 265,000 1,325,000 Produced Using Plan-It CIP Software Page 105 Water Distribution Features 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-06 Project Name Water Distribution Features Total Project Cost $960,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Water Trunk Fund Description The Water Plan provides guidance in identifying future water system features required to serve areas of planned land development, including features to either reduce or boost the water pressure due to the elevation of new development. New pressure reducing valves are programmed for 2026, 2028 and 2030 construction. Construction timing and location subject to growth rate and location of planned land development. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 60,000 Construction 150,000 0 150,000 0 150,000 450,000 450,000 Total 150,000 0 150,000 0 150,000 450,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 60,000 Water Trunk Fund 150,000 0 150,000 0 150,000 450,000 450,000 Total 150,000 0 150,000 0 150,000 450,000 Produced Using Plan-It CIP Software Page 106 Well and Pump Rehabilitation 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-07 Project Name Well and Pump Rehabilitation Total Project Cost $1,000,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Equipment Fund Description Pumps, motors and equipment are inspected, repaired and replaced to ensure uninterrupted, efficient service and a water system operating at maximum pumping capacity. City wells provide water for on-demand distribution system (24 hours/day, 7 days/week). Multiple starts/stops place tremendous stress on the motors and pump components and constant water exposure can lead to corrosion. Well and pumps are scheduled for rehabilitation every 8-10 years, based on pump type. Prior Expenditures 2026 2027 2028 2029 2030 Total 100,000 Well 10 0 0 100,000 0 0 100,000 Well 11 0 0 0 100,000 0 100,000 Well 12 0 0 0 0 100,000 100,000 Well 19 100,000 0 0 0 0 100,000 Well 20 100,000 0 0 0 0 100,000 Well 21 0 100,000 0 0 0 100,000 Well 22 0 100,000 0 0 0 100,000 Well 8 0 0 0 100,000 0 100,000 Well 9 0 0 0 100,000 0 100,000 Total 200,000 200,000 100,000 300,000 100,000 900,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 100,000 Water Operating Fund 200,000 200,000 100,000 300,000 100,000 900,000 Total 200,000 200,000 100,000 300,000 100,000 900,000 Produced Using Plan-It CIP Software Page 107 Tower and Reservoir Maintenance 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-08 Project Name Tower and Reservoir Maintenance Total Project Cost $1,300,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Type Maintenance Department Utilities Funding Description Water Operating Fund Description Maintenance program designed to manage, preserve and protect investment in water storage tanks (interior and exterior). Maintenance removes buildup, dirt/dust, and extends the life of the coating system, minimizing total lifecycle costs. Expenditures 2026 2027 2028 2029 2030 Total Construction 1,150,000 0 0 150,000 0 1,300,000 Total 1,150,000 0 0 150,000 0 1,300,000 Funding Sources 2026 2027 2028 2029 2030 Total Water Operating Fund 1,150,000 0 0 150,000 0 1,300,000 Total 1,150,000 0 0 150,000 0 1,300,000 Water meter replacement 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-09 Project Name Water meter replacement Total Project Cost $2,000,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Department Utilities Funding Description Equipment Fund Description Annual program designed to replace residential and commercial water meters approaching the end of their life cycle, to ensure accurate water monitoring use data for Minnesota Department of Natural Resources reporting. Program goal is 1,200 water meter replacements per year (based on meter age) with the intent of meeting/maintaining a 20-year service life. Routine water meter replacement is completed by City Utilities staff. Prior Expenditures 2026 2027 2028 2029 2030 Total 150,000 Equipment purchase 350,000 350,000 350,000 400,000 400,000 1,850,000 Total 350,000 350,000 350,000 400,000 400,000 1,850,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 150,000 Water Operating Fund 350,000 350,000 350,000 400,000 400,000 1,850,000 Total 350,000 350,000 350,000 400,000 400,000 1,850,000 Produced Using Plan-It CIP Software Page 108 Fiber Optic Cable Connection 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #U-10 Project Name Fiber Optic Cable Connection Total Project Cost $484,000 Contact Shane Quade, Utilities Superintendent Cost Type Utility Type Other Department Utilities Funding Description Equipment Fund Description Extension of fiber optic cable to remote utility sites (lift stations, wells) for better and more reliable communication. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 70,000 Fiber conduit (Well/tower)37,000 37,000 40,000 30,000 40,000 184,000 80,000 Fiber Conduit (Lift Station)25,000 25,000 30,000 30,000 40,000 150,000 Total 62,000 62,000 70,000 60,000 80,000 334,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 70,000 Water Operating Fund 37,000 37,000 40,000 30,000 40,000 184,000 80,000 Sanitary Sewer Operating Fund 25,000 25,000 30,000 30,000 40,000 150,000 Total 62,000 62,000 70,000 60,000 80,000 334,000 Produced Using Plan-It CIP Software Page 109 Pavement Management - Maintenance 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #XX-01 Project Name Pavement Management - Maintenance Total Project Cost $33,235,500 Contact Steve Ferraro, Public Works Coordinator Cost Type Transportation Type Maintenance Department Construction Services Funding Description Pavement Management Description Annual preventive maintenance program designed to protect the City’s investment in public street/road infrastructure assets. Best management practices include crack sealing, seal coating, surface sealing, mill and overlay and roadway patching. Associated maintenance activities such as curb and gutter repair, drain tile repair, pavement marking painting, and stormwater infrastructure repair are included. Maintenance is financed primarily through property taxes. A portion of the City’s annual Municipal State Aid (MSA) allotment is applied toward street/road maintenance, with the remaining MSA balance applied toward MSA-designated projects and debt payments on previously issued bonds supporting these projects. The remaining principal and interest balances due on MSA-supported bonds at the end of 2025 will be $3,045,000. The final principal payment will be made in 2036. Prior Expenditures 2026 2027 2028 2029 2030 Total Future 2,650,500 Patching & Minor Overlays 1,710,000 1,760,000 1,830,000 1,900,000 1,935,000 9,135,000 16,180,000 Surface Sealing 375,000 375,000 375,000 375,000 375,000 1,875,000 Crack Seal 200,000 200,000 200,000 200,000 225,000 1,025,000 Construction- Sanitary Sewer infrastructure (repair/replace)100,000 100,000 100,000 100,000 100,000 500,000 Construction- Water infrastructure (repair/replace)100,000 100,000 100,000 100,000 100,000 500,000 Sidewalk ADA 65,000 65,000 65,000 65,000 65,000 325,000 Safety Improvements 50,000 50,000 50,000 50,000 50,000 250,000 Velocity Patching 35,000 50,000 50,000 50,000 50,000 235,000 Concrete Curb & Draintile 30,000 30,000 30,000 30,000 40,000 160,000 County Road Stormwater Infrastructure 30,000 30,000 30,000 30,000 30,000 150,000 Eclipse Ave Outlot A to Greenway 150,000 0 0 0 0 150,000 Bridge Inspections & Repairs 20,000 20,000 20,000 20,000 20,000 100,000 Total 2,865,000 2,780,000 2,850,000 2,920,000 2,990,000 14,405,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total Future 2,650,500 Pavement Management Fund 2,515,000 2,580,000 2,650,000 2,720,000 2,790,000 13,255,000 16,180,000 Sanitary Sewer Operating Fund 100,000 100,000 100,000 100,000 100,000 500,000 Water Operating Fund 100,000 100,000 100,000 100,000 100,000 500,000 Park Dedication Fund 150,000 0 0 0 0 150,000 Total 2,865,000 2,780,000 2,850,000 2,920,000 2,990,000 14,405,000 Produced Using Plan-It CIP Software Page 110 Street Reconstruction 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #XX-02 Project Name Street Reconstruction Total Project Cost $24,407,500 Contact Steve Ferraro, Public Works Coordinator Cost Type Transportation Type Reconstruction/Maintenance Department Construction Services Funding Description Improvement Construction Description Annual program designed to extend street life, minimize total life cycle costs, and improve local streets when routine maintenance costs exceed the cost-benefit of the investment or streets approach the end of their life cycle. Citywide OCI goal for local streets is 75. Both rehabilitation (surface sealing/mill and overlay) and reconstruction (reclamation) practices are utilized. Expenditures 2026 2027 2028 2029 2030 Total Construction 3,580,000 3,682,500 4,690,000 4,320,000 4,010,000 20,282,500 Construction- Water infrastructure (repair/replace)470,000 470,000 470,000 470,000 470,000 2,350,000 Construction- Sanitary Sewer infrastructure (repair/replace)250,000 250,000 250,000 250,000 250,000 1,250,000 Construction- Stormwater infrastructure (new)105,000 105,000 105,000 105,000 105,000 525,000 Total 4,405,000 4,507,500 5,515,000 5,145,000 4,835,000 24,407,500 Funding Sources 2026 2027 2028 2029 2030 Total G.O. Improvement Bonds - Taxes (Streets)3,580,000 3,682,500 3,790,000 3,900,000 4,010,000 18,962,500 Water Operating Fund 470,000 470,000 470,000 470,000 470,000 2,350,000 G.O. Improvement Bonds - Sp. Assess.0 0 900,000 420,000 0 1,320,000 Sanitary Sewer Operating Fund 250,000 250,000 250,000 250,000 250,000 1,250,000 Stormwater Infrastructure Fund 105,000 105,000 105,000 105,000 105,000 525,000 Total 4,405,000 4,507,500 5,515,000 5,145,000 4,835,000 24,407,500 Produced Using Plan-It CIP Software Page 111 Collector Roadway Rehabilitation 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #XX-03 Project Name Collector Roadway Rehabilitation Total Project Cost $10,266,527 Contact Zach Johnson, City Engineer Cost Type Transportation Type Rehabilitation Department Engineering Funding Description Improvement Construction Description Annual program designed to extend roadway life, minimize total life cycle costs, or improve collector/arterial roads when routine maintenance costs exceed the cost- benefit of the investment or roads approach the end of their life cycle. Citywide OCI goal for collector/arterial roads is 75. Both rehabilitation (mill and overlay) and reconstruction (reclamation) practices are utilized. Expenditures 2026 2027 2028 2029 2030 Total Streets/Storm- Construction/Engineering/Other 971,152 3,710,709 2,043,578 2,130,488 810,600 9,666,527 Construction- Water infrastructure (repair/replace)0 100,000 100,000 50,000 100,000 350,000 Construction- New trails 0 100,000 0 0 0 100,000 Construction- Sanitary Sewer infrastructure (repair/replace)0 25,000 25,000 25,000 25,000 100,000 Construction- Sanitary Sewer infrastructure (new)0 50,000 0 0 0 50,000 Total 971,152 3,985,709 2,168,578 2,205,488 935,600 10,266,527 Funding Sources 2026 2027 2028 2029 2030 Total G.O. Improvement Bonds - Taxes (Streets)485,576 3,380,709 2,043,578 2,085,799 810,600 8,806,262 Other cost share arrangement- Credit River (Judicial Rd)485,576 0 0 0 0 485,576 G.O. Improvement Bonds - Sp. Assess.0 330,000 0 44,689 0 374,689 Water Operating Fund 0 100,000 100,000 50,000 100,000 350,000 Park Dedication Fund 0 100,000 0 0 0 100,000 Sanitary Sewer Operating Fund 0 25,000 25,000 25,000 25,000 100,000 Sanitary Sewer Trunk Fund 0 50,000 0 0 0 50,000 Total 971,152 3,985,709 2,168,578 2,205,488 935,600 10,266,527 Produced Using Plan-It CIP Software Page 112 County Pavement Preservation/City Utility Repairs 2026 thru 2030 Capital Improvement Plan Lakeville, MN Project #XX-10 Project Name County Pavement Preservation/City Utility Repairs Total Project Cost $95,000 Contact Zach Johnson, City Engineer Cost Type Transportation Type Maintenance Department Engineering Funding Description Water Operating Fund County Project #TBD SA/SAP #N/A JPA #TBD Description Storm sewer, sanitary sewer and water repairs completed in conjunctions with annual Dakota County pavement preservation program. Prior Expenditures 2026 2027 2028 2029 2030 Total 50,000 Construction 0 25,000 0 0 0 25,000 Construction- Sanitary Sewer infrastructure (repair/replace)5,000 5,000 0 0 0 10,000 Construction- Water infrastructure (repair/replace)5,000 5,000 0 0 0 10,000 Total 10,000 35,000 0 0 0 45,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 50,000 Pavement Management Fund 0 25,000 0 0 0 25,000 Sanitary Sewer Operating Fund 5,000 5,000 0 0 0 10,000 Water Operating Fund 5,000 5,000 0 0 0 10,000 Total 10,000 35,000 0 0 0 45,000 Produced Using Plan-It CIP Software Page 113 CITY OF LAKEVILLE STREET RECONSTRUCTION PLAN Project # Project description: 2026 2027 2028 2029 2030 Total XX-02 Street Reconstruction 3,580,000 3,682,500 4,690,000 4,320,000 4,010,000 20,282,500 XX-03 Collector Rehabilitation 485,576 3,710,709 2,043,578 2,130,488 810,600 9,180,951 - - - - - - 4,065,576$ 7,393,209$ 6,733,578$ 6,450,488$ 4,820,600$ 29,463,451$ Ca p i t a l Im p r o v e m e n t Pl a n & O p e r a t i n g B u d g e t Infrastructure Specific Plans Water System Plan Adopted 2019 Transportation Plan Adopted 2019 Next update 2028 Sanitary Sewer Plan Adopted 2019 Next update 2028 Water and Natural Resources Management Plan Adopted 2019 Next update 2028 Parks, Trails and Open Space Plan Last update 2015 Next update 2025 Citywide Planning 20 4 0 C o m p r e h e n s i v e Pl a n / L a n d U s e P l a n Ad o p t e d 2 0 2 0 En v i s i o n L a k e v i l l e 2 0 4 0 La s t U p d a t e d 2 0 2 3 Studies & Site Specific Plans/REPORTS Sanitary Sewer and Water Rates & Fees Study (Last Update 2017) Water Treatment Facility Expansion Plan (Last U date 2022 CMF Expansion Study (Last Update 2015) Dakota County East-West Corridor Preservation Study (Phase 1: 2003 / Phase 2: 2006) NPDES MS4 Permit Implementation (Last Update 2023) Park Dedication Fee Study (Last update 2012) Various Park Master Plans (As needed ADA Transition Plan (2019 Downtown Development Guide (Last U date 2018 Indoor Athletic Facility Study (2017) 2026 Projects Pavement Maintenance Local Street Rehabilitation Arterial/Collector Rehabilitation County Pavement Preservation and City Utility Repairs 215th Street Public Improvements Lake Marion Greenway Water Quality and Water Conservation Lake Management Stormwater Infrastructure Maintenance Forestry Vegetation Management East Community Park Various other park projects NOTES: not all 2026 CIP projects are listed here (only Highlights) City and Dakota County Partnership Projects Are Subject to Adopted Dakota County 2040 Transportation Plan Cost Share Policies. (Revised in 2020) Fire Resource and Space Needs Study (Last Update 2020) School Road Safety Task Force (2014) Dakota County Principal Arterial Study (2018) Dakota County Pedestrian Crossing Safety Assessment (2022) MnDOT I-35 Roadway Study: Burnsville and Lakeville (2024) Strategic Plan for Economic Development (Last Update 2019) Pedestrian Crossing Study (2024 Trail Condition Review (OCI) (2022 Kingsley Lake Lee Lake Orchard Lake Ea s t L a k e Lake Marion 5 50 9 31 23 60 46 7035 162ND ST W KE N W O O D T R L 160TH ST W 185TH ST W 210TH ST W DO D D B L V D 185TH ST W 215TH ST W 179TH ST W KENW O O D T R L DO D D B L V D 179TH ST W PI L O T K N O B R D CEDAR AVE DODDBLVD 185TH ST W 202ND ST W 200TH ST W 26-09 23-13 26 - 1 5 B 26-01 26-15A 26-15A 25-15B 31 - 0 6 24-05 28 - 0 4 26 - 0 4 27 - 0 9 26-10 26-10 30-02 30-02 29-02 29-02 29- 0 2 28-02 28-02 28 - 0 2 28-02 28 - 0 2 28 - 0 2 27-02 27-02 27-02 27-02 26-0226-02 31-07 30-03 29-03 29 - 0 3 25 - 0 5 28-03 28-03 27-03 27-03 27-03 26 - 0 3 26-15C 26-15D 26-15E 27 - 0 7 26-07 31-05 29-04 29-04 30-05 30-06 26-05 28-XX 28-0628-07 27-06 27-08 27-XX 28-05 27-05 26-15B 27-XX 27-11 25-15B XX-XX 24-44 U-8 22-16 26-15A 26-08 2026 - 2030 Capital Improvement Projects 0 1 20.5 Miles P: \ P r o j e c t s \ C o n s t r u c t i o n S e r v i c e s \ C I P M a p s \ C I P M a p s . a p r x 5 2026 2027 2028 2029 2030 2031 Parks & Recreation Utilities Transportation Environmental Local Street Reconstruction Trail Construction/Rehabilitation County Pavement Preservation Collector Roadway Rehabilitation Studies/Preliminary Design County Roadway Expansion/Modernization Utilities Projects