HomeMy WebLinkAbout18155 Hideaway TrlCITY OF LAKEVILLE
CERTIFICATION OF GRADING AND
FINAL PLACEMENT OF IRON MONUMENTS
Building Permit #:
LV24-00175
Legal Description: Lot 5 Block 8
Subdivision: CASLANO
Address: 18155 Hideaway Trail
I hereby certify that on 11th day of July 2025 an inspection of
this property was conducted by me or under my direct supervision and that the as -built
grades, elevations and drainage patterns of the site and building are in conformance
with the grading plan approved by the City Engineer or amendments previously
approved by the City Engineer. In addition, all property corner monuments are in place
as of this date.
I hereby certify that this survey, plan or report was prepared by me or under my direct
supervision and that I am a duly Licensed Land Surveyor under the laws of the State of
Minnesota.
Print Name: Mark A. schwanz
Signature: a )
Date: Tne=25 MN License #:
NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS -
BUILT GRADES, ELEVATIONS AND DRAINAGE PATTERNS
Approved subdivision grading plans should be obtained from the property owner or
developer. General questions relating to the building permit should be directed to the
Building Inspections Department at 952-985-4440. Questions relating to grading should
be directed to the Engineering Department at 952-985-4500.
Prior to release of the Grading Security, this document shall be filed with:
City of Lakeville
Engineering Department
20195 Holyoke Avenue
Lakeville, MN 55044
RECEIVED
By sliggett at 2:55 pm, Aug 01, 2025
a
N,,,P
l
P i
\ x
4 y x1�p9 PAID
hm
N m
FPS
j
N°
IX /R=m5o 00
1=10d60314114 11 WC)SE
We W
\ \Did-
GENERAL
NOTES:
/
Ex CAR MIT
=105685
1.
Grading plan by ISG last dated May 9, 2022 was
FNI1,55 (18" RCB SE
1=1r 59 a RC
�P)W
used to determine proposed elevations shown
he Edon.
1
2.
This survey does not purport to show
improvements or encroachments, except as
by ISG direct
shown, as surveyed or under my
3.
supervision.
No specific soil investigation has been performed
\
on this lot bythe surveyor. The suitability of soils
to support the specific house is not the
N
/�L
proposed
r RR— /
^
\
responsibility ofthe surveyor.
BE/
`\
��
4.
This cc di fi date tloes not purport to show
easements otherthan those shown on the
5.
recorded plat.
Bearings shown are based on the Final Plat.
/x
\�
i 6RIVEWAY����
1o5r.Sd / /
\/�
6
Site address is 18155 HideawayTrail Lakeville,
a /
—
/
MN 55044
5.6%SLOPE �.` / � �� /. House/Basement type. Itasca EH09 B3- Right -
! Ro walk) y�.�N �� Walkout
So hN p/�yJfi/ 0 n PillPill8. Topographic survey was completed on July 11,
/... \ ctmtlCIA /on --// \ 2025.
i GARAGE
°° 18155Hideaway 7ri
WALKOUT
— -iR
.RATIO
SRI
N
r �1u
N30 A \
x �
M °GIs
S.24
e-
N° i NiAszh./ate
ro
x
1
0 / S g'S./`66 BENCHMARK:
x; 1�.
/ s Top nut fire hydrant located In the NE quadrant of
HideawayTrail and Highview Avenue.
Elevation = 1038.03 feet
N
®il
0
SCFLE IN FEET
MARK A SCHWANZ
or,n p NN .
�//^�
HOUSE ELEVATIONS:
Proposetl/As-Built
xo 45817
3
,� CV
Garage Floor
Top Foundation=
1059211059.2
1059.5/1059.5
/ ^�7
of
THI DOCUMENT IS THE PROPERTY OF A F GROUP
/
Lowe at Floor
1051511051.5
ING AND WHY NOT USEDOR ourucn TER
Lowe st Opening=
10515/1051.5
O0.wBIE DOCOPIED
/
/PROJECT
LENNAR
CORPORATION
fV x
CASLANO
LOT 5, BLOCK 8
IAIREVILLE MINNESOTA
aemsiox scxeou�
� cy9
/
/
s
/
N°et79
x
N°et e1
NOet� e
N
IXN°xr
R=10d69766 R
FLGRt66
1000]4302 /
1
LEGEND
XN0
Existing Building Line
,°'
Existing Spot Elevation
--�
Surface Drainage Direction
--- a ---
---I---
--- a> ---
Sanitary Line
Water Line
Storm Line
®
0
yy
V
Utility Pedestal
Transformer
Fire Hydrant
DESIGNED By
REVENED By ISO
OR131- ISSUE FREE
mxc.
E
nc Air Conditioner
® Water Valve
cN
Gas Meter
GRADING
EM
Electric Meter
®
Curb Stop
AS -BUILT
Light Pole
d
O0
Cleanout
ManholaGatch Basin
SURVEY
Iron Monument Found
E,
RL545817
1