Loading...
HomeMy WebLinkAbout18017 Hinckley AveCITY OF LAKEVILLE CERTIFICATION OF GRADING AND FINAL PLACEMENT OF IRON MONUMENTS Building Permit #: LA226021 Legal Description: Lot 11 Block 5 Subdivision: Address: 16 I hereby certify that on 5th day of June 2025 an inspection of this property was conducted by me or under my direct supervision and that the as -built grades, elevations and drainage patterns of the site and building are in conformance with the grading plan approved by the City Engineer or amendments previously approved by the City Engineer. In addition, all property corner monuments are in place as of this date. I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. Print Name: Mark A. schwanz Signature: a. Date: 6/13/2025 MN License #: NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS - BUILT GRADES, ELEVATIONS AND DRAINAGE PATTERNS Approved subdivision grading plans should be obtained from the property owner or developer. General questions relating to the building permit should be directed to the Building Inspections Department at 952-985-4440. Questions relating to grading should be directed to the Engineering Department at 952-985-4500. Prior to release of the Grading Security, this document shall be filed with: City of Lakeville Engineering Department 20195 Holyoke Avenue Lakeville, MN 55044 RECEIVED By sliggett at 3:52 pm, Aug 01, 2025 —� '—�—_— GENERAL NOTES: _ _--' IX03946 >�.—_ � T R=183946 -> ---->_-- -� oVESUE 1. Grading plan by ISG last dated May 9, 2022 was used todetermine proposed elevations shown hereon . 1=rn1E86(12"Pbp7E -/+i/T �-r ��+� 1=1o18.87 rye"PW7w I 2. This survey does not purport to show improvements or E, Foot R/ghfOfWay) encroachments, except as shown, as surveyed by ISG Sao 3 or under my direct supervision. 3. No specific soil investigation has been performed on ---21 _ this lot bythe surveyor. The suitability ofsoils to support N.1784 606-- the specifichouse prepoiodis notthe responsibilityof - I E5198 147 surveyorthe rr L= 2.36 R=47 00 =�=1 I 2'2 4. Thiertificatodoes not purport toshow casements .qb0 otherthan those shown on the recorded plat - - - - a1 A ie39.9.j X' shown are based on the Final kley MN 6 Site s18017 HincP m- �� 93 tl4 iI gj e��2 X N address Avenue,Lakeville, ° j°® P006 ^°^,rt Fee) 1_-__ 55044 NOO°p0IN I-_____________ ___L- I�.- __--I 7. House/Basementtype. Lewis EK05 B3- Right- Lookout xN0 - OR 5 P ORIVEWAY j I 8. Topographic survey was completed on June 5, 2025. � r °° II 3° `0a i 3.0%SLOPE °° }+°�- 11`°p0' BENCHMARK: ,is D g 15 Top nut fire hydrant located in the NE quadrant ofHideaway I OF7- m - 0 10 20 Trail and ITighview Avenue. PORCH gyp^ jQ om Oil Elevation = 1038.03 feet ) Q S Q 1 I GARAGE �-N� M SCiAE IN FEET ' Q. { II � � HOUSE ELEVATIONS: Proposetl/As-Built , ,�°�'>}Be � � G Drag Fl der= 10407110407 i k 11 .11�2 __ J ; N°� xN woi�s"msw nnaurn °1"°s "` Top of Foundation = 1033 0/1033 ,11 18017H%Oc**Aw P° - °' Lowest Floor= 1033 0/1033.0 0 _ I I M 1 I N i MARK A. scewrwz Lowest Opening = 1036 2/1036 2 - - i LOOKOUTiIT k" Q �9 NO } X - - DARD 5 TO xo45817 O i THis DOCUMENT IS THE PaoPERTv oP I sE GROUP. c AND M" NOT BE USED COPIED OR DUPLICATED Q PRIOR WR THOUT poawa TTEx coxsExT. �3° c,ECT N II 11 i EM LENNAR x Ndfi- I 1 ° + ' CORPORATION LEGEND g X g� 1 1 } 10�pk 1�p9 x Nam° � i °°& °° 4 I° 1 N00l ° CASLA NO ,�° # + LOT 11, BLOCK 5 3 I k I IBIG G;1 2 N' Existing Building Line +�Sd> Existing Spot Elevation II kNs' }N65°1 3°°� �15°6§yG ° X }` N N9 j x LAKEATE MINNESOTA -- y Surface Drainage Direction _ _ }N _7t DATE DESCRIPTION R, --->--- Sanitary Line _ _JI ��_ m T ® Utility Pedestal x x�33 1 #Np30� ° �5d' ' Water Line yN r-� 4 II 1 }' N 31� es, 4111 °° N ® Curb 5[oP } I # N0 dn" N°�' \ 1 0 1 I ---»--- Storm Line } ` 1 ; kN � �� I N.17834971 I d Pc Air Conditioner Cleanout � , By " E51�44.93� r- 1 o gy ManholeGatch Basin °q NO''°' ' � 1 j I J1�_ �511 X L— ---�J PxweLT CAN FILE CAME DOW LI I RA GAR cM Gas Meter T------1------ - GRAMINIHI A, ROOF Grain `�`1 gl IX DROP INTAKE R=103088 DESIGNED By EM EeCIIIC Meter .�.� N�j N __ Np° k Be , ORGINALISSUE DATE Iron Monument Pountl °+, 3= L=59.58 R=340.0 34»— PROJECT NO RLS 45817 x�36 o N°'5�CLIENT v?�.-�py"O2�Z 3n N. 178334.fi5- -_TF N°3''I N° } k PY 3 E519849.fi5 X E ° °b kq0� I GRADING #Az a AS -BUILT SURVEY FHEET � of , 260160