Loading...
HomeMy WebLinkAbout18287 Huntley Trl--->--- Sanitary Line ---I--- Water Line ---»--- Storm Line Iron Monument Found RLS 45817 4 Cleanout ® Curb Stop O (] ManholelCatch Basin Fire Hydrant pQ Water Valve ® Utility Pedestal 171 Utility Vault AUtility Marker Light Pole v Sign ❑ Offset Iron — — — Existing Contour —W— Proposed Contour 91 Proposed Spot Elevation Existing Spot Elevation --� Surface Drainage Direction. CONSTRUCTION NOTES: 1. Install mck construction entrance. 2. Install silt fence as needed for erosion. 3. Sidewalks shall drain away from house a minimum of1% 4. Contractor must venfy driveway design. 5. Contractor must venfy service elevation priorto construction. fi. Add or remove foundation ledge as required. GENERAL NOTES: 1. Grading plan by ISO last dated May 9, 2022 was used to determine proposed elevations shown hereon 2. This survey does not purport to show improvements or encroachments, except as shown, as surveyed by ISO or under my direct supervision. 3. Proposed building dimensions shown are for horizontal location ofstructures on the lot only. Contact builder prior to construction for approved construction plans. 4. No specific soil investigation has been performed on this lot bythe surveyor. The suitability ofsoils to support the specific house proposed is not the responsibility ofthe surveyor. 5. Ifbuilding footprint exceeds the building pad, additional earthwork and testing will be required to meet the requirements as outlined within the geotechnical report. fi. This certificate does not purport to show easements otherthan those shown on the recorded plat. 1. Bearings shown are based on the Final Plat. 8. Site address is 18287 Huntley Tmil, Lakeville, MN 55044 9. House/Basement type. McKinley EN,1 B3-Right- Walkout-Morning Room. 10. Building dimensions shown are based on First Floor Plan 11. Proposed Contours are shown hereon. 12. Topographic surveywas completed on July 14, 2025 BENCHMARK: Top nut fire hydrant located in the NE quadrant of Hideaway Trail and Highview Avenue. Elevation = 1038.03 feet AREA TABLE: House/Garage Area = 2, 241 sq. ft. Porch Area = 145 sq. ft. Dnveway=alk Area = 803 so. ft. Total Impervious Area = 3,189 sq. ft. Lot Area = 11 204sq. ft. Impervious Coverage = 28.5% HOUSE ELEVATIONS: Proposed/As-Built Garage Floor= 1070.0 Top of Foundation = 1070.3 Lowest Floor= 1062.3 Lowest Opening= 10823 RGE= 1061.8 7900 International Drive, Suite 550 Bloomington, MN 55425 952-426-0699 N 020 SCALE IN FEET MARK A SCHWARZ � 1nS a No4`811 pN THI DOCUMENT IS THE PROPERT'F OF I SO GROUP WITHOUT PRIOR WRITTEN CONSENT PROJECT LENNAR CORPORATION CASLANO 2nd LOT 3, BLOCK 7 IAKEVILLE MINNESOTA RECISION SCHEDULE DATE DESCRIPTION R, IRGGEUT NO OR FILE NAME 1— .1 ONE DESIGNED By REMENNED By CIA s 0 RGINAL ISSUE DOES CLIENT PROJECT NO TITLE CERTIFICATE OF SURVEY NEB